G.O.(P)No.1/2020/PWD 07/04/2020 Thiruvananthapuram GOVERNMENT OF KERALA PUBLIC WORKS (H) DEPARTMENT NOTIFICATION flood of 2018, the Government had decided as per G O.(MS)No.22/2019/PWD dated 4/5/2019 to build the road sector reform agenda around the core road network which entails enhanced budgetary provisions, improved climate and framework. The prioritization of the Core Road Network was to be broadly based on economic importance, connectivity to economic growth centres and strategically important corridors, traffic volume, share of commercial vehicle, public transport routes, disaster relief and climatic resilence functionalities.The Chief Engineer(Maintenance) has submitted list of roads to be declared as core road network after completing the prioritisation exercise 2) Accordingly, Government of Kerala, hereby notify the following roads for setting up the Core Road Network in the State. LIST OF CORE ROAD NETWORK Sl No District State Highway RITES 2001 Roads Other MDRs- Scorewise length (in Km) Addl MDRs Total No. of roads Total length (in Km) > 90 > 80 > 70 1 Thiruva nantha puram 201.56 152.45 33.02 10.83 24.00 397.85 2 Kollam 164.19 158.38 23.00 322.57 3 Alappu zha 170.841 122.29 44.25 22.75 25.00 360.13 4 Pathan amthitt a 196.084 138.50 5.30 110.18 34.00 450.05 File No.PWD-H1/6/2020-PWD Considering the devastation faced by Kerala due to unprecedented disaster resilient standards and performance based maintenance contracting

LIST OF CORE ROAD NETWORKkeralapwd.gov.in/keralapwd/eknowledge/Upload/...Ch. 64/620 to 71/690 - 25.12.2017 Ch. 71/690 to 90/315 - 24.12.2020 Cherupuzha - Vallithode - work in progress

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

G.O.(P)No.1/2020/PWD 07/04/2020 Thiruvananthapuram

GOVERNMENT OF KERALA

PUBLIC WORKS (H) DEPARTMENTNOTIFICATION

flood of 2018, the Government had decided as per G O.(MS)No.22/2019/PWDdated 4/5/2019 to build the road sector reform agenda around the core roadnetwork which entails enhanced budgetary provisions, improved climate and

framework. The prioritization of the Core Road Network was to be broadlybased on economic importance, connectivity to economic growth centres andstrategically important corridors, traffic volume, share of commercial vehicle,public transport routes, disaster relief and climatic resilence functionalities.TheChief Engineer(Maintenance) has submitted list of roads to be declared as coreroad network after completing the prioritisation exercise

2) Accordingly, Government of Kerala, hereby notify the following roadsfor setting up the Core Road Network in the State.

LIST OF CORE ROAD NETWORKSlNo

District StateHighway

RITES 2001Roads

Other MDRs-Scorewise length(in Km)

Addl MDRs

TotalNo. ofroads

Totallength(in Km)

> 90 > 80 > 701 Thiruva

nanthapuram

201.56 152.45 33.02 10.83 24.00 397.85

2 Kollam 164.19 158.38 23.00 322.573 Alappu

zha170.841 122.29 44.25 22.75 25.00 360.13

4 Pathanamthitta

196.084 138.50 5.30 110.18 34.00 450.05

File No.PWD-H1/6/2020-PWD

Considering the devastation faced by Kerala due to unprecedented

disaster resilient standards and performance based maintenance contracting

5 Kottayam

406.531 122.27 7.46 67.30 34.00 603.56

6 Idukki 959.222 7.43 20.86 17.00 987.517 Ernakul

um325.206 209.54 12.02 14.99 49.00 561.76

8 Thrissur

374.033 17.74 29.36 129.82 19.13 47.00 570.08

9 Palakkad

245.987 191.12 13.08 23.00 450.18

10 Malappuram

374.764 209.57 9.78 35.00 594.11

11 Kozhikkode

359.435 167.09 33.50 61.15 33.00 621.17

12 Wayanad

128.955 172.03 21.96 19.00 322.95

13 Kannur 244.665 227.21 0.51 13.95 22.00 486.3314 Kasara

god141.78 109.38 20.20 9.00 271.36

Totallength(Km)

4293.253 2004.99 66.52 173.19 375.24 86.43 394.00 6999.61

3) The district wise details are appended herewith.

4) The Chief Engineer(Roads), Chief Engineer(Bridges) and ChiefEngineer(Maintenance) should ensure that priority be given to works onthese roads and enhanced climate and disaster risk resilience standards aremaintained. The Chief Engineer(Admin) to take steps to create separatebudget head for Core Road Network(CRN) in FY 2020-21.

By order of Governor

T K JOSEADDITIONAL CHIEF SECRETARY

File No.PWD-H1/6/2020-PWD

Priority I Priority II

Total

length

4293.25 2004.99 614.94 86.43 6999.61 394.00

PWD ROAD MAINTENANCE WING

DRAFT LIST OF CORE ROAD NETWORK

CHIEF ENGINEER

Road

Priority III

Total

length (in

Km)

State

Highways

RITES 2001

Roads

Other MDRs

>70

Additional

MDRs

recommended

Total No

of roads

4360290/2020/OS-PWD67

> 90 > 80 > 70

1

Thiruvananthapur

am

201.56 152.45 33.02 10.83 24.00 397.85

2 Kollam 164.19 158.38 23.00 322.57

3 Alappuzha 170.841122.29 44.25 22.75 25.00

360.13

4 Pathanamthitta 196.084138.50 5.30 110.18 34.00

450.05

5 Kottayam 406.531122.27 7.46 67.30 34.00

603.56

6 Idukki 959.2227.43 20.86 17.00

987.51

7 Ernakulum 325.206 209.54 12.02 14.99 49.00 561.76

8 Thrissur 374.033 17.74 29.36 129.82 19.13 47.00 570.08

9 Palakkad 245.987 191.12 13.08 23.00 450.18

10 Malappuram 374.764 209.57 9.78 35.00 594.11

11 Kozhikkode 359.435 167.09 33.50 61.15 33.00 621.17

12 Wayanad 128.955 172.03 21.96 19.00 322.95

13 Kannur 244.665 227.21 0.51 13.95 22.00 486.33

14 Kasaragod 141.78 109.38 20.20 9.00 271.36

Total length

(Km)

4293.253 2004.99 66.52 173.19 375.24 86.43 394.00 6999.61

CHIEF ENGINEER

PWD ROAD MAINTENANCE WING

DRAFT LIST OF CORE ROAD NETWORK PRUNED DOWN AT HIGHER LEVEL

Sl

No

District

State

Highways

RITES

2001

Roads

Other MDRs-Scorewise

length (in Km)

Addtl

MDRs

recomme

nded

Total

length

(in Km)

Total No.

of roads

4360290/2020/OS-PWD68

Grade ScoreStarting

Node

End

NodeScore Grade Score Category Grade Score Grade Score Present status DLP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

1

Cherkala - Jalsoor road

(S.H. No. 55)

km 0/00 to 39/138

Cherkala Jalsoor 39.138 SH

DLP of BM&BC

work expired long

ago. The road is

made trafficable

by patch works

03.05.2015

2

Hosdurg - Panathur

road (S.H. No. 56)km

0/00 to 44/175

HosdurgPanathu

r44.175 SH

Road is trafficable

at present. Km

0/000 to 15/000

DLP expired. Patch

work ongoing in

this reach DLP of

these patch works

is 6 months. Km

15/000 to 24/000

is under DLP upto

29/10/2022.

Km24/000 to

42/000 patch

works were

arranged this

reach and DLP will

expire by June

2020. Km 42/000

to 44/175 is under

DLP upto March

2021.

Km 0/000 to

15/000 -2016,

Km15/000 to

24/000-

29/10/2022, Km

24/000 to

42/000- June

2020 (for patch

works) , 42/000

to 44/175-

March 2021.

KASARAGOD DISTRICT

Core Road Network

SL.

NoName of Road

Details of Link

Length of

Road

Criteria of selection of Road (As per Methodology)

Remark

s

Starting Node Ending Node

Constit

uency

NameChainag

eName Chainage

STATE HIGHWAYS

Traffic Density of Connecting

Corridors

Tribal or Under

Developed Regions

Tourits/Pilgrim

Centers/Ports&HarboursInterstate Connectivity

Total

Score

4360290/2020/OS-PWD69

3

Kasaragod -

Kanhangad road (S.H.

No. 57) km 0/00 to

Kasaragod Kanhan

gad29.500 SH

Road handed over

to KSTP. Work

completed.

4

Kalladka - Cherkala

road km 23/227 to

52/194 (SH 31) km

Adkasthal

a

Cherkal

a28.967 SH

KIIFB work is

ongoing in this

road. The DLP is

3 years after the

completion

2024 (

anticipated)

141.780

1 Uppala Kanyana road Kaikamba 0/00 Kanyana 15/550 15.55 Manjeshwar

This road is

maintained by

RICK. DLP upto

2033 (13 years)

2033

2 Thekkil Alatty road Poinachi 0/00Manimo

ola34/696 34.696 Udma

KIIFB work is

ongoing in this

road. The DLP is

3 years after the

completion

2024 (

anticipated)

3

Nileshwar Raja road &

Nileshwar Edathodu

road

Nileshwar 0/00Edathod

u22/130 22.13

Thrik

aripu

r

KIIFB work is

ongoing in this

road. The DLP is

3 years after the

completion

2024 (

anticipated)

4 Odayanchal Cherupuzha roadOdayanch

al0/00

Cherupu

zha37/00 37.00

Kanh

anga

d&Tri

karip

ur

0/000 to 6/500-

Budget work

ongoing, 6/500 to

16/500-DLP

expired on

30/01/2018 ,

16/500 to 22/000

Budget work

ongoing, 22/000 to

32/000 KIIFB

work ongoing,

32/000 to 37/000

Hill Highway work

ongoing

6/500 to

16/500-

30/01/2018.

TOTAL 109.38

RITES LIST 2001

OTHER MDRs

4360290/2020/OS-PWD70

1

Badiadka-Yethadka-

Sulapadavu Road

Badiadka 0/00 Sulapadavu

20/200 20.200

D

30

b d

5

Tribal(

E)

25

Minor

pilgrim

centre

Z 5 Y 10 75Kasar

agod

KIIFB work is

ongoing in this

road. The DLP is

3 years after the

completion

2024 (

anticipated)

20.200

4360290/2020/OS-PWD71

Grade Score

Starti

ng

Node

End Node Score Grade Score Category Grade ScoreGrad

eScore

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

1

SH-30 Thalassery-

Coorg road km

0//0 to 55/128

Thalassery

Koottupuz

ha (State

Border)

55.128 SH Handed over to

KSTP

2

SH 36-

Taliparamba -Iritty

road km 0/00 to

46/470 Taliparamba

(NH17)

Iritty

bridge

46.470 SH Ongoing work

under CRF

3

SH 38-

Puthiyangadi -

Kuttiyadi -

Peringathur -

Panoor -

Kuthuparamba-

Chovva Byepass

road km 66/480 to

80/967 and 82/967

to 102/017

Peringathur

bridge

(District

Border)

Thazhe

Chovva

(NH17)

33.537 SH

100/300 to

103/350 -

work

completed on

30/11/2019

and DLP up

to

28/11/2022

Good

Hill Highway km

134/380 to 243/910

Tribal or

Under

Tourits/Pilgrim

Centers/Ports&Harbours

Interstate

Connectivi

Name

KANNUR DISTRICT

Core Road Network

SL.N

oName of Road

Details of Link

Length of

Road(K

M)

Criteria of selection of Road (As per Methodology)

Total

ScoreConstituency Remarks

Chainage Name Chainage

STATE HIGHWAYS

DLP Status

Starting Node Ending NodeTraffic

Density of Connecting

Corridors

4360290/2020/OS-PWD72

(Kannur Division

portion connecting

Cherupuzha -

Manjakkad -

Alakode -

Karuvanchal -

Thavukunnu -

Naduvil- Chemperi -

Payyavoor- Ulikkal -

Vallithodu -

Anapanthy -

Karikottakari --

Edoor -Aralam-

Kappukadavu -

Perumbunna -

Madapurachal -

Manathana-

Kottiyoor-

Ambayathodu)

Ch. 64/620

to 71/690 -

25.12.2017

Ch. 71/690

to 90/315 -

24.12.2020

Cherupuzha -

Vallithode -

work in

progress

Vallithode to

Ambayathode -

DPR submitted

for AS

Total 244.665

1

Valapattanam

Cheruthazham (

Pilathara

Pappinissery)

Valapattanam 0.000 Pilathara 21.000 21 Azhikode,KalliasseryByepass to

NH

KSTP

2Thaliparamba

Coorg Border road

Thaliparamb

a0.000 coorg 36.985 32.435

Thaliparamba,I

rikkurInter state

connectivity

DLP completed Good

Thalassery 0.000Anjarakka

ndy15.000 32.502

Anjarakkand

y15.000 Chalode 21.330 6.330

Ch. 0/300 to

3/300 -

28.05.2020

&

14.11.2020

work

completed

on

15/01/2019

and DLP up

to

14/01/2022 Good

Chalode 21.330 irikkur 32.502 11.172

work

completed

on

31/01/2016

and DLP up

to

30/01/2019 Good

4

Cherupuzha

(District

Border)

Ambaytho

du109.530 SH

RITES LIST 2001

3 Thalassery Irikkur Mattannur

connecting

NH 66 and

SH 36 via

Kannur

Airport

4360290/2020/OS-PWD73

4 Kannur Mattannur Mele Chovva 0.000 Mattannur 23.023 23.023 Kannur,Mattannur

connecting

NH 66 from

kannur town

and

KannurAirpo

rt

work

completed

on

29/06/2017

and DLP up

to

28/06/2020 Good

5 Thalassery Bavaly Thalassery 15.696Nedumpoi

l38.000 22.304 Thalassery

Inter district

connectivity

6Old NH

Valapattanam

NH JN

Puthiya

Theru

0.000Valapattan

am2.470 2.47 Azhikode

Port

connectivity

DLP

completed

on 4/2015 Good

7

Kannur

Valapattanam road

via Alavil

Padannappal

am0.000 Manna jn 5.690 5.69 Kannur,Azhikode

Byepass to

Kannur town

work

completed

on

30/03/2018

and DLP up

to

29/03/2021 Good

8Alavil Azhikode

roadAlavil 0.000 Azhikode 4.420 4.42 Kannur,Azhikode

Port

connectivity

work

completed

on

23/03/2012

and DLP up

to

22/03/2015 Good

9

Vellur -

Padiyottuchal -

Pulingome -

Rajagiri - Josegiri

road

Vellur 0.000 Josegiri 45.500 45.5 Payyannur CRPF camp 29.04.2021

Good

10 Iritty Nedumpoil Iritty 0.000Nedumpoi

l20.360 20.36 Peravoor

Inter district

connectivity DLP CompletedGood

227.206

OTHER MDRs

4360290/2020/OS-PWD74

1

Old Sub way

kannur (old Bus

stand-

Muneeswaran

Kovil)

Old Bus

stand0.000

Muneeswa

ran Kovil0.511 0.511 A 60 a a 15 nil 0 intermediate y 10 no 0 85.00 Kannur

Kannur town

road

work

completed

on

27/02/2016

and DLP up

to

26/02/2019

(Patch work

was recently

done to

make the

roadway

trafficable

and

completed

on

25/01/2020

DLP of

patch is

upto

24/07/2020

) Good

0.511

2

Old West Coast

(NH Caltex-

Kannur Civil

Station)

NH Caltex 0.000

Kannur

Civil

Station

0.305 0.305 A 60 a a 15 nil 0 Minor z 5 no 0 80.00 KannurKannur town

road

work

completed

on

24/02/2016

and DLP up

to

23/02/2019

(Patch work

was recently

done to

make the

roadway

trafficable

and

completed

on

25/01/2020

DLP of

patch is

upto

24/07/2020

) Good

3

Dharmashala -

Parassinikadavu

road

Dharmashala 0.000Parassinik

kadavu4.500 4.5 B 50 a b 12.5 nil 0 major x 15 no 0 77.50 Thaliparamba

Pilgrim

centre

Parassinikka

davu Sree

Muthappan

Temple Work arrangedTrafficable

4360290/2020/OS-PWD75

4 Kannur Thalap AKG JUNCTION 0.000 BSNL Bhavan 1.910 1.91 A 60 a a 15 nil 0 nil nil 0 no 0 75.00 KannurKannur town

road

work

completed

on

25/06/2013

and DLP up

to

24/06/2016

(Patch work

was recently

done to

make the

roadway

trafficable

and

completed

on

25/01/2020

DLP of

patch is

upto

24/07/2020

) Good

5

Approach road to

Railway

underbridge

Thavakkara

NH JN near

NS 0.000

Plaza

circle1.263 1.263 A 60 a a 15 nil 0 nil nil 0 no 0 75.00 Kannur

Kannur town

road

work

completed

on

24/02/2016

and DLP up

to

23/02/2019

(Patch work

was recently

done to

make the

roadway

trafficable

and

completed

on

25/01/2020

DLP of

patch is

upto

24/07/2020

) Good

6Mahe byepass

RoadRailway Crossing 0.000 Mahe bridge 3.710 3.710 B 50 a a 15 nil 0 intermediate y 10 no 0 75.00 Thalassery

Tourist

centres

7

Link road

connecting NH 17

and approach road

to Payyannur

railway station

NH at

payyannur0.000

Payyannur

railway

station

0.260 0.26 A 60 a b 12.5 nil 0 nil nil 0 no 0 72.50 PayyannurNaval

Academy

Nil Trafficable

4360290/2020/OS-PWD76

8Payyambalam

beach road south

Payyambala

m beach0.000

Payyamba

lam beach2.000 2 B 50 b c 7.5 nil 0 major x 15 no 0 72.50 Azheekode tourism

work

completed

on

12/5/2019

and DLP up

to

11/05/2022 Good

13.948

4360290/2020/OS-PWD77

1CVG Road( Calicut -Vythiri-Gudalur ) SH

:29

Chundel at km

67/000 of NH:212

Choladi-Tamil

Nadu State

Border

30.070 SH 29 KalpettaKIIFB Works ongoing &

Budget work arranged-

2 Kalpetta Varambetta road -SH 54Kalpetta at km

72/400 of

NH:212

Padinjarathar

a at km 82/00

of SH 54

17.725 SH 54 KalpettaKIIFB Works

ongoing -

3Thalassery-Bavali Road(68/200 to

81/000 )

Boys Town at km

68/200 of TB

Road

Mananthavad

y at km

81/000 of TB

Road

12.800 SH 59 MananthavadyProviding BM and

BC work in

progress

-

4Mananthavady-Kalpetta Road 0/000 to

30/800Mananthavady

Kainatty at km

76/00 of

NH:212

30.800 SH 59Mananthavady,

Kalpetta

KIIFB Works

ongoing -

5 Kalpetta -Meppadi road Kalpetta at km

72/00 of NH:212

Kappenkolly

at km 75/800

of CVG road

7.000 SH 59 Kalpetta - 6/19/2020

6 Meppadi-Chooralmala RoadMeppadi-at

km78/050 of

CVG Road

Chooralmala

at km 69/650

of SH 59

12.800 SH 59 KalpettaKIIFB Works

ongoing -

7 Chooralmala - Aranappuzha RoadChooralmala at

km 69/650 of SH

59

Aranappuzha

at km 75/650

of SH 59

6.000 SH 59 KalpettaKIIFB Works

Arranged -

8Vythiri- Tharuvana Road 23/600 to

31/590

Padinjarathara at

km 82/00 of SH

54

Tharuvana at

km 10/240 of

M.P.Road

7.990 SH 59

Kalpetta

Budget work

ongoing-

9Mananthavady-Pakramthalam Road

6/470 to 10/240

4 th Mile at km

6/470 of M.K.

