18
Loading doesn’t have to be this complicated v 1

Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

Loading doesn’t have to be this complicated

v1

Page 2: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

219 Safety Avenue

866.761.7225 phone

Andrews

803.744.7223 fax

South Carolina 29510

SAFERACK.COM

Every product inthis catalog is built with

the strongestmaterial we know of:

OUR WORDBecause what we really build is trust.

We build trust by putting the people who use our products first. We continually invest in and create technology that allows us to better meet the needs of our customers, and we never stop looking for ways to improve our products

and services. We are not looking for a medal; we just want a partnership, and we want it for the long haul.

Page 3: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

page 2 SAFERACK.COM

4 MAXRACKELEVATING SAFETY CAGE2 G4 GANGWAY

PRECISION BUILT

6 OPERATOR SHELTERSAND GUARD HUTS

3 RAILCAR TRACK PANAND SPILL CONTAINMENT1 SAFELOK

GANGWAY LOCKING DEVICE

8 LOADING ARMSTOP/BOTTOM LOADING APPLICATIONS 9 SPILL CONTAINMENT

IBC AND PORTABLE BERM7 ERECTARACKPRE-ENGINEERED PIPE RACKS

5 RAILROAD CONSTRUCTIONFULL DESIGN/INSTALLATION SERVICES

10 YELLOWGATESAFETY SWING GATES

6

5

10

97 11

84

3

1

2

Page 4: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

219 Safety Avenue, Andrews, SC 29510 / P 866.761.7225 / F 803.774.7233 / SAFERACK.COM

11 TRANSLOADERMOBILE PLATFORM 12 METAL HANDRAILS

AND CUSTOM PLATFORM 13 FACILITY LIGHTINGFOR PLATFORMS & GANGWAYS 14 ERECTASTEP

MODULAR ACCESS SYSTEM

16 WEATHER PROTECTIONLOADING SHEDS & CANOPIES

15 ROLLASTEPMOBILE WORK PLATFORM

17 GROUNDING SYSTEMFOR TRUCK AND RAILCAR 18 M3 MAUI

PORTABLE PLATFORM 19 BLENDING, METERING AND LOADING SKID 20 BOLLARDS AND BUMPERS

HIGH-VISIBILITY SAFETY BOLLARDS

11

15

14

17

18

20

19

16 12

13

LeadingIntegrator foreverything inyour loading

facility

Page 5: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

SafeRack’s capabilities range from full design and construct

of the entire project from start to finish to simple material

receiving or installation management.

Our Design / Construct Services Include:

Contract Review Drawings and associated documents relating to the contract prior to site arrival

Assessment Undertaking a site risk assessment

Material Receiving Off-loading and transport at site to ensure product is without shipping damage or abnormalities

Installation Management Supervised installations and coordination

Startup & Commissioning On-site training for both users and maintenance personnel

page 4

Full ServiceDesign / Construct

Have Saferack Construction Services

Install all of ourproducts To make your project easier

Bulk loadingfacility

design andconstruction

experts

Page 6: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

Project Overview Wyoming Fractionator

SafeRack Construction Services (SCS) supplied and installed 4200’ of ladder track on customer owned rail spur adjacent to Union Pacific right-of-way. An additional 8 spot rail loading platform accompanied the rail install at the fractionating facility in Wyoming. The facility receives feedstock via pipelines from nearby wells and refined products are loaded into railcars using SafeRack, LLC advanced platform and loading systems designed and manufactured by SafeRack, LLC. The refinery is now capable of processing up to 50,000 barrels of raw materials per day into #1 Gasoline, Diesel, Butane and Iso-Butane that supply many of the surrounding states.

Project Overview

As one of the primary railcar loading points, Hardisty is one of the major crude oil hubs in North America and a major origination point of pipelines that export to the United States. SafeRack Construction Services (SCS) was asked to supply and construct a SafeRack crude oil loadout terminal spanning nearly half a mile. The USD Hardisty terminal can load up to two 120-railcar unit trains per day and consists of a fixed loading rack with 62 railcar loading positions enclosed, separate control, operator and mechanical buildings, as well as a unit train staging area and loop tracks capable of holding multiple unit trains simultaneously. SCS also supplied and installed boom-supported loading arms with supply and vapor management systems.

