2 WSH SYMPOSIUM O N CRANES 25 JAN 2019 by: Victor Ng (GS E&C T301 WSH Manager) Construction of 4 in 1 Rail and Bus Depot and Reception Tunnels for Thomson – East Coast Line Lifting Personnel Assessment System and Other Initiatives for Safe Lifting Operation 25 th January 2019

Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

2

WSH SYMPOSIUM ON CRANES 25 JAN 2019

by: Victor Ng

(GS E&C T301 WSH Manager)

Construction of 4 in 1 Rail and Bus Depot and Reception Tunnels for Thomson – East Coast Line

Lifting Personnel Assessment System and

Other Initiatives for Safe Lifting Operation

25th January 2019

Page 2: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Outline of Presentation:

1. Project Introduction

- Brief on LTA Contract T301

2. Lifting Personnel Assessment System

3. Competence and requirement of Lifting Engineer(LE)

and Crane Maintenance Supervisor (CMS)

4. Crane Operation Safety Practices

5. Conclusion

Page 3: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

East Coast Integrated Depot:

❖ The 1st in the world to integrate 3 train depots and 1 bus depot

within a single site.

1. Project Introduction

Thomson-East Coast Line Contract T301 …..3 GS E&C

Page 4: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

1. Project Introduction

Thomson-East Coast Line Contract T301 …..4 GS E&C

Page 5: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

6 Category of Key Lifting Personnel:-

• Lifting Engineers

• Crane Maintenance Supervisor

• Lifting Supervisor

• Crane Operator

• Rigger

• Signalman

2. Assessment System of Lifting Personnel

Thomson-East Coast Line Contract T301 …..6 GS E&C

Page 6: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

2. Assessment System of Lifting Personnel

Competency is one of the key areas for improvement

Thomson-East Coast Line Contract T301 …..7 GS E&C

Page 7: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

LTA General Specifications

2. Assessment System of Lifting Personnel

Thomson-East Coast Line Contract T301 …..8 GS E&C

Page 8: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Crane Operators shall undergo Health Checks

❖ The health of each Crane Operator is critical to ensure Crane Safety.

❖ Any impairment due to medical conditions, can affect their ability to perform Safe

Lifting Operations.

2. Assessment System of Lifting Personnel

Thomson-East Coast Line Contract T301 …..9 GS E&C

Page 9: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Lifting Personnel with certificates

from Training Provider whose

approval are cancelled by MOM will

be required to go for re-certification

from an approved training provider

List of MOM ACCREDITED Training Provider (ATP) with Approval cancelled by MOM

2. Assessment System of Lifting Personnel

Thomson-East Coast Line Contract T301 …..10 GS E&C

Page 10: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

2. Assessment System of Lifting Personnel

Verifications of Competency

Applicants are required to register & retake

their certifications by attending courses

with an Approved Training Provider before

issue of Letter of Appointment

Thomson-East Coast Line Contract T301 …..11 GS E&C

Page 11: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

2. Assessment System of Lifting Personnel

Competency Assessment of Lifting Team

Thomson-East Coast Line Contract T301 …..12 GS E&C

• We try to maintain same group of

lifting team in order to build trust and

rapport which is beneficial for

effective communication and effective

lifting operations.

• Any inclusion or changes to the lifting

team would requires assessment on

knowledge and competency by lifting

engineer before Letter of Appointment

(LOA) is issued

Page 12: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Competency Based Assessment & Written Test are conducted for

Key Lifting Personnel .