Road

Tharuvana at

km 10/240 of

M.P.Road

3.770 SH 59 Mananthavady

no work ongoing

BM and BC DLP

: 30-07-2020

128.955

0/000 3/000 - 6/30/2020

3/000 11/200KIIFB WORK : FS

obtained-

0/000 4/100Budjet work

ongoing-

Sulthan Bathery

Total

RITES LIST 2001

1 Sulthan Bathery- Cherambadi road 11.200

Status DLP

cha

ina

ge

Fro

m

Ch

ain

ag

e T

o

Km

STATE HIGHWAYS

Po

ints

ba

sed

on

To

uri

st S

po

t

Wh

eth

er

Inte

rsta

te

Co

nn

ect

ivit

y

Po

ints

ba

sed

on

In

ters

tate

Co

nn

ect

ivit

y

Wh

eth

er

Co

nn

ect

ivit

y t

o

Tri

ba

l A

rea

To

tal

Po

ints

Co

nst

itu

en

cy

WAYANAD DISTRICT

CORE ROAD NETWORK

Sl.

No Name of Road Cla

ssif

ica

tio

n b

ase

d o

n T

raff

ic

Vo

lum

e

Po

ints

ba

sed

on

Tra

ffic

Vo

lum

e

Cla

ssif

ica

tio

n b

ase

d o

n D

en

sity

at

Sta

rtin

g P

oin

t

Cla

ssif

ica

tio

n b

ase

d o

n D

en

sity

at

En

d P

oin

t

Po

ints

ba

sed

on

De

nsi

ty

Gra

din

g o

n T

ou

rist

Sp

ot

4360290/2020/OS-PWD78

4/100 5/500 - 3/30/2022

5/500 8/000 - 4/10/2020

8/000 14/313 - 7/20/2020

0/000 10/000Budjet work

arranged2007

10/000 15/705 - 2007

4Sulthan Bathery - Pulpally - Perikkalloor

road(MDR)0/000 34/200 34.200 Sulthan Bathery - 2007

5 Vythiri- Tharuvana Road

0/000 22/000 22.000 KalpettaBudget work

ongoing-

50/400 81/000

Providing BM and

BC work in

progress

-

81/000 87/000

Providing renewal

BC work

completed

Providing

renewal BC DLP

: 22/7/20121

87/000 93/000

Providing BM and

BC work

submitted for

-

7 Kattikulam - Tholpetty road (MDR)

0/000 15/300 15.300 Mananthavady providing renewal

BC : agreement to

be executed

main work DLP

year 2011.

patching DLP

29/6/2020

0/000 4/000

work completed

BM and BC DLP

: 29-06-2022

4/000 9/000

Providing BM and

BC work in

progress

9/000 11/200 Providing BM and

BC work in

progress

9/000 to

13/000

patching DLP

30/6/2019

11/200 14/300

Providing BM and

BC work in

progress

Mananthavady

8

Mananthavady - Kandothuvayal road 14.300 Mananthavady

Sulthan Bathery

6 Thalassery - Bavali road (HH)

34.6

3 S.Bathery- Noolpuzha road 15.705

Sulthan Bathery2 Vaduvanchal - Kolagappara road 14.313

4360290/2020/OS-PWD79

9

Mananthavady Kaithakkal road 0/000 10.415 10.415 MananthavadyKIIFBproviding BM

and BC work in

progress

0/000 to 3/000

Patching DLP

6/11/2018.

5/500 to

10/415

patching DLP

4/10/2018

172.033

1

Mananthavady-Pakramthalam

road(MDR)10/240 32/200 21.960 C 40 b b 10 X 15 Yes 10 Yes 75 Mananthavady

KIIFB Works

ongoing -

21.960

OTHER MDRs

4360290/2020/OS-PWD80

Grade ScoreStartin

g Node

End

NodeScore Grade Score Category Grade Score Grade Score

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

1

Koyilandy Thamarassery

Mukkom Areacode

Edavanna road upto

Erannymakkal

Koyilandy

(0/000)

Erannymak

kal

(51/245)

51.245 S H Trafficable DLP

Exisiting

0/0 -0/400 DLP

Exisiting up to

28-02-2023

15/700 -16/500

BM & BC work

in Progress,

25/000 to 36/625

good NO DLP

2

Puthiyangadi Ulliyeri

Perambra Kuttiadi

Nadapuram Irringannur

Peringathur Punnur

Kuthuparamba Chovva

Bye pass road

Pavangad

(0/000)

Peringathur

(66/565)66.565 S H Trafficable

DLP

Exisiting

4/400 -10/600

under DLP up to

14-01-2020

3

Kappad Thushargiri

Adivaram Nooranthodu

Go ( Rt) No 147 / 2004

/ pwd dt T v m 6. 2.04

Kappad

(0/000)

Nooramtho

du

(68/000)

68.000 S H Trafficable DLP

Exisiting

0/0 to 3/750 DLP

till 27/01/2021,

60/900to66/045

DLP upto

26/08/2020.

6/600-11/240

Under DLP of

CRF work

4

Kadiyangad

Peruvannamoozhi

Kadiyangad

Km:0.000

Peruvanna

moozhi

Km:7/00

7.000 S.H.

Trafficable No DLP

5

Peruvannamoozhi-

Poozhithodu

Peruvannam

oozhiKM

0/00

Poozhithod

u KM

9/400

9.4 SH

up to 2/280

Traficable

up to 2/280

Traficable and

balance portion

forest area

6

Poozhithodu -

Padinjarathara Road

Poozhithodu

KM 0/00

Padinjarath

ara

KM 27/225

27.225 SH

Trafficable No DLP

7From Vilangad to

kakkadampoil

Vilangad

(520)

Kakkadamp

oil

(650)

130.000

Hill

High

way

No DLP

Proposed Hill

Highway under

KiIFB

TOTAL 359.435

RITES LIST 2001

Interstate

Connectivity Total

Score

Constituen

cyNameChaina

geName Chainage

Starting Node Ending NodeTraffic

Density of Connecting

Corridors

Tribal or Under

Developed

Regions

Tourits/Pilgrim

Centers/Ports&Harbours

STATE HIGHWAYS

KOZHIKKODE DISTRICT

Core Road Network

SL

.N

o

Name of Road

Details of Link

Length of

Road

Criteria of selection of Road (As per Methodology)

Status DLP Remarks

4360290/2020/OS-PWD81

1Kozhikode-Balussery

roadKozhikode 0/000 Balussery 20/500 20.500 Trafficable No DLP

Budget work

sanctioned for

BM&BC

renewal

2Kunnamangalam-

Agastianmuzhi road

Kunnamanga

lam0/000

Agastianmu

zh13/100 13.100 Trafficable No DLP

Work is being

done under

CRF

3Kozhikode-Mavoor

roadKozhikode 0/000

Mavoor

road19/540 19.540 Trafficable No DLP

4Meenchanda- Beypore

roadMeenchanda 0/000

Beypore

road6/000 6.000 Trafficable

DLP

Exisiting

0/0-6/00 DLP

existing up to

28/7/2021

5Kakkodi-Puthiyangadi

roadKakkodi 0/000

Puthiyanga

di4/400 4.400 Trafficable No DLP No DLP

6 Perambra-Vatakara road Perambra 0/000 Vatakara 21/500 21.500 Trafficable DLP

Exisiting

0/0 - 9/800

KIIFB work

completed with

DLP up to

31/03/2023

9/800 - 12/200

and 17/00 -

21/500 work

on going

7Kuttiadi-Pakramthalam

road Kuttiadi0/000

Pakramthal

am17/000 17.000 Trafficable NO DLP NO DLP

8Muttungal-Nadapuram

roadMuttunga 0/000 Nadapuram 12/000 12.000 Trafficable NO DLP

KIIFB work

ongoing

9Padanilam-Nanminda

roadPadanilam 0/000 Nanminda 13/350 13.350 Trafficable NO DLP

10Mankavu-Kanniparamba

roadMankavu 0/000

Kannipara

mba15/800 15.800 Trafficable NO DLP No DLP

11Francis road jn. -

Konthenar road

Francis road

jn0/000 Konthenar 3/900 3.900 Trafficable

DLP

Exisiting

0/0 -3/900

DLP existing

12Pottammal-

Puthurmadam roadPottammal 0/000

Puthurmad

am8/700 8.700 Trafficable NO DLP No DLP

13Pantheerankavu-

M.anakadavu road

Pantheerank

avu0/000 M.davu 3/300 3.300 Trafficable

DLP

Exisiting

0/0 -2/00 BM

& BC work

ongoing

2/0-3/300 DLP

Existing

14Mavoor-Pannikkode

roadMavoor 0/000 Pannikkode 8/000 8.000 Trafficable NO DLP No DLP

Total 167.090

1 Perode Parakkadavu

Chettakandy Road- Perode 0/000 Chettakandy 5/000 5.000 B 50 b b 10 T/U 25 b y 10 N 0 95 Nadapuram

Trafficabl

e

DLP

ExisitingDLP up to

31/03/2022

2 Kuttiadi Mullankunnu -

Pasukadavu Road Kuttiadi 0/000 Pasukadavu 13/000 13.000 B 50 b c 7.5 T/U 25 b y 10 N 0 92.5 Nadapuram

Trafficabl

eNO DLP

NO DLP , work

tenderd

OTHER MDRs

4360290/2020/OS-PWD82

3 Chorod vykkilassery

orkkattery kunjippally

monthal kadavu road

Chorod 0/000 monthal kadavu15/500 15.500 B 50 b c 7.5 T/U 25 b y 10 N 0 92.5 Vadakara

Trafficabl

e

DLP

Exisiting

CRF work

Executed , DLP

up to 2023

march

33.500

4 Bank road Jn- beach

road

Bank road Jn- 0/000 Beach 1/100 1.100

A

60 a a 15 0 a x 15 N 0 90

Kozhiko

de

South

Trafficabl

e

DLP

Exisiting

BM&BC carried

out under

budget work in

2016-17.DLP

up to

29/7/2020

5

Payyoli Perambra Road Payyoli 0/000 Perambra 18/125 18.125 B 50 b b 10 T/U 25 c z 5 N 0 90 Perambra

Trafficabl

e

DLP

Exisiting

Chainage -

0/000 to

18/125 KIFB

work

Completed on

01-03-2020 &

DLP up to 28-

02-2023

6 Parakkadavu-

kadavathur Road Parakkadavu- 0/000 kadavathur 2/000 2.000 B 50 b b 10 T/U 25 c z 5 N 0 90 Nadapuram

Trafficabl

eNO DLP

NO DLP

existing

7 Vatakara Villiappally

Chelakkad Road

Vatakara old NH 0/000 Chelakkad SH PUKC15/985 15.985 B 50 b b 10 T/U 25 c z 5 N 0 90

Vadakar

a,

Kuttiady

&Nadap

uram

Trafficabl

eNO DLP

NO DLP, KIIFB

work Proposed

8 Koodathai Kodencheryi

Road Km 0/000 to

6/200

Koodathai 0/000 Kodencheri 6/200 6.200 C 40 b c 7.5 T/U 25 a x 15 N 0 87.5 Koduvally

Trafficabl

eNO DLP

0/000 to

3/200 included

in NABARD

XXV. Estimate

submitted for

TS. Road is

made

trafficable with

patch repairs

9 Old N.H.Road in FerokeCheruvannur

(0/000)

Ferokepetta

(2/565)2.565

Trafficabl

e

DLP

Existing,

MDR

BM&BC are

being carried

out.Yes DLP

exists.

10

Old N.H.portion in

Vatakara

town(Peruvattumthazha

Karinpanapalam road)

Peruvattumt

hazha

(0/000)

Karinpanap

alam

(3/000)

3.000Trafficabl

eMDR

4360290/2020/OS-PWD83

11

Mini Bye pass road from

Meenchanda to West

Hill

Meenchanda

(0/000)

West hill

(11/615)11.615

Trafficabl

e

DLP

Existing,

MDR

0/0 - 5/00

Budget work

arranged,

5/00 -8/00

DLP Existing,

8/140-11/615

KIIIFB work

ongoing

12Approach road to

Eranhikkal bridge

Eanhikkal

(0/000)

Eranhikkal

(0/558)0.558

Trafficabl

eNO DLP MDR

Total61.148

Grand Total 621.173

4360290/2020/OS-PWD84

Startin

g

Node

End

Nod

e

Categor

yGrade

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1

Guruvayoor Altharam

Ponnai

Vanneri-14.858 Ponnani-

28.970

14.112 S.H

Good

km 14/858 to 19/500 -

26.06.2022

km 19/500 to 23/800 -

21/11/2021

km 23/820 to 28/970 -

27/02/2022

2

Trissur Kuttippuram

23/340 to 52/650

Kolikkara- KM

23.340

Kuttippuram-

52.650

18.340 S.H

Good

km 41/400 to 42/300 -

26/08/2020

3

Valanchery-

Angadippuram -

Perintalmanna-

Pandikkad- Wandoor-

Vadapuram Road

Valancheri-

0.000

Vadapuram-

51.505

51.505 S.H

damaged

except work

in progress

area and

0.000 to

2.000

24/555-29/105, 36/595-

51/505- (work in progress)

1) 6.395 to 10.895 DLP

finished Before 2012

2) 10.895 to 14.395 DLP

finished Before 14.03.2013

3) 14.395 to 20.055 DLP

finished Before 18.05.2012

in this Road every year

Pothole developing and

totally damaged

(4) DLP dates km 0/000 to

2/000 - 31/12/2023

4

Kozhikkode -Palakkad

Road

Kondotty-

27.900

Kondotty-

29.500

1.600 S.H

Good

surface renewal completed

5

Malappuram -

Parappanangadi Road

Malappuram-

Kizhakkethala-

0.000

Parappanang

adi-23.000

23.000 S.H

Good

(1) 0/000 to 15/000

Improvements work

(Excluding surface work )

in progressing in DFIP

work (Nadukani -

Parappangadi road )

(2) 15/000 to 23/000

Improvements work

(Excluding surface work )

STATE HIGHWAYS

Ending Node

Traff

ic

Density of

Connecting

Tribal

or

Under

Devel

oped

Tourits/Pilgrim

Centers/Ports&Harbours Interstate

Connectivit

y

Total

ScoreNameChaina

geName

Chaina

ge

MALAPPURAM DISTRICT

Core Road Network

SL.

