10
Lincoln MPO 2040 Long Range Transportation Plan Update Technical Report Adopted January 13, 2017 FELSBURG HOLT & ULLEVIG

Lincoln MPO 2040 Long Range Transportation Plan Update

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Lincoln MPO 2040Long Range Transportation Plan Update

Technical Report

AdoptedJanuary 13, 2017

FELSBURGH O L T &U L L E V I G

ADOPTED January 13, 2017 

Felsburg Holt & Ullevig    ACK‐1 | P a g e  

AcknowledgmentsPageProject Oversight Planning Committee 

Lincoln‐LancasterPlanningDepartment Mike Brienzo (Project Manager), 

Transportation Planner 

Kellee Van Bruggen, Multi‐Modal Transportation Planner 

Brandon Garrett, Planning Department 

David Cary, Planning Director 

LincolnPublicWorks&Utilities:EngineeringServices

Randy Hoskins, Assistant City Engineer 

Kris Humphrey, Design & Construction Engineer 

Lonnie Burklund, Traffic Engineering & Operations Engineer 

Roger Ohlrich, Senior Engineering Specialist 

LincolnPublicWorks&Utilities:StarTran Brian Praeuner, Transit Planner  

Lincoln‐LancasterInformationTechnologyServices

Ryan Axmann, Systems Software Integrator 

LincolnUrbanDevelopmentDepartment Wynn Hjermstad, Community Development 

Manager 

ParksDepartment Sara Hartzell, Park Planner 

LancasterCountyEngineering Brendan Lilley, Senior Engineer 

LCLCHealthDepartment Chris Schroeder, Environmental Health 

Manager 

Gary Bergstrom, Environmental Health Specialist 

NebraskaDept.ofRoads Brad Zumwalt, Transportation Planner 

 

 

 

FederalHighwayAdministration:NebraskaDivision

Justin K. Luther, Transportation Planner, Realty, and Civil Rights 

Morgan Wilbers, Transportation Finance Specialist 

FederalTransitAdministration,RegionVII Daniel Nguyen, FTA Community Planner  

Technical Committee 

Pam Dingman (Tri‐Chair), County Engineer 

David Cary (Tri‐Chair), Director of Planning 

Miki Esposito (Tri‐Chair), Director of Public Works 

Paul Barnes, Planning Dept. – Long Range Principal Planner 

Michael Davis, StarTran – Transit Manager 

Roger Figard, Public Works – City Engineer, RTSD 

Tom Goodbarn, Nebraska Dept. of Roads – District 1 Engineer 

David Haring, Lincoln Airport Authority – Executive Director 

Randy Hoskins, Public Works – Assistant City Engineer 

Lynn Johnson, Parks & Recreation – Director 

David Landis, Urban Development Dept. –Director  

Brendan Lilley, County Engineering – Design Division Head 

Brandie Neemann, Nebraska Dept. of Roads – Project Dev Manager 

Chris Schroeder, Health Dept. – Air Quality Supervisor 

Kellee Van Bruggen, Planning Dept. –  Multi‐Modal Transportation Planner  

 

 

 

 

 

ADOPTED January 13, 2017 

  ACK‐2 | P a g e     Lincoln MPO Long Range Transportation Plan Update 

Planning Commission 

Michael Cornelius 

Tracy Corr 

Chris Hove 

Maja V. Harris 

Ken Weber  

Jeanelle Lust 

Dennis Scheer 

Lynn Sunderman 

Cathy Beecham 

Officials Committee 

Chris Beutler, Mayor, City of Lincoln 

Roma Amundson, County Board Chair 

Todd Wiltgen, County Board Vice‐Chair 

Leirion Gaylor Baird, City Council Chair 

Roy Christensen, City Council Vice‐Chair 

Kyle Schneweis, Dept. of Roads Director 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Consultant Team 