2. Assessment System of Lifting Personnel

SCORE < 50% . Candidate to attend retraining and retest

Score =50-69 : Provisional LOA with Probation

Score : 70 and above ; Issued with Letter of

Appointment

Thomson-East Coast Line Contract T301 …..13 GS E&C

Page 13: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Competency Based Assessment – Rigger

2. Assessment System of Lifting Personnel

Thomson-East Coast Line Contract T301 …..14 GS E&C

Page 14: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Assessment Test – Rigger

2. Assessment System of Lifting Personnel

Thomson-East Coast Line Contract T301 …..15 GS E&C

Page 15: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

2. Assessment System of Lifting Personnel

Letter Of Appointment

Thomson-East Coast Line Contract T301 …..16 GS E&C

Page 16: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Identification of Lifting Team Members

Lifting Supervisor Signalman (3 Yellow Strips)Rigger

2. Assessment System of Lifting Personnel

Thomson-East Coast Line Contract T301 …..17 GS E&C

Page 17: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

LTA General Specifications

3. Competency and Requirement of Lifting Engineers and Crane maintenance Supervisor

LTA Particular Specifications

Thomson-East Coast Line Contract T301 …..18 GS E&C

Page 18: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Lifting Engineer Organization Chart

Ki-Tae, Park

Aiden Jung

Parameswaran

Sutharsanan

Johnny Han Nak-Seung, Paek

Sugit

Jamie, Lee

Hlaing Moe

Rupert Big

Sean Kim

Safety

Team

Rail

Depot

Reception

TunnelBus

Depot

Archi /

E&M

Precast

Team

Construction

Managers

appointed as

Lifting

Engineers in

respective

zones and

trades

3. Competency and Requirement of Lifting Engineers and Crane maintenance Supervisor

Thomson-East Coast Line Contract T301 …..19 GS E&C

Page 19: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

LTA General Specifications

3. Competency and Requirement of Lifting Engineers and Crane maintenance Supervisor

Thomson-East Coast Line Contract T301 …..20 GS E&C

Page 20: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

3. Competency and Requirement of Lifting Engineers and Crane Maintenance Supervisor

Thomson-East Coast Line Contract T301 …..21 GS E&C

Page 21: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Regular Safety Timeout conducted for Sharing of Industrial Accidents and Lessons Learnt

4. Crane Safety Practices

Regular Communication With Lifting Crew

Briefing was conducted on 14 July to all Lifting Team and Staff by GS and individual

subcontractors regarding the related crane incident

Thomson-East Coast Line Contract T301 …..22 GS E&C

Page 22: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Safety Timeout Agenda

4. Crane Safety Practices

Thomson-East Coast Line Contract T301 …..23 GS E&C

Page 23: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

4. Crane Safety Practices

Permit to Mobilize Plant and equipment includes route check and material height check

Mobilisation Plan

Thomson-East Coast Line Contract T301 …..24 GS E&C

Page 24: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Mobilisation Plan

4. Crane Safety Practices

Only Machine operator is allowed to operate/offload the machine from the vehicle.

Total Height =4m< 4.5m

Thomson-East Coast Line Contract T301 …..25 GS E&C

Page 25: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Pre-Mobilisation Check by Crane maintenance Supervisor

Before any crane is

accepted onto site for use

it must undergo a thorough

mechanical check by the

Crane Maintenance

Supervisor.

4. Crane Safety Practices

Thomson-East Coast Line Contract T301 …..26 GS E&C

Page 26: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

4. Crane Safety Practices

REFRESHER TRAINING FOR LIFTING RELATED PERSONNEL

Thomson-East Coast Line Contract T301 …..27 GS E&C

Page 27: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Safety Bulletin for communicating Safe Work Practices & Safety Information

4. Crane Safety Practices

Thomson-East Coast Line Contract T301 …..28 GS E&C

Page 28: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

4. Crane Safety Practices

PE Design access & Permit to Move (PTM) System

Permit-to-Move required for movement of heavy

machinery on PE certified platform consisting of steel

plates resting on hardcore.

Thomson-East Coast Line Contract T301 …..29 GS E&C

Page 29: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

4. Crane Safety Practices

Laying of Steel Plate for Crane movement

Thomson-East Coast Line Contract T301 …..30 GS E&C

Page 30: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Only Approved crane contractors and approved erectors are allowed to conduct any

installation, repair or dismantling of relevant cranes.

