1 Johnston Burner Company Low NOx Technology Seminar Sponsored by The Gas Company April 30 th , 2003 Downey,CA David Thornock Johnston Burner Company Presentation Overview Who is Johnston Burner Company Overview of the FIR Burner – Burner design – Demonstrations and Installations • Summary

Low NOx Technology Seminar - Cleancleanboiler.org/files/2016/09/JohnstonFIR_pres.pdf · 2016-09-27 · 0 10 20 30 40 50 60 70 Excess Air (%) Boiler Thermal Efficiency 250 Hp Johnston

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Low NOx Technology Seminar - Cleancleanboiler.org/files/2016/09/JohnstonFIR_pres.pdf · 2016-09-27 · 0 10 20 30 40 50 60 70 Excess Air (%) Boiler Thermal Efficiency 250 Hp Johnston

1

Johnston Burner Company

Low NOx Technology Seminar

Sponsored by

The Gas Company

April 30th, 2003Downey,CA

David Thornock

Johnston Burner Company

Presentation Overview• Who is Johnston Burner Company• Overview of the FIR Burner

– Burner design– Demonstrations and Installations

• Summary

Page 2: Low NOx Technology Seminar - Cleancleanboiler.org/files/2016/09/JohnstonFIR_pres.pdf · 2016-09-27 · 0 10 20 30 40 50 60 70 Excess Air (%) Boiler Thermal Efficiency 250 Hp Johnston

2

Johnston Burner Company

Johnston Burner Products• “AR” Burner

– Low NOx – 30-25 PPMNOx on NG

– Standard – 60-80 PPM NOxon NG

• “A” Burner– Low NOx – 30 PPM NOx

on NG– Standard – 90-110 PPM

NOx on NG

• “S” Burner– Low NOx – 30 PPM NOx

on NG– Standard – 90-110 PPM

NOX on NG

• “J” Burner– Standard – 60-80 PPM NOx

on NG

• “FIR” Burner– Low NOx – Under 9 PPM

NOx on NG (Gas onlyburner)

Johnston Burner Company

FIR BURNER• Burner was developed at the

Gas Technology Institute

• Licensed Technology toJohnston Boiler Co. forFiretube Market

• Funded by SMP, GRI,SoCalGas, and DOE

• Retrofit or new

• Premixed staged combustion

• Forced internal recirculation

• No efficiency loss

• Lowest cost premium

Page 3: Low NOx Technology Seminar - Cleancleanboiler.org/files/2016/09/JohnstonFIR_pres.pdf · 2016-09-27 · 0 10 20 30 40 50 60 70 Excess Air (%) Boiler Thermal Efficiency 250 Hp Johnston

3

Johnston Burner Company

Johnston’s FIR Burner

• The FIR Burner was chosen to address theUnder 20 PPM to Under 9 PPM NOxrequirement

• Gas only applications• Targeted towards the non-attainment areas

like California, Texas, and isolated areas onthe east coast

• We are using the FIR burner for new andretrofit applications

Johnston Burner Company

FIR Burner Cross Section

Recirculation Sleeve

High Velocity Premixed Nozzle

Air Inlet

PilotAssembly

Gas Supply

Page 4: Low NOx Technology Seminar - Cleancleanboiler.org/files/2016/09/JohnstonFIR_pres.pdf · 2016-09-27 · 0 10 20 30 40 50 60 70 Excess Air (%) Boiler Thermal Efficiency 250 Hp Johnston

4

Johnston Burner Company

FIR Burner Mechanics

Recirculation Sleeve

High Velocity Premixed Nozzle

Flue Gas Recirculation

Johnston Burner Company

FIR Burner Installations

• The FIR Burner has been installed and tested on 3different Firetube Boilers– Vandenberg AFB 50 hp Kewanee– GTI’s Laboratory 250 hp Johnston 2-pass Ohio Special– Fullerton College (2) 250 hp Johnston 4-pass boilers

• An 800 hp FIR burner has been tested at Johnstonand we are now in the process of building andtesting a 900 hp

Page 5: Low NOx Technology Seminar - Cleancleanboiler.org/files/2016/09/JohnstonFIR_pres.pdf · 2016-09-27 · 0 10 20 30 40 50 60 70 Excess Air (%) Boiler Thermal Efficiency 250 Hp Johnston

5

Johnston Burner Company

VANDENBERG AFB DEMO

Firetube Boiler20 vppm NOx

Johnston Burner Company

FIRETUBE BOILERDEMONSTRATION

• SITE: Vandenberg AFB inSanta Barbara County,California

• Pilot site for ENVVESTprogram (EPA/DoDpartnership to achieveregulatory compliance viapollution prevention)

• 45 firebox and firetubeboilers located at site

Page 6: Low NOx Technology Seminar - Cleancleanboiler.org/files/2016/09/JohnstonFIR_pres.pdf · 2016-09-27 · 0 10 20 30 40 50 60 70 Excess Air (%) Boiler Thermal Efficiency 250 Hp Johnston

6

Johnston Burner Company

FIR Firetube BoilerDemonstration

• BOILER: 2.5 X 106 Btu/hKewanee firetube

• Burner fabricated byDetroit Stoker Company

• >1800 hours unattended operationfor >2300 cycles

• Meets all emissions targets

• Continue to monitor and addresslong-term reliability

Johnston Burner Company

Firetube Boiler:NOx BEFORE AND AFTER

0

20

40

60

80

100

0.0 0.5 1.0 1.5 2.0 2.5

Firing Rate, X 106 Btu/h

NO

x,

vp

pm Uncontrolled

with FIR burner

Page 7: Low NOx Technology Seminar - Cleancleanboiler.org/files/2016/09/JohnstonFIR_pres.pdf · 2016-09-27 · 0 10 20 30 40 50 60 70 Excess Air (%) Boiler Thermal Efficiency 250 Hp Johnston

