TERIAKIDIS G. 2013-03-06 LNG Fuelled Ships IENE Energy & Shipping

LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

TERIAKIDIS G. 2013-03-06

LNG Fuelled Ships

IENE Energy & Shipping

Page 2: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Topics Current situation in shipping

LNG: Why ?

LNG fuelled vessels

Propulsion and tanks

Supply of LNG fuel

Examples of bunkering

Conclusions

2

Page 3: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Current situation

3

Page 4: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

4 4 4

Demanding regulatory timeline

CO2 SOx NOx Ballast

Page 5: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

What should owners do ?

5

Page 6: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

6 © Det Norske Veritas AS. All rights reserved.

Requirement 2010: SOx < 1,0% 2015: SOx < 0,1%

Compliance option • HFO + scrubber • Distillate fuels • LNG

Existing fleet

Requirement 2011: NOx Tier 2 2016: NOx Tier 3

Compliance option • Scrubber + SCR • LNG

Newbuilds

Environmental requirements are on the rise

Page 7: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Ok… but why LNG ?

7

Page 8: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

8

The NOx fund: The alternative to governmental NOx tax!

Fund’s finances: - Oil and gas producers pay to the fund 1 850 USD per ton NOx emitted - All other emitters pay to the fund 670 USD per ton NOx emitted (30’-50‘ USD/year) - Total disposable funds for NOx reducing measures: 300 M USD

The fund has been prolonged until 2018 due to its recognized success.

No NOx-Tax

NOx-Fund

670

US

D/to

n N

Ox

M U

SD

NOx-Tax 2700 USD/ton NOx

Page 9: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

9

Source: EIA

Current LNG fuel sales price in Norway

Growing predicted price disparity oil /gas

Increasing distillate

prices (demand/

production)?

LNG fuel price

development?

Page 10: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Cost of fuel is the key parameter

10

Ref: PriceWaterhouseCoopers and US Energy Information Administration

10

Page 11: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

So… are there any such ships ?

11

Page 12: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Situation prior to 2000

12

Page 13: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

2000…GLUTRA

13

Page 14: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

The technology is available and in use today…

14

2020 guess:

1000

50

Page 15: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Examples

15

Page 16: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Examples

16

Source: Rolf Jensen, GL, LR, Viking Line Buguerbus

Page 17: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

The LNG fuelled fleet in service and on order

17

Ships in operation Confirmed orderbook Year Type of vessel Owner Class Engine type 2000 Car/passenger ferry Fjord1 DNV Gas 2003 PSV Simon Møkster DNV DF 2003 PSV Eidesvik DNV DF 2006 Car/passenger ferry Fjord1 DNV Gas 2007 Car/passenger ferry Fjord1 DNV Gas 2007 Car/passenger ferry Fjord1 DNV Gas 2007 Car/passenger ferry Fjord1 DNV Gas 2007 Car/passenger ferry Fjord1 DNV Gas 2008 PSV Eidesvik Shipping DNV DF 2009 PSV Eidesvik Shipping DNV DF 2009 Car/passenger ferry Tide Sjø DNV Gas+Diesel 2009 Car/passenger ferry Tide Sjø DNV Gas+Diesel 2009 Car/passenger ferry Tide Sjø DNV Gas+Diesel 2009 Patrol vessel REM DNV Gas+Diesel 2009 Car/passenger ferry Fjord1 DNV Gas+Diesel 2010 Patrol vessel REM DNV Gas+Diesel 2010 Car/passenger ferry Fjord1 DNV Gas+Diesel 2010 Patrol vessel REM DNV Gas+Diesel 2010 Car/passenger ferry Fjord1 DNV Gas+Diesel 2010 Car/passenger ferry Fjord1 DNV Gas+Diesel 2010 Car/passenger ferry Fosen Namsos Sjø DNV Gas+Diesel 2011 PSV DOF DNV DF 2011 Chemical tanker Tarbit Shipping GL DF 2011 Car/passenger ferry Fjord1 DNV Gas 2011 PSV Solstad Rederi DNV DF