Project Details

• 4200 linear ft of new rail construction on customer owned spur

• Perform all grubbing of organic soils, excavating down 6’

• Install compactible materials for sub-grade

• Install road base prior to rail installation

• Install foundations, structural steel, and mechanical components

• Design/Construct four process lines including subterranean trunks (duct bank)

• Install LPG, Butane, #1 gasoline, and diesel loading arms

• Install vapor recovery hoses and API couplings

• Install electrical system including duct banks

• Install instrumentation

• Install owner supplied compressor and vessel

• Install owner supplied Knockout tank, Yokogawa flare, and propane fuel line

• Install track mobile building and instrument air supply building

• Install track pans, drainage system, and geo-membrane lined spill containment pond

• Commissioning and start up assistance

Project Details

• Erect 1998’ SafeRack tower and platform system

• Construct 1998’ steel building on caisson foundation

• Install control building

• Construct utility/mechanical building

• Construct operator/mechanical building

• Install crossover access from MCC to loadout

• Install 2 operator shelters

• Install 31 OPW boom supported loading arms

• Install supply and vapor recovery hoses

Client: Fractionator

Location: Wyoming

Project: 8 Spot Railcar

Services: Full Service - Design/Construct

Product: LPG, Butane, #1 Gasoline, Iso-Butane

Status: Completed August 2013

Safety: Exemplary - Zero Recordables

Client: USD Terminals

Location: Hardisty, Alberta, Canada

Project: 62 Spot Railcar

Services: Full Service - Design/Construct

Product: Crude Oil

Status: Completed May 2014

Safety: Exemplary - Zero Recordables

page 5

LPG Fractionating

Loading Facility

USD Terminals

Crude LoadoutFacility

We are the leading project loading Integrator

Recent Project Profiles

Page 7: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

Please visit SAFERACK.COM for thousands of customer reviews

Project Overview

SafeRack was tapped to supply and install all anhydrous ammonia loading platform and safety equipment as part of their $175 million investment in upgrades and infrastructure to increase production capacity to 800,000 metric tons at an 800 acre, Louisiana anhydrous ammonia manufacturing complex located on the Mississippi River, Jefferson Parish, just outside New Orleans, LA. SafeRack assisted with design, manufacturing and specifications for all loading towers, platforms, pipe bridges and canopy systems. As well as designing and procuring anhydrous ammonia metering skids and installing the anhydrous ammonia proving tower.

Project Overview

When it came time to upgrade and modernize this 1940’s rail loading facility, SafeRack Construction Services (SCS) was the only installer trusted to meet deadlines and exceed expectations. SCS provided a variety of SafeRack products and services for this project including cost analysis of replacing existing versus retrofit. SCS also performed all new equipment design/engineering, as well as demolition plan for removal of existing original loading platform system. SafeRack manufactured all the platform system and safe access equipment in their state-of-the-art facility located in South Carolina. All shipping logistics and on-site receiving/staging was accomplished using SCS on-site project management. Installation of the new rail loading platform, pipe bridge, process piping, I&E, and ergonomic/environmentally friendly loading arms. With the ability to move feedstock by rail, the customer has experienced an increase in refined product output at many out-of-state facilities previously unable to gather enough raw materials.

Project Details

• Site preparation & grading

• Install foundations

• Structural steel installation

• Design and construct pipe bridge

• Canopy system installation

• Design and construct mechanical supply

• Design and construct return system

• Design and construct metering skids

• Install ammonia prover

Project Details

• Demolish and remove existing platform system

• Install epoxy anchor system in existing foundations

• Install platform, process supports, I&E supports

• Install tower support and 420 linear foot of pipe bridge

• Install loading arms, vent hoses, and API couplings

• Install owner-supplied eyewash/safety showers

• Install utility stations

• Procure, fabricate, install process piping with metering/ valves/instrumentation

• Install access platform system to satellite MCC

• Commissioning and startup support

Client: Ammonia Supplier

Location: Louisiana

Project: 4 Spot Railcar

Services: Full Service - Design/Construct

Product: Ammonia

Status: Completed June 2015

Safety: Exemplary - Zero Recordables

Client: Refinery

Location: Salt Lake City, Utah

Project: 12 Spot Railcar

Services: Full Service - Design/Build

Product: Crude Oil

Status: Completed January 2015

Safety: Exemplary - Zero Recordables

SAFERACK / ORANGE. SAFETY HAS A NEW COLOR.

Louisiana

AmmoniaLoading Facility

Black Wax

Crude OilLoading Facility

Page 8: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

For safe, efficient loading of trucks and railcars

page 7

SAFETY NEVER TAKES A BREAK

SafeRack Cement and Sand Loading Systems

Page 9: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

OFFSET SAFETY CAGE

TRACK-MOUNTED GANGWAY SYSTEM

GANGWAY LOCKING SYSTEM

3X5 SAFETY CAGE PLATFORM SYSTEM

TRACKING GANGWAY, ANTWERP, BELGIUM

Page 10: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

page 9

For all truck and railcarloading applications

SafeRack LiquidLoading Systems

BLENDING, METERING AND LOADING SKIDS

RAILCAR LIQUID LOADING SOLUTION

Page 11: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

Pneumatic Air Drive

Electric Drive, Single and 3-Phase (Explosion and Non-Explosion Proof)

DUAL MAXRACK TRUCK LOADING

MAXRACK RAILCAR LOADING SOLUTION

Optional multiplehatch access

Patent Pending

DesignMultiple

safety cageoptions

Availablefor Both

truck andRailcar

multiplepower

options

EliminatesLeaky

Hydraulics

Manual lift control safety feature

AVAILABLE IN TWO POWER OPTIONS

Page 12: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

Universal Platforms Safety StairsPlatform Handrails Ladder Units Tower Supports

MainComponents

Railcar earth berm crossover

5

Page 13: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

page 12

Customized Industrial Stairs andWork Platforms for ANY Application

• Quick bolt-together assembly for easy installation

• Real time design and estimation

• Pre-engineered components

• Fully engineered and OSHA compliant with current regulations

• In-stock and ready-to-ship!