FelsburgHolt&Ullevig Jenny Young, PE, AICP – Project Manager 

Rick Haden – Deputy Project Manager 

Steven Marfitano, PE – Travel Demand Modeler 

JEOConsulting Steve Wolf 

Andrea Gebhart 

ADOPTED January 13, 2017 

Felsburg Holt & Ullevig    i | P a g e  

 

TableofContents1. INTRODUCTION ............................................................................................................................................ 1 

Planning Area ......................................................................................................................................................... 1 

Compliance with Federal Regulations ................................................................................................................... 1 

Plan Update Process .............................................................................................................................................. 3 

Completed Projects ............................................................................................................................................... 3 

2. COMMUNITY VISION .................................................................................................................................... 5 

Public Engagement Process ................................................................................................................................... 5 

Key Themes of Public Input ................................................................................................................................... 6 

Transportation Vision and Principles ..................................................................................................................... 7 

Transportation Goals ............................................................................................................................................. 8 

3. NEEDS ASSESSMENT ..................................................................................................................................... 9 

Land Use and Demographics ................................................................................................................................. 9 

Travel Patterns and Trends .................................................................................................................................. 13 

Roads and Bridges ............................................................................................................................................... 17 

Bicycle and Pedestrian ......................................................................................................................................... 31 

Transit .................................................................................................................................................................. 35 

Intermodal Connections ...................................................................................................................................... 35 

Rail ....................................................................................................................................................................... 37 

Freight .................................................................................................................................................................. 37 

Safety ................................................................................................................................................................... 40 

4. NEEDS BASED PLAN .................................................................................................................................... 43 

Roadway .............................................................................................................................................................. 43 

Bicycle and Pedestrian ......................................................................................................................................... 52 

Transit .................................................................................................................................................................. 53 

5. PERFORMANCE MEASURES ........................................................................................................................ 57  

Maintenance ........................................................................................................................................................ 59 

Mobility and System Reliability ........................................................................................................................... 66 

Livability and Travel Choice ................................................................................................................................. 70 

Safety and Security .............................................................................................................................................. 75 

Economic Vitality ................................................................................................................................................. 82 

Environmental Sustainability ............................................................................................................................... 87 

Funding and Cost Effectiveness ........................................................................................................................... 93 

   

ADOPTED January 13, 2017 

  ii | P a g e     Lincoln MPO Long Range Transportation Plan Update 

 

6. FUNDING OUTLOOK ................................................................................................................................... 99 

Revenue Forecasts ............................................................................................................................................... 99 

Resource Allocation ........................................................................................................................................... 103 

Funding Objective .............................................................................................................................................. 109 

7. FISCALLY CONSTRAINED PLAN .................................................................................................................. 111 

Project Prioritization Process ............................................................................................................................ 112 

Fiscally Constrained Plan Elements ................................................................................................................... 114 

Illustrative Plan .................................................................................................................................................. 132 

8. ENVIRONMENTAL OVERVIEW ................................................................................................................... 139 

Introduction ....................................................................................................................................................... 139 

Air Quality .......................................................................................................................................................... 139 

Natural Environment ......................................................................................................................................... 144 

Socioeconomic Environment ............................................................................................................................. 161 

Cultural Environment ........................................................................................................................................ 166 

Agency Coordination ......................................................................................................................................... 169 

9. IMPLEMENTATION PLAN .......................................................................................................................... 171 

Strategies ........................................................................................................................................................... 171 

Amendment Process .......................................................................................................................................... 172 

 

Appendices 

Appendix A – LRTP Meetings 

Appendix B – Public Meeting Summaries 

Appendix C – Land Use Forecasts 

Appendix D – Travel Demand Model Documentation and User’s Guide 

Appendix E – Congestion Management Process 

Appendix F – Project Scoring Packets 

Appendix G – Roadway and Trail Project Scoring Results 

Appendix H – References – Environmental Overview 

   