Year Type of vessel Owner Class Engine type 2012 General Cargo Nordnorsk Shipping DNV Gas 2012 PSV Olympic Shipping DNV DF 2012 PSV Eidesvik DNV DF 2012 PSV Eidesvik DNV DF 2012 Ro-Ro Sea-Cargo DNV Gas 2012 Ro-Ro Sea-Cargo DNV Gas 2012 High speed RoPax Buquebus DNV DF Turbine 2012 PSV Island Offshore DNV Gas+Diesel 2012 PSV Island Offshore DNV Gas+Diesel 2012 PSV REM DNV DF 2013 General Cargo Eidsvaag Gas 2013 Ro-Ro Norlines DNV Gas 2013 Ro-Ro Norlines DNV Gas 2013 RoPax Torghatten Nord DNV Gas 2013 RoPax Torghatten Nord DNV Gas 2013 RoPax Torghatten Nord DNV Gas 2013 RoPax Torghatten Nord DNV Gas 2013 RoPax Viking Line LR DF 2013 PSV Harvey Gulf Int. Marine ABS DF 2013 PSV Harvey Gulf Int. Marine ABS DF 2013 Patrol vessel Finish Border Patrol DF 2013 Car/passenger ferry Society of Quebec ferries DF 2014 Car/passenger ferry Society of Quebec ferries DF

Planned conversion Year Type of vessel Owner 2011 Car/passenger ferry Fjord1 DNV Gas 2011 Inland/port tanker Argonon/Deen LR DF

DF= Dual Fuel engine Gas+Diesel= Separate LNG and diesel fuelled engines Gas= Lean burn (mono fuel) LNG engine

Page 18: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Propulsion & tanks

18

Page 19: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Propulsion systems and fuel combinations

19

Source: Marintek

Page 20: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Test of ME GI engine and fuel supply of HHI in November 2012

20

Source: HHI

Page 21: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

21

Tank location

Page 22: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

22

Coast guard vessels- delivered 2009/2010 Power take in from LNG fuelled engines, to be used in normal operation

Diesel engine to be used as backup, and for full speed operation

Page 23: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Supply of LNG fuel

23

Page 24: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Current and forecast of global LNG bunkering infrastructure by 2020

24

Existing Planned (Feasibility study, risk study, proposed locations, pending approval) Proposed (currently being discussed)

* See detailed map

Bass Strait

Europe*

Tokyo Bay Busan Fujairah

Singapore

Incheon

Shaanxi

Hubei

Buenos Aires

New York

Fourchon

Tadoussac

Tacoma

Duluth

Page 25: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

1 7

2 3 4

5

6

8 9

11

10

12

13 14

16

15

20 19

18 17

22

23

24 26

25 27

28

29 30 31

34 33 32

35

36

39

38

37

LNG Bunkering supply in Europe by 2020

25

1. Florø 2. CCB 3. Halhjem 4. Snurrevarden 5. Risavika

Existing

22. Gothenborg 23. Pori 24. Turku 25. Sillamäe 26. Helsinki 27. Paldiski 28. Riga 29. Swinoujscie 30. Lubeck 31. Rostock 32. Helsingborg 33. Copenhagen 34. Aarhus 35. Aberdeen 36. Dunkerque 37. Marseilles 38. Barcelona 39. Algeciras

Proposed

Planned 6. Bodø 7. Mongstad 8. Øra 9. Lysekil 10. Porvoo 11. Stockholm 12. Tallin 13. Klapeida 14. Hirtshals 15. Brunsbüttel 16. Hamburg 17. Rotterdam 18. Antwerp 19. Zeebrugge 20. Ghent 21. Vestbase

21

Existing Planned (Feasibility study, risk study, proposed locations, pending approval) Proposed (currently being discussed)

Page 26: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Bunkering alternatives in Norway

26

Source: Marintek

Page 27: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Ship to ship (STS) operation

27

Source: Marintek

Page 28: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Purpose built LNG distribution and bunker

28

Pictures courtesy Veka-Group

Page 29: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

29

Page 30: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Examples of bunkering

30

Page 31: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Bunkering

31

Page 32: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

LNG bunkering station, Ågotnes Jetty with

bunkering equipment

Shore based LNG tank

Page 33: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Onshore tank arrangement

33

LNG piping arranged underground

Page 34: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Jetty/ LNG piping

34

Page 35: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

LNG transfer equipment

35

Page 36: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Supervision from ECR (2)

36

Page 37: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Ongoing transfer

37

Page 38: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

LNG flange

38

Page 39: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Halhjem: 1000 m3 tanks for bunkering

39

Source: M. Andreola

Page 40: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Conclusions

40

Page 41: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Conclusions

Challenging years ahead

Target: Vessel emissions

Various solutions - Scrubbers - SCRs - LNG

LNG

Small coastal vessels: - steady increase

Larger vessels: - Region of trading - Frequency of trading - Space ! - Case to case

41

Page 42: LNG Fuelled Ships - IENE...LNG Fuelled Ships 2013-03-06 Current and forecast of global LNG bunkering infrastructure by 2020 24 Existing Planned (Feasibility study, risk study, proposed

© Det Norske Veritas AS. All rights reserved.

LNG Fuelled Ships

2013-03-06

Safeguarding life, property and the environment

www.dnv.com

42