8/2/2019 Main Building Take Off
1/50
236 m2
Coeff. Location L B H/D Nr Total Coeff.
17.10 13.80 235.98
0.00
235.98
27 m3
Coeff. Location L B H/D Nr Total
1/B-F 6.93 0.45 0.78 1 2.42
1B/D-E 1.55 0.45 0.78 1 0.54
2/B-F 6.03 0.45 0.78 1 2.10
3/A-F 7.00 0.45 0.78 1 2.46
5/C-E 3.75 0.45 0.78 1 1.32
5A/E-E2 1.50 0.45 0.78 1 0.53
6/E2-F 1.00 0.45 0.78 1 0.35
8/A-E 6.35 0.45 0.78 1 2.23
A/3-7 5.35 0.45 0.78 1 1.88 Coeff.
B/1-3 5.63 0.45 0.78 1 1.97
C/3-7 5.20 0.45 0.78 1 1.83
D/1-2 3.30 0.45 0.78 1 1.16E/1-8 10.73 0.45 0.78 1 3.76
E1/2-3 2.40 0.45 0.78 1 0.84
F/1-6 9.30 0.45 0.78 1 3.26
76.00 26.65
83 m2
Coeff. Location L B H/D Nr Total
76.00 0.45 1.00 1 34.20 tr Coeff.
_
43.48 1.00 1.00 1 48.31 pits
Topsoil exc. 150mm thick Pit Exc
Exc. foundation trench
Compa
Compaction to bottom of excavations
Remov
8/2/2019 Main Building Take Off
2/50
82.51
43 m3
Coeff. L B H/D Nr Total
26.65 TR
43.48 PITS
Coeff.
70.12
DDT 26.99
43.13
58 m3
Coeff. Location L B H/D Nr Total
1-2/B-D 4.20 4.20 0.45 1 7.94
1B-2/D-E 2.85 1.85 0.45 1 2.37 Coeff.
1-2/E-F 4.20 3.70 0.45 1 6.99
ddt 1.80 0.60 0.45 1 0.49
2-3/B-E 6.00 3.15 0.45 1 8.51
2-3/E-E1 3.15 1.20 0.45 1 1.70
2-3/E1-E2 3.15 2.35 0.45 1 3.33
3-5/C-E 4.65 2.20 0.45 1 4.60
5-7/C-E 4.65 4.55 0.45 1 9.52
3-6/E-F 4.20 3.70 0.45 1 6.99
ddt 1.80 0.60 0.45 1 0.49 50.991-1B/D-E 1.85 1.20 0.30 1 0.67
3-8/A-C 7.20 2.85 0.30 1 6.16 6.82
57.81
Reinfd
Backfill
Plain in
Hardcore Filling
Reinfd
8/2/2019 Main Building Take Off
3/50
8 m3 Coeff.
Coeff. Locaton L B H/D Nr Total
1/B-F 6.93 0.45 0.23 1 0.70
1B/D-E 1.55 0.45 0.23 1 0.16
2/B-F 6.03 0.45 0.23 1 0.61
3/A-F 7.00 0.45 0.23 1 0.71
5/C-E 3.75 0.45 0.23 1 0.38
5A/E-E2 1.50 0.45 0.23 1 0.15
6/E2-F 1.00 0.45 0.23 1 0.10
8/A-E 6.35 0.45 0.23 1 0.64
A/3-7 5.35 0.45 0.23 1 0.54
B/1-3 5.63 0.45 0.23 1 0.57
C/3-7 5.20 0.45 0.23 1 0.53
D/1-2 3.30 0.45 0.23 1 0.33
E/1-8 10.73 0.45 0.23 1 1.09
E1/2-3 2.40 0.45 0.23 1 0.24
F/1-6 9.30 0.45 0.23 1 0.94Coeff.
7.70
2 m3
Coeff. Location L B H/D Nr Total
B1 0.45 0.15 1.15 4 0.31
B2 0.45 0.45 1.00 1 0.20 Coeff.
B3 0.30 0.15 1.15 11 0.57
B4 0.23 0.15 1.15 11 0.43
0.62
0.62
0.62
1.51 0.62
0.62
1 m3
Coeff. Location L B H/D Nr Total
1.00 1/D-E 1.85 0.30 0.30 1 0.17
Plain in-situ conc (1:3:6-40mm agg) in fdn
Mesh
Reinfd in-situ conc (1:2:4-20mm agg) in col
10mm
Reinfd in-situ conc (1:2:4-20mm agg) in steps and staircase
150mm
8/2/2019 Main Building Take Off
4/50
1.00 1.85 0.70 0.15 1 0.19
0.50 1.85 0.30 0.15 2 0.08 Coeff.
1.00 8/A-C 2.85 0.30 0.30 1 0.26
1.00 2.85 0.70 0.15 1 0.30
0.50 2.85 0.30 0.15 2 0.13
1.13
0.43 t
Coeff. Bar L B H/D Nr Total
1.58 1601 2.50 104 410.54
1.58 1602 2.30 6 21.79
432.33 kg
0.34 t
Coeff.
Coeff. Bar L B H/D Nr Total
0.89 1201 1.25 206 228.66
0.89 1202 2.30 24 49.02
0.89 1203 1.40 16 19.89
0.89 1204 1.10 44 42.98
340.55 kg
Coeff.
