Little Flower / LaGuardia Bath House: Fall 2020

2

Befo

re

Aft

er

LaGuardia Bathhouse Demolition, Synthetic Turf Installation

Page 3: Little Flower / LaGuardia Bath House: Fall 2020...Sep 10, 2020  · Little Flower / LaGuardia Bath House: Fall 2020 2 e After LaGuardia Bathhouse Demolition, Synthetic Turf Installation

3

Baruch Bathhouse Request for Proposals (RFP)

South & East Facade North & East Facade

Page 4: Little Flower / LaGuardia Bath House: Fall 2020...Sep 10, 2020  · Little Flower / LaGuardia Bath House: Fall 2020 2 e After LaGuardia Bathhouse Demolition, Synthetic Turf Installation

Permitted Fields: Moveable Solar Field Lights

• Coleman

• Corlears Hook

• Sara D

• Columbus

• Chelsea Park

• Baruch Field

4

Page 5: Little Flower / LaGuardia Bath House: Fall 2020...Sep 10, 2020  · Little Flower / LaGuardia Bath House: Fall 2020 2 e After LaGuardia Bathhouse Demolition, Synthetic Turf Installation

PIER 36

EAST RVER PARK

EAST

RIVER

PIER 42 UPLAND

PIER 42 DECK

NYCDOT

MAINTENACE

YARD

CORLEARS

HOOK

PARK

NYC FERRY -

LOWER EAST

SIDE CORLEARS

HOOK STOP

New Open Space: Pier 42 Upland & Deck

5

Page 6: Little Flower / LaGuardia Bath House: Fall 2020...Sep 10, 2020  · Little Flower / LaGuardia Bath House: Fall 2020 2 e After LaGuardia Bathhouse Demolition, Synthetic Turf Installation

EAST RIVER

FDR DRIVE

PIER 42 SHED DEMOLITION PHASE 1A

MO

NT

GO

MER

Y

ST

RE

ET

NYC FERRY

NYCDOT MAINTENANCE

YARDBASKETBALL CITY/ PIER 36

FUTURE SHARED PATH (ESCR)

2. COMFORT STATION

3. PLAYGROUND

4. LOWLAND GARDENS

5. LAWN

6. VIEWING PLAZA

7. PICNIC KNOLL

8. FERRY LANDING WITH BOULDER TERRACE

9. RETAINED SHED STRUCTURE FROM PHASE 1A

10.CON ED AIR VENT

11.EXISTING TREES TO REMAIN

12.ELEVATED DECK

13.ELEVATED DECK MAINTENANCE ACCESS

1

34

2

6

7

10

58

9

Key1. ENTRY PLAZA

LIMIT OF WORK

1313

12

N

100’

Pier 42 Upland Park

11

6

Page 7: Little Flower / LaGuardia Bath House: Fall 2020...Sep 10, 2020  · Little Flower / LaGuardia Bath House: Fall 2020 2 e After LaGuardia Bathhouse Demolition, Synthetic Turf Installation

2. DECK ACCESS FROM PIER 42 PHASE 1B: UPLAND PARK

3. EXISTING RAMP

4. RAISED DECK, TYP.

5. EXISTING 8' HEIGHT CHAIN LINK FENCE

6. ELEVATED DOCK

7. EXISTING BOAT CLEATS, TYP.

8. COMFORT STATION

9. SYNTHETIC TURF

10. RAISED CURB AT SOCCER FIELD WITH MODIFIED 16' HEIGHT FENCE

11. ACCESS TO SOCCER FIELD (MAX 5% SLOPE)

12. OUTDOOR EXERCISE EQUIPMENT AREA

13. 16' HEIGHT CHAIN LINK FENCE ON DECK

14. PAINTED TENNIS COURT, TYP OF 4.

15. PAINTED HALF COURT BASKETBALL, TYP OF 4.

16. PICNIC TABLE, TYP 0F 13.

17. BENCH, TYP OF 17.

18. MODIFIED RAMP TO COMPLY WITH ADA REGULATIONS

Key1. EXISTING FRAME, PAINTED RED

E A S T R I V E R

NYCDOT MAINTENANCE

YARD

FDR DRIVE

FUTURE SHARED PATH (ESCR)

FUTURE PIER 42 PHASE 1 B: UPLAND PARK

300' +/-

150'+/-

10'10'

340' +/-

170'+/-

+11.19

+9.96

+11.84

+9.40

+7.66

+10.86

+10.18

+9.59

+9.07

+9.28

+8.45

+11.79+10.77

+10.31

+7.07

+10.77

1

2

+8.42

LIMIT OF WORK

18

5

3

5 2

6

8

10

9

13

14

1115

16

4

17

10

711

+9.55

Existing deck slopes north to south, toward the

East River at +/- 1.3%.

+7.08

+9.45

12

Pier 42 Deck

7

Page 8: Little Flower / LaGuardia Bath House: Fall 2020...Sep 10, 2020  · Little Flower / LaGuardia Bath House: Fall 2020 2 e After LaGuardia Bathhouse Demolition, Synthetic Turf Installation

8

Overview Map