Upload
vobao
View
216
Download
0
Embed Size (px)
Citation preview
London Tideway Tunnels
Modernising London’s Sewerage System
Rob Furniss
AECOM Water
Global Director of Community Infrastructure
The Background to London’s Sewers
1848 – Cholera deaths peak In London1858 - The Great Stink – Parliament suspended
12000
14000
16000
London Cholera Deaths
0
2000
4000
6000
8000
10000
1831 1833 1848
3
“Lost” rivers of London
River Roding
Barking Creek
Stoke NewingtonHampstead
BowIslington
Waterloo
Black
DitchErith
Notting Hill
Bev erley B rookBev erley B rookBev erley B rookBev erley B rook
8383
Forest Hill
Roehampton
Streatham
Eltham
WoolwichWaterloo
Battersea
Chelsea
4
Plan
London’s Sewers - Evolution and Complexity
Original sewers and local collectors River
Wall
RiverThames
Section
High Tide
Low Tide
Storm relief sewers and pumping station
Bazalgette’s Interceptor Sewers
Thames
Ground level
5
Intercepting sewers
Central LondonIntercepting Sewersat the present day
Hampstead
StokeNewington
Notting Hill
Bow
Waterloo
Abbey MillsPumping Station
Middle Level No. 1
PiccadillyBranch
High Level
Western
BermondseyBranch
Wick
Do
gs B
ran
ch
Lo
w L
evel
Northern
Northern Outfall
Sou
Isle
of
thern Outfall No. 1
NorthernLowLevelNo. 1
Lan
eB
ranch
LowLevel No. 2
Middle Level No. 2
Southern Outfall No. 2
Islington
Western Pumping
Station
CrossnessPumping Station
Sewer
3288-03/127
Roehampton
Streatham
ForestHill
Eltham
Woolwich
DeptfordPumpingStation
Western
Fulham
Branch
High LevelExtension
Southern
Low Level
SouthernHigh Level No. 1
Effra B
ran
ch
mondsey
Branch Southern Outfall No. 1
SouthernLow L
evel No. 2
Lewish
am
Bra
nch
Sou
Hig
h L
evel
No. 2
ther
n
Southern Outfall No. 2No. 1
Western Pumping
Station
6
1859 – 1865 Construction of Bazalgette’s new interceptor sewers
Northern Outfall Sewer Sewer tunnels
7
The Victorian legacy
8
After 150 years …….an Upgrade is Required
Urban Wastewater Treatment Directive
10
London’s sewerage system today – mostly combined
Beckton STW
Crossness STW
Separate system
Partially separate system
Combined system
Percentage Connected
Crossness STW
11
Distribution of impermeability in the Thames Tideway catchment
12
Combined Sewer Overflows (CSOs)
• Sir Joseph Bazalgette’s sewerage system constructed with 57 CSO
points along the tidal River Thames.
• CSOs prevent flooding to buildings and streets by diverting excess
sewage into the river when full to capacity after rainfall.
• On average, in excess of 32 million tonnes of untreated sewage is
estimated to be discharged annually.
• Discharges occur more than once a week on average.
• Many sewers run 80% full on dry weather flow
• As little as 2mm of rainfall can trigger a discharge.
13
57 existing Combined Sewer Overflows
14
Existing Combined Sewer Overflows
15
Discharging CSO
16
London Tideway Tunnels - CSOs proportion of discharge
17
Thames Tunnel CSOs proportion of discharge
18
Increasing recreational use of River Thames
19
Headline news
20
The SolutionThe London Tideway Tunnels
Solutions?
Action before sewer: Source Control &
Sustainable Urban
Drainage Systems
(SUDS)
NO
Within sewer network:
Localised storage &
separation.
NO
In-river: More ‘Bubbler’ &
‘Skimmer’ vessels. NO
Intercept overflows:
central storage &
transfer.