NoName of Road

Details of Link

Length

of Road

Criteria of selection of Road (As per Methodology)

Present

statusDLP

Starting Node

(Excluding surface work )

in progressing in DFIP

work (Nadukani -

Parappangadi road )

4360290/2020/OS-PWD85

6

Tirur- Malappuram-

Manjeri Road

Tirur-0.000 Manjeri-

39.000

39.000 S.H

Good

(1) Km 13/000 to 24/191

Improvements work in

progressing ( KIIFB ) ,

25/650 to 26/230

Improvements work in

progressing(Budget 2018-

19 ) and (Malappuram

Manjeri road km 8/000 to

10/900) Anakkayam -

Kacheripadi - site handed

over to contractor

(2) Km 13/000 to 24/191

Improvements work in

progressing ( KIIFB ) ,

0/000to 3/000

Improvements work in

completed under DLP

period 8/000 to 11/700 Bc

7Manjeri Bye Pass I st

reach

Manjeri-0.000 Manjeri-1.370 1.370 S.H work in

progress

Site handed over to the

contractor

8Malappuram Bye Pass I

st reach

Melmuri-0.000 Munduparam

ba-1.075

1.075 S.H Good

Condition

9

Perumpilavu - Nilmbur

Road Km 30/00 to

107/112

Pulamanthole-

30.000

Nilambur-

Chanthakunn

u-107.112

77.112 S.H

road surface

severly

damaged in

many

streches

42/780-50/000,54/000-

54/800(bc renewal) 56/000-

56/900(bc renewal)

1) 0.000 to 0.600 BM and

BC work completed in

January 2018 ( Good

Condition)

2) 40.200 to 42.780 BM

and BC work completed in

18.06.2012 ( Road

damaged in this area)

3) 40.000 to 41.700 BC

renewal work in progress

4) Balance portion DLP

finished before 2012 (

Road damaged in this

area)

(5)86/112 to 107/112

under DLP Period

10

Palakkad -

Perintalmanna Road

Km 48/800 to 58/540

Thootha-48.800 Perinthalman

na-58.400

9.700 S.HRoad totally

damaged

48.800 to 58.540 DLP

finished Before 2011 (Road

totally damaged)

11

Perintalmanna-Bye

pass Road I st reach

Perinthalmanna

(Presentation

school)-0.000

Manathuman

galam-1.680

1.680 S.H

Good

Condition

0/000 to 0/700 DLP

1) 0.000 to 0.700 BM patch

and BC renewal Work Just

Finished.

2) 0.700 to 1.680 BC 11

Condition 2) 0.700 to 1.680 BC

renewal Work Completed

in 18.05.2018

(Good Condition)

4360290/2020/OS-PWD86

12Karuvarakundu-

Melattur Road

Punnakadu-

Chungam-

0.000

Melattoor9.82

0

9.820 S.HTrafficable No DLP

13

Kozhikkode -Nilambur-

Gudallur Road Km

38/200 to 103/600

Valluvambrum-

38.200

Nadukani-

103.600

65.400 S.H

Good

Condition

Km 46/050 - Km 46/200,

Km 47/600-64/000 - site

handed over to contractor

, 64/00 to 103/600 -

under DLP Period

14

Koilandi - Edavanna

Road Km 51/200 to

69/750

Valillapuzha-

51.200

Edavanna-

69.750

18.550 S.H

work in

progress

Km 51/200-52/400,

Km 55/800 - Km 56/500,

Km 57/920 - KM 58/180-

site handed over to

contractor,

Km 56/500 -

KM57/250 - under DLP

23/12/2021

15

Parappanangadi-

Areacode Road

Parappanangad

i-0.000

Areacode-

42.500

42.500 S.Hroad surface

severly

damaged in

many

streches

0/000 to 8/000

Improvements work

(Excluding surface work )

in progressing in DFIP

work (Nadukani -

Parappangadi road )

374.764

1

B P Angadi -

kuttipuram road (Upto

NH)

B P Angadi 0.000 kuttipuram 14 14 - - - - - - - -work in

progress

DLP dates ; CRF work in

progress in km 8/100 to

13/300

1/200 to 3/145

Improvements work in

progressing 5/000 to

14/000 CRF work on going

under NH section

kuttipuram

2Thirunavaya -

Kalpakanchery RoadThirunavaya 0.000

Kalpakanch

ery8.2 8.2 - - - - - - - - Trafficable

No DLP

3

Malappuram- Thirur -

Chamravattam

Road(Tirur -

Malappuram -Manjeri

SH 71, Tirur-

Tirur

Thazhepalam0/000

Chamravatt

am Kadavu11/500 11.500 - - - - - - - -

Good

Condition

0/000 to 3/00

Improvements work in

progressing 3/000 to

11/500 competed last

year's

4 Tirur - Kadalundi Road Tirur 0.000 Kadalundi 27.4 27.4 - - - - - - - -

damaged

severly in

some

streches

'0/000 to 27/040

Improvements work in

progressing

5Kadgathukundu -

Panambalam Road

Kadgathukun

du0.000

Panambala

m7.77 7.77 - - - - - - - - Trafficable

No DLP

6Approch road to

AirportKolappuram 0.000 Kodakkad 13 13 - - - - - - - - Trafficable

No DLP

TOTAL

RITES LIST 2001

6Airport

Kolappuram 0.000 Kodakkad 13 13 - - - - - - - - Trafficable

4360290/2020/OS-PWD87

7

Feroke - college -

Vazhakkad Road &

Areekode -

Vazhakkad Road

Azhinjilam 0.000 Areekode 29 29 - - - - - - - - Trafficable

No DLP

8

Chelari -

Parappanangadi

Road

Chelari 0.000 Chettapadi 6.6 6.6 - - - - - - - -Good

Condition

work comleted last year's

9Edavanna - Wandoor -

Velayur RoadEdavanna 0.000 Velayur 26.5 26.5 - - - - - - - - Trafficable

No DLP

10

Manjeri Pandikkad

Road (Manjeri -

Olipuzha Road)

Manjeri 0.000 Pandikkad 16.2 16.2 - - - - - - - -

road surface

severly

damaged in

many

streches

13.300 -16.200 Wandoor

Section No DLP

Km 5/800 (Kuttipara town)-

Under DLP 6/04/2020,

Km 3/410 - km3/970- site

handed over to contractor

2/900 km no dlp

11Manjeri Anakkayam

Puzhakkatiri RoadManjeri 0.000 Tirurkkad 17.5 17.5 - - - - - - - - Trafficable

No DLP

12

Areekode Kavanoor

Manjeri Road

(Areekode - Manjeri

Road)

Areekode 0.000 Manjeri 14.5 14.5 - - - - - - - -

road surface

severly

damaged in

many

streches

Km 3/000 -4/000- site

handed over to contractor

13Changaramkulam -

Cheruvallur Road

Changaramku

lam0.000 Cheruvallur 6 6 - - - - - - - -

Good

Condition

km 0/000 to 0/060 & 2/900

to 6/000 -21.05.2022

km 0/060 to 2/900 -

9.01.2022

14Palakkad - Ponnani

RoadNeeliyad 0.000 Ponnani 11.4 11.4 - - - - - - - -

Good

Condition

km 76/456 to 80/700 -

30.12.2021

km 80/700 to 82/600 -

30.12.2023

km 82/600 to 84/900 -

km 84/900 to 87/515 -

30.12.2023

209.57

1 AK road Kunnummal 0/000 Kottappadi 0/815 0.815 A a a Tourist x 90work in

progress

byepass to NH 966 at

malappuram townHaned

over to NH Subdivision

Perinthalamanna for

Improvement work .

TOTAL

OTHER MDRs

Improvement work .

4360290/2020/OS-PWD88

2 Jubilee roadJubilee

junction 0/000

Collector

bunglow

junction

0/365 0.365 A b a Tourist x 87.5Good

Condition

Resurfacing work

completed.

DLP Period 14.06.2019 to

14.12.2020

3Kumarambathoor -

Olipuzha Road

Kolapparamb

a Jn16/000

Ucharakkad

avu Jn19/390 3.390 A a b

Intermed

iate

Pilgrim

y 82.5 TrafficableNo DLP

4Approach Road to

Calicut Airport

Kolathur

(NH 966)0/000

Calicut

International

Airport

2/000 2.000 A a d NoMajor

Airportx No. 82.5

Good

Condition

Approach road to Calicut

International Airport

5

Melmuri -

Munduparamba

Kootilangadi

bye pass road I st

reach

Machingal 0/000Mundupara

mba1/075 1.075 A a b Tourist y 82.5

work in

progress

Improvements work in

progressing in DFIP work

(Nadukani - Parappangadi

road )

byepass to NH 966 at

malappuram town

6

Melmuri -

Munduparamba

Kootilangadi

bye pass road 2nd

reach

Munduparam

ba 0/000 Kavungal 2/130 2.13 A b a Tourist y 82.5

work in

progress

Haned over to NH

Subdivision

Perinthalamanna for

Improvement work .

Improvement work in

progress in CRF

byepass to NH 966 at

malappuram town

9.775

4360290/2020/OS-PWD89

Starting

Node

End

NodeMarks

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

1

Nattukal-

Velanthavalam 0/00-

11/664

Nattukal junction, 14/200

of Tattamangalam

Nattukal Road

Velanthavalam, State

border11.664 SH 20.06.2021

BC overlay

work (km

0/000 to

11/664 )

completed

2

Nemmara-

Nellyampathy 0/00-

30/714

Nemmara, 14/300 of

Vadakkenchery Pollachi

Road

Paadagiri 30.714 SH 25 b d 5 Yes x 15 0 45

Not executed

NSV Since

included in

Rebuild

Kerala

Ongoing

0/000 - 8/000 Ongoing

3

Palakkad-

Perinthalmanna 12/0-

48/980

Mundur junction, of NH

213

km 48/880,

Thoothappuzha Bridge

starts,District Boundary

36.980 SH

12/000-21/000DLP

Expired

33/900-35/500 7/9/2020

35/500-43/880 09/07/2020

43/880-48/880 8/24/2020

4Palakkad-Pollachi

Road 5/0-29/992

BPL Koottupatha Jn: at

NH 47

Gopalapuram ,State

Border24.992 SH

05/000-11/000 7/26/2020

11/000-17/000 7/27/2020

17/000-29/992 24.07.2020

only patch

work

arranged

5

Palakkad-

Thathamangalam-

Pollachi 0/00 to

35/010

Yakkara, km 209/300 of

OLD NH

Meenakshipuram, State

Border35.010 SH

0/000-4/000DLP

Expired

4/000-6/000 Ongoing

6/000-9/746DLP

Expired

9/746-16/000ongoing BC

overlay work

16/000-35/010DLP

Expired

6Perimbilavu

Nilambur road km

3/347-18/500

Thanathara Bridge,border

of Thrissur District

16/200 of Shornur

Perinthalmanna road15.153 SH

DLP

Expired

Interstate

Connectivity

STATE HIGHWAYS

Chainage Category Grade

Traffic Traffic

Marks

Density of Connecting

Corridors

Tribal or

Under

Developed

Regions

Tourits/Pilgrim

Centers/Ports&Harbours

PALAKKAD DISTRICT

Core Road Network

Sl.

NoName of Road

Details of Link

Length of

Road

Criteria of selection of Road (As per Methodology)

RemarksStarting Node Ending Node

Total Score DLP Status

Name Chainage Name

4360290/2020/OS-PWD90

7

Shornur-

Perinthalmanna road

0/00-27/600

Kochin Bridge,Border of

Thrissur District

Pulamanthol Bridge

end,District Boundary27.600 SH 50 b b 10 x 15 0 75

Not executed

NSV Hence

include in

RITES list 1

Km 4/000 - 14/000 Ongoing

Km 14/00- 27/350

(BM & BC work)Ongoing

8Thattamangalam-

Nattukal road 0/0 -

14/200

Mettupalayam JunctionNattukal Jn:, 0/00 of

Nattukal Velanthavalam

Road

14.200 SH

0/000-4/000DLP

Expired

4/000-5/500 Ongoing

06/000-14/200 3/16/2021

9Vadakkenchery-

Pollachi road

Km.0 /00to 38/912

Mangalam ,0/200 of

Vadakkancheri Bazar

Road

Govindapuram Border

(State Boundary)38.912 SH

0/000-0/600DLP

Expired

0/600-1/700 7/29/2020

1/700-2/000

SLTF-2019-

2020 In

tender

process

Trafficable

2/000-2/900

SLTF-2019-

2020 In

tender

process

Trafficable

2/900-3/200DLP

Expired

4/900-6/100 7/19/2020

6/100-6/900

SLTF-2019-

2020 In

tender

process

Trafficable

6/900-8/100 7/29/2020

8/100-12/000

SLTF-2019-

2020 In

tender

process

Trafficable

12/000-25/000 Ongoing

25/000-38/912DLP

Expired

10Vallanghy Byepass

road. 0/00 to 0/520

Vallanghy, 14/700 of

Vadakkenchery Pollachi

Raod

Vallanghy 0.520 SH Ongoing

11Vazhakkode-Alathur

22/648-32/890

Plazhi,22/648 of the same

road

Malamalamukku, 4/200 of

Alathur Bazar Road10.242 SH

22/648-29/648DLP

Expired

29/648-32/890DLP

Expired

245.987Total

RITES LIST 2001

4360290/2020/OS-PWD91

1

Palakkad - Ponnani

Road km 0/000 -

45/000, km 66/300 -

76/500

SBI Junction (0/000),

Kootanad Junction

(66/300)

0/000,

66/300

Kulappully (45/000),

Neeliyad (76/500)

45/000,

76/50055.200 B 50 b b 10 x 15 0 75

20/00-22/00 1/30/2021

Km 22/00 - 36/00 Ongoing

Km 36/000 - 45/000,

Km 66/300 - 69/500Ongoing

2Old NH Road km

204/600 - 215/000Kalmandapam 204/600 Kannannur 215/000 10.400 C 40 a a 15 x 15 0 70

213/00-215/00 24.1.2022

kazchaparambu

junction27.1.2023

3

Mannarkkad -

Chinna Thadagam

Road km 0/000 -

52/692

Nellipuzha Junction 0/000 Anakatti 52/692 52.692 C 40 c c 5 Yes x 15 10 70

Urgent Patch Repair

works to

Mannarkkad -

Chinnathadakam

road km.0/000-8/000

(Price ID -

27.8.2020

Stripped BT works to

Mannarkkad-

Chinnathadakam

road km8/000-

15/000 (Price ID -

RD/2019/5801)

28.8.2020

Stripped BT works to

Mannarkkad-

Chinnathadakam

road km15/000-

22/000 (Price ID -

RD/2019/5802)

28.8.2020

Urgent Patch Repair

works to

Mannarkkad -

Chinnathadakam

road km.43/000-

45/000 (Price ID -

RD/2019/5861)

30.9.2020

UPR works to

Mannarkkad -

Chinnathadakam

road km 3/000 -

8/000 (Price ID -

RD/2019/7130)

18.8.2020

4360290/2020/OS-PWD92

UPR to Mannarkkad

Chinnathadakam

Road KM from

11/500 to 15/000

(Price ID -

RD/2019/6792)

28.8.2020

UPR to Mannarkkad

Chinnathadakam

Road KM from

18/500 to 22/500

(Price ID -

RD/2019/6795)

28.8.2020

UPR to Mannarkkad

Chinnathadakam

Road KM from

24/000-26/000 (Price

ID -RD/2019/6799)

30.9.2020

4

Kollengode -

Pudunagaram Road

km 0/000 - 8/414

Kollengode 0/000 Pudunagaram 8/414 8.414 C 40 b b 10 x 15 0 65DLP

Expired

5

Ottapalam -

Perinthalmanna

Road km 0/000 -

17/800

Ottapalam 0/000Cherppulassery

Kacherikunnu17/800 17.800 C 40 b b 10 y 10 0 60

Km 4/000 - 8/000 Ongoing

Km 16/000 - 17/800 Ongoing

6

Palakkad -

Malampuzha 100

Feet Road km 0/000 -

6/850

Victoria College Junction 0/000 Malampuzha Garden 6/850 6.850 C 40 c c 5 x 15 0 60DLP

Expired

7

Palakkad - Chittur

Road km 0/000 -

13/620

Fort Maidan 0/000 Annikode Junction 13/620 13.620 C 40 b b 10 z 5 0 55

0/000-0/740 30.5.2021

0/000 - 5/750 3/16/2021

7/420 - 13/000 3/16/2021

8

Kuzhalmannam -

Mankara Road km

0/000 - 15/180

Chanthapura Junction 0/000 Kaalikavu Bridge 15/180 15.180 C 40 c c 5 y 10 0 55

0/000 - 6/500non

motorable

Estimate

submitted

for revised

AS

6/500 - 8/000 8/31/2020

8/000 - 10/500 7/24/2021

10/500 - 11/200

Work yet

to be

started

4360290/2020/OS-PWD93

11/200 - 12/800

Work yet

to be

started

9

Pathiripala - Kongad

Road km 0/000 -

10/960

Pathiripala Junction 0/000 Kongad Junction 10/960 10.960 C 40 b b 10 0 0 50

4/700-4/800 19.6.2020

191.116

1

Kalmandapam -

Kalpathy Road km

0/000 - 3/550

Kalmandapam 0/000 Sekharipuram Junction 3/550 3.550 B 50 a c 10 x 15 0 75

0/250-1/500 18.12.2022

0/00-0/525

2/300-3/550

2GVC- Kalpathy Road

km 0/000 - 2/030Sai Junction 0/000 GVC 2/030 2.030 B 50 c a 10 x 15 0 75

0/000-1/200 25.06.2021

3

Gopalapuram -

Meenakshipuram

Road km 0/000 -

7/500

Gopalapuram 0/000 Meenakshipuram 7/500 7.500 C 40 b b 10 x 15 10 75

1/500 to 6/500 4/4/2021

13.080

26.12.2022

OTHER MDRs

4360290/2020/OS-PWD94

Grade ScoreStarting

Node

End

NodeScore Grade Score Category Grade

Scor

eGrade Score

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

1Thrissur - Mannuthy

Road

District

hospital

Junction,

Thrissur

Round

Ch.0/000

Mannuthy Bye

pass at NH 47

Ch.5/020

5.020Old

N.H.2021-May 31

BC overlay

completed on

01/06/2019

2

Thrissur -

Kuttippuram Road

(S.H. 69)

Paramekkavu

Temple -

Thrissur

Round

Ch.0/000

Kadavallur

(Thrissur -

Malappuram

District Boundary)

Ch.34/315

34.315 S.H. NiL

FD Work 2018-19

Flood rectification

work to Thrissur

Kuttipuram road

Ch 6/950 to 10-900

Site handed over

to Contractor.

