LRI/LOI Pilots. April 17 , 2012. Participants. Pilot I Project P articipants Allscripts Atlas Development CAP Cerner Halfpenny Technologies KHIE LabLynx RML. Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support Team Others. - PowerPoint PPT Presentation

Citation preview

Page 1: LRI/LOI Pilots

LRI/LOI Pilots

April 17, 2012

1

Page 2: LRI/LOI Pilots

ParticipantsCoordination of Effort

• Validation Suite• Vocabulary Group• Implementation Guide Analysis• Support Team• Others

2

Pilot I Project Participants• Allscripts• Atlas Development• CAP• Cerner• Halfpenny Technologies• KHIE• LabLynx• RML

Pilot II Project Participants• Lab System and EHR Vendor• Lab System Vendor• Lab System Vendor• EHR Vendor• EHR Vendor• HIE / EHR

Page 3: LRI/LOI Pilots

Ongoing Support for Existing Pilots

1) Current pilots• Support for DSTU version and next version of Validation Tool• Continue with community update every other week• Weekly call with each pilot group to facilitate effort (pending on receipt

of best time for each group – coordination via support group)

2) Invitation to participate in coordination between Pilots, Validation, and Vocabulary workgroups

3) Validation and Vocabulary• Checklist for HL7 Messages – Tests by Category

– Identified additional needs above and beyond the current Validation tool set – work to be completed over next couple of weeks

• Expanded LRI Test Cases – Ongoing effot

3

Page 4: LRI/LOI Pilots

LRI/LOI/EDOS Initiative: Pilots II Scope

4

1. LRI • DSTU IG• Validation Suite for DSTU

– Expanded scenarios– Full test list (new list)

• Pre-production testing with intent for production deployment• Interoperability testing (Labs or Labs/integration Partners and EHRs)

2. LOI• Participation in LOI effort• Implementation of LOI DSTU version• Pre-production testing with intent for production deployment

3. eDOS – electronic Directory of Services (scope to be determined)

4. Plan for production deployment in Q1 2013

Page 5: LRI/LOI Pilots

Next Steps / Questions

• Next Steps• Indicate interest in Pilot Phase II participation• Work on expanded scenarios for validation suite• Establish weekly calls for project review – each group to send 3-4 available 30

minute periods

– Schedule• Pilot calls for coordination every other week at same time 4/3, 4/17, …• Start weekly work with Validation Suite on 4/26 and continue every week there after• Start participation in LOI and compendium effort based on LOI calendar

• For questions, please feel free to contact • Bob Dieterle: [email protected]