Frmwk: Edge of bed 150mm high 57 m 1.00
0.50
12mm Dia m.s bar in col bases
Frmwk
16mm Dia m.s bar in col
Frmwk
8/2/2019 Main Building Take Off
5/50
Coeff. Location L B H/D Nr Total
Left & Right 16.65 2 33.30
Front & Back 11.80 2 23.60
56.90 Coeff.
Frmwk: Sides of col base 250 - 500mm high 103 m
Coeff. Location L B H/D Nr Total
B1 2.05 1.05 2 12.40
B2 1.20 1.20 1 4.80B3 1.05 1.05 11 46.20
B4 0.90 0.90 11 39.60
103.00
Frmwk
8/2/2019 Main Building Take Off
6/50
43 m3
Location L B H/D Nr Total
B1 2.05 1.05 0.90 12.00 23.25
B2 1.20 1.20 0.90 1.00 1.30
B3 1.05 1.05 0.90 11.00 10.91B4 0.90 0.90 0.90 11.00 8.02
43.48
136 m2
Location L B H/D Nr Total
Ref HCF 50.99 1.00 1.00 1.00 113.30
Ref HCF 6.82 1.00 1.00 1.00 22.74
136.04
27 m3
Location L B H/D Nr Total
Blinding 2.42
Foundation 7.70
Col. bases 8.03
Columns 0.45 0.15 0.55 4.00 0.15
avation
tion to h'core filling
e from site
8/2/2019 Main Building Take Off
7/50
0.45 0.45 0.55 1.00 0.11
0.30 0.15 0.55 11.00 0.27
0.23 0.15 0.55 11.00 0.20
Blockwork 98.33 0.15 0.55 1.00 8.11
26.99
2 m3
Location Area H/D Nr Total
48.31 0.05 1.00 2.42
2.42
8 m3
Location L B H/D Nr Total
B1 2.05 1.05 0.30 2.00 1.29
B2 1.20 1.20 0.30 1.00 0.43
B3 1.05 1.05 0.30 11.00 3.64
B4 0.90 0.90 0.30 11.00 2.67
0.00
8.03
in-situ conc (1:2:4-20mm agg) in flr bed 23 m3
-situ conc blinding under col base
in-situ conc (1:2:4-20mm agg) in col base
8/2/2019 Main Building Take Off
8/50
Location L B H/D Nr Total
B-F/1-3 10.15 7.73 0.15 1.00 11.76
ddt 1.80 0.60 0.15 1.00 0.16
1B/D-E 1.85 0.15 0.15 1.00 0.04
A-E/3-8 7.80 7.43 0.15 1.00 8.69
ddt 2.25 0.30 0.15 1.00 0.10
E-F/3-6 3.85 4.43 0.15 1.00 2.56
ddt 1.80 0.60 0.15 1.00 0.16
22.62
151 m2
L B H/D Nr Total
1.00 1.00 1.00 1.00 150.80
150.80
0.09 t
Bar L B H/D Nr Total
1001 0.85 78.00 40.84
1002 1.15 12.00 8.50
1003 1.75 5.00 5.39
1004 0.70 5.00 2.16
1005 0.70 66.00 28.46
85.35 kg
113 m2
o. 65 in floor bed
ia m.s bar in links, etc in col
Solid blockwork wall in fdn
8/2/2019 Main Building Take Off
9/50
Location L B H/D Nr Total
1/B-F 9.18 1.15 1.00 10.55
1B/D-E 1.85 1.15 1.00 2.13
2/B-F 9.25 1.15 1.00 10.64
3/A-F 10.90 1.15 1.00 12.54
5/C-E 4.50 1.15 1.00 5.18
5A/E-E2 1.80 1.15 1.00 2.07
6/E2-F 1.68 1.15 1.00 1.93
8/A-E 6.90 1.15 1.00 7.94
A/3-7 6.38 1.15 1.00 7.33
B/1-3 7.35 1.15 1.00 8.45
C/3-7 6.45 1.15 1.00 7.42
D/1-2 4.20 1.15 1.00 4.83
E/1-8 13.50 1.15 1.00 15.53
E1/2-3 3.00 1.15 1.00 3.45
F/1-6 11.40 1.15 1.00 13.11
98.33
113.07
28 m2
Location L B H/D Nr Total
B1 0.45 0.15 1.15 4.00 5.52
B2 0.45 0.45 1.00 1.00 1.80
B3 0.30 0.15 1.15 11.00 11.39
B4 0.23 0.15 1.15 11.00 9.49
28.19
1 m2
Location L B H/D Nr Total
waist 0.70 0.15 4.00 0.42
steps 0.30 0.15 8.00 0.18
: Sides of steps and staircase
: Sides of plain rect. col
8/2/2019 Main Building Take Off
10/50
0.60
9 m
Location L B H/D Nr Total
8/A-C 2.65 2.00 5.30
1/D-E 1.85 2.00 3.70
9.00
: Sides of risers 150mm high
8/2/2019 Main Building Take Off
11/50
8/2/2019 Main Building Take Off
12/50
8/2/2019 Main Building Take Off
13/50
1.20
1.80
8/2/2019 Main Building Take Off
14/50
6 m3 Reinfd
Coeff. Location L B H/D Nr Total Coeff.
C1 0.23 0.15 3.00 11 1.11
C2 0.45 0.45 3.15 1 0.64
C3 0.45 0.15 4.70 2 0.63C4 0.30 0.15 5.80 13 3.39
0.00
5.78
Reinfd in-situ conc (1:2:4-20mm agg) in suspended floor slab 11 m3
Coeff. Location L B H/D Nr Total
1-4/B-E 8.95 6.30 0.15 8.46
4-5/C-E 1.35 4.95 0.15 1.00
2-3/E1-F 3.45 2.65 0.15 1.37 Reinfd
0.00 Isolate
0.00
Coeff.
10.83
Reinfd in-situ conc (1:2:4-20mm agg) in steps and staircase 3 m3
Coeff. L B H/D Nr Total
1.00 1.50 0.60 0.60 1 0.54
1.00 2.05 0.15 0.75 1 0.23
1.00 4.36 1.20 0.18 1 0.92
1.00 1.68 1.20 0.18 1 0.350.50 1.20 0.30 0.15 18 0.49
2.53
Reinfd in-situ conc (1:2:4-20mm agg) in col
8/2/2019 Main Building Take Off
15/50
0.93 t
Coeff.
Coeff. Location L B H/D Nr Total
1.58
1.58
1.58 1610 3.30 44 229.27 1.58
1.58 1611 3.45 61 332.30 1.58
1.58 1612 2.90 8 36.63 1.58
1.58 1613 4.00 52 328.43 1.58
1.58
1.58
1.58
926.64 kg
0.28 t
Coeff. Locaton L B H/D Nr Total
0.62 1002 0.70 44 18.97
0.62 1003 0.70 17 7.33 Coeff.
0.62 1004 1.75 17 18.33
0.62 1005 1.15 50 35.42
0.62 1006 0.85 390 204.20 0.89
0.89
284.25 kg
1.11 t
Coeff. Location L B H/D Nr Total
Coeff.0.89 1201 5.80 11 56.65
0.89 1202 5.50 19 92.80
0.89 1203 7.30 29 187.99 0.62
0.89 1204 3.20 22 62.52
0.89 1205 4.20 12 44.76
0.89 1206 2.10 128 238.69
0.89 1207 1.70 6 9.06
0.89 1208 1.40 18 22.38
0.89 1209 3.30 32 93.77
16mm
16mm Dia m.s bar in columns
10mm Dia m.s bar in columns
12mm
12mm Dia m.s bar in floor slab
10mm
8/2/2019 Main Building Take Off
16/50
0.89 1210 6.30 10 55.94
0.89 1211 3.80 40 134.98
0.89 1212 5.05 22 98.66
0.89 1213A 4.80 3 12.79
Coeff.
1110.98 kg
1.58
1.58
1.58
1.58
0.05 t 1.58
1.58
1.58
Coeff. Location L B H/D Nr Total 1.58
1.58
1.58
0.89 1213 17.30 1 15.36 1.58
0.89 1214 2.80 8 19.89 1.58
0.89 1215 2.85 2 5.06 1.58
0.89 1216 2.85 2 5.06
45.38 kg
0.12 t
Coeff.