From ch.29/100 to

29/300 ,33/000 to

34/315 BW on

going. From km

0/000 to 33/000

proposed under

rebuild kerala

3Thrissur - Thalore

Road

Thrissur

Round -

District

Hospital

South Corner

Ch.0/000

Manaly Bridge at

NH 47 - Ch.10/58310.583

Old

N.H.NIL BC overlay due

Thrissur District

DLP Present status

NameChainag

eName

Chaina

ge

Traffic Density of Connecting

Corridors

Tribal or

Under

Developed

Regions

Tourits/Pilgrim

Centers/Ports&HarboursSL.

NoName of Road

Details of Link

Length of

Road Total

Score

STATE HIGHWAYS

Remarks

Starting Node Ending Node

Constituency

Criteria of selection of Road (As per Methodology)

Interstate

Connectivity

4360290/2020/OS-PWD95

4Kodungallur Shornur

Road (SH-22)

Kodungallur

Ch.0/000

Devamatha

School,

Patturaikkal

Ch.38.163

Koorkanchery -

Elite Mission

Hospital Ch.33/963

Kochin Bridge -

Cheruthuruthy

(Thrissur -

Palakkad District

Boundary)

Ch.67.512

63.312 S.H.

from 14/500 to

22/160 DLP

due,from ch 50/805

to 53/605 DLP ends

on 27-01-2022,From

ch 53/940 TO

54/940 ends on 30-

12-2021,from

54/940 to 55/185

DLP ends on 30-12-

2022. from 53/605

to 53/940 DLP ends

on 30-03-2023.

1,B/W 2017-19

Improvements of

Kodungalur-

Shornur Road from

ptturaikal to

kolazhy(37/860 to

42/000) on going

work 2,B/W 2017-

19 Improvements

of Kodungalur-

Shornur Road from

ptturaikal to

kolazhy(42/000 to

46/780) on going

work.from 62/605

to 70/600 BW on

going.from 58/200

to 61/200 ongoing

FD work .From

55/235 to 58/200

5Thrissur - Kanjani -

Vatanappilly Road

Chungam -

West Fort

Ch.0/580

NH-17 at

Vatanappilly

Ch.16.120

15.540 S.H. nil

FD work 9/000-

16/002 Initial level

reported (BM& BC

Road surface).

2,Improvements to

Thrissur- Kanjani

Vadanappilly Road

from Km0/000 to

9/000 on going

work

6

Potta -

Moonnupeedika

Road (S.H.-

61)

Potta at old

NH-47

Ch.0/000

Moonupeedika at

NH-17 Ch.22/05822.058 S.H.

0/000 to 1/000 on

going work,1/000 to

6/000 DLP up to

20/05/2021,6/000 to

10/200 and 12/658

DLP up to

07/03/2021,12/895

to 22/058 DLP due

Good

7Kodakara Bazar

Road

NH-47 at

Santhi

Hospital

Ch.0/000

NH-47 at

Kodakara

Ch.1/100

1.100Old

N.H.up to 29/11/2022

in good condition

8

Kodakara -

Kodungallur Road

(SH-51)

Kodakara

Junction at

old NH-47

Ch.0/000

Keetholy at NH-17

Ch.25/95625.956 S.H.

DLP period

completed from

km 0/000 to

4/000, km 4/000

to 16/800 DLP

due, km 16/800

to 17/100 DLP up

to 2022,km

17/100 to 25/956

DLP Due

0/00 to 4/00 BC

OVERLAY

Proposed

Submitted for TS

4360290/2020/OS-PWD96

9

Chavakkad -

Wadakkanchery

Road (S.H. - 50)

Chavakkad

Junction

Ch.0/000

Ottupara Junction

in Thrissur shornur

road Ch.31/015

31.015 S.H.

From ch 15/000 to

19/015 DLP upto 02-

02-2023.

BM&BC road.Ch

0/000-5/785

surface condition

not satisfactory.AS

obtained in budget

work.work can be

done after KWA

AMRUT pipe

laying .ch 9/400

to 13/000 work

arranged.

10

Kuranchery - Velur

Road (S.H. -

76)

Kuranchery

Railway Over

Bridge in

Kuranchery

Bye pass

Road

Ch.0/000

Kechery Junction

in Thrissur -

Kuttippuram road

Ch.13/228

13.228 S.H. NIL

Work arranged.

From 10/838 to

12/838 on going

work.From

ch.0/000 to 10/838

AS obtained

11

Perumbilavu -

Nilambur Road

(S.H. 39)

Perumbilavu

Ch.0/000

Thanathara bridge

(Thrissur -

Palakkad District

Boundary)

Ch.3/372

3.372 S.H. OR work ongoing.Road surface

satisfactory.

12Vazhkode -Alathur

Road (S.H. 74)

Vazhakode

Junction in

Thrissur -

Shornur Road

Ch.0/000.

Plazhy Bridge

(Thrissur -

Palakkad

boundary)

Ch.22.642

22.642 S.H.under DLP of OR

work only

OR work

completed.Road

surface

satisfactory.

13

Chalakudy -

Anamala Road

(S.H. 21)

Chalakudy

(Anamala

Junction)

Malakkappara

Check Post

(Kerala - Tamil

Nadu State

Boundary)

Ch.88/403

88.403 S.H.

18/200 to 21/300

DLP upto

26/06/2021,21/000

to 40/000 BC Patch

DLP up to

25.02.2021,

56/000 to 88/403

KIIFB work

tendering stage

0/000 to 2/000 BC

overlay work

ongoing. 2/000 to

18/000 and 40/000

to 56/000 surface

is satisfactory,

14

Guruvayur -

Choondal Road

(S.H. 49)

Manjulal -

Guruvayur

Ch.0/000

Choondal Junction

in Thrissur -

Kuttippuram Road

Ch.7/288

7.288 S.H. DLP upto 19/5/2021

BM&BC completed

on 20/5/2019

.Surface is

satisfactory

15

Guruvayur - Althara

- Ponnani Road

(S.H. 62)

Guruvayur at

Km.0/050 of

Guruvayur-

Choondal

Road

Vanneri

(Thrissur-

Palakkad District

Boundary)

Ch.14/858.

14.858 S.H. DLP upto 29/5/2020

BM&BC completed

on 30/5/2017

.Surface is

satisfactory

16

Portion of Old

Kodungallur -

Shornur Road

Athani

Ch.0/000

Arafa School

Junction

Ch.0/000

Vyasa College

Junction Ch.3/000

Attoor Over Bridge

Ch.1.122

3.000

1.122

Old

S.H.

0/000 to 1/122 DLP

of patch work

0/000 to 1/122

patch work

completed. 0/000

to 3/000 No work

arranged and

condition is

satisfactory

17Pattikkad Bazar

Road

NH-47 at

Peechi Jn.

Ch.0/000

NH-47 at

Kallidukku

Ch.3/621

3.621Old

N.H.NIL

Budget work in

progress

4360290/2020/OS-PWD97

18Mannuthy Bazar

Road

NH-47 at

Mannuthy

Junction

Ch.0/000

NH-47 at

Mannuthy Church

Ch.0/520

0.520Old

N.H.NIL Saisfactory

19 Old NH Chalakudy

NH-47 at

P.M.G.

Junction

Ch.0/000

NH-47 at South

Junction,

Chalakudy

Ch.4/430

4.430Old

N.H.NIL

0/00 to 2/700 BM &

BC ongoing , 2/700

to 4/430

satisfactory

20 Old NH Koratty

NH-47 at

Koratty

Junction

Ch.0/000

NH-47 at

Chirangara

Junction Ch.2/650

2.650Old

N.H.NIL

CRF work

arranged

374.033

1 Arattupuzha Temple

Road

Near Raja

Company

0/000 Arattupuzha

Temple

1/816 1.816 Nattika .Length

Corrected as per

asset.Included in

CRN List 2001 DLP upto

31.01.2023

BM & BC work

completed.

2 Chavakkad

Mullurkayal

Road(Amalanagar

pavaratty road)

0/000 11/500 11.500 Manalur,

Guruvayur

Included in CRN

List 2001

DLP up to

27/09/21( BM &

BC road surface)

Good

3 Azhikode Padakulam

road

Padakulam 0/000 Azhikode 4/426 4.426 Kodungallur

,Kaipamang

alam

Included in CRN

List 2001

NIL

Budget work

ongoing

17.742

1 Karunakaran Nambiar

Road

Swaraj Round 0/000 Aswini Junction 0/950 0.950 A 60 a a 15 No 0 M ajor x 15 No 0 90 Thrissur Connects Swaraj

Round at

Thrissur to

Thrissur-

Kuttippuram

State Highway

NIL

Budget work for

BC overlay

awarded

2 Kodungallur Scout

Road

South Nada

Kodungallur

0/000 West Nada

Kodungallur

0/501 0.501 A 60 a a 15 No 0 Major x 15 No 0 90 Kodunagllur Road

surrounding

Kodungallur

Temple

NIl

Good

3 Chembukkavu -

Museum - Bishop

Palace - East Fort -

Jubilee Hospital -

Chelakkottukara Road

chembukkav 0/000 Chelakkottukara 3/900 3.900 A 60 a b 12.5 No 0 Major x 15 No 0 87.5 Thrissur Important Road

passing infront

of Zoo and

Mueseum

Thrissur

Satisfactory

Bc overlay work

pending due to

KWA cutting for

first 700m only

Total

RITES LIST 2001

OTHER MDRs

4360290/2020/OS-PWD98

4 Amballur Palapilly

Echippara Road

Amballur

junction @

279.400 of

NH 47

0/000 ECHIPPARA 24/004 24.004 C 40 c c 5 Yes 25 Major x 15 No 0 85 Pudukkad Road passing

through Tribal

residential area

and Chimmoni

Dam Tourism

project

From Km 0/00 to

6/000 DLP UP TO

13/06/2020

Fom KM 6/000

TO 14/500

ESTIMATE

SUBMITTED

FOR FS under

KIIFB

29.355

5 Pattikkad - Peechi

Road

Pattikad

centre

0/000 Peechi Dam Gate 6/622 6.622 B 50 a b 12.5 No 0 Major x 15 No 0 77.5 Ollur Peechi Dam and

Tourism project

DLP period

completed Good

6 Cherpu Thriprayar

Road

Perumbillisser

y

0/000 Thriprayar Centre 14/070 14.070 B 50 b a 12.5 No 0 Major x 15 No 0 77.5 Nattika Access to

Thriprayar sree

rama temple.

Nil

KWA cutting.

Restoration work

arranged

7 Cheruthuruthy

Ponnani Road

Cheruthuruthy 0/000 Arangottukara 9/352 9.352 B 50 b a 12.5 No 0 Major x 15 No 0 77.5 Chelakkara Connects

Thrissur and

Palakkad

Districtsfrom 5/300 to

9/300 on DLP 19-

07-2021

Nabard work

0/000 to 5/300

on going

8 Muthuvattur

Guruvayur Road

Muthuvattur 0/000 West Nada

Guruvayur

1/051 1.051 B 50 a b 12.5 No 0 Major x 15 No 0 77.5 Guruvayur Guruvayur

Temple

DLP upto

23/03/2020

BM&BC surface

is satisfactory

9 Guruvayur Northern

Link Road

Manjulal

Junction.

0/000 Thahani Junction 1/070 1.070 B 50 a b 12.5 No 0 Major x 15 No 0 77.5 Guruvayur Guruvayur

Temple

DLP upto

23/03/2020

BM&BC surface

is satisfactory

10 Thrissur

Mannamagalam Road

Chelakkottuka

ra

0/000 Puthur 8/200 8.200 B 50 a b 12.5 No 0 Major x 15 No 0 77.5 Thrissur,Oll

ur

Proposed Zoo

NIL Good

4360290/2020/OS-PWD99

11 Thriprayar Kanjani

Chavakkad Road

Peringottukar

a 3 way

Junction

0/000 Chavakkad 24/000 24.000 B 50 b a 12.5 No 0 Major x 15 No 0 77.5 Nattika,

Manalur,

Guruvayur

Palayur Church

Thriprayar

temple

NIL

This road is

BM&BC

road.KWA

(AMRUTH )

Water Cutting is

progress .

Budget work

0/000-

1/500,7/000-

14/600

Terminated due

to Amruth

scheme.ch

17/000-22/000

proposed for

budget work and

22/000-24/000

AS obtained in

budget work

.(14/600-17/100

BM&BC,0/000-

14/600 CC)

12 Muringoor Kadukutty

Road

NH 47@

301.950

0/000 Naralakadavu

bridge

6/600 6.600 C 40 b c 7.5 Yes 25 Minor z 5 No 0 77.5 Chalakudy BM&BC work

agreement

executed.

Connects Mala NIL

Budget work (BM

& BC) ongoing

13 Kolothumpadam Road Aswini

Junction

0/000 Peringavu 0/953 0.953 A 60 a a 15 No 0 No NA No 0 75 Thrissur Connects

Thrissur-

Kuttippuram SH

and Kodungallur

Shornur SH

NIL

B/W 2019-20

Improvements to

Kovilakathumpad

am Road and

Food path with

BM and BC

0/000 to

0/953(MDR332)(

4lane) TS

14 Edakkunni Road

(Mannuthi-Nadathara-

Ollur-Anakkallu-

Poochinippadam)

Mannuthy

junction under

pass

0/000 Poochinippadam 12/860 12.860 B 50 a a 15 No 0 No Inter

medi

ate

y 10 75 Ollur Connect NH 544

and Thrissur

Thalore Road

(SH)

NIL

KIIFB work in

progress

15 Koratty

Pulikkakadavu Road

Pallinada Old

NH Koratty

0.325

0/000 Pulikkakadavu

river

4/000 4.000 B 50 b b 10 No 0 Major x 15 No 0 75 Chalakudy Koratty St Marys

Church

Pilgrimage

Centre

DLP up to

10/11/2022 Good

16 Guruvayur Karakkad

Road

Karakkad

Junction

0/000 Pancharamukku

Junction

1/050 1.050 B 50 b b 10 No 0 Major x 15 No 0 75 Guruvayur Access to

Guruvayur

Temple

NIL

This road is

BM&BC

road.surface

condition not

satisfactory.AS

obtained in

4360290/2020/OS-PWD100

17 Chavakkad - Blangad -

Chettuvai road

Mullathara 0/000 Munamkallu -

Chettuvai

8/315 8.315 B 50 b b 10 No 0 Major x 15 No 0 75 Guruvayur Chettuva

Tourism,

Chavakkad and

Blangad Beach

DLP upto

8/10/2021 for the

ch 0/000-6/000

This road is

BM&BC road.ch

6/000-8/315

surface condition

not

satisfactory.TS

obtained in

Budget work

,tendered no

response

18 Irinjalakuda Kattur -

Edamuttam Road

Irinjalakuda

Bus stand

0/000 Edamuttam NH 66 11/480 11.480 B 50 b b 10 No 0 Major x 15 No 0 75 Irinjalakuda,

Nattika

Irinjalakuda

Koodalmanikya

m Temple7/712 to 11/480

DLP upto

28/02/2023

Buget work

ongoing ch 0/000

to 3/000 (BM &

BC)

19 Anjoor Road Girls High

School

Junction

0/000 Mukhammoodimuk

ku

4/785 4.785 B 50 a b 12.5 No 0 Interme

diate

y 10 No 0 72.5 Guruvayur

NIL

Proposed for BC

overlay.This road

is BM&BC road

20 Arakkulam -

Azhikode Road

Cheraman

Mosque

0/000 Puthenpally

Church

4/495 4.495 B 50 b c 7.5 No 0 Major x 15 No 0 72.5 Kodungallur .Pilgrim centres

of Cheraman

Mosque and

Marthoma

Church are

situated besides

of this road.

0/000 to 2/800

DLP 21/12/2022

2/800 to 4/260

DLP 27/6/2022

4/260 to 4/495

DLP 20.4.2022

BM&BC surface

is satisfactory

21 Kondazhy Mayannur

Road

Kayampoova

m

0/000 Mayannur kadavu 10/914 10.914 C 40 b c 7.5 Yes 25 No NA No 0 72.5 Chelakkara Passes near

Bharathapuzha.

Connects

Thrissur and

Palakkad

Districts.

Navodaya NIL

on going OR

works only.

