Lunch n Learn 04 APR 18 CADE Mission & Major Initiatives Session will start at 1230 EDT (1130 CDT). Audio will be through DCS – there will be a sound check 30 minutes prior to the session. Everyone but the presenter is muted please Download the Presentation: Click on the Bold Arrow pointing downward just below the lower left hand corner of the presentation Questions are welcome during the session, please type them into the DCS Chat Window 1 Mike Taylor, Co-Host/Moderator Professor, CE, CON DAU 703-805-3005 [email protected] Mr. Daron Fullwood - Presenter DCARC 571-372-4267 [email protected] Ellen Barber, Host Professor, CE, EVM 703-805-3328 [email protected] Marc Stephenson - Presenter CADE Flex Files Lead DCARC 703-697-0362 [email protected]

Lunch n Learn 04 APR 18 CADE Mission & Major Initiatives · Lunch n Learn 04 APR 18 CADE Mission & Major Initiatives • Session will start at 1230 EDT (1130 CDT). • Audio will

  • Upload
    hangoc

  • View
    212

  • Download
    0

Embed Size (px)

Citation preview

Lunch n Learn 04 APR 18CADE Mission & Major Initiatives

• Session will start at 1230 EDT (1130 CDT).  • Audio will be through DCS – there will be a sound check 

30 minutes prior to the session.  Everyone but the presenter is muted please

• Download the Presentation: – Click on the Bold Arrow pointing downward just below the lower 

left hand corner of the presentation

• Questions are welcome during the session, please type them into the DCS Chat Window  

1

Mike Taylor, Co-Host/ModeratorProfessor, CE, CON [email protected]

Mr. Daron Fullwood - [email protected]

Ellen Barber, HostProfessor, CE, [email protected]

Marc Stephenson - PresenterCADE Flex Files Lead [email protected]

COST ASSESSMENT DATA ENTERPRISE

CADE Vision &Major Initiatives 

Daron Fullwood, Director

Defense Cost and                      Resources Center (DCARC) 

[email protected]

Defense Acquisition University Learn @ Lunch

April 4th, 2018

AgendaCADE Update

3

This brief is a success if it provides an overview and update on…

› Cost Assessment Data Enterprise› CADE Major Initiatives › Top Priorities 

› FlexFile / Quantity Report (FF/‐Q) › Value Proposition › Data Requirements › Industry/ Government FF Submission Process› Implementation/ Future of Flex Files 

Improve Data Quality through Access to Native Data

Ensure Completeness through Allocation & Mapping Visibility

Increase Efficiency through Seamless Data Integration

The Future of Cost & Data Analysis

CADE

Data

CADE INTIATIVES

4

What is CADE?CADE Overview

Cost

› Analysis‐Ready Data Downloads

› Profit & Fee Visibility on FFP contracts

› Insight into Prime and Subcontractor Cost Data

Earned Value (EVM)

› Aligned Cost‐EVM allows for time‐phased analysis

› Program Health metrics and Visualization Tools

Acquisition

› Program Information

› SAR/MAR    › Annual Funding› SAR/MAR Schedule 

Events› CARDs*

Technical

› Software Database

› Electronic CARDs (eCARDs)*

› Technical Data Reports*

Library

› Searchable data for historical reference at your fingertips”─ Cost Estimates─ Funding Memos─ Program Briefings─ ICEs, SCPs─ Research Studies

CADE is the authoritative data source for estimating & analyzing Major Defense Programs

URL http://cade.osd.mil

› Actuals:Cost & Technical Data

› Program and Data Situational Awareness

› Analysis‐Ready         Data Downloads

› Quick‐Look Visualizations

Strategic PlanningTechnicalCost

5

Major InitiativesCADE Vision and Major Initiatives

Co‐Planning› Reporting strategy that aligns CSDR & 

EVM requirements› Cooperative planning leads to better 

data, lower costs, and improved program management

Institutional Knowledge/Community Support› What analysts need to know about the 

data› Additional contextual information on 

programs

Cost/Quantity Reporting› Cost Data (CCDRs/1921s) – contains 

most of what analysts need to build an estimate – dollars, hours, quantities, and descriptive tagging

› FlexFiles – new generation of cost reporting, government data reporting

› Quantity Report (1921‐Q) – provides actual account of physical units completed in a streamlined submission process 

› 1921‐3 – improved ways of reporting business unit data

Bill of Materials› Standardized collection of parts and 

supplier pricing data

Technical Reporting› Cost Analysis Requirements 

Description (CARD) / Technical Data (1921‐T) – programmatic and technical descriptions analysts need to build estimates

Software› SRDRs – software effort, size, and 

schedule estimating approaches including analogy, parametric, and commercial models  

Maintenance & Repairs› 1921‐M/R – collection of information 

related to each maintenance event such as the specific system being repaired and reason for failure

Cost analysts will have all of this data and institutional knowledge at their fingertips. It will be the exception – not the rule – to go back to industry to do our estimates.

