6
LOGO Team HDX Tariq Yousafzai Ghayyur and Basit Point Electronics Corporation

LOGO Team HDX Tariq Yousafzai Ghayyur and Basit Point Electronics Corporation

Embed Size (px)

Citation preview

Page 1: LOGO Team HDX Tariq Yousafzai Ghayyur and Basit Point Electronics Corporation

LOGOLOGO

Team HDXTariq Yousafzai

Ghayyur and Basit

Team HDXTariq Yousafzai

Ghayyur and Basit

Point Electronics Corporation Point Electronics Corporation

Page 2: LOGO Team HDX Tariq Yousafzai Ghayyur and Basit Point Electronics Corporation

A Case A Case Study of Study of

Team HDXTeam HDX

Problems and bottlenecks

Who should make the visit & what to investigate

Whether on target or wayward

Q.1Q.1

Q.4Q.4

Q.3Q.3

Q.2Q.2

Scheme of PresentationScheme of Presentation

Process Map for HDTV

Limmer Trip

Krisheads selection of the labor cost KPI

Randall suggestions regarding the facility setup.

Should Limmer follow them or come up with another plan

Page 3: LOGO Team HDX Tariq Yousafzai Ghayyur and Basit Point Electronics Corporation

14-4. Process Map for HDTV14-4. Process Map for HDTV

 

Page 4: LOGO Team HDX Tariq Yousafzai Ghayyur and Basit Point Electronics Corporation

• He should concentrate on un-programmed decisions• Contingency Planning such as coming up a multi sourcing strategy for LCD displays.

14-3. Trip to Jakarta, Indonesia14-3. Trip to Jakarta, Indonesia

INSTEAD

• Send a representative having expertise in the problem area• He or She should investigate in below manner(a) Take a Transit Walk of the facility(b) Packaging and material handling equipment(c) Inspect their variety of glasses as pointed out

by Sunny representative.(D) Give advise to Suny as to how to fix defects

Page 5: LOGO Team HDX Tariq Yousafzai Ghayyur and Basit Point Electronics Corporation

14-2 Labor as KPI? Yes/No 14-2 Labor as KPI? Yes/No

CSF and KPIs should support operations, overall objectives and end-user requirements. Differences between Cathode Ray Tube televisions & HDTV Operations exist by design or default.

Labor Cost is part of Overall Cost . Therefore not meaningful when used in isolations

KPIs should be measurable, somewhere (5-6) and support overall organizational objectives.

Page 6: LOGO Team HDX Tariq Yousafzai Ghayyur and Basit Point Electronics Corporation

14-1. Recommendations of Randall14-1. Recommendations of Randall

Questions is what type process layout are the using today?

Layout should help in moving materials, people and equipments. Therefore the above concerned should be taken into confidence before making any decisions.

We believe Randall suggestions are practical as it involves little change in facility layout.The reasons are (a) Continuous innovation and not a breakthrough(b)Cost effective as not retraining(c)Establishing new setup in short span of time is somewhat unrealistic