ADOPTED January 13, 2017 

Felsburg Holt & Ullevig    iii | P a g e  

List of Figures 

Figure 1. Lincoln Metropolitan Planning Area ........................................................................................................... 2 

Figure 2. Major Projects Completed Since 2011 LRTP .............................................................................................. 4 

Figure 3. Household Growth ................................................................................................................................... 10 

Figure 4. Commercial Growth ................................................................................................................................. 11 

Figure 5. Industrial Growth ...................................................................................................................................... 12 

Figure 6. Workflows ................................................................................................................................................. 13 

Figure 7. Distance and Direction from Home to Work ............................................................................................ 14 

Figure 8. Housing + Transportation Index ............................................................................................................... 14 

Figure 9. Commuter Mode Split .............................................................................................................................. 15 

Figure 10. Zero Vehicle Households ........................................................................................................................ 16 

Figure 11. Bridge Sufficiency Ratings ...................................................................................................................... 18 

Figure 12. National Highway System ....................................................................................................................... 20 

Figure 13. Existing Functional Classification ............................................................................................................ 21 

Figure 14. Existing Through Lanes ........................................................................................................................... 22 

Figure 15. Current Daily Traffic Volumes ................................................................................................................. 23 

Figure 16. Current Congestion Levels ...................................................................................................................... 25 

Figure 17. 2026 Daily Traffic Forecasts (E+C Network) ........................................................................................... 27 

Figure 18. 2040 Daily Traffic Forecasts (E+C Network) ........................................................................................... 28 

Figure 19. 2026 Congestion Levels (E+C Network) .................................................................................................. 29 

Figure 20. 2040 Congestion Levels (E+C Network) .................................................................................................. 30 

Figure 21. Existing Bicycle Facilities ......................................................................................................................... 32 

Figure 22. Existing Sidewalks and Trails .................................................................................................................. 34 

Figure 23. StarTran Bus Routes ............................................................................................................................... 36 

Figure 24. Railroad At‐Grade Crossings ................................................................................................................... 38 

Figure 25. Truck Routes ........................................................................................................................................... 39 

Figure 26. Crash Severity ......................................................................................................................................... 40 

Figure 27. Candidate Roadway Capital Projects ...................................................................................................... 44 

Figure 28. Rural Roads Project Needs ..................................................................................................................... 51 

Figure 29. Existing and Proposed Bicycle Facilities ................................................................................................. 54 

Figure 30. Fiscally Constrained Plan Development ............................................................................................... 104 

Figure 31. Community Input on Funding Priorities ............................................................................................... 106 

Figure 32. Resource Allocation Scenarios – Total Funding by Program ($Millions) .............................................. 108 

Figure 33. LRTP Resource Allocation ..................................................................................................................... 111 

Figure 34. Priority Trail Projects ............................................................................................................................ 118 

Figure 35. Fiscally Constrained Roadway Capital Projects .................................................................................... 123 

Figure 36. Congestion Levels ................................................................................................................................. 124 

Figure 37. 2026 Congestion Levels (Fiscally Constrained Plan) ............................................................................. 125 

Figure 38. 2040 Congestion Levels (Fiscally Constrained Plan) ............................................................................. 126 

Figure 39. Rural Roads Projects ............................................................................................................................. 131 

Figure 40. Illustrative Plan (Unfunded) Roadway Capital Projects ........................................................................ 136 

Figure 41. Illustrative Plan (Unfunded) Trail Projects ........................................................................................... 137 

Figure 42. Example Pollutant Emission Rates for Lincoln Arterial Streets in Summer .......................................... 142 

ADOPTED January 13, 2017 

  iv | P a g e     Lincoln MPO Long Range Transportation Plan Update 

Figure 43. Typical Weekday Pollutant Emission Totals for Fiscally Constrained Road Network ........................... 143 

Figure 44. Stream Corridors .................................................................................................................................. 146 

Figure 45. Floodplains ........................................................................................................................................... 148 