6

Top PrioritiesCADE Overview

Quality Data That Tells A Story› Comprehensive Data:

› Authoritative & Searchable› Seamlessly integrated› Aligned 

› Process Streamlining

› Modernized & Integrated

Policy Driven Data Initiativesand Informs Decision Making

› Data Accessibility:› Intuitive user interface› Data sharing

› Improves Analysis:› Increases Analyst Productivity› Shift from Reactive to Proactive› Informs Lifecycle Program Decisions

› The Right Data

› The Right Partnerships

› The Right Priorities

By 2020, CADE will be a modernized, fully integrated system that tells the story of a program’s Lifecycle Cost 

Data WarehouseData Integration w/the ServicesTechnical Refresh

API

Cloud / Amazon Web Services Migration

COST ASSESSMENT DATA ENTERPRISE

Torri Preston

[email protected]

(571) 372‐4270

Defense Acquisition University Learn @ Lunch

April 4th, 2018

Flex Files: Overview & Submission Process

8

Legacy 1921 ReportsFlexFiles

1. Requires cost and hours to be mapped/allocated to standard “government” categories• Belief is that requesting data in standard categories from industry will relieve govt. 

effort normalizing data• However, normalization is not straightforward and data requested does not provide 

enough detail to understand/reevaluate industry normalization

2. Forms do not account for capabilities of modern data systems• Require Excel (~2004) and XML (2014) formats but volume of data requested same as 

when forms were submitted in paper• Native data and tags that are already present in industry systems are not 

accommodated by legacy formats 

Legacy cost reports are useful in many cases, but given additional time and industry cooperation cost estimators will generally request more detailed data from industry

9

Value of FlexFilesFlexFiles

1. Additional insight for cost estimators• Insight below WBS reporting level (e.g., control accounts, work packages)• CLIN and contractor‐internal categories that align with FPRAs

• Helps to trace back to proposal information

• Time‐phased by month• Other data fields explicitly planned into DID/ data structure

• E.g., allocation scheme (as necessary), 12 additional contract‐specific fields

2. Potential efficiencies for industry• Less likely to require allocation from internal functional categories to “government” 

categories• Some mappings/allocation still may be required

• Less incentive for Government to require lower level in reporting WBS• Changes EACs to FACs in attempt to avoid concerns with CCDRs driving EVM effort

FlexFiles require data already present in industry’s systems that is useful to cost estimators and does so in a way that overall lessens or is neutral to the industry cost to prepare the reports

FlexFile 1921‐Q

FlexFiles/Qua

ntity

 Rep

ort

1921‐5CWBS 1921‐2

1921‐11921

Legacy Rep

orts

10

Industry Submission ProcessFlexFiles

FlexFileData Model “Schema”

Creation Tool

DCARC converts/normalizes industry’s raw file into database format (JSON) for CADE ingestion

1. DCARC verifies that all data requirements have been met

2. DCARC iterates with contractor if necessary

Once verified by the contractor, DCARC will submit file into CSDR‐SR for CWIPT validation

Contractor converts/normalizes file into database format (JSON) for CADE ingestion1. CADE Developed Tool2. Internally Developed Tool3. Third Party Tool (optimal)

CADE developed tool allows the contractor to verify all the data requirements (pre‐submission)

Contractor will submit file into the CSDR‐SR for CWIPT Validation

Short Term: 6 – 12 months

OptimalSolution:

12‐18 months

FlexFile

Verification Tool Industry Submission

Convert Upload Submit

Convert Upload Submit

ERPAccounting

EVMS

11

Government Validation ProcessFlexFiles

Submit Review

System validates submission & generates standardized reports (e.g. 1921 and flat file)

DCARC will provide specialized reports such as the mapping key

Legacy validation rules will be applied automatically to reports

DCARC will provide guidance on what else to review

Analysts will have the ability to download both Legacy reports and flat files from accepted report

System generates new reports necessary for validation based on input from implementation period

System will apply FlexFile unique validation rules based on input from implementation period

Analysts will have the ability to dynamically view FlexFiles before downloading

Govt. Review

Short Term: 6 – 12 months

OptimalSolution:

