4
TM HORIZON CHUTES G. S. PARKHE INDUSTRIAL MERIT AWARD - 2005 By MCCIA, Pune. Garbage Chutes - Debris Chutes - Odor Control Systems Access Doors - Fire Doors www.horizonchutes.com HORIZON CHUTES PVT. LTD. PROOF COPY LINEN CHUTES

Linen Chute(Laundry)-Horizon Chutes

Embed Size (px)

Citation preview

Page 1: Linen Chute(Laundry)-Horizon Chutes

TMHORIZONCHUTES

G. S. PARKHE INDUSTRIAL MERIT AWARD - 2005 By MCCIA, Pune.

Garbage Chutes - Debris Chutes - Odor Control SystemsAccess Doors - Fire Doors

www.horizonchutes.com

HORIZON CHUTES PVT. LTD.

PROOF

COPY

LINEN CHUTES

Page 2: Linen Chute(Laundry)-Horizon Chutes

Advantages of Horizon Linen Chutes 4Facilitates total building Linen collection at one

single point.4Linen disposal with ease and safety.4Reduces power consumption.4Widely used all over the World.4Reduces manpower.

HORIZON LINEN (LAUNDRY) CHUTES

Linen Chutes can be installed in4Hotels, Hospitals, Bungalows.4Residential buildings.4In any duct, accessible from every floor.

Hotels and

Hospitals generate

soiled linen on different

floors.

This used linen needs

to be taken to Laundry

Room, for sorting and

cleaning.

Thus Linen (Laundry)

Chutes are planned and

installed in such a way

that laundry disposed

from individual floors

gets collected in the

Laundry Room.

Salient features of

Horizon Linen Chutes

4Manufactured & Installed as per

BS 1703:2005, NFPA 82.

4Weather proof Stainless Steel construction.

4Interlocking of chute - hoppers to achieve one user at a time. Hoppers will remain locked with busy indication for all other floors, when one floor is operating.

4Vent system to allow air movements for vacuum breaking.

4Intake Hoppers are 90 minute fire rated as per

UL Label 10B.

4Intake Hoppers can be L-hand or R-hand side hinged.

4Discharge end fire door D Type.

4Available in different sizes.

4Optional sanitation system for internal cleaning of chutes.

4

4

Stand alone access control system dedicated for Linen Chute only.

Access control system with 12 digit key pad is provided near the intake hopper.

4 digit changeable password for each intake hopper will allow usage by authorized persons only.

=A master password is provided with higher management for overriding any password.

ON/READY

BUSY/CLEANING

FAULT

PRESS TO

OPEN DOOR

HORIZONCHUTES R

1 2 34 5 67 8 9

#0

Schematic Layout of Linen Chute

½” BIB Cock

Weather Cowl

Full Dia. Vent

Vent with Bird Nettting

Flashing

Roof Slab

½” Fire Sprinkler

Door Frame

1” Wet Riser

Side Hinged Hopper

UL Listed Door Controller

PVC Pipe Schedule. 40

Flat Structural Bracket

Intermediate Piece to Adjust Floor Height

Optional Cleaning Sprinkler 120 10 LPM Discharge

0

Finish Floor

Fusible Link Floor Slab

“L” Type Bracket

Discharge End Fire Door

Anchor Fastener

Interlocking Master

Control Panel

Line Sorting Table

Gully Trap

Support Prop

Slope

1.8

TO

2 M

tr.

Access Control Key Pad

Sanitation Unit

(Optional)

Cravat

Fire WaterTank

WaterSource

Page 3: Linen Chute(Laundry)-Horizon Chutes

600 mm Typ. Size 16" x 18"

(18”) Max. Size 16" x 24"

750 mm Typ. Size 21" x 21"

(24”) Max. Size 24" x 24"Any bigger sizes are available with max. intake hopper size 30”x 30” Mfg. as per UL Label 10 B.

Hopper size for std. chute

Chute DiameterSide Hung

Hopper Size

Type of building Linen chute dia.

Residential 600 mm

Hotels / Hospitals 750 mm

Selection of Chute Diameter Fire Protection in Linen Chutes

Manufacturing and installation codes and standards.

BS 1703:2005 seen along with BS 476 part 22,

NFPA 82, IS 6924:2001, NBC 2005 - clause 3.4.8.3

FIRE SAFETY

Requirements for Intake Hopper -

490 Minute fire rated. 4Passage for flame is not allowed

o4If fire exposed side temp. is @1000 C. then unexposed side

otemp. shall be 121 C. 4Door should not fall open after Hose reel test at the end of

fire test.4Inter-locking chute hopper controllers are also UL Listed for

user safety.

4

4

4

4In case of fire in Laundry room this shall cut off fire path oat 79 C.

Fire Sprinklers -

Discharge End Fire Door -

0Opens at 68 C. to extinguish fire.Installed at top and bottom intakes and in between alternate floors. Starting from top .½" IPS (BSP) female threading ready to be connected to 1” wet riser of fire protection system.

