    Sr no Description Tick ( ) Remarks

    1 Confirmation of line Outage Permit no:2 Feeder LBB & Busbar Links In RP removed3 TBC LBB & Busbar Links In TBC RP removed4 Disconnection of CT TBs5 Removal of PT fuses and links6 Distance Relay Make: Type:a All DRs and Events in the relay Downloaded and savedb Correct Date and Time in Relay checked If Date/Time not correct change itc Prepare/ Refer Distance Relay Calculations as per setting guidelinesd Check Relay Settings for correctness as per calculatione Distance Relay Zone reach/timing testedf Distance relay testing for various features

    1. VT Fuse Failure2.Broken conductor3.Carrier Aided scheme trials and TX Counter reading check4.AR Trials on own CB for Z1 and Carrier Aided trip

    5.AR LO Trials on own CB for Z2,Z3,Z4 and Reclaim time fault6. AR Trials on TBC CB for Z1 and Carrier Aided trip IF TBC AR in service else mention NA7.AR LO Trials on TBC CB for Z2,Z3,Z4 and Reclaim time fault IF TBC AR in service else mention NA

    g Relay LEDs check all above distance relay testsh Annunciation Check all above Distance relay features Attend problem if detectedi Results recorded in register

    j Soft copy of results saved in Laptop.7 Directional (O/C + E/F) Relay Make: Type:a All DRs and Events in the relay Downloaded and savedb Correct Date and Time in Relay checked If Date/Time not correct change itc Prepare/ Refer Relay Calculations as per setting guidelines and fault datad Check Relay Settings for correctness as per calculatione Directional (O/C + E/F) testing for features

    1.Relay OC and EF characteristics checked2.OC and EF Directional test checked3.Own CB Trip test on 86/LO relay operation through current injection in BU relay.4.TBC CB Trip test on 86/LO relay operation through current injection in BU relay. IF TBC available else mention NA

    g Relay LEDs check all above BU relay testsh Annunciation Check for all above BU relay test Attend problem if detectedi Results recorded in register

    j Soft copy of results saved in Laptop.

    Name of the Substation:Name of the feeder:Date of testing :Type of Testing: Routine/Post occurence analysis/ Troubleshooting ( the correct one)Previous date of Testing:

  • 8/12/2019 Line Outage Checklist

    2/2

    Sr no Description Tick ( ) Remarks

    8 LBB Relay Make: Type:a Confirmation of 3 OC element relay if 2OC+1EF then modifyb Relay Settings correctness as per setting guidelinesc LBB Relay Testing

    1.LBB Initiation check from all inputs2.Relay Operation with I>ISET +LBB initiation check3.Relay Non Operation I>ISET+without LBB initiation check3.Relay Non Operation I