YES
22
Pump out toBeckton STW
Crossness
Abbey
Mills PS
Houses of
Parliament
Tower ofLondon
Thames Barrier
The Thames and Lee tunnels Option 1c
This figure is indicative only and subject to site selection process and further design work
Earl PS
Greenwich PS
Proposed Lee Tunnel
Proposed Thames Tunnel
Combined Sewer Overflow (CSO) Pumping station
Combined Sewer Overflow (CSO) Gravity
Sewage treatment works
Pumping station
CrossnessSTW
WesternPS
Heathwall PS
HammersmithPS
STW
PS
23
CSO Interception
Section
High Tide
Low Tide
Ground level
Main tunnel
Interception chamber and drop shaft
Connection tunnel
24
London Tideway Tunnels
Thames Tunnel
Lee Tunnel
• 6.9km tunnel from Abbey Mills Pumping Station to Beckton STW.
• £400m project. Largest single contract ever awarded by Thames Water.
• Will intercept 16 million cubic metres of storm sewage that currently makes its way into the River Thames.
• 32.2km (20 mile) tunnel from west London to Beckton Sewage Treatment Works.
• Starting point still to be determined, major shaft sites and combined sewer overflow
connection points required.
• Planning application to be submitted 2011.
• Construction not expected to start until 2012/13 for completion by 2020.
Thames Tunnel
25
10
0
-20
-30
-40
-50
-10
10
0
-20
-30
-40
-50
-10
ELE
VA
TIO
N (
mO
D)
RIV
ER
TH
AM
ES
BE
CK
TO
N O
VE
RF
LO
W S
HA
FT
BE
CK
TO
N P
UM
PIN
G S
HA
FT
Lee Tunnel - general geology
-100
-60
-70
-80
-90
-100
-60
-70
-80
-90
ELE
VA
TIO
N (
mO
D)
MADE GROUND / ALLUVIUM RIVER TERRACE GRAVEL LONDON CLAY FORMATION HARWICH FORMATION
LAMBETH GROUP THANET SAND FORMATION WHITE CHALK SUBGROUP
KEY TO GEOLOGY
THE GREENWICH FAULT ZONE
‘THE PLAISTOW GRABEN’
1+
090
6+
061
6+
904
3+
905
2+
591
1+
491
1+
936
3+
126
3+
409
4+
831
5+
468
0+
587
0+
000
CHAINAGE
GEOLOGICAL FAULT
POSITION OF MID LAMBETH GROUP HIATUS BOREHOLE AND DESIGNATION
(PHASE 1, PHASE 2) 26
Thames Tunnel – ground conditions
29
London ClayThanet Sands and Lambeth
BedsChalk
29
Tideway Tunnels – 8.8m OD tunnel boring machine (TBM)
Technical challenges
• Tunnel-to-tunnel connections
beneath river
• Lining durability - 150 yr design life
• Transient pressure waves
30
Earth Pressure Balance Machine
• Aquifer protection
• Proximity to other tunnels
• Settlement impact on third parties
• Construction logistics: 80m water
pressure through chalk/very long
drives
Ground investigations
31
Challenges
• 34 CSOs
• Up to 60m3/s
• Up to 30m dia
shafts
• Up to 75m deep
CSO interception
• Up to 75m deep
• De-aeration
• Air release
• CSO interception
in river or busy
London Streets
32
Assessment of fluvial impact of works
33
Operation and maintenance - purpose made inspection vehicle in Milwaukee sewer tunnel
34
The search for shaft sites
35
35
Consultation
Page 3636
Timeline
Reportto
Government
Dec 2006
Planningapplication
ThamesTunnel
2011
CommissionThamesTunnel
2020
Consultation began
Autumn 2008
Public consultation on preferred sites
Mid 2010
Minister’sdecision
Mar 2007
ThamesTunnel
contract awards
2012
Site identification
Spring-Autumn 2009
Finalise list of sites
Summer 2010
Planning application
Lee Tunnel
& Beckton STW
May 2008
LeeTunnel
contractaward
Early 2010
CommissionLee
Tunnel&
Beckton STW
2014
37
Thank You
Questions?