Chute Frame & Fire Door Assembly.oFire Rating 1½ Hr., Temp. rise 30 Min. 250 F Max.

R 25465

NRNT2. E317138

Switches, Industrial Control – Component

CHUTE SPECIFICATIONS

Fire sprinkler 0opens at 68 C to

extinguish fire.

Inside temp.@10000C.

Passage to flame is not allowed.

Outside surface temp.1210C.

Fire Inside Chute

Passage to flame is not allowed.

Hopperinside surfacetemp. 1210C.

Outside surface temp.@10000C.

Door integrity shall remain even after “Hose reel test”at the end of 90 min. fire test.

Fire Outside Chute on Floor

Material of Construction

Floor Frames

Sound Dampener Coating (Optional)

Intake Hoppers

Vent

Discharge

Linen Trolley

4Stainless Steel SS 304 - 1.5 to 2 mm thick.

4Fibre, Plastic chutes are not allowed considering fire hazard, as per BS/NFPA Codes.

4Total chute weight is divided on each floor.

4MS Galvanized structural frame fabricated from

40 X 40 X 5 mm angles.

4Anchor fastened with floor / beam.

4Min. 2 mm thick sound deadner coating to reduce sound, if required.

4Laundry Chute Hoppers - Side hung, left or right hand opening.

4Fixed with chute in face with front wall.4Hopper can be interlocking for “One user at a time”

concept.490 minute fire rated as per Underwriters Laboratory

(UL) USA. 4As per UL Label 10B. Std. Max. temperature rise of

0121 C in 30 min. (of unexposed surface)

4Installed at roof level or just above last intake hopper.

4Designed to break vacuum created by falling Linen.

4Provided with weather cowl & bird screen.

4Chute shall directly discharge into Laundry room on laundry sorting table.

0490 diverted discharge at 1.8 to 2 mtr. height above

Laundry Room floor level. 4Discharge end fire cut off door.

4Customized fabricated trolleys available.

4Our "D" type discharge end fire rated door is held 0horizontally against gravity by 79 C. fusible link.

In case of fire, fusible link melts and fire door closes

the upward path of chute restricting heat transfer to

upper floors.

Discharge End Fire Door ' D ' type

Page 4: Linen Chute(Laundry)-Horizon Chutes

PROOF

COPY

Elevation at Linen Chute Duct

Required Minimum Duct Size for Installation

Chute Diameter Duct / Slab Opening

24” (600 mm) 32” x 32”

30” (750 mm) 36” x 36”

For other sizes Dia of chute +8”

Duct Size

1. Front wall shall be constructed after the erection of chute.

2. Provide 1”wet riser from fire protection system for total building height inside chute duct.

3. Connect fire sprinklers provided by us at top most intake, lower most intake & in between alternate floors starting from top.( Fire sprinklers are provided with 1/2” BSP female threading ready to be connected. )

4. In case of requirement of integral cleaning system, provide predefined water connection as per our requirement.

Provisions for Linen Chute

DoorSide HingedIntake hopper

Duct wall infloor lobby to be constructed after chute erection

Floor slabbeam

Structural bracket anchor fastened

Upper floor slab

60

0 -

70

0 m

m

LIN

EN

CH

UT

E

LIN

EN

CH

UT

E D

UC

T

Floor slab infloor lobby

12

00

mm

Inta

ke d

oo

r

As

per

floo

r to

flo

or

heig

ht.

Inte

rmed

iate

pie

ces

Floor ServiceLobby

Side Hinged Intake Hopper

Duct for Linen Chute -

(for sizes see table)

Linen Chute

Outside wall of Duct

1” Wet riser

Plan at Linen Chute Duct

Pipes, Cables for control panel.

1. Provide wall tiles (min. 1.8 mtr. high ) & floor tiles.

2. Floor to have slope towards gully trap connected to drainage/basement sump. (In case of Interval cleaning system.)

3. Provide 6 Amp. MCB, earth, neutral for control panel in laundry room.

4. Lighting arrangement.

5. Provide clear min. 1.5 mtr. wide, out side opening flush door (40 mm thick) to Laundry room.

6. Chute duct slab to be closed in Laundry Room after installation of chute.

Laundry Room

HORIZON CHUTES PVT. LTD.HORIZONCHUTES

TM

AUTHORISED DEALER

Unit 1: 11/16/2, Village Nanded, Pune Sinhagad Road, PUNE - 411041. (Maharashtra) INDIA.

Tel.: +91-20-24394617, 24390445. Mobile : +91-9822037079. Email : [email protected]

Unit 2 : Gat No. 6B, Village Kasurdi, Shivapur - Saswad Road, Tal. Bhor, PUNE - 412 205. (Maharashtra) INDIA.

Adg

raph

In v

iew

of o

ur c

onst

ant e

ndea

vor

to im

prov

e th

e qu

ality

of o

ur p

rodu

cts,

We

rese

rve

the

right

to a

lter

or c

hang

e sp

ecifi

catio

ns w

ithou

t prio

r no

tice.