129.817

22 Veemb Road Mar APREM

church

0/000 Veemb temple 5/289 5.289 B 50 a b 12.5 No 0 Minor z 5 No 0 67.5 Ollur

NIL good

23 Chalakkudy Mala

Road

Chalakudy

North junction

0/000 Ashtamichira 9/940 9.940 B 50 a b 12.5 No 0 Minor z 5 No 0 67.5 Chalakud,K

odungallur

Chalakudy

Railway Station

km5/830 to

7/940km DLP Due

0/000 to 5/830

budget work

ongoing, 7/940

to 9/940 CRF

work arranged

Additional list of roads to be replaced with LSGD Roads

4360290/2020/OS-PWD101

24 Ayyanthole Road West Fort

Junction

0/000 TOYOTA Junction

at Thrissur

Kuttippuram Road

3/901 3.901 B 50 a a 15 No 0 No NA No 0 65 Thrissur Connect SH

Kodungallur

Shornur Road

and NH 544,

District Head

Quarters,

District Court

and Court

DLP up to

29.08.2020 Good

19.130

4360290/2020/OS-PWD102

Star

ting

Nod

e

End

Nod

e

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 16

1SH -1 M .C . Road - 187/800 -

233/250 Chorakuzhy

Kalady Sree

Sankara Bridge45.450 SH Perumbavoor

Newly repaired and

trafficable

30-01-2020 for ch 215/400

to 224/000 ,ch 208/000

to224/000,ch224/100 to

225/600,ch 226/600 to

227/000, ch 227/100 to

228/150

PerumbavoorNewly repaired and

trafficable

08-07-2021 for ch224/000 to

224/100 ,ch 225/700 to

226/500, ch 227/000 to

227/100 ,ch 228/150 to

230/000

PerumbavoorNewly repaired and

trafficable

28-01-2021 for ch 230/000

233/230

2SH - 8 P. M .Road - 137/000 -

153/000 Achan Kavala

Muvattupuzha

P.O.Jn.16.000 SH

Sabarimala work

ongoing(Ch 137/000

to 140/500 &

143/850 to 152/449).

BC overlay required

at ch 140/500 to

143/850

S/F work ongoing

3SH -16 A . M .Road - 7/600 -

35/226

Thadiyittaparamb

uKothamangalam 27.626 SH Kothamangalam

Urgent rectification

needed

BMBC work is proposed in

KIIFB.

Perumbavoor&k

unnathunadu

pot hole

free,closegradede

pacth arranged at

most damaged

areas.BM BC

work proposed in

KIIFB

Ch 20/000 to 22/100 & 22/400

to 23/000 DLP upto 22.05.2020,

22/100 to 22/400 & 27/100 to

28/000 DLP up to 23.02.2021

and Ch 25/000 to 27/100 Patch

work started

29-06-2020 for ch 15/670 to 20/500

ch 7/600 to 9/600,ch 9/600 to

10/700,ch10/800 to 11/995,ch

12/000 to 15/670 work in

progress

4SH - 40 Alappuzha - Madura

Road - 0/000 - 16/000

Perumbadavom

P.O.Jn.

Koothattukulam

Panchayath Office16.000 SH

Ch 11/200 to 20/000

BC overlay required

, Ch 0/000 to 1/900

BM& BC

Upgradation

required.

5SH - 41 Ernakulam - Thekkady

Road - 11/300 - 50/400

Manakkakkadavu

BridgeParakkadavu 35.930 SH DLP Existing

Traff

ic

Density of

Connecti

Tourits/Pilgri

CategoryGra

de

Ending Node

Chainage

Present physical

status (pothole

free/newly

repaired/damage

d/Urgent

rectification

needed)

DLP

STATE HIGHWAYS

Total

Score Name

Inter

state

Conn

ectivi

ty

Trib

al or

Und

er

Dev

elop

Ernakulam

Core Road Network

SL.

NoName of Road

Details of Link

Length

of Road

Criteria of selection of Road (As per

Constituency Remarks

Starting Node

NameChainag

e

4360290/2020/OS-PWD103

ch 10/800 to 29/000 is under

KIIFB work,ch 29/000 to

31/700 is under Budget work

6

SH - 42 Kumarakom -

Kambammed Road - 0/000 -

29/680

Koduvely Marika bridge 29.680 SH

Ch 27/200 to 31/200

BC overlay work

ongoing, Ch 5/000

to 8/100, ch 10/115

to 20/500,Ch 25/000

to 27/200 BM & BC

surface Renewal

required

DLP nil

7SH - 43 Muvattupuzha -Theni

Road - 0/000 - 15/790

Kavumkara NH-

49

Vengalloor - Kaloor

road15.790 SH

Taken in Rebuild

KeralaDLP nil

8

SH - 44 Sabarimala - Kodaikanal

Road (Vengalloor - Oonnukal

portion) - 4/750 - 30/000

Kumaramangalam Neendapara 18.250 SH

16 km comes under

roads

sectionpothanicad,2k

m work arranged

under SLTF

work.Balance km is

pothole free now

No DLP

9SH - 16 Kothamangalam Bye -

pass Road - 0/000 - 2/800Thankalam Kozhippilly 2.800 SH

Urgent rectification

needed

BMBC work is proposed in

KIIFB.

10

Old NH 47(NH 47 at North of HMT

Jn to Municipal Office ,

Kalamassery

HMT JnIn front of Municipal

office Kalamassery1.530

Old

NH 47Good condition DLP Up to 19.07.2021

11 Old NH 47 Edapally Edapally Bank Jn Edapally School Jn 0.500Old

NH 47Good condition Under DLP

12 Old NH 47 Palarivattom SN Jn St Martin Church 0.600Old

NH 47

KSEB

Restoration

works in

progress.Minor

potholes

DLP Expired

13Old NH 47 ( Aluva Ernakulam

road 342/150 to 352/00 )

Edapally Station

KavalaThevara bridge 10.050

Old

NH 47minor potholes

DLP Expired other than (

Ch: 350/200-352/200- will

be expired on 08-07-2021)

14

Old NH 47 (Thevara Venduruthy

Bridge to Mattanchery Bridge)

352/200 to 355/400

Venduruthy Bridge Mattanchery Bridge 3.200Old

NH 47minor damages

354/000 to 355/300

portion of Road is under

DLP and expaires on

08.04.2021 - and

352/200 to 352/400 -

reach - nearing

completion,

15 Old NH 47 km 356/000 to 363/600 Thoppumpady Aroor Police station 7.600Old

NH 47Good condition

in reach 356/400 to

360/000 - bill under

preparation,- in reach

360/000 to 363/000 work

is on going

16Old NH 17 from cheranellore Bus

stand to Manjummel Jn

Cheranellore

BusstandManjummel 1.800

Old

NH 17trafficable. DLP Expired

17Kothamangalam Tripunithura road

39/980 to 40/800 Karingachira Tripunithura 1.420 SH 20 Good condition DLP up to 19/12/2020

18 P.T Jacob Road Thoppumpady Soudi Jn 1.900

Portio

n of

SH 66

Good conditionThe road is under DLP

and expires on 18.03.2021

19 Pandikudy Chellanam road Pandikudy Chellanam 17.900

Portio

n of

SH 66

minor damages

This road is not under DLP

except Ch.6/850 to 7/000

& 9/900 to 10/050(CC Tile

work on going)

4360290/2020/OS-PWD104

20

Ettumanoor Ernakulam road

37/800 to 51/700,52/700 to

55/200,55/200 to 57/330

Poothotta Bridge

S.N. Jn ( 37/800)Pallimukku 18.530 SH 15

Minor

damages.Work

started for the

damaged portions.

CH: 37/800 to 38/500 ,

40/000 to 46/900, 48/00 to

49/00 ( DLP Up to 30-11-

2021)

21Palarivattom Kumarapuram road up

to Manakkadavu bridge 0/000 to

11/300

Palarivatom Manakkadavu Bridge 11.300

Portio

n of

SH 41

minor potholes DLP Expired

22 Aluva Munnar Road Aluva Vazhakulam 8.000 SH

16

1/000 to 5/000 &6/000-

7//600 27/08/2020,other

portion not in dlp

23 M.C Road Kalady Angamaly 7.300 SH 1

24 month(bm&bc work

is on going ch233/300 to

240/600)24 Vypin Pallipuram road Vypin Pallipuram 25.200 SH 63 Good condition DLP period completed

25Old NH 17. Moothakunnam Ferry

to Gothuruth Junction in NH 17

Moothakunnam

Ferry

Gothuruth Juction NH

170.850

Portio

n of

Old

NH 17

Good condition DLP period completed

TOTAL 325.206

1 Aluva - Paravur - Cherai Road Aluva 0/000 Cherai 20/020 20.020

Aluva,Kalama

ssery,Paravur,

Vypin

Good condition

except for a few

KWA cuttings

Aluva paravur ch3/000

to 15/500 DLP up to

5/12/2020,ch11/400 to

15/500 DLP up to

27/05/2021,paravur -

cherai 0/000 to 2/674

DLP period completed.

Included in

CRN List

2001

2Angamaly -Ayiroor-

Thuruthippuram RoadAngamaly 0/000 Thuruthippuram 24/000 24.000

Angamaly,Alu

va,Kalamasser

y,

Paravur

Good condition

Ayiroor -

Thuruthipuram road

0/000 to 11/050 DLP

up to 04/06/2020.

Included in

CRN List

2001

3

Angamaly -Manjapra Road

and Manjapra-Malayattoor

Road

Angamaly 0/000 Malayattoor 16/000 16.000 Angamaly work on going

Angamaly-manjapra

road Transferred to

NH ,BM&BC work

ongoing& 6 month dlp

for Manjapra -

Malayattoor

road,work is ongoing.

Included in

CRN List

2001

4 Aluva-Perumbavoor Road Aluva 0/000 Perumbavoor 18/000 18.000

Kunnathunadu

, Aluva

pot hole

free,closegradede

pacth arranged at

most damaged

areas

9/600 to 11/400 DLP

Up to

27/08/2020,14/850 to

16/126 -27/08/2020

Included in

CRN List

2001

on going work

RITES LIST 2001

4360290/2020/OS-PWD105

5Perumbavoor-Puthencruz

roadPerumbavoor 0/000 Puthencruz 18/200 18.200

Kunnathunadu

, Perumbavoor

Pot hole free ,

trafficable 12/200

to 18/200

damaged (

KIIFBwork on

going. After

completion of this

work road would

be in good

condition)

CH 0/000 to 2/600

work in progress,4/000

to 8/250 work in

progress ,8/250 to 9/650

DLP 13/08/2020 ch

9/600 to 12/200 is in

good condition, 12/200

to 18/200 is under

KIIFBwork

Included in

CRN List

2001

6Ponjassery- Kizhakkambalam-

Chithrappuzha RoadPonjassery 0/000 Chithrappuzha 20/000 20.000

Kunnathunadu

, Perumbavoor

Pot hole free,

Urgent

rectification

needed

handed over from

KSTP on 7/1/2020 after

DLP

Included in

CRN List

2001

7 Pulluvazhi-Thattamugal Road Pulluvazhi 0/000 Thattamugal 7/750 7.750

Kunnathunadu

, Perumbavoor

Pot hole free,

trafficable

Ch 0/000 to 1/000 Patch

work started 1/000 to

1/600 is in good codition

1/600 to 2/200 overlap in

KIIFB work Mannoor

Ponjassery & Ch2/2000 to

7/750 DLP upto

30.01.2023

Included in

CRN List

2001

8Mangalathunada-Pancode

RoadMangalathunada 0/000 Ponnode 8/000 8.000

Kunnathunadu

Newly repaired

and trafficable

under DLP, Road in

good condition

Included in

CRN List

2001

Choondi 0/000 Ramamangalam 5/800 5.800 pot hole free,

trafficable

Ramamangalam 0/000 Thodupuzha 18/070 18.07

Ch 8/650 to

10/480 (Existing

20 mm chipping

carpet suface )

upgradation

required

Choondi- Ramamangalam-

Thodupuzha Road

Kunnathunadu

,Piravom,

Muvattupuzha

In ch 0/000 to 0/420

patch work started,

0/420 to 1/400 & 3/100

to 5/800 is in good

contion ch 1/400 to

3/100 is in DLP

10/12/2020

Included in

CRN List

2001,Choondi

-

Ramamangala

m 0/000 -

5/800,Ramam

angalam to

Thodupuzha

0/000 -18/070

Total length

23.87km

9

4360290/2020/OS-PWD106

10

Kothamangalam- Keeranpaara-

Kuttanpuzha- Perimbankuthu

Road

Kothamangalam 0/000 Perumbankuth 40/000 40.000

Kothamangala

m

Damaged surface

will be rectified in

KIIFB

Budget Work and

KIIFB work is

arranged from ch

0/000 to 4/700 and

11/300 to 19/000

respectively, patch

work arranged from ch

9/200 to 11/000 and

20/000 to 23/000, DLP

existing for ch 4/800 to

9/000 and Road is

trafficable till ch

28/000 only,Rest of the

porton is under the

custody of Forest Dept.

Included in

CRN List

2001

11Muvattupuzha- Anchalpetty

RoadMuvattupuzha 0/000 Anchalpetty 13/700 13.700

Muvattupuzha

,Piravom

BM& BC surface

Renewal required

for ch 0/000 to

13/700

DLP Nil

Included in

CRN List

2001

209.540

1 Goshree RoadKin-Co boat

jetty0/000 Goshree Jn. 1/000 1.000 A a a No Major x No 90.00 Ernakulam

Good

condition.Hand

overed to CSML

DLP will be expired on

26-12-2020

Starts from

High Court Jn

and ends in

front of the

culvert near to

CMFRI .

( From here

the

Chathiayath

road of GIDA

starts and

other road

towards

Goshree

bridge.)

2 Kariyad Matoor Rd Kariyad 0/000 Mattoor 6/900 6.900 A a a No Major x No 90.00

Angamaly,Alu

va

Good condition

ch. 2/300 to 6/900

29.05.2021, ch.0/000 to

1/800 - 6

month,ongoing work.

3 High Court Road High court Jn. 0/000 Banerji Road 0/410 0.410 A a a No Major x No 90.00 Ernakulam trafficable. DLP Expired

4 Broadway Road Rest house 0/000 Ernakulathappan

ground1/020 1.020 A a a No Major x No 90.00 Ernakulam

minor pot

holes(handover to

CSML)

DLP Expired other than

(Ch: 0/300 to 0/500-will

be expired on 31-10-

2020),(Ch: 0/200 to 0/300-

will be expired on 31-07-

2020)

All these

roads together

form the

roads in

Marine Drive,

OTHER MDRs

4360290/2020/OS-PWD107

5 Banerji Road Kin-Co boat

jetty0/000

Madhavana

pharmacy Jn.0/800 0.800 A a a No

Intermedi

atey No 85.00 Ernakulam

Good

condition.Hand

overed to CSML

DLP will be expired on 26-

09-2021

6 Shanmugham Road Rest house 0/000 Kin-Co boat jetty 0/900 0.900 A a a NoIntermedi

atey No 85.00 Ernakulam

minor pot

holes(handover to

CSML)

DLP Expired

7 Road Behind Guest House Rest house 0/000 Taj hotel 0/280 0.280 A a a NoIntermedi

atey No 85.00 Ernakulam

Trafficable(hand

over to CSMLDLP Expired

8 Parallel Shanmugham Road Taj hotel 0/000 Kin-Co boat jetty 0/710 0.710 A a a NoIntermedi

atey No 85.00 Ernakulam

minor pot

holes(handover to

CSML)

DLP Expired

12.020

9 Vengoor Nayathodu RdM C

Road(Vengoor)0/000 Nayathodu 3/500 3.500 B a a No Major x No 80.00 Angamaly on going work

36 month,bm&bc work

ongoing

10 Vyttila Palarivattom Road Vyttila 0/000 Palarivattom 4/400 4.400 A a a No Minor z No 80.00 Thrikkakara Good condition Work just completed

Starts

fromVytilla

NH junctions

and reaches

Palarivattom

Jn in PK Road

SH through

Thammanam.

( Corporation

Road:-

Thammanam

Pulepady road

and GCDA

road Kaloor

Kathrikadavu

Kadvanthara

Road and

Corporation

SA road and

Subhas Bose

Road need to

be connected

to this net

work.)

Marine Drive,

front and back

of Guest

House , front

of childrens

Park .

Here DH road

(corporation

road) starting

in front of

BTH Hotel

end ending at

Jose JN in

MG Road to

be included in

core net work

4360290/2020/OS-PWD108

11 Foreshore RoadErnakulathappan

ground0/000 TDM hall 0/550 0.550 A b b No

Intermedi

atey No 80.00 Ernakulam Trafficable DLP Expired

Starts from

BTH Junction

towards Fine

Arts Hall.

Road from

Fine Arts

(Corporation

road) to

Medical Trust

Jn to be

included in

core network.

12 HMT Road HMT JN. 0/000 Manalimukku 5/000 5.000 A a a No Minor z No 80.00 Kalamassery Good condition not in dlp

13 Chithrapuzha RoadHill palace main

gate0/000 Vilakku JN 1/540 1.540 B a a No Major x No 80.00 Piravom good condition Work almost completed

Road in front

of Hill Palace

leading

towards

Refinery Road

14.990

4360290/2020/OS-PWD109

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1Punaloor - Muvattupuzha road Km.

122/605 to 137/000 (SH -8)Nellappara Vengalloor 14.395 SH

Work completed by KSTP and handed over over to PWD,

the Road is in good conditionDLP completed

2Erattupetta - Peermade road (SH -

14)Wagamon Elappara 17.000 SH

Road is in CC surface ,SLTF work arranged and the Road

is trafficable, BM BC to be arranged

3Aluva - Munnar road Km. 113/650 to

114/100 (SH- 16)

Devikulam

junction

Marayoor

junction0.450 SH

BM & BC completed, road under DLP and in good

condition. DLP up to April 2022

4Northern - Outlet road Km. 0/000 to

59/170 (SH - 17)Munnar chinnar 59.170 SH

Km. 0/000 to 40/000 BM & BC completed, road is under

DLP

Km. 40/000 to 59/170 is in CC surface, pot hole free and

trafficable

Km. 0/000 to 40/000 DLP

upto April 2023

5Munnar - Top station road Km. 0/000

to 32/150 (SH- 18)Munnar Topstation 32.150 SH

BC overlay arranged, no response on tendering. Hence

estimate is revised and retedering process is in progress

6Munnar - Kumily road Km. 31/200 to

106/010 (SH - 19) Munnar Kumily 74.810 SH BM & BC surface, BC overlay completed

road is under DLP up to

March 2021

7Thodupuzha - Puliyanmala road

Km. 0/000 to 92/167 (SH - 33)Thodupuzha Puliyanmala 66.267 SH

Km. 0/000 to 8/000 BC overlay completed, DLP completed.

