Loss Control Findings & Follow-up Spring / Summer 2006 Jobsite Visits. Loss Prevention Audit Findings Process 2006. HC&A performing two separate audits per policy period (May 1- April 30); 1. Spring / Summer Audit (Focusing on jobsite inspections & compliance with previous Recommendations) - PowerPoint PPT Presentation
Citation preview
Loss Control Findings & Follow-upSpring / Summer 2006 Jobsite Visits
Loss Prevention Audit Findings Process
2006
HC&A performing two separate audits per policy period (May 1- April 30);
1. Spring / Summer Audit (Focusing on jobsite inspections & compliance with previous Recommendations)
2. Fall / Winter Audit (focusing on Best Practice Standard compliance and performing jobsite inspections)
Spring / Summer Audit Process
Review all recommendations
made during the last audit.
Provide a reminder to companies of the New Best Practice Standard which need implementation, and document the companies current progress towards meeting the deadlines.
Perform as many jobsite inspections as possible.
Jobsite Evaluation Tool
General Statistics
Highest Single Project Score: 94
Lowest Single Project Score: 66
Highest Company Score*: 87
Lowest Company Score*: 75
Average Company Score: 81
* - Requires a minimum of 2 or more jobsite visits
Average Scores
A total of 74 jobsite audits were performed
15 above average - 1 at average 7 - below average
79
84 8487
91
83
78
81
75
8180
86
82
77 77
81
86 87
94
78
81
85
68
50
60
70
80
90
100
Allied
Boone
Broth
ers
Bradf
ord
Centra
l Sta
tes
Clark
's Q
ualit
y
Cobble
stone
Dougla
ssElli
s
Dahill
Fryer
Idea
l
J.D. M
iles
J.T. C
azea
ult
Jam
es M
yers
John
F. S
hea
L.E. S
chw
artz
Lawso
n
Mel
anso
n
Orndorff
& S
paid
Pionee
r
Scalo
Com
panie
s
Scholte
n
Wolfe
Member Captive Members - 82 Best Practice - 80
Module 1: Fall Protection, Roof Openings & Skylights
The PR 600 cart is utilized as a tie-off point for the employees who are tossing trash into the
chutes.
Good Use of Safety Monitor & Warning Lines. Still a common method used by the captive, though many are now mandating PFAS or
guardrails whenever feasible.
Module 2: Material Handling
Material Handling tool used to elevate small HVAC units.
Team lifting observed
Module 3: Ladders & Scaffolds
Excellent scaffolding awareness. Utility lines protected by Utility company. De-energized
during erection & dismantling.
Excellent ladder set up. Warning lines extended from ladder good
Module 4: Personal Protective Equipment
Excellent PPE usage, hard hats & safety glasses required at all times. Harness wear also good.
Excellent use of PPE. Half mask respirator worn to protect again concrete dust inhalation, safety glasses, hard hart, gloves, and knee pads also
worn.
Module 5: Housekeeping
Excellent protection of trash chute area. Fencing in place, trash chutes allow for quick removal of
debris.
Excellent storage and organization of equipment & material. Notice all equipment organized, fire
extinguishers stacked behind equipment also well organized
Module 6: Electrical
Portable GFCI protection provided on generators which do not have built in. Good hazard
recognition, and understanding of requirements.
Electrical outlet with GFCI and weather protection erected into the scaffold structure.
Module 7: Fire Prevention / Material Storage
Overview showing very good material storage, cleanliness around flammables, and fire
extinguishers available.
Good use of case for fire extinguishers. Extinguishers can now be safely moved and/or placed in gang boxes without being damaged or
discharged.
Module 8: Emergency Preparedness
Excellent job set up documentation provided for each project. MSDS’s as well as contact info & directions for nearest medical facilities included.
Rigo was proud that he had his first aid kit and MSDS book, as his MSDS book was not
available during the last round of audits(Excellent Employee Buy-In to the Safety
Program)
Module 9: General Liability
Excellent protection of finished product. Mandatory changing of footwear, as well as protection of flooring inside finished areas.
Excellent securement of material.
Additional Points – Common Findings
Use of guardrails in lieu of warning lines / monitors Parapet wallsInterior stairwells / elevator to work area100% hard hat and safety glasses policyLocation & telephone number of nearest occupational health clinic / hospital on the project.Demarcating ground areaProtecting the interior of the buildingSeparate Storage of equipment and PFASNo smoking on project
Room For Improvement
Folded, unsecured ladder used for access to elevated level.
Guardrail violation. Top rail on the outside of post could easily be dislodged if fallen against.
Room For Improvement
Many companies storing tools & chemicals atop fall protection. Here the blade to a skill saw
was resting atop a safety harness.
Another folded unsecured step ladder in use.
Room For Improvement
Poor housekeeping Employee using vertical lifelines. Lanyard on BACKWARDS!! Had employee fallen, the
rope grab never would have locked.
Room For Improvement
Hole cover not secured, and no markings. Particle board is not the best cover available.
Poor housekeeping, and securement of debris. Heavy winds could lead to GL claims.
Deducted Points – Common Findings
Ladders not tied-off
Improper use of Personal Fall Arrest Equipment
Improper use of Safety Monitor
Step ladders used in lieu of extension ladder
Ladders not three-feet over landing
Missing ground pins on electrical cords
No guardrails around trash chute / hoist area
No fire extinguishers near flammables
Scaffolds not inspected
HC&A requires that a written response to recommendations be forwarded within ten (10) days from the receipt of your evaluation report. Typically, we receive a written response from 50% of the membership.
The Loss Control Committee shall be notified of all members who do not provide a written response within the 10-day time frame.
HC&A has started conducting the fall / winter audits, which includes a comprehensive review of the Best Practice Standards, in addition to jobsite visits.
To date, HC&A has completed 10 of the fall / winter audits.
Follow-up to Audit Findings