Coeff. Bar L B H/D Nr Total
0.62
1.58 1601 9.00 3 42.63 0.62
1.58 1602 4.15 2 13.11 0.62
1.58 1603 7.80 2 24.63 0.62
1.58 1604 3.00 3 14.21
1.58 1605 7.25 3 34.34
1.58 1606 4.85 3 22.97
1.58 1607 4.70 6 44.53
1.58 1608 9.00 6 85.27
1.58 1609 6.65 17 178.51
1.58 1610 4.45 2 14.05
1.58 1611 2.40 2 7.58
1.58 1612 5.20 6 49.261.58 1613 17.16 1 27.10
1.58 1614 5.25 4 33.16 Coeff.
117.10 kg
0.89
110 m2
16mm
12mm Dia m.s bar in beams
10mm
16mm Dia m.s bar in roof beams
12mm
Frmwk: Sides of plain rect. col
8/2/2019 Main Building Take Off
17/50
Coeff. Bar L B H/D Nr Total
C1 0.23 0.15 3.00 11 24.75
C2 0.45 0.45 3.15 1 5.67 Coeff.
C3 0.45 0.15 4.70 2 11.28
C4 0.30 0.15 5.80 13 67.86
0.62
0.62
109.56
Coeff.
2.00
Frmwk: Edge of bed 150mm high 50 m 2.00
2.00
2.00
Coeff. Location L B H/D Nr Total 2.00
2.00
2.00
1-5 8.95 2 17.90 2.00
B-F 10.15 2 20.30 2.00
Staircase are 4.10 2 8.20 2.00
1.85 2 3.70 2.00
2.00
50.10 2.00
Frmwk: Soffit of suspended floor slab 57 m2
isolate
Coeff. Location L B H/D Nr Total
Coeff.
1-2/B-D 4.20 4.00 1 16.80
1-2/D-E 4.20 1.85 1 7.77 2.00
B-C1/2-3 2.05 3.15 1 6.46 2.00
C1-E/2-3 3.95 3.15 1 12.44 2.00
C1-E/2-2A 3.95 1.20 1 4.74 2.00
1.20 0.50 1 0.60 2.00
B-E/3-5 6.00 2.20 1 13.20 2.00
B-C/4-5 1.35 1.05 1 1.42 2.00
10mm
Frmwk
Frmwk
8/2/2019 Main Building Take Off
18/50
E1-F/2-3 2.35 3.15 1 7.40 2.00
2.00
2.00
2.00
57.32 2.00
2.00
2.00
2.00
22 m 2.00
2.00
2.00
Coeff. Location L B H/D Nr Total 2.00
1.20 18 21.60
21.60
6 m
Coeff.
Coeff. Location L B H/D Nr Total
4.36 1 4.36
1.68 1 1.68
6.04
Frmwk:Riser of steps 150mm high
FrmwkFrmwk:Open string staircase
8/2/2019 Main Building Take Off
19/50
in-situ conc (1:2:4-20mm agg) in horizontal beams 6 m3
Location L B H/D Nr Total
B/1-4 8.80 0.15 0.60 1 0.79
E/1-5 10.00 0.15 0.60 1 0.90
1/B-E 6.15 0.15 0.60 1 0.552/B-F 10.00 0.15 0.60 1 0.90
3/A-F 10.15 0.15 0.60 1 0.91
F/2-3 3.30 0.15 0.45 1 0.22
E1/2-3 3.30 0.15 0.45 1 0.22
4/B-C 1.50 0.15 0.60 1 0.14
5/C-E 4.80 0.15 0.60 1 0.43
C/4-5 1.20 0.15 0.60 1 0.11
C1/2-3 3.30 0.15 0.60 1 0.30
D/1-2 4.35 0.15 0.60 1 0.39
2A/C1-D2 4.10 0.15 0.60 1 0.37
6.24
in-situ conc (1:2:4-20mm agg) in horizontal beams 3 m3
Location L B H/D Nr Total
A/3-8 7.35 0.15 0.30 1 0.33
3/A-B 1.50 0.15 0.30 1 0.00
C,E/5-8 5.00 0.15 0.30 2 0.008/A-C 3.00 0.15 0.30 1 0.14
1/E2-F 1.90 0.15 0.30 1 0.09
1A/E-E2 1.95 0.15 0.30 1 0.09
5A/E-E2 1.95 0.15 0.30 1 0.09
6/E2-F 1.90 0.15 0.30 1 0.09
7/C2-D2 2.40 0.15 0.30 1 0.11
8/C-C2,D-E 1.20 0.15 0.30 2 0.11
E/1-8 15.00 0.15 0.30 1 0.68
D/1-2 4.35 0.15 0.30 1 0.20
B/1-4 8.80 0.15 0.30 1 0.40
C/4-5 1.20 0.15 0.30 1 0.05
1 & 2/B-E 6.15 0.15 0.30 1 0.285/C-E 4.80 0.15 0.30 1 0.22
8/C-E 4.80 0.15 0.30 1 0.22
4/B-C 1.50 0.15 0.30 1 0.07
7/C2-D2 2.40 0.15 0.30 1 0.11
3.23
8/2/2019 Main Building Take Off
20/50
0.25 t
Location L B H/D Nr Total
1601 2.25 8 28.42
1602 1.80 8 22.74
1603 1.60 8 20.21
1604 1.00 8 12.63
1605 1.50 8 18.95
1606 4.55 8 57.48
1607 1.50 8 18.95
1608 2.70 8 34.11
1609 2.60 8 32.84
246.32 kg
0.06 t
Location L B H/D Nr Total
1201 1.10 56 54.70
1202 2.30 2 4.08
58.79 kg
0.01 t
Location L B H/D Nr Total
1001 1.75 10 10.78
10.78 kg
ia m.s bar in steps and staircase
ia m.s bar in steps and staircase
ia m.s bar in steps and staircase
8/2/2019 Main Building Take Off
21/50
0.86 t
Location L B H/D Nr Total
1601 9.00 6 85.27
1602 7.30 6 69.16
1603 9.00 12 170.53
1604 6.70 12 126.95
1605 5.50 16 138.95
1606 3.60 9 51.16
1607 8.20 3 38.84
1608 5.00 3 23.69
1609 3.00 2 9.47
1610 7.80 6 73.90
1611 3.30 5 26.05
1612 18.25 1 28.82
1613 4.00 2 12.63
855.42 kg
0.40 t
Location L B H/D Nr Total
1001 1.25 310 238.70
1002 1.15 80 56.67
1003 0.85 105 54.98
1004 1.70 51 53.41
403.76 kg
0.01 t
Location L B H/D Nr Total
1201 2.30 4 8.17
8.17 kg
ia m.s bar in beams
ia m.s bar in beams
ia m.s bar in roof beams
8/2/2019 Main Building Take Off
22/50
0.15 t
Bar L B H/D Nr Total
1001 0.85 230 120.43
1002 1.70 27 28.27
148.70 kg
83 m2
Location L B H/D Nr Total
B/1-4 8.80 0.60 1 10.56