Km. 8/000 to 39/500 BC overlay done by KSTP, DLP

completed and handed over to PWD. Km. 39/500 to 42/000

CC completed and DLP completed, Km. 42/000 to 60/000

BM &BC work arranged and is going on. Km. 60/000 to

85/900 handed over to NH (NH 185) Km. 85/900 to 92/167

BC overlay completed road under DLP

Km. 85/900 to 92/167is

DLP up to March 2022

8Alappuzha - Madhurai road

(SH - 40)Marika

Cumbumme

ttu128.740 SH

Marika to Udumbannoor, BM & BC,road under DLP.

Arappamattom to Blathikkavala CC surface road trafficable

DLP completed. Blathikkavala to Chelachuvadu (18.1Km)

CC road Chelachuvadu to periyar Bridge (2.5Km) BM & BC

completed.Periyar Bridge to Melechinnar CC road road

trafficable. Melechinnar to nedumkandom (14.250Km) CC

road, road trafficable, nedumkandom to seventh mile,

Closed graded CC, road trafficable. Seventh mile to

Cumbummettu CC surface, road is trafficable.

Marika Udumbannoor road

DLP up to December

2020.chelachuvadu to

periyar DLP upto April 2023

9Eranakulam - Thekkady road

(SH-41)Parakkadavu Thekkady 102.538 SH

Parakkadavu to Irukkumpuzha BM & BC road, road under

DLP, Irukkumpuzha to Manappady gate, CC surface, road

trafficable DLP completed. Pullikkanam gate to Parappu BM

BC work tendered. Chelachuvadu to Chelimada (6.8Km)

Handed over to NH (NH185), Chelimada to Kumily CC

surface, road trafficable,

Parakkadavu to

Irukkumpuzha road DLP up

to May 2022

10Kumarakom - Cumbum

(SH -42)Marika

Cumbumme

ttu74.574 SH

Marika to Inchiyani BM & BC road under DLP, Inchiyani to

Pannimattom Kulamavu CC surface road, road trafficable.

Cheruthony to Karimban (6.450Km) under NH(NH 185).

Karimban to Murikkassery BM & BC work arranged.

Murikkassery to Vettikkamattom CC road, road trafficable.

Vettikkamattom to cumbummettu CC surface road

trafficable.

Marika to Inchiyani road

DLP upto June 2021

11Muvattupuzha - Theni

(SH - 43)

Perumankando

m

Cumbumme

ttu98.010 SH

Perumankandom to paramada CC surface, road trafficable.

Painavu to Asokakkavals (21Km) road handed over to

Rebuild kerala. Idukki to Nalumukku (17.990Km) BM & BC

road, road under DLP Nalumukku to Erattayar BM & BC

work in progress and Erattayar to kattappana BM & BC

work completed, road under DLP . Amayar Chettukuzhy

(2.5Km) BM & BC. Chettukuzhy to cumbummettu CC

surface, road trafficable.

Idukki to Nalumukku road

DLP up to December 2021.

Erattayar to kattappana road

DLP upto December 2020

NameChaina

geName

Chaina

ge

Startin

g Node

End

Node

Interstate

Connectivi

tyCateg

oryGrade

STATE HIGHWAYS

Status of DLP

IDUKKI

Core Road Network

SL.

NoName of Road

Details of Link

Length of

Road

Criteria of selection of Road (As per Methodology)

TOTAL

SCOREStatusStarting Node Ending Node

Traffic

Density of

Connecting

Corridors

Tribal or

Under

Developed

Regions

Tourits/Pilgrim

Centers/Ports&

Harbours

4360290/2020/OS-PWD110

12Sabarimala - Kodaikanal

(SH -44)Thonikallu Kadavoor 134.180 SH

Thonikkallu to Pallikkavala BM & BC, road under DLP,

Pallikkavala to Vengalloor Bridge CC surface, road

trafficable.. Neriyamangalam to Pakuthipalam (30.320Km)

BM & BC work arranged(under CRF by NH). Pakuthipalam

to Chappath (2Km) Earthen road. Chappath to Kallarkutty

CC surface, road trafficable.

thonikallu to Pallikkavala

DLP up to Januvary 2022

13Hill Highway

(SH - 59)Mundakayam

Kuruthikkud

y.156.938 SH

Mundakkayam to Kuttikkanam under the control of NH183,

Kuttikkanam to chappath 19Km. Hill Highway work in

progress. Chappath to Kattappan (15.500Km) hill Highway

work arranged and to be tendered.Kattappana to

Myladupara BM & BC road.Myladumpara rajakkadu 15Km.

BM & BC work arranged Rajakkadu Ellackal 7.1Km. Road

under DLP . Iruttukanam anachal 5Km. BM & BC

completed. Anachal Ellackal 5Km. BM & BC in progress.

Kallar mankulam (18Km) BM & BC work arranged. Balance

8km portion Forest land

Puliyanmal to myladumpara

road DLP up to December

2020. Rajakakdu Ellackal

road DLP up to December

2020

959.222

1 Ramakkalmedu - Cumbummettu road Cumbummettu 0Ramakkalme

du6.35 6.35

Already selected road under Core Road Network .CC surface road

trafficable.

2 Devikulam Town loop road Periyakanal 0 Muttukadu 1.08 1.08 Already selected road under Core Road Network . CC road road trafficable.

7.43

1 Vandanmedu - Cumbummettu road Chettukuzhy 2.2Cumbummet

tu10.8 8.60 HIGH 60 Nil Z 5 10 75

Chettukuzhy ,Manthippara,Cumbummettu BM & BC road, road under

DLP

Vandenmedu cumbummettu

road DLP up to December

2020

2 Puliyanmala - Cumbumettu road puliyanmala 0cumbummett

u12.26 12.26 HIGH 60 Nil Z 5 10 75 Puliyanmala,Annarthollu,cumbummettu. BM & BC road, road under DLP

Puliyanmala Cumbummettu

road DLP uo to April 2022

20.86

OTHER MDRs

TOTAL

RITES LIST 2001

4360290/2020/OS-PWD111

Starting

Node

End

Node

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17

18 19

1Main Central Road

(131/300Km to 187/685Km)Laikad Puthuvely 56.385 High

165/000187/685 No connects NH183 No

taken over

ch131/330 to

142/000 from KSTP

on 27/01/2020 Good condition

2Punaloor-Muvattupuzha Road

(61/800 Km to 122/680Km)Plachery Nellappara 60.880 SH

84/000-96/000

DLP period

expired on 25-

03.2018

Good condition

61/800 to 84/00

handed over to kstp,

84/00- 96/00- BC

surface and

3

Kottayam-Kurukachal-

Mallappally-Kozhencherry

Highway (0/00 - 22/065)

Kanjikuzhy Jn Nedungadapally 22.065 High

4/000 22/065 No

connects

Pathanamthit

ta District No

As per Asset

Register, road

incuded as MDR.

4

Alappuzha-Pallathuruthy-

Nedumudi-Kidangara-

Changanachrry Highwy

(19/600 to 24/200)

Kidangoor East Perunna Jn 4.600 SH

19/600 24/200 No

connects MC

road and NH

66 No

Taken over ch

19/600 to 24/200

from KSTP on

27/01/2020 Good condition

5

Erattupetta-Teekoy-Vellikulam-

Vagaman-Peerumedu

Highway( 0/00 to 24/300

Erattupetta Wagamon 24.300 SHVagamon

Tourist

Centre Major SH-32

Connecting

Ettumanoor-Poonjar

SH way

Patch repair work

arranged. DLP is

6 months

SLTF19-20. patch

work arranged. work

in progress.

6

Ettumanoor-Kaduthuruthy-

Thalayolaparambu-Vaikom-

Thrupunithura-Ernakulam

Highway(0/00 37/220)

Pattithanam Jn Poothatta Bridge 37.220 SH

0/000 14/200 No

Sabarimala

Idathavalam-

Kaduthuruth

y temple and

via to

Ettumannoor

& Vaikom

Mahadeva

temple(Pilgri

m) No

Patch repair work

arranged. DLP is

26.10.2020,CH:20/5

00-27/000 KM patch

work ongoing,

ch27/000-29/000

km BC overlay

ongoing, ch:29/000-

35/200kmDLP is

24/04/2021

Patch repair work

arranged. DLP is

26.10.2020,CH:20

/500-27/000 KM

patch work

ongoing,

ch27/000-29/000

km BC overlay

ongoing,

ch:29/000-

35/200kmDLP is

24/04/2021 Trafficable

7

Ettumanoor-Kummannoor-

Kadapattoor-Pala-

Bhranganam-Erattupetta-

Poonjar road( 0/00 to 34/400

Ettumanoor Poonjar 34.400 SH

Sabarimala

Idathavalam-

Kadappattoo

r temple

(Pilgrim)

Patch repair work

arranged. DLP is

26.10.2020 Trafficable

DLP period

Core Road Network

SL.

NoName of Road

Details of Link

Length of

Road

Criteria of selection of Road (As per Methodology)

Total

Score Remarks

Starting Node Ending Node

STATE HIGHWAYS

Status of roadName Chainage Name Chainage Category Grade

Traffic

Density of

Connecting

Corridors

Tribal or

Under

Developed

Regions

Tourits/Pilgrim

Centers/Ports&HarboursInterstat

e

Connect

ivity

4360290/2020/OS-PWD112

8Alappuzha-Madurai Road

24/634 to 54/850Km

Thanneermukko

m Bund EastAverma 23.996 SH

no no

Thalayolaparamb

u Koothattukulam

road Ch 4/100-

11/200 BC

overlay

arranged.thaneer

mukkom bund

road ch:0/00-

1/780 km dlp is

25/06/2020,vaiko

m-vechoor road

ch:5/000-7/000

km DLP is

25/06/2020,pulinc

huvadu

cherumchuvad

road 0/000-2/212

kmDLP is

27/01/2022 ,EE

Road ch:20/500-

26/000 km patch

work arranged trafficable

9Kumarakom-Cumbam road

0/00 to 43/104Km

Kumarakom Boat

Jetty Jn

Kothalapady in

T.K. road35.400 SH

Kallara-Vechoor

road ch:3/044-

7/524 km DLP is

23/06/2020,vaiko

m-vechoor road

Ch:7/800-12/200

not in DLP Trafficable

10Sabarimala--Kodaikkanal road

29/000 to 87/785KmKanamala Thonikallu 58.785 SH

kanjirappally

Erumely-:0/000-

11/815DLP

period expired

on 30/12/2019

KPLY Subdivision

(1) SH kanjirapally

erattupetta (Ch

0/00 to 7/00)-

handed over to

RICK-BC Suface&

trafficable (2)

SH:Kanjirapally-

erumely- (Ch 0/00

to 11/815,- reach

from 26th mile to

erumely . )-BC

Suface , trafficable

4360290/2020/OS-PWD113

11 Hill Highway 0/00 to 22/050km Mundakayam Plachery 22.050 SH

Erumely -

Mukkada work in

progress -DLP

peirod 18 months

Placherry -

Mukkada road

will expired on

10.08.2021

The reach from

Karimkallumoozhy to

Placherry in under

Erumely section.It

consists of Two roads

,Erumely-Mukkada

&Placherry -Mukkada

one SF work recently

completed other one

is in Progress

12

Mundakayam-Elavungal

S.H.(Mundakayam-Koruthodu-

Mukkampetty-Pampavally)

0/00 to 21/250Km

Varikani Jn Kanamala 21.250 SHDLP peirod

expired Trafficable

13Changanacherry-By pass road

0/00 to 5/200Palathrachira Laikkad 5.200 High

0/000 5/200 No Railway station No

from ch 0/000 to

2/500 -20/11/2020

and from ch 2/500

to 4/200 -

11/12/2020 Good condition

TOTAL 406.531 KM

1Thalayolaparambu

Koothattukulam Road

Thalayolaparamb

u 0/000 koothattukulam 11/500 11.5 2001 CRN list

1/500-4/000

Patch repair work

arranged. Trafficable

2 Kottayam Kumarakom road Illickal Jn 0/000 Boat Jetty Jn 7/000 7 MDR

list Connecting

Illikkal Junction to

Boat Jetty 2001

CRN list

Patch Work

Tendered Trafficable

3 Kumarakom Vechoor road Boat Jetty Bridge 0/000Kaipuzhamuttu

Bus Stand6/350 6.35 SH

Connecting Boat

Jetty to

Kaipuzhamutt in

Patch Work

Tendered Trafficable

4Vadakkenada and landing

pagoda road 0/000-1/655

Valiyakavala -

Vaikom in EE

27/000 & South

Gate of Vaikom

Temple

0/000

WestGate of

Vaikom Temple &

Boat Jetty

Vaikom

0/805 &0/850 1.655

list Connecting

SH15 and Vaikom

Boat Jetty road -

2001 CRN list

Vadakkenada

road no DLP & LP

road DLP is on

11/08/2020 Trafficable

5 EV road Valiyakavala 0/000 Boat Jetty 1/200 1.2

Connecting

valiyakavala and

Vaikom temple- -

2001 CRN list

DLP peirod is

on 06/01/2021 Trafficable

6Manarcad - Kidangoor road

0/000-13/272Manarcadu 0/00 kidangoor 13/272 13.272 high 0/000

13/27

2No

Pilgrim

centreMajor No

Connecting NH 183

and Ettumanoor -

Poonjar SH way -

2001 CRN listGood condition,traffic

7Marangattupally-Uzhavoor

roadMarangattupally 0/000 Uzhavoor 13/228 13.228 2001 CRN list

24.07.2019 Good condition

8Manarcad-Puthuppally-

Thenganal road 0/000-15/267Manarcadu 0/000 Thenganal 15/267 15.267 High 0/000 15/267 No

pilgrim

centre

Connecting NH

183( at Manarcadu

Jn) to MC Road (at

Perunthuruthy Jn)

and also connects

Thenganal Jn in Satisafactory

RITES LIST 2001

4360290/2020/OS-PWD114

9Meenachil Kaduthuruthy road

0/000-4/000Meenachil 0/000 Kaduthuruthy 8/000 8.000 high 0/000 4/000 No

pilgrim

centreMajor

Conne

cting

to SH1

Connecting

Kuravilangad-

Kuruppanthara

road and

Ettumanoor -

Not in Defect

liability period Good condition

10

Changanacherry Vazhoor

karukachal-pathanamthitta

road 0/000-25/540

Changanassery

Boat Jetty0/000 Manimala 33/800 33.8 high 0/000 No

pilgrim

centre

Connecting

Vazhoor Jn in

NH183 to MC road

at Changanacherry

Central Jn

,Sabarimala leading

satisfactory

11 Anthinadu- Melukavu road Anthinadu 0/000 Melukavu 11/0000 11 Nil Major

Conne

cting

SH8

2001 CRN list

DLP Expired

Allegated cracks

with undulations

122.272

1Koothattukulam - Ramapuram

road Perumkutty 3/600 Ramapuram 11/056 7.456 high No

Nalambalam

Temple

(pilgrim)

Major No 75Nalambalam

Temple (pilgrim)Not in Defect

liability period

Trafficable.Cracks

and depressions

formed along the

7.456

282nd mile MC Road to 5th

mile CW road 0/480 - 8/190Kallukadavu 0/480 Thengana 8/190 7.71 High 0/480 8/190 No

Pilgrim

centre42.5

CW(Changanacherr

y Vazhoor) road

and MC road linktrafficable

3Kottayam Municipal bus stand

road Starts at Green Park Junc@on0/000

Nagambadom

Muttabalam

Nagambadam

End

0/340 0.34 high NO No 45

Road connecting to

Kottayam Railway

Station Agreement ExecutedTrafficable

4 Lower Bazar road Baker Jn 0/000 Alumood Jn 2/660 2.66 high NoKumarakom

(Tourist)Major 55

Connecting MC

road to Aruthootty Budget Work in ProgressTrafficable

5Vazhoor Puliyannoor road

0/000-19/588Vazhoor 0/000 Puliyannoor 19/588 19.588 medium No

Sabarimala

(Pilgrim)Major no 55

Connecting

Kodungoor Jn in

NH183 to Mutholy

CH 0/000 TO

2/000-DLP period

expired. Trafficable

6Thalappara Neerpara road

0/000-6/000

Thalappara Jun:

TK road Ch:

1/300 km

0/000Neerpara Jun:

(District boundry)6/000 6 high 0/000 6/000 No NA NA No 52.5

Connecting SH40

and SH15 leading

road to Ernakulam

patch work

arranged trafficable

7Gandhi Nagar road 0/000-

2/000Gandhinagar Jn 0/00

Medical college

Jn2/00 2 high No na Major no 42.5

Connecting MC

road to Medical

College road

trafficable

8 Pala Ramapuram road Pala 0/000 Ramapuram 11/600 11.6 Medium noNalambalam

(Pilgrim)Major no 42.5

Connecting

Ettumanoor

Poonjar SH way and

Ramapuram

Work done by

KSTP. DLP

expired

Road made

trafficable by

carrying out

patch repairs

9 Pala Kozha road 0/000-15/630 Pala 0/000 Kozha 15/630 15.63 Medium No Major No 45

Connecting MC

road and

Ettumanoor

Poonjar SH

Work done by

KSTP Trafficable

10 Thiruvathukkal Illikkal road Thiruvathukkal jn 0/000 Illickal Bridge 1/770 1.77 medium NoKumarakom

(Tourist)Major 55 Leading to Illickal

DLP period

expired on

22.07.2019 Trafficable

67.298

OTHER MDRs

Additional Roads recommended for addition

4360290/2020/OS-PWD115

Grade Score

Startin

g Node

End

Nod

e Score Grade Score

Catego

ry Grade Score

Grade Score

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

1 M.C. Road Adoor 83/315 Manthuka 108/100 24.785 S.H.

KSTP ROAD KM 90/300-

93/300-bm AND bc.DLP

Period.

