Magna Environmental Group

Embed Size (px)

Citation preview

  • 8/14/2019 Magna Environmental Group

    1/35

  • 8/14/2019 Magna Environmental Group

    2/35

    MAGNA ENVIRONMENTAL GROUPMAGNA ENVIRONMENTAL GROUP

    Design,

    Build

    operateintegrated solutions for waste

    management

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    3/35

    WasteWaste ClassificationsClassifications

    CONTROLLEDWASTEHousehold Waste

    Industrial Waste

    Commercial Waste

    SPECIAL WASTE

    Controlled waste consisting of,or contaminated with,substances which make it

    dangerous to life

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    4/35

    TraditionalTraditional SolutionsSolutionsOffered by the IndustryOffered by the Industry

    Collect

    Haul

    Bury

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    5/35

    The Dawn of aThe Dawn of a NewNewApproachApproach

    Magna Environmental Services

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    6/35

    Project Design Premise

    There is Money to be made in

    Recycling when the recovered

    materials are processed to add

    value before leaving the Facility.

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    7/35

    Project DesignProject Design CycleCycle

    Project Design Premise:Project Design Premise:There is Money to be made inThere is Money to be made in

    Recycling when the recoveredRecycling when the recovered

    materials are processed to addmaterials are processed to add

    value before leaving thevalue before leaving the

    Facility.Facility.

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    8/35

    Project DesignProject Design CycleCycle

    Project Design Premise:Project Design Premise:

    There is Money to be made inThere is Money to be made inRecycling when the recoveredRecycling when the recovered

    materials are processed to addmaterials are processed to add

    value before leaving thevalue before leaving the

    Facility.Facility.

    Classification of Materials inClassification of Materials inthe Contracted Waste Streamthe Contracted Waste Stream

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    9/35

    ProjectProject DesignDesign CycleCycleProject Design Premise:Project Design Premise:

    There is Money to be made inThere is Money to be made inRecycling when the recoveredRecycling when the recovered

    materials are processed to addmaterials are processed to add

    value before leaving thevalue before leaving the

    Facility.Facility.

    Classification of Materials inClassification of Materials inthe Contracted Waste Streamthe Contracted Waste Stream

    Identify Markets forIdentify Markets forRecovered MaterialsRecovered Materials

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    10/35

    ProjectProject DesignDesign CycleCycle

    Project Design Premise:Project Design Premise:

    There is Money to be made inThere is Money to be made inRecycling when the recoveredRecycling when the recovered

    materials are processed to addmaterials are processed to add

    value before leaving thevalue before leaving the

    Facility.Facility.

    Classification of Materials inClassification of Materials inthe Contracted Waste Streamthe Contracted Waste Stream

    Identify Markets forIdentify Markets forRecovered MaterialsRecovered Materials

    Brokers/ ProcessorsBrokers/ Processors

    Ferrous MetalsFerrous Metals

    Non Ferrous MetalsNon Ferrous Metals

    FiberFiber

    Shipping & HandlingShipping & Handling

    RequirementsRequirements

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    11/35

    Project Design CycleProject Design Cycle

    Project Design Premise:Project Design Premise:

    There is Money to be made inThere is Money to be made in

    Recycling when the recoveredRecycling when the recovered

    materials are processed to addmaterials are processed to add

    value before leaving thevalue before leaving the

    Facility.Facility.

    Classification of Materials inClassification of Materials inthe Contracted Waste Streamthe Contracted Waste Stream

    ManufacturersManufacturersRaw Materials RequiredRaw Materials Required

    Required Material SpecsRequired Material Specs

    Annual Available CapacityAnnual Available Capacity

    Manufacturers ReadyManufacturers ReadyRaw MaterialsRaw Materials

    GlassesGlasses

    PlasticsPlastics

    Consumers and/orConsumers and/or

    Alternate MarketsAlternate Markets

    Identify Markets forIdentify Markets forRecovered MaterialsRecovered Materials

    Brokers/ ProcessorsBrokers/ Processors

    Ferrous MetalsFerrous Metals

    Non Ferrous MetalsNon Ferrous Metals

    FiberFiber

    Shipping & HandlingShipping & Handling

    RequirementsRequirements

  • 8/14/2019 Magna Environmental Group

    12/35

    ProjectProject DesignDesign CycleCycle

    Project Design Premise:Project Design Premise:

    There is Money to be made inThere is Money to be made in

    Recycling when the recoveredRecycling when the recovered

    materials are processed to addmaterials are processed to add

    value before leaving thevalue before leaving the

    Facility.Facility.