E/1-5 10.00 0.60 1 12.00
1/B-E 6.15 0.60 1 7.38
2/B-F 10.00 0.60 1 12.00
3/A-F 10.15 0.60 1 12.18
F/2-3 3.30 0.45 1 2.97
E1/2-3 3.30 0.45 1 2.97
4/B-C 1.50 0.60 1 1.80
5/C-E 4.80 0.60 1 5.76
C/4-5 1.20 0.60 1 1.44
C1/2-3 3.30 0.60 1 3.96
D/1-2 4.35 0.60 1 5.22
2A/C1-D2 4.10 0.60 1 4.92
0.00
83.16
50 m2
Location L B H/D Nr Total
A/3-8 7.35 0.30 1 4.41
3/A-B 1.50 0.30 1 0.90
C,E/5-8 5.00 0.30 2 6.00
8/A-C 3.00 0.30 1 1.80
1/E2-F 1.90 0.30 1 1.14
1A/E-E2 1.95 0.30 1 1.17
5A/E-E2 1.95 0.30 1 1.17
ia m.s bar in roof beams
: Sides of horizontal beams
: Sides of horizontal beams
8/2/2019 Main Building Take Off
23/50
6/E2-F 1.90 0.30 1 1.14
7/C2-D2 2.40 0.30 1 1.44
8/C-C2,D-E 1.20 0.30 2 1.44
E/1-8 15.00 0.30 1 9.00
D/1-2 4.35 0.30 1 2.61
B/1-4 8.80 0.30 1 5.28
C/4-5 1.20 0.30 1 0.72
1 & 2/B-E 6.15 0.30 1 3.69
5/C-E 4.80 0.30 1 2.88
8/C-E 4.80 0.30 1 2.88
4/B-C 1.50 0.30 1 0.90
7/C2-D2 2.40 0.30 1 1.44
50.01
7 m2
Location L B H/D Nr Total
4.36 1.20 5.23
1.68 1.20 2.02
0.00
7.25
: Soffit of steps and staircase
8/2/2019 Main Building Take Off
24/50
1.68
8/2/2019 Main Building Take Off
25/50
301 m2
Coeff. Location L B H/D Nr Total
1.00 3-4 1.30 2.10 1.00 2.73
1.00 B/1-3 7.15 2.10 1.00 15.02
1.00 C/3-8 6.75 2.10 1.00 14.181.00 D/1-2 4.35 2.10 1.00 9.14
1.00 E/1-8 13.90 2.10 1.00 29.19
1.00 F/1-6 11.30 2.10 1.00 23.73
1.00 1/B-F 9.55 2.10 1.00 20.06
1.00 2/B-F 9.55 2.10 1.00 20.06
1.00 3/A-F 11.05 2.10 1.00 23.21
1.00 4/A-C 2.85 2.10 1.00 5.99
1.00 5/C-E 4.65 2.10 1.00 9.77
1.00 6/E-F 3.70 2.10 1.00 7.77
1.00 8/C-E 1.05 2.10 2.00 4.41
1.00 undry/Out-kit 2.00 2.10 1.00 4.20
1.00Laundry/Store 2.00 2.10 1.00 4.201.00 Shower/WC 2.35 2.10 1.00 4.94
1.00 Staircase 0.85 2.10 1.00 1.79
1.00 Bedrm1 & 2 0.60 2.10 2.00 2.52
1.00Corri/Washrm 3.15 2.10 1.00 6.62
1.00 1 & 6/E-F 3.70 0.65 2.00 4.81
1.00 2 & 3/E-F 3.70 0.30 2.00 2.22
1.00Corri/Washrm 3.15 0.30 1.00 0.95
1.00 Terrace area 14.40 0.30 1.00 4.32
1.00 B/1-4 8.35 2.10 1.00 17.54
1.00 C/4-8 5.60 2.10 1.00 11.76
1.00 D/1-1A 2.40 2.10 1.00 5.04
1.00 E/1-8 13.90 2.10 1.00 29.19
1.00 1/B-E 6.15 2.10 1.00 12.92
1.00 1A/D-E 2.00 2.10 1.00 4.20
1.00 2/B-E 6.15 2.10 1.00 12.92
1.00 4/B-C 1.35 2.10 1.00 2.84
1.00 5/C-E 4.65 2.10 1.00 9.77
1.00 8/C-E 1.05 2.10 2.00 4.41
1.00 m-bedrm 0.60 2.10 2.00 2.52
1.00 Staircase 0.80 2.10 1.00 1.68
1.00 B/1-4 8.35 0.30 1.00 2.51
1.00 C/4-8 5.60 0.30 1.00 1.68
1.00 D1-2 4.35 1.20 1.00 5.22
1.00 1/B-E 6.15 0.30 1.00 1.85
1.00 1A/D-E 2.00 1.20 1.00 2.400.50 2/B-E 6.15 1.45 1.00 4.46
1.00 4/B-C 1.35 0.80 1.00 1.08
1.00 5/C-E 4.65 1.00 1.00 4.65
1.00 8/C-E 1.05 0.30 1.00 0.32
1.00 D1 2.10 1.00 1.00 2.10
1.00 D2 2.10 0.90 5.00 9.45
1.00 D3 2.10 0.75 6.00 9.45
1.00 W1 2.10 1.80 1.00 3.78
1.00 W2 2.10 1.10 1.00 2.31 Deduction
150mm Solid blockwork wall
Ground
floor
Ground
floor gable
ends
First floor
First floor
gable ends
8/2/2019 Main Building Take Off
26/50
1.00 W3 1.80 1.40 2.00 5.04
1.00 W4 1.20 2.15 2.00 5.16
1.00 W5 1.20 1.80 3.00 6.48
1.00 W6 1.00 1.80 2.00 3.60
1.00 W7 1.20 0.90 6.00 6.48
1.00 W8 0.65 0.90 5.00 2.93
301.18
for
opennings
8/2/2019 Main Building Take Off
27/50
4 m2
Coeff. Location L B H/D Nr Total
om. as r 2.10 2.10 1.00 4.41
0.00
4.41
100mm Solid blockwork wall
8/2/2019 Main Building Take Off
28/50
262 m2
Coeff. Location L B H/D Nr Total Coeff.
1.15 a,c 3.33 3.15 2.00 24.09 1.001.15 b 3.10 3.15 1.00 11.23 1.00
1.15 d 1.88 1.80 1.00 3.89 1.001.15 e,g 3.33 3.15 2.00 24.09 1.00
1.15 f 3.08 3.15 1.00 11.14
1.15 h 3.00 1.05 1.00 3.62
1.15 j 4.80 1.05 1.00 5.80
1.15 k 9.10 4.00 1.00 41.86
1.15 1.95 1.50 1.00 3.36
1.15 A 4.15 4.28 1.00 20.43
1.15 B,C 2.14 4.28 2.00 21.07
1.15 D,E 4.28 2.55 2.00 25.10
1.15 F 3.91 0.83 1.00 3.73
1.15 G 6.30 3.53 1.00 25.57 Coeff.
1.15 H 1.77 3.53 1.00 7.171.15 J 3.48 3.53 1.00 14.11
1.15 K 6.30 3.53 1.00 25.57 1.15
1.15 L 5.93 1.50 1.00 10.23 1.15
1.15 M 2.14 4.28 1.00 10.53 1.15
1.15
1.15261.77 1.15
8 m
Coeff. Location L B H/D Nr Total
1.15 4.88 1.00 5.61 Coeff.
