Staffing Telescope technical support –Sufficient staffing –Improved progress on long-term projects Observer support –Insufficient, even for experienced observers –Some observations lost due to slow communications Instrumentation support –Sufficient for routine work –Insufficient for new instrument commissioning
Citation preview
Magellan SAC
April 7-8, 2006Pasadena, CA
Personnel
• New hires:– None
• Open positions:– Programmer
– Scientists (two, through AAO)
• Changes– Pasadena EE to part-time
Staffing
• Telescope technical support– Sufficient staffing
– Improved progress on long-term projects
• Observer support– Insufficient, even for experienced observers
– Some observations lost due to slow communications
• Instrumentation support– Sufficient for routine work
– Insufficient for new instrument commissioning
Australia
• Sale of 30 nights over two years at $46K/night
• Cash ($690K) & personnel (two scientists)
• Personnel contribution:– Two AAO scientists (new hires)
– Two years at LCO (Magellan support & research)
– Third year in Australia (research)
• Hiring selection is AAO/Magellan collaboration
• Starts in 2007A
TSIP proposals (selections ~May)
• MMT and Magellan Infrared Spectrograph (MMIRS) Brian McLeod & collaborators, SAO. $917K, 9 Magellan nights in 1 year (and 9 at MMT).
• A Second, Higher-red-sensitivity Mosaic CCD Camera for IMACS (Mosaic2) Alan Dressler & collaborators, Carnegie Observatories. $648K, 15 Magellan nights in one year (community-wide).
• Development of a Magellan Adaptive Secondary Laird Close & collaborators, University of Arizona. $1,356K, 31 Magellan nights over three years
F/5 secondary news
• LBT secondary problems will delay Magellan F/5
• Magellan secondary now expected early 2007
• About 1 year to commission F/5 focal plane
• Ready in time for MMIRS arrival
WFC fit-test
• SAO team fit-checked F/5 Wide Field Corrector
• First test of instrument lift and WFC carts
• Minor modifications being applied
• WFC cells now being fitted with lenses
F/5 WFC fit-check
F/5 WFC fit-check
F/5 secondary cell
• Most parts are machined (cell body, supports)
• See it in the OCIW assembly area
Instrument News
• IMACS dispersers tested– 150 l/mm grism (McCarthy, Dressler)
– LDP “Low Dispersion Prism” (Burles)
• MMTF Maryland-Magellan Tunable Filter– Passed Director’s pre-ship review
– Installation starts in a few months
• LDSS– New shutter controller installed
– VPH-ALL grism fabricated
Computing and networking
• CTIO CISS now provides systems administration
• Major network upgrade– Firewall to the world
– Managed routers added
– New mail server to be installed
• CTIO network connection– 45 Mbit/sec to Internet2 from El Pino
– 4 Mbit/sec to El Pino from LCO
Cleanroom
• MMIRS and FourStar are large vacuum systems
• Both have expensive detectors
• Large clean work area needed for:– Particle and volatile contaminant control
– ESD control
• Alternatives:– Ship back to US (risky and lengthy)
– Work in dirty environments (risky, difficult)
Cleanroom concept
V3
V3
V3
20
D
1918
B
A
COMPRESOR
V4V4
MACHINE SHOP
V5
-0.35
V5
P2
MU
RET
E D
E P
IEDR
A
1615
9
13 14
10
DARK ROOM
P8
STORAGE
P8
P8
P4
-0.175
P3
-0.35
INSTRUMENT LAB.
V2 V1
VEREDA
STORAGE
P8P8
P6
TOILET
P8
P8 P8
-+0.00
ELECTRONIC LAB.
V1
DOWN FLOOR ACCESS
P1
-0.175
STORAGE
17
7
RADIER ARMADO NIVEL SUPERIOR
I
P5
I
F
E
-0.175
98 7
2
6 54
3
P8
P8
18
12
11
14
13
15
16
17
MECHANICAL TECH.
STORAGE
10
ELECTRONIC TECH.
V3
TEL. OPS
V3
V3
C
A12
V3
STORAGE
C.CIVILC.CIVIL
98-02A6
MANUEL RENCORET R. JUAN LUIS FLORES S.
ARQUITECTOS
DIBUJANTE TECNICO - UNIVERSIDAD DE CHILE PATRICIA VILLAGRAN B. ( CAD 14)
PLANO N°
ESC: 1:50
PROPIETARIO
CONTENIDO
UBICACION
PROYECTO
PROPIETARIO
PLANTA DE AMPLIACION PRIMER NIVEL
THE CARNEGIE INSTITUTION OF WASHINGTON
ASTRONOMERS SUPP. BUILDING
CERRO LAS CAMPANAS
PATIO ESTACIONAMIENTO
-0.35
VEREDONMURETE DE PIEDRA
ESCALA 1:50
PLANTA NIVEL INFERIORASTRONOMERS SUPP. BUILDING
21
23
21
22
23
D'
C'
B'
A'
CLEAN ROOM
GOWNING AREA
PUMP ALLEY
CLEAN PREP
AREA
DIRTY PREP
AREA
FECHA: Marzo 2006
rev-1: 28 Marzo 2006
A'CASETA
A'
Cleanroom location
Cleanroom view
VIEW FROM LODGEASTRONOMERS SUPP. BUILDINGESCALA 1:100
CERRO LAS CAMPANAS
ASTRONOMERS SUPP. BUILDING
THE CARNEGIE INSTITUTION OF WASHINGTON
FACHADAS
PROPIETARIO
PROPIETARIO
PROYECTO
UBICACION
CONTENIDO
MANUEL RENCORET R. JUAN LUIS FLORES S.
ARQUITECTOSC.CIVIL
ESC: 1:50
PLANO N°
98-03A6DIBUJANTE TECNICO - UNIVERSIDAD DE CHILE PATRICIA VILLAGRAN B. ( CAD 14)
C.CIVIL
rev-1: 28 Marzo 2006
FECHA: Marzo 2006
SECCION A'-A'ASTRONOMERS SUPP. BUILDING
SECCION B'-B'ASTRONOMERS SUPP. BUILDING
Clean Prep AreaDirty Prep Area
Cleanroom
• Approximate cost:– $200K for building
– $50K for cleanroom equipment
• Resolution from SAC requested