12‐18 months

FlexFile

Generate CWIPT Review

Generate CWIPT Review Display

FlexFile SQL DB

CADE Database

DisplayAcceptance

COST ASSESSMENT DATA ENTERPRISE

Marc Stephenson

[email protected]

(703) 697‐0362

Defense Acquisition University Learn @ Lunch

April 4th, 2018

Flex Files: Data Requirements & Examples 

Greatest value to cost estimator, in many cases, will be the additional insight requested in 

Group E  13

Approved FlexFile Data RequirementsFlexFiles

The foundation of the FlexFile is a Resourceassociating dollars or hours with a Accountin the accounting system at a point in Time

Traceability across programs and contracts by requiring the legacy government tags

Consistent costs elements from contract proposal through execution

Insight into how the contractor manages the program

Flexible reporting scope with additional/revised structure

Data Group AReport Metadata

Approved Plan NumberSubmission EventPeriod of PerformanceReporting OrganizationDate PreparedClassification

Data Group B

DD Form 2794 Data Elements

WBS Code/Level/NameOrder NameEnd ItemsAdditional Tags #1‐#12

Data Group CContractor Definitions and Remarks

CWBS DictionaryRemarks by WBS elementSummary Remarks

Data Group D

Summary Elements

SubtotalGeneral and AdministrativeUndistributed BudgetManagement ReserveFacilities Capital Cost of MoneyContract FeePrice

Data Group E

Actuals To Date (ATD)

Nonrecurring/RecurringStandard Func. Categories Tier 1/2Unit/Sublot First/Last NumberAccount Reporting PeriodCLIN Contractor Functional CategoriesContractor Rate PoolDollars/Hours

Data Group FAllocation Methodology

Allocation Method Type IDAllocation Method Name

Data Group GForecasts At Completion (FAC)

FAC (Dollars/Hours)

14

Approved Quantity Report Data RequirementsFlexFiles

Report Metadata

Approved Plan NumberSubmission EventPeriod of PerformanceReporting OrganizationDate PreparedClassification

DD Form 2794 Data Elements

WBS Code/Level/NameOrder NameEnd Items

Quantity At Completion

Delivered Quantity At CompletionInternal Quantity At CompletionConcurrent Units At CompletionGovernment Furnished Equipment 

At CompletionRemarks

Assessed Quantity To Date

Quantity Completed To DateQuantity In ProcessRemarks

Sequencing(as required by Co‐Plan)

First Unit NumberLast Unit NumberDelivered/Internal

Data Group A Data Group B Data Group C

Data Group D Data Group E

Current update improves on the existing quantity requirements

Same information collected as before with the addition of GFE data and sequencing

Separate form outside of a CCDR allows for a more streamlined submission process

Requires physical unit counts as opposed to a calculation 

Will collect more accurate quantity information prior to final report

IT updates will allow for the FlexFile and Quantity report to be consolidated to recreate Legacy 1921 reports

Quantity Report is closely related to the FlexFile

15

ExamplesFlexFiles

15

In this case, CCDRs do not support all cost estimating needs –Not practical to expect generic labor categories to work for all 

programs/situations

Time phased data provides a more dynamic view of costs overtime rather than the static, infrequent data points provided by the 1921 

reports

FlexFile dynamic view

Ctr Categories

Engineering Design

Engineering Systems

Engineering ProgramManagement

Manufacturing AAA

Manufacturing Program Management

Raw Material

Purchased Equipment

Subcontractor 1

Quality Control

Quality Control Eng

Quality Control Man

Program Management

Manufacturing Support

Standard Categories

Engineering

Manufacturing

Material

Other

Example Data – Legacy 1921

Example Data – FlexFile

COST ASSESSMENT DATA ENTERPRISE

FlexFile Demonstration

17

Flat FileFlexFile Demonstration

FlexFiles will be submitted as a JSON file, however, analysts will be able to view and download the data in different ways

› Analysts will be able to download FlexFile as a flat file

› Allows for more dynamic tables and charts

18

1921FlexFile Demonstration

Flat file allows for quick conversion in to the historically collected forms

19

1921‐1FlexFile Demonstration

Flat file allows for quick conversion in to the historically collected forms

Note changes to legacy 1921‐1 categories (for example, Program Management and Manufacturing Touch)

Having WBS as a filter allows analysts to view 1921‐1 for individual 

elements

20

Data Over TimeFlexFile Demonstration

FlexFiles provides data over time 

› Standard for Actuals› Optional for FACs

“Time Now”

21

Data Over Time and Multiple ScopesFlexFile Demonstration

FlexFiles provides data over time 

› Standard for Actuals› Optional for FACs

FlexFiles allows for multiple Orders (e.g., LRIP 1, LRIP 2) as well as multiple End Items (e.g., Variant A, Variant B).