1.15 1.20 2.00 2.76
1.158.37 1.15
1.00
1.00
1.00
1.001.00
ACP concrete roofing tiles @ 30 degrees Ridge ti
Hip tile
Valley flashing
Wall fla
8/2/2019 Main Building Take Off
29/50
13 m
Location L B H/D Nr Total
1.88 1 1.88
1.88 1 1.88
2.55 1 2.556.30 1 6.30
12.61
49 m
Location L B H/D Nr Total
4.43 2 10.18
4.35 2 10.01
1.50 1 1.73
5.63 1 6.47
6.00 3 20.70
4.95 2
49.08
29 m
Location L B H/D Nr Total
2.10 2 4.83
1.28 2 2.94
5.63 1 5.63
3.00 1 3.00
4.80 1 4.80
3.00 1 3.005.25 1 5.25
29.45
les
shing
8/2/2019 Main Building Take Off
30/50
2.40
8/2/2019 Main Building Take Off
31/50
884 m
Coeff. Location L B H/D Nr Total Coeff.
1.00 e rm 1 3.60 7.00 25.80 1.001.00 3.70 7.17 25.90 1.00
1.00 Bedrm 1 1.75 3.92 3.50 1.001.00 0.60 2.00 2.35 1.00
1.00 Corridor 1.20 3.00 6.30 1.00
1.00 2.55 5.25 7.65 1.00
1.00 Bedrm 2 3.60 7.00 25.80 1.00
1.00 3.70 7.17 25.90 1.00
1.00 Bedrm 2 1.75 3.92 3.50 1.00
1.00 0.60 2.00 2.35 1.00
1.00 Terrace 6.00 11.00 34.50 1.00
1.00 2.85 5.75 31.35 1.00
1.00 Guest W.C 2.85 5.75 7.60 1.00
1.00 1.00 2.67 5.75 1.00
1.00 M-Bedrm 4.00 7.67 32.00 1.00
1.00 4.20 8.00 32.20 1.00
1.00 W.i.c 2.00 4.33 7.83 1.00
1.00 1.75 3.92 7.58 1.00
1.00 Bath 2.25 4.75 9.75 1.00
1.00 2.00 4.33 9.50 1.00
1.00 Lounge 6.30 11.50 51.45 1.00
1.00 4.30 8.17 49.45 1.00
1.00 Lounge 4.65 8.75 13.95 1.00
1.00 1.20 3.00 10.50 1.00
1.00 Living area 4.65 8.75 39.91 1.00
1.00 4.55 8.58 39.81 1.00
1.00 1/E-F 3.85 7.42 10.27 1.00
1.00 1.00 2.67 7.42 1.001.00 F/1-2 6.20 11.33 16.53 1.00
1.00 1.00 2.67 11.33 1.00
2.00 2 & 3/E-F 2.35 4.92 9.79 2.00
1.00 0.65 2.08 3.20 1.00
1.00 1.80 4.00 3.75 1.00
1.00 0.65 2.08 2.60 1.00
1.00 F/3-6 6.15 11.25 16.40 1.00
1.00 1.00 2.67 11.25 1.00
1.00 6/E-F 3.85 7.42 10.27 1.00
1.00 1.00 2.67 7.42 1.00
1.00 E/6-8 3.00 6.00 8.00 1.00
1.00 1.00 2.67 6.00 1.00
1.00 8/A-E 7.80 14.00 20.80 1.00
1.00 1.00 2.67 14.00 1.00
1.00 A/3-8 9.10 16.17 24.27 1.00
1.00 1.00 2.67 16.17 1.00
1.00 3/A-B 1.50 3.50 4.00 1.00
1.00 1.00 2.67 3.50 1.00
1.00 E/1-8 17.15 29.58 45.73 1.00
1.00 1.00 2.67 29.58 1.00
1.00 8/C-E 6.95 12.58 18.53 1.00
1.00 1.00 2.67 12.58 1.00
50 x 50 mm Noggings 50 x 50
8/2/2019 Main Building Take Off
32/50
1.00 C/5-8 6.00 11.00 16.00 1.00
1.00 1.00 2.67 11.00 1.00
1.00 4/A-C 2.50 5.17 6.67 1.00
1.00 1.00 2.67 5.17 1.00
1.00 B/1-4 9.80 17.33 26.13 1.00
1.00 1.00 2.67 17.33 1.00
1.00 1/B-E 6.30 11.50 16.80 1.00
1.00 1.00 2.67 11.50 1.00
884.48
146 m
Coeff. Location L B H/D Nr Total Coeff.
Bedrm 1 3.60 3.70 2.00 14.60 1.15
Bedrm 1 1.75 0.60 2.00 4.70 1.15Corridor 1.20 2.55 2.00 7.50 1.15Bedrm 2 3.60 3.70 2.00 14.60 1.15Bedrm 2 1.75 0.60 2.00 4.70 1.15
Terrace 6.00 2.85 2.00 17.70 1.15
Guest W.C 2.85 1.00 2.00 7.70 1.15M-Bedrm 4.00 4.20 2.00 16.40 1.15
W.i.c 2.00 1.75 2.00 7.50 1.15Bath 2.25 2.00 2.00 8.50 1.15
Lounge 6.30 5.50 2.00 23.60 1.15
Living area 4.65 4.55 2.00 18.40 1.15
1.15145.90 1.15
1.15
1.15
1.15
1.15318 m 1.15
1.15
1.15
Coeff. Location L B H/D Nr Total 1.15
1.15 a,b,c 3.10 11.24 40.06
1.15 d 1.88 2.71 5.87
1.15 e,f,g 3.10 8.42 30.011.15 h 1.05 3.86 4.66
1.15 j 1.05 5.57 6.73
1.15 k 4.05 9.67 45.02
1.15 1.50 0.79 1.36 Coeff.
1.15 A 2.10 8.90 21.51
1.15 B & C 4.20 5.00 24.15
1.15 D 4.20 3.43 16.56
1.15 E 4.20 3.43 16.56
1.15 F 3.80 1.71 7.49
50 x 100mm Ceiling joists 50 x 50
50 x 150mm Rafters
50 x 15
8/2/2019 Main Building Take Off
33/50
1.15 G 3.53 7.00 28.42
1.15 H 3.53 2.18 8.85
1.15 J 3.53 3.81 15.46
1.15 K 3.53 6.93 28.15
1.15 L 1.20 5.08 7.01
1.15 M 2.14 5.08 12.49
317.63
Coeff.
17 m 1.15
1.15
1.15
Coeff. Location L B H/D Nr Total 1.15
1.15
1.15
1.15 4.88 2.00 11.21
1.15 1.20 4.00 5.52
16.73
Coeff.