    Classification of Materials inClassification of Materials inthe Contracted Waste Streamthe Contracted Waste Stream

    Development of BuildingDevelopment of Building& Site Plan& Site Plan

    Integration Plan &Integration Plan &

    Process & ProcedureProcess & ProcedureDesignDesign

    Equipment SelectionEquipment Selection

    Equipment & ProcessEquipment & Process

    RequirementsRequirements

    ManufacturersManufacturersRaw Materials RequiredRaw Materials Required

    Required Material SpecsRequired Material Specs

    Annual Available CapacityAnnual Available Capacity

    Manufacturers ReadyManufacturers ReadyRaw MaterialsRaw Materials

    GlassesGlasses

    PlasticsPlastics

    Consumers and/orConsumers and/or

    Alternate MarketsAlternate Markets

    Identify Markets forIdentify Markets forRecovered MaterialsRecovered Materials

    Brokers/ ProcessorsBrokers/ Processors

    Ferrous MetalsFerrous Metals

    Non Ferrous MetalsNon Ferrous Metals

    FiberFiber

    Shipping & HandlingShipping & Handling

    RequirementsRequirements

  • 8/14/2019 Magna Environmental Group

    13/35

    Project Design CycleProject Design Cycle

    Project Design Premise:Project Design Premise:

    There is Money to be made inThere is Money to be made in

    Recycling when the recoveredRecycling when the recovered

    materials are processed to addmaterials are processed to add

    value before leaving thevalue before leaving the

    Facility.Facility.

    Classification of Materials inClassification of Materials inthe Contracted Waste Streamthe Contracted Waste Stream

    Development of BuildingDevelopment of Building& Site Plan& Site Plan

    Integration Plan &Integration Plan &

    Process & ProcedureProcess & ProcedureDesignDesign

    Equipment SelectionEquipment Selection

    Equipment & ProcessEquipment & Process

    RequirementsRequirements

    ManufacturersManufacturersRaw Materials RequiredRaw Materials Required

    Required Material SpecsRequired Material Specs

    Annual Available CapacityAnnual Available Capacity

    Manufacturers ReadyManufacturers ReadyRaw MaterialsRaw Materials

    GlassesGlasses

    PlasticsPlastics

    Consumers and/orConsumers and/or

    Alternate MarketsAlternate Markets

    Identify Markets forIdentify Markets forRecovered MaterialsRecovered Materials

    Brokers/ ProcessorsBrokers/ Processors

    Ferrous MetalsFerrous Metals

    Non Ferrous MetalsNon Ferrous Metals

    FiberFiber

    Shipping & HandlingShipping & Handling

    RequirementsRequirements

    PROJECT APPROVALPROJECT APPROVAL

  • 8/14/2019 Magna Environmental Group

    14/35

    Other MajorOther Major

    ConsiderationsConsiderationsThe Process Must Allow for the Elimination of Household

    Hazardous Waste

    The Plant Design Must Go Beyond Simple Separation - ItMust Add Value by Creating Materials of Value

    The Plant Capabilities Must be Redundant by Design toManage the Risk of Plant Downtime

    Design Must be Both Modular and Flexible toRespond to Significant Changes in Technology andMarket Requirements

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    15/35

    Downstream Technologies

    Compos ting

    Syn-C oalSlurry

    Paper Products

    Was teProcess ingFacility Fabrica tionGlas sProcessi ngP lastic&Lu mberE xtrudingDistributio n

    Tile/Ce ramicPlant

    Fuelto Energy

    Bio Solids Processing

    Fabrication

    Distribution

    Composting

    Glass Processing

    Plastic and LumberExtruding

    Paper Products

  • 8/14/2019 Magna Environmental Group

    16/35

    Processing Objectives:Processing Objectives:

    WasteWaste ProcessingProcessing FacilityFacility

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    17/35

    1600

    15001400

    1300

    1200

    1100

    1000

    900

    800

    700

    600500

    400

    300

    200

    100 Recovered &Processed642 Tons

    Compost/Fuel

    446 Tons

    Wood Mulch81 Tons

    Aggregate131 Tons

    Landfill/Fuel

    200 Tons

    Waste Reduction ChartWaste Reduction ChartRegional Class WasteRegional Class Waste

    Processing FacilityProcessing Facility

    Based on 1500 Tons Per Day

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    18/35

    FinishedFinished GoodsGoods (Plant Objectives)(Plant Objectives)

    Manufacturing

    Raw Materials

    Consumer

    Finished Goods

    Processing FacilityProcessing Facility

    Fraction

    13.5%13.5%

    43.8%43.8%42.7%42.7%

    Landfill

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    19/35

    THETHE

    TEAMTEAM

    APPROACHAPPROACH

    Legal/Environmental Commodity Sales

    Systems & Controls Transportation

    Equipment Suppliers Civil Engineer General Contractor

  • 8/14/2019 Magna Environmental Group

    20/35

    USA (Georgia) Waste Processing FacilityUSA (Georgia) Waste Processing Facility

  • 8/14/2019 Magna Environmental Group

    21/35

    Key Facts - USA (Georgia)Key Facts - USA (Georgia)