“Time Now”

Note how LRIP 2 starts about a year after LRIP 1. Previous CCDRs required separate submissions to get this insight.

22

Drill Into Lower Level Cost AccountsFlexFile Demonstration

FlexFiles allows you to gain insight by drilling into cost accounts that make up the WBS element scope

1.4 Systems Test & Eval is a lowest level WBS element

Note that “Electrical and Systems Integration” as well as “Fabrication Planning” were assigned to Systems 

Test & Eval

23

Drill Into Contractor Functional CategoriesFlexFile Demonstration

Understand which contractor functional categories are binned to the standard

› Use this information to make cross‐walk to proposal categories and relate to FPRs

› Better isolate functions affected by learning and/or rate

24

Take Advantage of Additional (Optional) TagsFlexFile Demonstration

Slice the data by Organizational Breakdown Structure (OBS), or in other ways that reporting entities may elect to track costs

These additional tags are optional through the Co‐Planning process

25

Take Advantage of Additional (Optional) TagsFlexFile Demonstration

Slice WBS Element 1.1.4 – Wing by the Organizational Breakdown Structure (OBS), or in other ways that reporting entities may track costs

These additional tags are optional through the Co‐Planning process

Wing labor hours dominated by:› Tooling› Mate› Assembly

COST ASSESSMENT DATA ENTERPRISE

FlexFile: Current Status 

Daron Fullwood, Director

Defense Cost and                      Resources Center (DCARC) 

[email protected]

Defense Acquisition University Learn @ Lunch

April 4th, 2018

Flex FilesCADE Update

DIDs Approved November 2017

Initiate

22 Pilots Completed 

2014 ‐ 2017Train and Explain

Implement

obtain 25 Additional Pilots

2018Review the implementation stage

Assess

2018 +

Built consensus resulting in an approved DID 

Collaborated with industry and government

8 draft DIDs  since 2015 1,344 comments from industry and government 

Developed IT capabilities to create and ingest the FlexFile/Quantity Report

Accomplishments:

Government Lead: Daron Fullwood, CAPE [email protected] 27

2 Plans Approved** Plans approved using older draft versions DID and CSDR plan

8 Plans Being NegotiatedPlans currently using all approved documentation

1. WSF – Weather Satellite Follow‐on 2. PAC‐3

1. CH‐53K – LRIP 22. CH‐53K – LRIP 33. CH‐53K – LRIP 44. STRYKER

5. EPS‐R6. SIBRS7. AMF – JTRS8. F‐22

3 Reports Due in CY 18

COST ASSESSMENT DATA ENTERPRISE

Torri Preston

[email protected]

(571) 372‐4270

Defense Acquisition University Learn @ Lunch

April 4th, 2018

Training Opportunities &What do We Need From You? 

29

Train and ExplainFlexFiles

1. In‐Person Sessions

Will be holding 6 training events in CY18

21 Feb  South (Huntsville, AL) Complete9, 10 Apr West (SD/LA, CA)10 May Midwest (Detroit, MI)30 May, 12 Sep DMV Area3 Oct  North (Boston, MA)

2. Online Learning

Learning Management System (LMS): Assists those who may not be able to attend In‐Person Sessions. Will host all training material and demos. 

Public Website: Contains all approved documents and policy in addition to user guides and FACADE (academic CADE). 

3. Analyst Support

Call our office to set up any additional meetings needed to answer questions or to provide feedback. 

FlexFile Material

Team will have a number of different artifacts to train government analysts and industry on the FlexFile initiative….

Training Material

Demos of IT capabilities (e.g., Creation Tool, FlexFile Ingestion In CADE, Chart and Analytics)

Demo using fake data to show how an analyst may be able to use FlexFile data

Implementation Guide

Detailed instructions on how to fill out the new Co‐Plan form

What do we need from you?CADE Update

30

The Future of Cost & Data Analysis

CSDR

EVM

SCP

CADE Help Desk(253) 564‐[email protected]

Director, Defense Cost and Resource Center (DCARC)Daron Fullwood571‐372‐4267 [email protected]

CADE Training & Engagement :Torri Preston (571) 372‐4270 [email protected] 

1. Identify early adapters that can benefit from a FlexFile

2. Become and advocate for the FlexFile

Socialize the benefits of the FlexFile Attend similar meetings to support initiative

3. Allow us to come train 