83 m
Coeff. Location L B H/D Nr Total
4.00 1,2,3,6/E-F 3.85 4 17
1.00 F/1-2 4.35 5 5
1.00 3.30 4 4
1.00 F/3-4 4.35 5 5
1.00 4/A-B 1.50 2 2
1.00 8/A-C 3.00 4 4
1.00 A/4-8 6.20 6 6
1.00 E/1-8 15.00 14 14
1.00 8/C-E 4.80 5 5
1.00 C/4-8 6.20 6 61.00 4/B-C 1.50 2 2
1.00 B/1-4 8.80 8 8
1.00 1/B-E 6.30 6 6
83.25
50 x 15
50 x 150mm Valley rafters
50 x 15
18mm Thick M.S Fishtail bolt
8/2/2019 Main Building Take Off
34/50
596 m
Location L B H/D Nr Total
e rm 1 3.60 0.80 21.50 17.203.70 0.80 21.58 17.27
Bedrm 1 1.75 0.80 2.92 2.330.60 0.80 1.96 1.57
Corridor 1.20 0.80 5.25 4.20
2.55 0.80 6.38 5.10
Bedrm 2 3.60 0.80 21.50 17.20
3.70 0.80 21.58 17.27
Bedrm 2 1.75 0.80 2.92 2.33
0.60 0.80 1.96 1.57
Terrace 6.00 0.80 28.75 23.00
2.85 0.80 26.13 20.90
Guest W.C 2.85 0.80 6.33 5.07
1.00 0.80 4.79 3.83
M-Bedrm 4.00 0.80 26.67 21.33
4.20 0.80 26.83 21.47
W.i.c 2.00 0.80 6.53 5.22
1.75 0.80 6.32 5.06
Bath 2.25 0.80 8.13 6.50
2.00 0.80 7.92 6.33
Lounge 6.30 0.80 42.88 34.30
4.30 0.80 41.21 32.97
Lounge 4.65 0.80 11.63 9.30
1.20 0.80 8.75 7.00
Living area 4.65 0.80 33.26 26.61
4.55 0.80 33.18 26.54
1/E-F 3.85 0.80 8.56 6.84
1.00 0.80 6.18 4.94F/1-2 6.20 0.80 13.78 11.02
1.00 0.80 9.44 7.56
2 & 3/E-F 2.35 0.80 8.16 13.06
0.65 0.80 2.66 2.13
1.80 0.80 3.13 2.50
0.65 0.80 2.17 1.73
F/3-6 6.15 0.80 13.67 10.93
1.00 0.80 9.38 7.50
6/E-F 3.85 0.80 8.56 6.84
1.00 0.80 6.18 4.94
E/6-8 3.00 0.80 6.67 5.33
1.00 0.80 5.00 4.00
8/A-E 7.80 0.80 17.33 13.87
1.00 0.80 11.67 9.33
A/3-8 9.10 0.80 20.22 16.18
1.00 0.80 13.47 10.78
3/A-B 1.50 0.80 3.33 2.67
1.00 0.80 2.92 2.33
E/1-8 17.15 0.80 38.11 30.49
1.00 0.80 24.65 19.72
8/C-E 6.95 0.80 15.44 12.36
1.00 0.80 10.49 8.39
mm Hangers
8/2/2019 Main Building Take Off
35/50
C/5-8 6.00 0.80 13.33 10.67
1.00 0.80 9.17 7.33
4/A-C 2.50 0.80 5.56 4.44
1.00 0.80 4.31 3.44
B/1-4 9.80 0.80 21.78 17.42
1.00 0.80 14.44 11.56
1/B-E 6.30 0.80 14.00 11.20
1.00 0.80 9.58 7.67
596.18
1021 m
Location L B H/D Nr Total
a 3.37 11.33 43.86
b 3.10 11.00 39.22c 3.37 11.33 43.86
d 1.80 7.27 15.04
e 3.37 11.33 43.86
f 3.08 11.00 38.90
g 3.37 11.33 43.86
h 3.00 4.50 15.53
j 4.80 4.50 24.84
k 9.10 14.50 151.74
1.88 4.00 8.65
A 4.15 15.00 71.59
B & C 4.20 15.00 72.45
D 2.55 15.00 43.99
E 2.55 15.00 43.99
F 0.75 13.88 11.97
G 6.30 12.77 92.49
H 1.77 12.77 25.91
J 3.48 12.77 51.02
K 6.23 12.77 91.39
L 1.50 15.27 26.34
M 2.14 15.27 37.57
1020.76
25 m
Location L B H/D Nr Total
1.88 2.00 3.76
1.88 2.00 3.76
2.55 2.00 5.10
m Battens
mm Ridge piece
8/2/2019 Main Building Take Off
36/50
6.30 2.00 12.60
25.22
121 m
Location L B H/D Nr Total
4.43 4.00 20.36
4.35 4.00 20.01
1.50 2.00 3.45
5.63 2.00 12.94
6.00 6.00 41.40
4.95 4.00 22.77
120.92
81 m
Location L B H/D Nr Total
1,2,3,6/E-F 3.85 4.00 15.40
F/1-2 4.35 1.00 4.35
3.30 1.00 3.30
F/3-4 4.35 1.00 4.35
4/A-B 1.50 1.00 1.50
8/A-C 3.00 1.00 3.00
A/4-8 6.20 1.00 6.20
E/1-8 15.00 1.00 15.00
8/C-E 4.80 1.00 4.80
C/4-8 6.20 1.00 6.20
4/B-C 1.50 1.00 1.50
B/1-4 8.80 1.00 8.80
1/B-E 6.30 1.00 6.30
80.70
mm Hip rafters
mm Hardwood wall plate
8/2/2019 Main Building Take Off
37/50
54 M 25 x 30
Coeff. Location L B H/D Nr Total Coeff.