DLP Period.

2 M.C. Road Thiruvalla 121/400 Idinjillam 131/300 9.900 S.H. kstp ROAD

3Kayamkulam - Pathana puram

road

Pazhakula

m19/400 Adoor HS Jn. 25/00 5.600 S.H.

BC overlay

completed.DLP up to

2022

DLP up to

2022

4Kayamkulam - Pathanapuram

roadAdoor 27/056 Pathanapuram 42/520 15.464 S.H.

BC overlay completed

for 27/050-35/000.DLP

up to 2022.km 35/000-

42/520 BC overlay work

ongoing

DLP up to

2022

5 Punalur - Muvattupuzha road Pathanapu

ram13/796 Placherry 61/700 47.904 S.H. KSTP ROAD

6 Kayamkulam - Thiruvalla road Parumala 21/400 Thiruvalla 30/560 9.160 S.H. bm and bc

completed.DLP ended.DLP ended.

7 Thiruvalla - Kumbazha road Thiruvalla 0/00 Kumbazha 33/000 33.000 S.H. bm and bc

completed.DLP ended.DLP ended.

8 Ambalappuzha - Thiruvalla road Neerettup

uram18/800 Thiruvalla 22/500 3.700 S.H.

bm and bc

completed.DLP period. Under DLP

9 Mannarakulanji - Pamba road Mannarak

ulanji32/000 Pampa 53/500 21.500 S.H.

Bm and bc

completed.DLP period.Under DLP

10 Kottayam - Kozhencherry road Nedungad

a ppally24/660 Pullad 40/890 16.230 S.H.

bm and bc completed.

For 28/000-29/600 DLP

period. Balance portion

work started by NH.

up to 28/000

DLP

completed

28/000-29/600

under DLP

From 29/600

to 40/890

11 Mavelikkara - Kozhencherry Aickadu

Palam19/925 Kozhencherry 28/766 8.841 S.H.

bm and bc

completed.DLP period.Under DLP

Total 196.084

STATE HIGHWAYS

DLP

Starting Node Ending Node

Traffic

Density of

Connecting Corridors

Tribal or Under

Developed Regions

Tourits/Pilgrim

Centers/Ports&Harbours

Interstate

Connectivity

Name Chainage Name Chainage

Pathanamthitta

Core Road Network

SL.

No Name of Road

Details of Link

Length of

Road

Criteria of selection of Road (As per Methodology)

Total

Score

Constitue

ncy Remarks

4360290/2020/OS-PWD116

1 Thiruvalla- Mallappally Road Thiruvalla 0/000 Mallappally 14.160 14.160 Thiruvalla

included in the KIIFB

project 2016-17.(to be

executed through RICK)

2 Vennikkulam -Ranny Road

Vennikkul

am 0/000 Ranny 15.500 15.500 Ranni

from 4/500-15/600 BM

and BC work

completed.(nabard

work )completed

Under DLP

3 Mannarakulanji - Kozhencherry Mannarakulanji0/000 Kozhencherry 15.635 15.635 Aranmula

project nearing

completion under KIIFB

project 2016-17

Under DLP

4

Vadasserikkara - Plappally

Road

Vadasserik

kara 0/000 Plappally 37.000 37.000 Ranni & Konni

DLP period up to

7/2024.BM and BC

completed

DLP period up

to 7/2024.

5

Pathanamthitta- Kaipattoor -

Kodumon - Ezhamkulam Road

Pathanam

thitta 0/000

Ezhamkulam

Road 17.500 17.500 Adoor

Pathanamthitta

Kaipattoor (6.33km) is

part of NH

183A.kaippattoor-

Kodumon -Ezhamkulam

road has been included

in the KIIFB project

2017-18.DPR

submitted for A.s.

6

Kochalummodu- Pandalam-

Kaipattoor Road

Ayranikuz

hy 0/000 Kaipattoor 13.900 13.900 Adoor

Kochalummoodu-

Pandalam BC overlay

completed.DLp up to

2022.pandalam-

kaippattoor Road.DLP

ends.

DLP

7 Pandalam - Omalloor Road Kulanada 0/000 Omalloor cross Jn11.800 11.800 Aranmula

BM and BC work under

Nabard ongoing.

8

Pandalam - Aranmula Road &

Temple approach Road Kulanada 0/000 Aranmula 13.000 13.000 Aranmula

Pandalam-aranmula

road DLP period of BM

and BC work up to

DLP period

of BM and BC

work up to

138.495

1 Ring Road 0/000 - 5/300 Aban Jn 0/000 Aban Jn 5.300 5.300 A 60 a a 15 NO Pilgrim x 15 no 0 90.0 Aranmula

BC overlay

completed.DLP up to

05/2023

DLP up to

05/2023

5.300

RITES LIST 2001

OTHER MDRs

4360290/2020/OS-PWD117

2 Cherukolppuzha-Ranny Road Cherukolpuzha0/000 Cheukolpuzha 9.200 9.200 B 50 a a 15 Under Developed x x 15 no 4 80.0 Ranni

included under KIIFb

project 2017-18

3 Adoor Anandappally Kaippattoor Adoor 0/000 Kaippattor 10/980 10.980 B 50 a a 15 NO X X 15 no 5 80.0 Adoor

BM and BC work

completed.DLP period

up to 2022

DLP period up

to 2022

4 Pathanamthitta - Mylapra Road 0/000 - 2/290Pathanamthitta0/000 Maylapra 2.290 2.290 B 50 a b 12.5 NO Pilgrim x 15 no 6 77.5 Aranmula DLP period up to 05/2023

DLP period up

to 05/2023

5 Kumbazha -Konni Kumbazha 0/000 Konni 5/200 5.200 B 50 a b 12.5 Under Developed x x 15 no 7 77.5 konni PM road. KSTP

6 Chandanappalli - Konni Chandanappalli 0/000 Konni 12/200 12.200 B 50 b a 12.5 Under Developed x x 15 no 8 77.5 konni

patch works completed.

DLP up to 7/2020

DLP up to

7/2020

7 Thannithodu-Chittar Thannithodu0/000 Chittar 5/965 5.965 B 50 a b 12.5 Under Developed x x 15 no 9 77.5 konni Patch work ongoing .

8 Konni-Kalleli Eliyarakkal 0/000 Kalleli 6/120 6.120 B 50 a b 12.5 Under Developed x x 15 no 10 77.5 konni BM and BC Road .DLP ended.DLP ended.

9 Mannarakulanji-Puthukkulam Mannarakulanji0/000 Puthukulam 7/200 7.200 B 50 a b 12.5 Under Developed x x 15 no 11 77.5 konni Patch work completed.

DLP up to

7/2020

10 Kaippattoor -Vallicodu Kaipattoor 0/000 Vallicodu 3/400 3.400 B 50 a b 12.5 Under Developed x x 15 no 12 77.5 konni

patch work

completed.DLP up to

8/2020

DLP up to

8/2020

11 Thumpamon - Kozhencherry Thumpamon 0/000 Kozhencherry 13.500 13.500 B 50 b a 12.5 Under Developed x x 15 no 13 77.5 Aranmula

A.s received for the

KIIFB project 2017-18.

12 Pathanamthitta-Ayroor Pathanamthitta0/000 Ayroor 10.000 10.000 B 50 a b 12.5 Under Developed x x 15 no 14 77.5 Aranmula

patch work

completed.DLP up to

7/2020

DLP up to

7/2020

13 Manjanikkara-Elavumthitta-Kidangannoor RoadManjinikkara0/000 Kidangannoor 17.700 17.700 B 50 a b 12.5 Under Developed x x 15 no 15 77.5 Aranmula Ongoing kiifb project

under DLP

(Ongoing kiifb

project)

14 Varattar Bridge in MC road Kallisserry - Eraviperoor roadAratukadavu in MC road0/000 Othera 4.420 4.420 A 60 a b 12.5 NO Z Z 5 no 16 77.5 Aranmula

patch work

completed.DLP up to

07/2020

DLP up to

07/2020

15 Kavumbhagom-Muthoor-KuttappuzhaKavumbhagom0/000 Kuttappuzha 2.000 2.000 A 60 a b 12.5 NO Z Z 5 no 17 77.5 Thiruvalla DLp up to 2022

DLp up to

2022

110.175

4360290/2020/OS-PWD118

Name Chainage NameChainag

e

1Alappuzha-Madhura road

km.0/000 to 24/634

Power

house

bridge

junction

Including

Thanneermu

kkom bund

24.634 SH 40

From Ch : 12/954 to

24/634Budget work

2018-19

Improvements to

Alappuzha-Madhura

road by providing

BM & BC overlay

work arranged, work

arranged from ch :

2

Alappuzha-Changanassery

road km.0/000 to 19/800

including Nedumudy &

Pallathuruthy landings

Alappuzha Kidangara 20.562 SH 11 Good condition

3Ambalapuzha-Thiruvalla

road km.0/000 to 18/800

Ambalapp

uzha

Neerettupur

am18.800 SH 12

KIIFB Work

Completed

4

Alappuzha-Arthunkal-

Chellanam road km.0/000 to

32/720

Thumpoly Chellanam 32.720 SH 66

Ch 11/500 to 15/000,

good condition patch

work completed on

31.12.2019- . From

Ch.17/500 to 20/500-

good condition patch

work completed on

10.05.2019. ch

28/000 to 32/720

handover to NH and

ch 21/040 to 28/000 -

good condition (

patch work done)

5Kayamkulam-Pathanapuram

road km.0/000 to 19/400

Kayamkul

am

Adikkattuku

langara

Continuing

in

Pathanamthi

tta Dist.

19.400 SH 5 good

6Kayamkulam-Thiruvalla

road km.0/000 to 21/400

Kayamkul

am

Pannayi

Bridge at

Mannar

Continuing

in

Pathanamthi

tta Dist.

21.400 SH 6 On going work

7Mavelikara-Kozhencherry

road km.0/000 to 19/925

Mavelikka

ra

Ayikkattu

Bridge at

Puthencavu

Continuing

in

Pathanamthi

tta Dist.

19.925 SH 10 good

Currently not in DLP

3/30/2023

From Ch: 11/500 to

15/000 DLP period is

upto 30.06.2020 ,

From Ch: 17/500 to

20/500 DLP period

upto 09.11.2019. from

Ch:16/000 to 17/500

DLP period upto

04.05.2019. from ch

21/040 to 28/000 DLP

period upto

20.07.2020

07.04.2023

NA

26.12.2020

28/10/2021 (ch :

0/000 - 3/000)

CORE ROAD NETWORK

ALAPPUZHA DISTRICT

Sl

No Name of Road

Road Code

No

Details of linkLink

Length

(Km)

Pavem

ent

width

in

Lane

Base

year

traffic

(in

PCU)

Remarks

Current Status

of Road (

Work

Ongoing/ Good

Condition/

DLP Period Starting node Ending node

STATE HIGHWAYS

4360290/2020/OS-PWD119

8Main Central road

km.108/000 to 121/400Karakadu Kuttoor 13.400 SH - 1 NA

TOTAL 170.841

1Mavelikkara -

Krishnapuram roadSA32

Mavelikka

ra0.000

Krishnapur

am11.900 11.900 IL 4289 good

2Thattarambalam -

ThrikkunnapuzhaSA34

Thattaram

balam0.000

Thrikkunna

puzha13.070 13.070 IL 4649 good

3

Sasthamkotta -

Charummod road &

Chaarumood Pallikal road

SA63 & SA36Sasthamk

otta 0.000

Chengannu

r15.000 15.000 IL 5517 NA

4Kayamkulam deviation

roadSA52

Kayamkul

am0.000

Kayamkula

m2.300 2.300 DL 4380

work on going under

NABARD

5Ochira Thamarakkulam

roadSA69 Ochira 0.000

Thamarakk

ulam14.000 14.000 IL 3641

KIIFB Work under

Roads Division

Kollam ongoing

6

Edathua Veeyapuram road

& Haripad Veeyapuram

road

SA237

&SA86Edathua 0.000 Haripad 9.822 9.822 IL 7375

Edathua

Veeyapuram - DLP

till March 2022

Harippad

Veeyapuram not in

DLP

7

Cherthala - Arthunkal road

& Alappuzha Arthunkal

road

SA103 &

SA88

Cherthala

Arthunkal

0.000

7.000

Arthunkal

Thumpoly

junction

7.000

25.00025.000 DL 1520

Cherthala Arthunkal

road From Ch: 0/000

to 0/500 BM- BC

Road good

condition., From Ch:

0/500 to 4/200 Good

condition-Patch work

completed . From

Ch:5/000 to 7/000

Good condition

Patchwork

completed. From Ch:

4/200 to 5/00 work

required

8

Kanichukulangara road &

Kanichukulangara Chethy

road

SA107

&SA123

Kanichuk

ulangara0.000 Chethy 3.500 3.500 SL 6362

Good condition (

BM&BC Road )

9Kanjikuzhy Muhamma

roadSA109

Kanjikuzh

y0.000 Muhamma 3.500 3.500 SL 4975

Good condition (

BM&BC Road )

10

Alappuzha - Nedumudi -

Kidangara -

Changanassery road

SH11 Kalarcode 0.000 Perunna 24.200 24.200 DL 5023 Good condition

122.292

Starting

Node

End

NodeScore Grade

1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 18 19 20 21 22 23

Name Chainage Grade Score Category Grade

Current

Status of

Road

DLP Perioud Tourits/Pilgrim Centers/Ports&Harbours Interstate

Connectivity Total

scoreScore Grade Score

24

OTHER MDRs

SL.

NoName of Road

Details of Link

Length of

Road

Criteria of selection of Road (As per Methodology)

Remar

ksConstituen

cyName Chainage

Starting Node Ending Node Traffic Density of Connecting

Corridors

Tribal

or

Under

11.09.2022

Proposed NH Currently not in DLP

Total length

Good condition

03.07.2020

11.09.2022

Overlapping SH 10

from Pallikal upto

Chengannur

NA

NA

Leads to Kollam NA

06.12.2021

NA

RITES LIST 2001

12.07.2021

4360290/2020/OS-PWD120

1Thattarambalam -

Thrikkunnapuzha RoadKarippuzha jn: 1/800

Thrikkunnapu

zha13/070 11.270 A 60 a a 15 No

Intermediate

tourist/pilgrim

centre

y 10 No 0 85 HaripadGood

Condition

2Erumakkuzhy - Edappon

RoadPara Junction 0/000 Edappon 06/380 6.380 A 60 a a 15

Intermediate

tourist/pilgrim

centre

Y 10 No 0 85Mavelikar

agood

3Puthiyakavu - Pallickal

RoadPuthiyakavu 0/000 Kattanam 9/400 9.400 A 60 a a 15

Intermediate

tourist/pilgrim

centre

Y 10 No 0 85

Kayamkul

am/

mavelikara

work on

going under

KIIFB

4

Bharanikkavu- Komallor -

Thervumukk- Padanilam -

Kudassanadu -

Athikkattukulngara Road

Bharanikkavu 0/000Athikkatukul

nagara17/200 17.200 A 60 a b 12.5

Intermediate

tourist/pilgrim

centre

Y 10 No 0 82.5

Kayamkul

am/

mavelikara

work on

going under

CRF

44.250

5Haripad - Veeyapuram

road

Haripad Town

hall Jn:0/000

Thrippakkuda

m1/650 1.650 B 50 b b 10 Yes

Major

tourist/pilgrim

centre

x 15 No 0 75 Haripad Good

6Thrikkunnapuzha -

Valiyazheekkal road

Thrikkunnapuz

ha0/000

Valiyazheekk

al 15/700 15.700 B 50 b b 10 Yes

Major

tourist/pilgrim

centre

x 15 No 0 75 Haripad

Good

Condition

(0/000 to

5/400 - Patch

Work

Arranged)

7 Sabarimala village RoadPottamelkadav

u2/400

puliyoor

kizhakkenada

jn

7/800 5.4 B 50 b c 7.5 NA

Major

tourist/pilgrim

centre

x 15 No 0 72.5Chengann

ur

BM & BC

Road, Good

Condition

22.750

06.12.2020

NA

NA

Not in DLP

30.06.2019

16.08.2022

17.04.2021

4360290/2020/OS-PWD121

Name Chainage Name ChainageStarting

NodeEnd Node Category Grade

1Challimu

kku43/000 Arippa 52/000

BC overlay

in progressGood

Hillhighway work

ongoing

Arippa 52/000

Kulathup

uzha

Temple

61/400BM overlay

in progressGood

Hillhighway work

ongoing

Kulathup

uzha

Temple

61/400Thenmal

a73/296 4/22/2024 Good

2

Adoor -

Sasthamk

otta road

7thmile 11/200Sasthamc

otta18/250 7.050 S.H 37 Good

SF 18-19 Heavy

maintenance -

Providing BM

and BC - work in

progress - Ch

4/200 to 16/000

handed over to

NH.