Figure 46. Freshwater Wetlands ........................................................................................................................... 150 

Figure 47. Saline Wetlands .................................................................................................................................... 151 

Figure 48. Native Prairie ........................................................................................................................................ 153 

Figure 49. Tree Mass ............................................................................................................................................. 154 

Figure 50. Threatened & Endangered Species: Northern Long‐Eared Bat ............................................................ 156 

Figure 51. Threatened & Endangered Species: Western Prairie Fringed Orchid .................................................. 157 

Figure 52. Threatened & Endangered Species: Saltwort ....................................................................................... 158 

Figure 53. Threatened & Endangered Species: Salt Creek Tiger Beetle ................................................................ 159 

Figure 54. Master Plan Watershed Basins ............................................................................................................. 162 

Figure 55. Parks, Trails, and Open Space ............................................................................................................... 164 

Figure 56. Low‐Income Population ........................................................................................................................ 167 

Figure 57. Minority Population .............................................................................................................................. 168 

 

   

ADOPTED January 13, 2017 

Felsburg Holt & Ullevig    v | P a g e  

List of Tables 

Table 1. Household and Employment Growth .......................................................................................................... 9 

Table 2. Travel Time to Work .................................................................................................................................. 13 

Table 3. Distance from Home to Work .................................................................................................................... 13 

Table 4. Bridge Sufficiency Ratings .......................................................................................................................... 17 

Table 5. Planning Level Daily Capacities (per Through Lane) .................................................................................. 24 

Table 6. Committed Projects ................................................................................................................................... 26 

Table 7. Congestion Levels over Time ..................................................................................................................... 26 

Table 8. Intersections with Highest Crash Rates ..................................................................................................... 41 

Table 9. Candidate Roadway Capital Projects ......................................................................................................... 45 

Table 10. Two Plus Center Turn Lane Projects ........................................................................................................ 48 

Table 11. Railroad Grade Separated Crossing Project Needs .................................................................................. 50 

Table 12. Candidate Trail Projects ........................................................................................................................... 55 

Table 13. Relationship between LRTP Goals and FAST Act Goals and Planning Factors ......................................... 58 

Table 14. Urban Roads Program Revenue Forecasts ($Millions) ............................................................................ 98 

Table 15. Transit Revenue Forecasts ($Millions) ................................................................................................... 100 

Table 16. Trails Revenue Forecasts ($Millions) ..................................................................................................... 102 

Table 17. Total Revenue Forecasts ........................................................................................................................ 103 

Table 18. Funding Restrictions and Commitments ............................................................................................... 105 

Table 19. LRTP Resource Allocation ...................................................................................................................... 111 

Table 20. Project Evaluation Criteria ..................................................................................................................... 113 

Table 21. Weights by Goal and Project Category .................................................................................................. 113 

Table 22. Priority Transit Projects ......................................................................................................................... 115 

Table 23. Priority Trail Projects ............................................................................................................................. 116 

Table 24. Fiscally Constrained Roadway Capital Projects ..................................................................................... 122 

Table 25. Daily Travel Time ................................................................................................................................... 127 

Table 26. Rural Roads Projects .............................................................................................................................. 129 

Table 27. Illustrative Plan (Unfunded) Roadway Capital Projects ......................................................................... 134 

Table 28. Composite LRTP‐Wide Vehicle Pollutant Emission Rates ...................................................................... 143 

Table 29. Composite Daily Pollutant Total Emissions ........................................................................................... 143 

Table 30. Saline Wetland Categorization .............................................................................................................. 149 

Table 31. Threatened and Endangered Species Listed in Lancaster County ......................................................... 155 

Table 32. Social Environment Definitions .............................................................................................................. 165 

   

ADOPTED January 13, 2017 

  vi | P a g e     Lincoln MPO Long Range Transportation Plan Update 

 

 

 

 

 

 

 

 

 

 

 

 

This page intentionally left blank.