1 2.10 0.90 1.00 5.10
D2 2.10 0.80 5.00 25.00
D3 2.10 0.65 6.00 29.10
54.10
53 M
Coeff. Location L B H/D Nr Total
D1 2.05 0.88 1.00 4.98
D2 2.05 0.78 5.00 24.40
D3 2.05 0.63 6.00 28.38 Doors
52.78 Coeff.
Ironmongery - Pair, 100mm butt hinges,Mortice lock 12 No
Coeff. Location L B H/D Nr Total
1.00 D1 2.05 0.90 1.00 1.00 Panel
1.00 D2 2.05 0.80 5.00 5.00 Panel
1.00 D3 2.05 0.65 6.00 6.00 Flush 20mm
12.00 Coeff.
44 x 144mm Hardwood door frame
10 x 25mm hardwood door stops
8/2/2019 Main Building Take Off
38/50
8/2/2019 Main Building Take Off
39/50
mm Fascia board 103 m
Location L B H/D Nr Total
1 - 4.85 1.00 4.85
F/1-2 6.20 1.00 6.20
2 & 3/E-F 2.35 2.00 4.701.80 1.00 1.80
F/3-6 6.15 1.00 6.15
6/E-F 3.85 1.00 3.85
E/6-8 3.00 1.00 3.00
8/A-E 9.80 1.00 9.80
A/3-8 9.10 1.00 9.10
3/A-B 2.50 1.00 2.50
B &E/1-8 17.15 2.00 34.30
1 & 8/A-E 8.30 2.00 16.60
102.85
0 m
Location L B H/D Nr Total
D1 2.05 0.90 1.00 Panel
D2 2.05 0.80 5.00 Panel
D3 2.05 0.65 6.00 Flush
0.00
hick Gyprock ceiling cornice 146 m
Location L B H/D Nr Total
Bedrm 1 3.60 3.70 2.00 14.60
Bedrm 1 1.75 0.60 2.00 4.70Corridor 1.20 2.55 2.00 7.50
Bedrm 2 3.60 3.70 2.00 14.60
Bedrm 2 1.75 0.60 2.00 4.70
Terrace 6.00 2.85 2.00 17.70
Guest W.C 2.85 1.00 2.00 7.70
M-Bedrm 4.00 4.20 2.00 16.40
W.i.c 2.00 1.75 2.00 7.50
Bath 2.25 2.00 2.00 8.50
Lounge 6.30 5.50 2.00 23.60
Living area 4.65 4.55 2.00 18.40
8/2/2019 Main Building Take Off
40/50
145.90
8/2/2019 Main Building Take Off
41/50
359 m2
Coeff. Location L B H/D Nr Total
- e rm & w. .c 6.15 4.20 2.55 2.00 52.79
Lounge 6.30 5.50 2.55 2.00 60.18
Void 4.65 4.55 2.55 2.00 46.92Store 2.00 1.20 2.55 2.00 16.32
Dining area 6.15 3.15 2.55 2.00 47.43
Corridor 1.20 2.55 2.55 2.00 19.13
Bedrm 1 4.20 3.70 2.55 2.00 40.29
Bedrm 2 4.20 3.70 2.55 2.00 40.29
Entrance Lobby 2.50 4.65 2.55 2.00 36.47
Living area 4.65 4.55 2.55 2.00 46.92
D1 2.10 1.00 1.00 2.10
D2 2.10 0.90 7.00 13.23
D3 2.10 0.75 2.00 3.15
W1 2.10 1.80 1.00 3.78
W2 2.10 1.10 1.00 2.31W3 1.80 1.40 2.00 5.04
W4 1.20 2.15 2.00 5.16
W5 1.20 1.80 3.00 6.48
W7 1.20 0.90 6.00 6.48
Skirtings 122.90 0.10 1.00 12.29
359.00
Polished porcelain tiles/Screeding 158 m2
Coeff. Location L B H/D Nr Total
M-Bedrm 4.00 4.20 1.00 16.80
W.i.c 2.00 1.75 1.00 3.50
Door ents. 2.75 0.15 1.00 0.41
Lounge 6.30 4.30 1.00 27.09
Lounge 4.65 1.20 1.00 5.58
Kitchen 4.20 4.00 1.00 16.80
Store 2.00 1.20 1.00 2.40
Door ents. 3.30 0.15 1.00 0.50Dining area 6.15 3.15 1.00 19.37
Corridor 1.20 2.55 1.00 3.06
Door ents. 1.10 0.15 1.00 0.17
Bedrm 1 3.60 3.70 1.00 13.32
Bedrm 1 1.75 0.60 1.00 1.05
Door ents. 0.90 0.15 1.00 0.14
Bedrm 2 3.60 3.70 1.00 13.32
Bedrm 2 1.75 0.60 1.00 1.05
Door ents. 0.90 0.15 1.00 0.14
Door ents. 2.00 0.15 1.00 0.30
12mm C & S rendering to internal walls
8/2/2019 Main Building Take Off
42/50
Entrance Lobby 2.20 4.65 1.00 10.23
Door ents. 2.90 0.15 1.00 0.44
Living area 4.65 4.55 1.00 21.16
Living area 1.05 0.30 2.00 0.63
Door ents. 2.15 0.15 1.00 0.32
157.76
38 m2
Coeff. Location L B H/D Nr Total
Bath 2.25 2.00 1.00 4.50
Out Kitchen 2.00 1.65 1.00 3.30
Laundry 2.00 1.20 1.00 2.40
Shower 2.35 2.10 1.00 4.94
Shower 1.20 0.10 1.00 0.12W.C 2.35 0.90 1.00 2.12
W.C 2.85 1.00 1.00 2.85
Terrace 6.00 3.00 1.00 18.00
Terrace 0.90 0.15 1.00 0.14
Terrace 0.45 0.45 1.00 0.20
37.64
22 m
Coeff. Location L B H/D Nr Total
1.20 18.00 21.60
0.00
21.60
124 m2
Coeff. Location L B H/D Nr Total
Laundry 2.00 1.20 2.55 2.00 16.32
Kitchen 4.20 4.00 2.55 2.00 41.82
Shower 1.08 2.10 2.40 2.00 15.26
1.18 2.10 2.40 2.00 15.74
W.C 2.35 0.90 2.40 2.00 15.60
Porcelain tiles to riser of steps/12mm C & S backing
Ceramic Wall tiles/12mm C & S backing to walls
Non-slip porcelain tiles/Screeding
8/2/2019 Main Building Take Off
43/50
Guest W.C 2.85 1.00 2.55 2.00 19.64
Bath 2.25 2.00 2.55 2.00 21.68
D2 2.10 0.90 2.00 3.78
D3 2.10 0.75 6.00 9.45
W6 1.00 1.80 2.00 3.60
W8 0.65 0.90 5.00 2.93
Openings 1.10 2.40 1.00 2.64
123.66
75 x 10mm PVC T & G ceiling materials at the eaves 94 m2
Coeff. Location L B H/D Nr Total
1/E-F 3.85 1.00 1.00 3.85F/1-2 6.20 1.00 1.00 6.20
2 & 3/E-F 2.35 0.65 2.00 3.06
1.80 0.65 1.00 1.17
F/3-6 6.15 1.00 1.00 6.15
6/E-F 3.85 1.00 1.00 3.85
E/6-8 3.00 1.00 1.00 3.00
8/A-E 7.80 1.00 1.00 7.80
A/3-8 9.10 1.00 1.00 9.10
3/A-B 1.50 1.00 1.00 1.50
E/1-8 17.15 1.00 1.00 17.15
8/C-E 6.95 1.00 1.00 6.95
C/5-8 6.00 1.00 1.00 6.00
4/A-C 2.50 1.00 1.00 2.50