3 Ayoor 0/000Agastyac

ode9/000 2012 Moderate

KIIFB work,

Awaiting T.S

Agastyac

ode9/000 Punalur 19/082 BM ongoing Good

Hillhighway work

ongoing

Parippally 0/00 kulamada 1/600 2019 Good

Elikkunna

m mugal11/200

Madathar

a33/100 11/20/2021 Good

5

Punalur

Moovattu

puzha

road

TB jn

Punalur0/00

Kallumka

davu13/800 13.800 S.H -8 May-20 Good

Anchal

RO Jn7/300

Alencher

ry9/200 2013 Moderate

Upgradation

work necessary

6Alencher

ry9/200

Kulathup

uzha 26/200 Good

Hillhighway work

ongoing

Old NH

Portions

Oachira

North

Puthiyaka

vu2.250 Old N.H

27/02/2023(

for bits on

LHS and

RHS near

Puthiyakavu

)

It is not a

continuous stretch

and is scattered in

small bits. Work

arraged by NH in

three bits near

Valiyakulangara.

It is not a

continuous stretch

and is scattered in

small bits.

KOLLAM DISTRICT

Core Road Network

Sl. No.Name of

Road

Details of link

Length of

roadCategory

Criteria of Selection of Road ( As per Methodology)

DLP STATUS RemarksStarting Node Ending Note

Traffic

Density of Tribal or

under

developed

Tourits/Pilgrim Interstate

Connectiv

ity

MarksRemarks

STATE HIGHWAYS

Thiruvana

nthapura

m -

Tschenkot

ta road

30.300 S.H-2

Ayoor -

Punalur

road

19.090 S.H 48

4

Varkala -

paripally -

Madathar

a road

23.500 S.H 64

Hill High

way Ayoor

Kulathupp

uzha

18.900 S.H -59

4360290/2020/OS-PWD122

2/18/2020 Good

Chipping carpet

provided on bit

near Pulliman

Junction.

1/22/2019 Good

Chipping carpet

provided on bit

near Lalaji

Junction.

Moderate

Chipping carpet

existing on bit near

Vettamukku. DLP

not Known.

Old NH

Portions

Sakthikula

ngaraKavanad 1.600 Old N.H

Old NH

Portions

Vellayitta

mbalam

Chinnakk

ada3.700 Old N.H May-21 Good

8 MC road Vazhodu 43/100 Enathu 83/500 40.4 SH 1

BC overlay

completed

Through

SCDP

safe corridor

Demonstration

Project

Total 164.190

1

Kollam-

Ayoor

Road

Kollam 0/000 Ayoor 30/750 30.750 MDR

Connectivi

ty to NH

66 , NH

744 &

MC road.

Presently

the road is

under

KSTP and

not yet

handed

over.

28.02.2015 Trafficable

2

Chavara -

Pattakkad

avu Road

KMML,

CHAVA

RA

0/000Karalimu

kku9/000 9.000 MDR 7/4/2019

work

progressing

from ch 0/00

to 5/000.

Balance in

trafficable

condition

BC Overlay

work proposed

from ch 5/000 to

9/000. It is in

Tender stage

3

Karalimuk

ku -

Kadapuzh

a Road

Karalimuk

ku0/000

Kadapuzh

a5/100 5.100 MDR

Good

Condition

Entire stretch is

under KIIFB

project and work

is in progress.

BM completed.

3.600 Old N.H

RITES LIST 2001

7

Old NH

Portions

Pulliman

Jn

Neendaka

ra

4360290/2020/OS-PWD123

4

Kundara

Pallimukk

u -

Chittumal

a

(RANDUR

OAD)

Randu

road0/000

Pallimukk

u5/500 5.500 MDR Trafficable

work started on

02/06/2018 and is

in progress

5

Chathann

oor -

Paravoor

Thirumuk

ku0/000

Pozhikkar

a9/660 9.660 MDR

Connectivi

ty to NH

66.

2018 Nov Good

6

Paravoor -

Thoppil

Landing

Paravoor 0/000 Kappil 2/810 2.810 MDR

Tourist

destinatio

n to

Kappil

Beach.

2020

MarchGood

7Paravoor-

Paripally Paravoor 0/000 Paripally 10/250 10.250 MDR

Tourist

destinatio

n to

Kappil

Beach.

2016 Nov Good

8 Ayoor 0/000 Roadvila 8/000 MDR

Connectivi

ty to NH

66.

11/29/2020 Good

Roaduvil

a8/000

Kummall

oor17/500 MDR 2/10/2023 Good

Kattachal

Junction17/600

Ithikkara

Junction24/043 MDR 2019 Good

9

Kottarakk

ara -

Sasthamc

otta Road

Kottarakk

ara0/000

Sasthamc

otta17/300 17.300 MDR

KIIFB 16-

17 work

ongoing.

Good

KIIFB work in

progress under

the control of

PWD roads

Section,

Kottarakara

NH-

Padanaya

rkulangar

a temple

0/000

kallukada

vu

Bridge

4/200 4/15/2019

Road

developed

potholes.

KIIFB work

progressing.

10Kallukad

av bridge4/200

Anjilimo

odu9/600

KIIFB work in

progress under

the control of

PWD roads

Section,

Karunagappally

Kottarak

kara

chandam

ukku

0/000nellikkun

nam5/000 25-11-2020 average

11nellikkun

nam5/000

kurisinm

ood15/000

Connectivi

ty to MC

road.

5/28/2021 Good

Kottarakk

ara -

Velinalloo

r Road

15.000 MDR

Ayoor -

Ithikkara

road

24.043

Sasthamc

otta -

Kochanjili

moodu -

Karunaga

ppally

Road

9.6 MDR

4360290/2020/OS-PWD124

12

Vavvakka

vu -

Thazhava

Road

Road

Vavvakka

vu0/000

Manappal

ly 5/650 5.650 Good

Budget work

ongoing.BM &

BC completed

13

Manappal

ly -

Anayadi

Road

Manappal

ly 0/000 Anayadi 8/426 8.426 11/30/2022

good upto

0/800

BM & BC upto

Ch 0/800.Balance

CC

14

Pazhakula

m -

Anayadi

Pazhakul

am0/000

vellachira

Junction1/200 2.000

Only 2km

is under

Kollam

Division

balance

Portion is

under

Pathanamt

hitta

district

May-23 Good

KIIFB work

ongoing- GSB

provided- WMM

laying ongoing

15

Oachira -

Thamarak

ulam

Oachira 0/000Erickal

bridge3/287 3.287

Connectivi

ty to NH

66,

Oachira

temple.

BAD

CC at present.To

be upgraded to

BM & BC -

Ongoing KIIFB

work

158.376

4360290/2020/OS-PWD125

Grade ScoreStarting

Node

End

NodeScore Grade Score Category Grade Score

1 2 3 4 5 6 7 8 9 10 11 12 13 15 16

1 M C Road Nalanchira

10/00Thattathumala

43/200 33.2 SH -1

0/000 to 14/650-

Cantonment

section,Good in

condition

Km 14/650 to 25/000

was with KSTP. Now

handed over after DLP

on January 2020.

Remaining with KSTP,

Road safety corridoor

project in progress

Km 0 to 16.6 - BM & BC

surface.

Km 16.6 to 19.7Chipping

carpet

0 to 11. SLTF works just

completed.

Km 11 to 19.7, Hill

Highway work in

progress

For 0/000 to

11/000 DLP

up to

09/2020

DLP Expired

on 09/2019

from Km

0/000 to

4/200

For 4/200 to

10/500 DLP

up to

06/2021

DLP Expired

on 01/2020

from Km 16

to 25

Balance

portion now

in DLP

Starting Node Ending NodeTraffic

Density of Connecting

Corridors

Tribal or Under

Developed Regions

Tourits/Pilgrim

Centers/Ports&Harbours

14 17

STATE HIGHWAYS

THIRUVANANTHAPURAM DISTRICT

CORE ROAD NETWORK

SL.

NoName of Road

Details of Link

Length of

Road

Criteria of selection of Road (As per Methodology)

Road Code

NoPresent Status

Remarks(DL

P Period)Pavement

width in Lane

Base Year

Traffic (in

PCU) 2001

Name Chainage Name Chainage

4360290/2020/OS-PWD126

(From 19/700)Kallikadu

to Vazhichal-

Hill Highway work in

progress

Vazhichal to

Kudappanamoodu-

Hill Highway work to be

tendered

Kudappanamoodu to

Anappara-

Hill Highway work in

progress

Anappara to

Kadukkara- SLTF work

arranged

Vellayambalam-Kowdiar

road=1.200

Kowdiar-Peroorkada

road=2.040

Peroorkada-Vazhayila

road=0.640( first stretch)

Peroorkada-Vazhayila

road=0.790( second

stretch) Good in

condition,BM&BC work

arranged in Kowadiar-

Peroorkada road

Ch.0/000 to 3/000-

SLTF work ongoing,

Road selected for doing

White topping project

Km 10 to 35,-

Sabarimala Project in

progress. Km 35

to 43.200,-Hill Highway

Project in progress

4

Thiruvananthapu

ram Ponmudi

Road

Chulliman

oor

0/0037/200

Ponmudi 37/200 37.200 SH - 45

BM & BC surfacing

Selected under Rebuild

Kerala.

5Venjaramoodu

Attingal

Venjaram

oodu 0/00

10/460

Attingal 10/460 10.460 SH - 47 SLTF Work -On going

6Kilimanoor

Alamcode Kilimanoor 0/00

10/800

Alamcode 10/800 10.800 SH - 46

(Budget Work 2017-

18) BC Overlay work

in progress

DLP not yet

started

37.5 SH - 3

DLP Expired

DLP up to

04.07.2022

22.02.2027

22.02.2027

30.05.2031

DLP not yet

started

2Nedumangad -

Shorlacode roadNeduman

gad

0/0037/500

Kadukkara37/500

DLP of

patchwork

will be over

by August

2020

DLP not yet

started

3

Thiruvanathapur

am - Shencotta

Road

Thiruvana

nthapuram

0/0043/200

Elavupalam43/200 43.2 SH - 2

4360290/2020/OS-PWD127

7Vembayam -

NedumangadVembaya

m

0/008/00

Nedumangad8/000 8.000 SH - 47 BM & BC surfacing,

Land acquisition for

KIIFB project in progress

8Varkala-

ParippallyVarkala 0/000 Parippally 11/600 11.600 SH - 64

KIIFB work submitted for

tender

9Parippalli-

MadatharaKulamada 1/600

Elikkunnam

mugal11/200 9.600 SH - 64

Work arranged for BC

Overlay

201.560

Attakulangara to

Thiruvallam-

BM & BC Work

arranged

Thiruvallam to Poovar -

BCoverlay required. Now

road not in good

condition but trafficable

Poovar to Sankurutty

road up to Oorambu

junction- 6/200 km,

Oorambu to

Cheruvarakonam-

TamilNadu reach

(4/200),

Cheruvarakonam to

Kaliyikkavila-2/700

{Road from Poovar to

Kaliyikkavila already

done by KSTP during

2010-2011}

Now Road in good

condition except

isolated potholes

vizhinjam

toPanayarakunnu- Road

in good condition

DLP Expired

Total

RITES LIST 2001

1

Thiruvananthap

uram-

Vizhinjam-

Poovar-

Sankurutty-

Cheruvarakona

m Road

Manacadu 0/000 Poovar 40/900 40.9 3271 ST201

DLP of

SLTF Work

(live)

DLP Expired

DLP Expired

on 2015

IL(5.5m)

DLP of

patchwork

will be over

by August

2020

DLP of SLTF

Work ended

on 11/2019

Not in DLP

4360290/2020/OS-PWD128

Panayarakunnu to

Balaramapuram - Road

in good condition

Balaramapuram to

Kattakada-

Road transferred to NH

Division TVPM for CRF

work

Kattakada to Kuttichal

3

Parassala

Panachamood

road

Parassala 0/000Panachamoo

du12/950 12.95 5479 ST205

Hill Highway work

(KIIFB) in progress

4Vamanapuram-

Chittar Road

Vamanpu

ram0/000 Palodu 20/900 20.9 2875 ST208

KIIFB Project in

Progress.Work not

completed

5

Vembayam-

pallipuram

Road

Pallipura

m0/000 Vembayam 11/300 11.3 4360 ST210

KM 0 to 1.2 Chipping

carpet surfacing.

Remaining BM &

BC.Land acquisition

for KIIFB project in

progress.

IL Not in DLP

SL(3.75m)DLP not yet

started

ILDLP not yet

started

IL 8718 ST204

DLP Expired

on 2021

Not in DLP

2

Vizhinjam-

Balaramapuram-

Kattakkada-

kuttichal road

Vizhinjam 0/000 Kuttichal 25/100 25.1

4360290/2020/OS-PWD129

6

Thiruvananthap

uram-

Malayinkil-

Kattakada-

Neyyardam

Road

Thiruvan

anthapura

m

0/000 Neyyar Dam 29/900 29.9 7246 ST213

Karamana to

Poojapura-BM&BC

work completed

Poojapura to

Pallimukku-

SLTFwork completed

Pallimukku-

Valiyavila-BM&BC

work in progress

Valiyavila to

Kundamankadavu-

BC overlay arranged

Kundamankadavu -

Malayinkeezhu-

Kattakada- Road in

good condition

Kattakada to

Neyyardam-

Surface damages are

there so SLTF work

arranged,KIIFB

project sanctioned

Kallambalam to

Puthusserymukku ch.

0/000 to2/000

Puthusserymukku-

Nagaroor-Poyyakara ch.

2/000- 10/200---- CRF

completed by NH Wing

in 2019

Poikakada to Karete ch.

10/200 to 16/200

152.45

Details of Link Criteria of selection of Road (As per Methodology)

Other MDRs

IL 5368 ST276

IL

Karamana

to

Kudamanka

davu-

DLP not yet

started

Kundamank

adavu -

Malayinkeez

hu-

Kattakada-

DLP up to

05/2020

Kattakada

to

Neyyardam-

DLP not yet

started

7

Kallambalam-

Nagaroor-

Karette road

Leading to

varkala

Kallambal

am0/000 Varkala 11/400 11.4

DLP

EXPIRED

DLP

DLP up

to 04/2021

4360290/2020/OS-PWD130

Grade ScoreStarting

Node

End

NodeScore Grade Score Category Grade Score Grade

Scor

e

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1

Perumkadavila

Kunnathukal

Road

Perumka

davila0/000 Kunnathukal 11/000 11 B 50 b b 10

Under

Develpoed 25 Nil Nil 0 Yes 10 95 Parassala Good in Condition

0/000 to 7/200-SLTF

Work Arranged

7/200 to 11/700- BM&

BC

11/700 to 14/965- BM

& BC work arranged

3Amaravila

Karakkonam

road

Thannimo

od0/000 Karakonam 7/050 7.05 C 40 a b 12.5

Under

developed

regions

25Pilgrim

centerx 15 No 0 92.5 Parassala

Obtained Financial

Sanction of 90crores

from KIIFB to the road

improvement

33.015

4Kovalam Ist

approach roadKovalam 0/000 Beach 1.6 1.6 A 60 a a 15 Nil 0 Kovalam X 15 No 0 90 Kovalam Deposit Work arranged

5Kovalam II

approach roadKovalam 0/000

udaya

samudhra0.78 0.78 A 60 a a 15 Nil 0 Kovalam X 15 No 0 90 Kovalam Good in condition

6

Nedumangad –

Town Branch

road

Neduman

gad

(Pazhakut

ty)

0/000

Nedumangad

(Market)

1.800 1.800 B 50 a a 15Under

developed25 Nil Nil 0 No 0 90 Nedumangad

BM & BC Surfacing.

BC Overlay work

arranged.

Part of the road is

included in 4 laning

project of KIIFB

DLP

Expired

DLP

Expired

DLP not yet

started

Parassala

DLP not yet

started

DLP up to

12/2021

DLP not yet

started

DLP

Expired

before

2010/not in

DLP

17

DLP up to

12/2021

2

Arattukuzhi

amboori

Neyyardam

Road

Choondik

kal0/000 Devapara 14/695 14.965 B Tourist Y 10 No 0 9550 b b 10

Under

Develpoed 25

Present StatusRemarks(DL

P Period)

Starting Node Ending NodeTraffic

Density of Connecting

Corridors

Tribal or Under

Developed Regions

Tourits/Pilgrim

Centers/Ports&Harbours

Interstate

Connectivity

Total Score

SL.

NoName of Road

Length of

RoadRemarks

Name Chainage Name Chainage

4360290/2020/OS-PWD131

7

Amaravila

ottasekharaman

galam Road

Perumka

davila7/000

ottasekharam

angalam12/200 5.2 B 50 b b 10

Under

Develpoed 25 Nil Nil 0 No 0 85 Parassala

BM&BC,KIIFB work

in Progress

8Parassala

Kollemcode road

Parassala 0/000

Kaduvakuzhi

1/448 1.448 D 30 a c 10

Under

developed

regions

25Pilgrim

centery 10 Yes 10 85 Parassala

Last improvement done

on 2015,now the road is

in good condition

10.828

397.853

DLP not yet

started

DLP

Expired on

2018

4360290/2020/OS-PWD132