    ProjectProject

    Permitted for

    Employees

    Annual Payroll

    Financing

    Guaranteed Revenue Stream

    25 Year Put or Pay Contracts

    Government Jurisdictions Served

    Homes Under Contract

    Target Completion

    1,700 TDP165

    $3,000,000 USD

    Bank - FHA Guarantee

    41

    85,000+

    Full Capacity Operation

    June 1998

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    22/35

    Facility DescriptionFacility Description

    Site Size 54 acres

    Processing Plant 165,000 square feet

    Windrow Compost Buildings 12 acres

    Greenhouse 5,000 square feet

    Soil Laboratory 1,200 square feet

    Administration Building 14,000 square feet

    Theater 1,200 square feet

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    23/35

    Program BenefitsProgram Benefits

    Magna and Norcon become involvedwith you for the long term to providean environmentally safe & costeffective solution

    Our Approach involves participation of

    many community segments: Citizens,University & Government

    Our Facility provides many new jobs &skill training to perform jobs

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    24/35

    Program BenefitsProgram Benefits

    This approach enables landfills to beclosed - South Georgia (USA) hasclosed 16 Landfills to date above thelargest aquifer in the SoutheasternUSA

    Construction & manufacturing jobsduring the development phase

    Provides business opportunities forlocal entrepreneurs

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    25/35

    Program BenefitsProgram Benefits

    Has a positive political impact -citizens generally support theapproach because it makes sense & issimply the right thing to do

    The MAGNA/NORCON solution is

    extremely flexible to adjust to thespecific needs of the communitiesserved

    Can be privatized, government ownedor joint venture

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    26/35

    Facility

    Design E&O

    Insurance

    NORCONDeveloper/Program

    ManagerFinancing

    Your

    Prime Contractor

    Construction

    +Surety Bond

    NORCON

    Prime Contractor

    Equipment

    +Surety Bond

    Waste StreamContracts

    Cover AllDebt ServiceOperationsReserves

    Subcontractors

    +Surety Bonds

    Revenuesfrom Sale ofMaterials of

    Value

    Subcontractors

    +Surety Bonds

    Financial SecurityConstruction Security

    OperationalOperational

  • 8/14/2019 Magna Environmental Group

    27/35

    pp

    StructureStructure

    GlassProcessing

    PlasticTechnology

    AlternativeFuels

    AluminumSmelting

    RepulpingPlant

    Organics &GroundCovers

    MiscellaneousTechnologies

    WasteProcessing

    FacilityComposting

    Facility

    Owner/Operator - Service Provider

    G O G O

  • 8/14/2019 Magna Environmental Group

    28/35

    Develop Projects

    Manage or OperateProject & Program Management

    Joint Venture or Partner

    Identify MarketsMarket Materials of Value

    Engineering & Design

    MAGNA ENVIRONMENTAL GROUPMAGNA ENVIRONMENTAL GROUP

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

    f d dfill

  • 8/14/2019 Magna Environmental Group

    29/35

    Cost Of A Modern LandfillCost Of A Modern Landfill

    (20 Year Operating Life, 100 Acres)(20 Year Operating Life, 100 Acres)

    Cost - 1988 US Dollars

    Site Characterization $175,000Preliminary Development (Land Acquisition, etc.) $2,605,000

    Final Development: Single Composite Liner $42,726,950

    Double Composite Liner $63,726,950

    Environmental Management $7,040,000

    Post-Closure Monitoring $13,404,000TOTAL (Single Liner) $65,950,950

    TOTAL (Double Liner) $86,950,950

    (USA) National Solid Waste Management Association

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    30/35

    Waste TrackingWaste Tracking

    Transfer

    Station

    Main

    Processing

    Facility

    Truck

    Landfill

    Customers

    Weight of Incoming Wasteby Sourc

    Weight of Landfill Wasteby Category

    Weight of Shipments toMain Facility

    Incoming Delivery & WeightContainers/Vehicles by WasteCategory & Destination

    Departure of Vehicles/Waste

    Dates, Times

    Internal Movement: Compost,Grinding, Glass, Incineration

    Destination Trackingof Vehicles

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    31/35

    Premise of Waste Services IndustryPremise of Waste Services Industry

    GARBAGE:

    Materials of

    Negative Value to

    be Disposed ofat a Cost to

    the Generator

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    32/35

    Program ComponentsProgram Components

    Waste Collection

    Waste Transfer

    Transportation

    Recovery

    Residual Waste Disposal

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    33/35

    Program ObjectivesProgram Objectives

    Long Term Rates & Services

    Economical

    Environmentally Sound

    Quality Service

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    34/35

    Solid Waste CollectionSolid Waste Collection

    ResidentialResidential

    CommercialCommercial

    IndustrialIndustrial

    SOLVING TOMORROWS ENVIRONMENTALPROBLEMS TODAY

  • 8/14/2019 Magna Environmental Group

    35/35

    MAGNA ENVIRONMENTAL GROUPMAGNA ENVIRONMENTAL GROUP

    in association within association with

    NORCON WASTETECHNOLOGIES INCNORCON WASTETECHNOLOGIES INC

    Mr. James Martins PereiraMr. James Martins Pereira

    [email protected]@hotmail.com

    SOLVING TOMORROWS ENVIRONMENTAL

    PROBLEMS TODAY