Create raised walkways, work platforms and more without costly engineering and fabrication.

Raised work platform for easy maintenance access

Safely crossover conveyor systems, with the ability to reconfigure your ErectaStep modular system should you change, add or remove equipment

Let Us Configure

Your Solution Today

5 Main Components

UnlimitedConfigurations

Page 14: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

Adjustable heightEasily mobileLarge work area

page 13

Flatbed fall protectionConfigurable handrailsHighly mobile

Ample room to workBuilt for safety

Stability meets mobilitySafe, spacious work areaOptional safety cage

All RollaStep products are Easily Customized

Mobile CantileverWork Platform

Mobile Work Platform

Tilt and RollWork Platform

Mobile Self Leveling Stair Work Platform

• Access when and where you need it

• User friendly – easy to roll and steer

• In-stock and ready-to-ship

• Easily customized

• Extremely versatile

SERIESCSERIESMP

SERIESTR

SERIESG

SERIESC

SERIESMP

SERIESG

SERIESTR

Designed for Work, Built for Safety

Mobile WorkPlatforms and Stairs

Page 15: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

• Universal mount for easy installation - no additional parts to order

• Helps meet OSHA regulations

• Built to last indoors and out

• In-stock and ready-to-ship

Mounts to walls, round and squaretube or angle iron, with a single mount.

YellowGate can swing either in or out by simply relocating two bolts.

The Malbec Tensioner eliminates the need for a swing gate’s most common failure point, the spring. The patent pending system provides field adjustable tension and maintenance-free closure, every time.

Malbec TensionerNo spring to fail.

YELLOWGATE SIMPLICITY INA SAFETY RAILING SYSTEM

Temporary, non-penetrating, modular roof top railing system

The MOST VERSATILETRAFFIC BARRICADES and

CONTROL GATES AVAILABLEYellowGate protection,

only BIGGER

Durable, safe and adjustable

KEEP ALL YOUROPENINGS SAFE– Order a pallet of 10 today

UNIVERSAL MOUNT

36” [914mm]16” [406mm]

EASILYADJUSTABLEIN THE FIELD

Is this whatyour current

safety solutionlooks like?

Parallel

Perpendicular

PATENT PENDING

MOUNTING OPTIONS

Fall Protection

The Most Adjustable Swing Gate Available

Page 16: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

Pipe racks faster and easier than ever before

ErectaRack eliminates the long engineering

and fabrication process typically involved in

pipe rack design and construction, often taking

several weeks, if not months. ErectaRack’s

modular design is a pre-engineered precision

manufactured system using the latest

technology. This enables pipe rack projects to

be completed fast with efficient construction in a

fraction of the time.

The SmartTech ImpactLog monitor is a

highly durable impact recorder which can be

configured to monitor critical parameters,

providing an alert when an impact to SafeRack

gangway equipment may have compromised

its integrity, performance, and/or safe

operation. Our monitor identifies incidents after

installation and before any serious malfunction

occurs. SmartTech’s ImpactLog delivers an

alert that the gangway has encountered an

impact which might affect its performance or

safety, enabling immediate inspection and

remediation by SafeRack service personnel.

The LOGIC controller has been developed for

single point top loading operations, providing

multiple truck and rail car grounding options,

with enhanced features such as, monitoring

potential overfills, adjusting loading arm

position, enabling dead-man control and can

log external environmental conditions such as

temperature and humidity, all in one enclosure.

Secure Grounding

Overfill Protection

Robust Analytics

Load Arm Position

Monitoring

page 15

Choose from four ErectaRack modular,pre-engineered pipe rack models.

T-Fr

ame

U-F

ram

e

2 Ti

er3

Tier

SmartWe utilize smart technologies to bring intelligence to the loading terminal.

DependableOur products are rigorously tested and con-structed with the highest quality materials.

InnovativeWe apply blue-sky thinking to today’s appli-cations and develop tomorrow’s products.

Made in the USAWe are proud to say that all of our products are developed and manufactured in the USA.

THE worlds first

Total Vehicle safety Monitoring SYSTEM

Don’t reinvent the wheel

Pre-EngineeredPipe rack systems

Page 17: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

219 Safety Avenue, Andrews, SC 29510 / P 866.761.7225 / F 803.774.7233 / SAFERACK.COM

Page 18: Loading doesn’t have to be this complicated...pipe rack design and construction, often taking several weeks, if not months. ErectaRack’s modular design is a pre-engineered precision

219 Safety Avenue // Andrews // SC // 29510P 866.761.7225 // F 803.774.7233 // SAFERACK.COM© 2017 SixAxis LLC