B/1-4 9.80 1.00 1.00 9.80
1/B-E 6.30 1.00 1.00 6.30
94.38
18 m
Coeff. Location L B H/D Nr Total
Out Kitchen 2.00 2.00 8.00
Terrace 2.55 2.00 10.20
0.00
18.20
Non-slip porcelain tiles to treads
8/2/2019 Main Building Take Off
44/50
27 m
Coeff. Location L B H/D Nr Total
Out Kitchen 2.00 3.00 12.00
Terrace 2.55 3.00 15.30
0.00
27.30
Non-slip porcelain tiles to risers
8/2/2019 Main Building Take Off
45/50
230 m2
Coeff. Location L B H/D Nr Total
1.00 ront 11.95 3.25 1.00 38.84
1.00 Front 0.60 3.25 2.00 3.90
1.00 Right 15.25 3.25 1.00 49.561.00 Right 15.25 2.45 1.00 37.36
0.50 Right 6.15 1.25 1.00 3.84
0.50 Right 6.20 1.25 1.00 3.88
0.50 Right 4.40 0.65 1.00 1.43
1.00 Right 3.30 0.65 1.00 2.15
1.00 Back/E-F 3.85 3.25 1.00 12.51
1.00 Back/E-F 0.60 3.25 2.00 3.90
0.50 Back/A-B 1.50 7.20 1.00 5.40
1.00 Back/B-E 6.45 5.70 1.00 36.77
1.00 Opening 2.00 2.30 1.00 4.60
1.00 Left/1-8 15.25 5.70 1.00 86.93
0.50 Left/1-8 10.90 1.50 1.00 8.181.00 Left/1-8 2.50 1.00 1.00 2.50
1.00 Terr. ent 2.35 2.30 2.00 10.81
Out kitchen 1.50 2.00 2.70 1.00 9.45
Terrace 5.90 3.00 2.70 1.00 24.03
D1 2.10 1.00 1.00 2.10
D2 2.10 0.90 0.00 0.00
D3 2.10 0.75 1.00 1.58
W1 2.10 1.80 1.00 3.78
W2 2.10 1.10 1.00 2.31
W3 1.80 1.40 2.00 5.04
W4 1.20 2.15 2.00 5.16
W5 1.20 1.80 3.00 6.48
W6 1.00 1.80 2.00 3.60W7 1.20 0.90 6.00 6.48
W8 0.65 0.90 5.00 2.93
Skirtings 13.25 0.10 1.00 1.33
230.49
57 m2
Coeff. Location L B H/D Nr Total
1-2/B-D 4.20 4.00 1.00 16.80
1-2/D-E 4.20 1.85 1.00 7.77
B-C1/2-3 2.05 3.15 1.00 6.46
C1-E/2-3 3.95 3.15 1.00 12.44
C1-E/2-2A 3.95 1.20 1.00 4.74
1.20 0.50 1.00 0.60
20mm C & S rendering to external walls
12mm C & S rendering to internal soffit of slab
8/2/2019 Main Building Take Off
46/50
B-E/3-5 6.00 2.20 1.00 13.20
B-C/4-5 1.35 1.05 1.00 1.42
E1-F/2-3 2.35 3.15 1.00 7.40
0.00
57.32
7 m2
Coeff. Location L B H/D Nr Total
4.36 1.20 5.23
1.68 1.20 2.02
0.00
7.25
12mm C & S rendering to window openings 113 m
Coeff. Location L B H/D Nr Total
W1 2.10 1.80 1.00 7.80
W2 2.10 1.10 1.00 6.40
W3 1.80 1.40 2.00 12.80
W4 1.20 2.15 2.00 13.40
W5 1.20 1.80 3.00 18.00
W6 1.00 1.80 2.00 11.20
W7 1.20 0.90 6.00 25.20
W8 0.65 0.90 6.00 18.60
0.00
113.40
Porcelain tiles to treads of staircase/Screeding 20 m
Coeff. Location L B H/D Nr Total
12mm C & S rendering to internal soffit of staircase
8/2/2019 Main Building Take Off
47/50
1.20 17.00 20.40
0.00
20.40
123 m
Coeff. Location L B H/D Nr Total
M-Bedrm 4.00 4.20 1.00 16.40
W.i.c 2.00 1.75 1.00 7.50
Door ents. 3.90 1.00 3.90
Lounge 6.30 5.50 1.00 23.60
Door ents. 0.85 1.00 0.85
Store 2.00 1.20 1.00 6.40
Door ents. 0.75 1.00 1.50
Dining area 6.15 3.15 1.00 18.60Corridor 1.20 2.55 1.00 7.50
Door ents. 7.75 1.00 7.75
Bedrm 1 4.20 3.70 1.00 15.80
Door ents. 0.90 1.00 0.90
Bedrm 2 4.20 3.70 1.00 15.80
Door ents. 0.90 1.00 0.90
Entrance Lobb 2.20 4.65 1.00 13.70
Door ents. 6.05 1.00 6.05
Living area 4.65 4.85 1.00 19.00
0.30 1.00 0.60
Door ents. 2.15 1.00 1.00 3.15
122.90
13 m
Coeff. Location L B H/D Nr Total
Out Kitchen 2.00 1.65 1.00 7.30
Terrace 6.00 3.00 1.00 18.0012.05 1.00 12.05
13.25
Polished porcelain Skirtings to tiles
Non-slip porcelain Skirtings to tiles
8/2/2019 Main Building Take Off
48/50
Ceiling material 130 m2
Coeff. Location L B H/D Nr Total
Bedrm 1 3.60 3.70 1.00 13.32
Bedrm 1 1.75 0.60 1.00 1.05
Corridor 1.20 2.55 1.00 3.06
Bedrm 2 3.60 3.70 1.00 13.32
Bedrm 2 1.75 0.60 1.00 1.05
Terrace 6.00 2.85 1.00 17.10
Guest W.C 2.85 1.00 1.00 2.85
M-Bedrm 4.00 4.20 1.00 16.80
W.i.c 2.00 1.75 1.00 3.50
Bath 2.25 2.00 1.00 4.50
Lounge 6.30 4.30 1.00 27.09
Lounge 4.65 1.20 1.00 5.58
Living area 4.65 4.55 1.00 21.16
130.38
8/2/2019 Main Building Take Off
49/50
589 m2
Coeff. Location L B H/D Nr Total
1.00 359.00
1.00 230.49
589.49
8 m2
Coeff. Location L B H/D Nr Total
0.14 54.10 1.00 7.79
7.79
20 m2
Coeff. Location L B H/D Nr Total
2.00 D1 2.05 0.90 1.00 3.69
2.00 D2 2.05 0.80 5.00 16.40
1.00 D1 4.10 0.04 1.00 0.16
1.00 D2 4.10 0.04 5.00 0.78
20.25
3EP to internal and external walls
Priming back of frames
Polishing of Panel doors
8/2/2019 Main Building Take Off
50/50
54 m2
Coeff. Location L B H/D Nr Total
1.00 54.10 1.00 54.10
54.10
17 m2
Coeff. Location L B H/D Nr Total
2.00 D3 2.05 0.65 6.00 15.99 Flush1.00 D3 4.10 0.04 6.00 0.93
16.92
31 m2
Coeff. Location L B H/D Nr Total
102.85 0.30 30.86
30.86
Painting to frames
Painting to flush doors
Painting to Fascia board