7

Johnston Burner Company

FIR BURNER

Johnston Burner Company

The FIR Burner onJohnston’s 2-Pass Ohio Special

• Challenging application because of theBoiler design– A 70 hp boiler that is fired at 250 hp– Typically a smaller furnace– Typically a larger pressure drop

Page 8: Low NOx Technology Seminar - Cleancleanboiler.org/files/2016/09/JohnstonFIR_pres.pdf · 2016-09-27 · 0 10 20 30 40 50 60 70 Excess Air (%) Boiler Thermal Efficiency 250 Hp Johnston

8

Johnston Burner Company

Installed at GTI’s Lab running at 250 hp 4.2% O2 and 11 PPM NOx

Johnston Burner Company

Page 9: Low NOx Technology Seminar - Cleancleanboiler.org/files/2016/09/JohnstonFIR_pres.pdf · 2016-09-27 · 0 10 20 30 40 50 60 70 Excess Air (%) Boiler Thermal Efficiency 250 Hp Johnston

9

Johnston Burner Company

Fullerton College

• (2) 250 hp boilers used for heating• 15# steam design• Gas firing only• Requires under 12 ppm NOx

Johnston Burner Company

Fullerton College

Page 10: Low NOx Technology Seminar - Cleancleanboiler.org/files/2016/09/JohnstonFIR_pres.pdf · 2016-09-27 · 0 10 20 30 40 50 60 70 Excess Air (%) Boiler Thermal Efficiency 250 Hp Johnston

10

Johnston Burner Company

Fullerton College

Johnston Burner Company

Fullerton College

• Load Requirements– Seasonal heating load with winter the highest

and summer non-existent– Early morning largest day load– Load tapers off in the afternoon and evening

Page 11: Low NOx Technology Seminar - Cleancleanboiler.org/files/2016/09/JohnstonFIR_pres.pdf · 2016-09-27 · 0 10 20 30 40 50 60 70 Excess Air (%) Boiler Thermal Efficiency 250 Hp Johnston

11

Johnston Burner Company

Fullerton CollegeOperating Results

NOx Performance Comparison

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

Min 1 2 3 4 5 6 7 8 9 10

Firing Pin Number

NO

x C

orr

ecte

d t

o 3

%O

2 (

PP

M)

Old Kewanee 200hpNew Johnston 250 hp

Johnston Burner Company

Fullerton CollegeOperating Results

Oxygen Performance Comparison

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

Min 1 2 3 4 5 6 7 8 9 10

Fi r ing P in Number

Ox

yg

en

(

% b

y v

olu

me

Dry

)..

Old Kewanee 200hp

New Johnston 250 hp

Page 12: Low NOx Technology Seminar - Cleancleanboiler.org/files/2016/09/JohnstonFIR_pres.pdf · 2016-09-27 · 0 10 20 30 40 50 60 70 Excess Air (%) Boiler Thermal Efficiency 250 Hp Johnston

12

Johnston Burner Company

Fullerton CollegeOperating Results

Stack Temperature Comparison

0.0

50.0

100.0

150.0

200.0

250.0

300.0

350.0

400.0

Min 1 2 3 4 5 6 7 8 9 10

Firing Pin Number

Sta

ck T

em

pera

ture

(F

) ...

Old Kewanee 200hp

New Johnston 250 hp

Johnston Burner Company

Fullerton CollegeOperating Results

Efficiency Comparison

80.0

81.0

82.0

83.0

84.0

85.0

86.0

Min 1 2 3 4 5 6 7 8 9 10

Firing Pin Number

Eff

icie

nc

y (

%)

Old Kewanee 200hp

New Johnston 250 hp

Page 13: Low NOx Technology Seminar - Cleancleanboiler.org/files/2016/09/JohnstonFIR_pres.pdf · 2016-09-27 · 0 10 20 30 40 50 60 70 Excess Air (%) Boiler Thermal Efficiency 250 Hp Johnston

13

Johnston Burner Company

Thermal Efficiency and Excess Air

81.0

81.5

82.0

82.5

83.0

83.5

84.0

84.5

0 10 20 30 40 50 60 70

Excess Air (%)

Bo

ile

r T

he

rma

l E

ffic

ien

cy

250 Hp Johnston BoilerOperating at 10 psig

Johnston Burner Company

Dry Gas Loss and Excess Air

0

50,000

100,000

150,000

200,000

250,000

300,000

0 10 20 30 40 50 60 70

Excess Air (%)

Dry

Gas In

cre

men

tal E

nerg

y L

oss

(Btu

/hr)

250 Hp Johnston BoilerOperating at 10 psig

Page 14: Low NOx Technology Seminar - Cleancleanboiler.org/files/2016/09/JohnstonFIR_pres.pdf · 2016-09-27 · 0 10 20 30 40 50 60 70 Excess Air (%) Boiler Thermal Efficiency 250 Hp Johnston

14

Johnston Burner Company

Summary• The FIR Burner is an Efficient solution for

Firetube Boiler Low NOx applications(under 10 ppm)– Burner operation at 4% O2 through travel– Simple controls– Standard boiler packages

• The FIR burner optimizes energy use:– No external FGR– No need for large hp fans to push extra FGR or

Excess Air

Johnston Burner Company

Summary• The FIR burner has now been demonstrated

for small firetube boiler applications50 – 250 hp

• Will be extended to 1000 hp this summerand installed in Houston

• GTI and Johnston Burner company arecommitted to move the FIR Burner and allof its benefits into the firetube market place