4. Crane Safety Practices

Thomson-East Coast Line Contract T301 …..31 GS E&C

Page 31: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Verifying The Approved Crane Contractor / Erector

4. Crane Safety Practices

Thomson-East Coast Line Contract T301 …..32 GS E&C

Page 32: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Safety School with Stations Simulating Actual Construction Hazards

Simulation on Experience of Crushed by

Heavy machinery

Simulation on varying loads exerted on lifting

gears just by varying the sling angle of Lifting

Gears

4. Crane Safety Practices

Thomson-East Coast Line Contract T301 …..33 GS E&C

Page 33: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

4. Crane Safety Practices

Thomson-East Coast Line Contract T301 …..34 GS E&C

Page 34: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Lifting plan to include Lifting radius

and physical obstructions.

Lifting plan are endorsed

4. Crane Safety Practices

Rigging details clearly specified for easy

understanding

LIFTING PLAN

Thomson-East Coast Line Contract T301 …..35 GS E&C

Page 35: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Rear View Camera

4. Crane Safety Practices

Thomson-East Coast Line Contract T301 …..36 GS E&C

Page 36: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Lightning Alert Warning System

4. Crane Safety Practices

Thomson-East Coast Line Contract T301 …..37 GS E&C

Page 37: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Using of WhatsApp's to share Daily TBM Topic that was brief every day during mass ToolBox Meeting

4. Crane Safety Practices

Thomson-East Coast Line Contract T301 …..38 GS E&C

Page 38: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

4. Crane Safety Practices

Weekly Joint Inspection with LTA

TELCP6 Management and T301

Project & Safety Management

Ad Hoc Joint Inspection with LTA

Safety Division

Weekly GS Management

Inspection

Corporate HSE Audit

Various Category of Audit & Inspections

Thomson-East Coast Line Contract T301 …..39 GS E&C

Page 39: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Cross Audit by TEL Contract 6

4. Crane Safety Practices

Night Inspection carried by Top management

Various Category of Audit & Inspections

Thomson-East Coast Line Contract T301 …..40 GS E&C

Page 40: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Phone booth for Authorised

Mobile User

Machine operator are not allowed

to use Mobile devices while at

work.

4. Crane Safety Practices

Thomson-East Coast Line Contract T301 …..41 GS E&C

Page 41: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

4. Crane Safety Practices

Monthly Award & Recognition for Most Safety Conscious

Crane Operator & Lifting Crew

Thomson-East Coast Line Contract T301 …..42 GS E&C

Page 42: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Near Miss Reporting Award Every Month

4. Crane Safety Practices

Thomson-East Coast Line Contract T301 …..43 GS E&C

Page 43: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Monthly Health Check of Crane Operators by In-House Nurse

4. Crane Safety Practices

Thomson-East Coast Line Contract T301 …..44 GS E&C

Page 44: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Weekly boom down inspection & scanning of wire rope using diagnostic scanner conducted by

Crane Maintenance Supervisor

4. Crane Safety Practices

NDT Test by Crane Maintenance Supervisor

Thomson-East Coast Line Contract T301 …..45 GS E&C

Page 45: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Step access with edge protection during unloading from delivery trailer

4. Crane Safety Practices

Thomson-East Coast Line Contract T301 …..46 GS E&C

Page 46: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

❖ Monthly inspections by the Crane Maintenance Supervisor to mitigate

the risks of component failures.

4. Crane Safety Practices

Thomson-East Coast Line Contract T301 …..47 GS E&C

Page 47: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

❖Lifting Operations is a high risk operations in

construction projects

❖Continuous attempt to educate and ensure

competent lifting crew is a key strategy for

ensuring safe lifting operations.

5. Conclusion

Thomson-East Coast Line Contract T301 …..48 GS E&C

Page 48: Lifting Personnel Assessment System and Other Initiatives ... · Pre-Mobilisation Check by Crane maintenance Supervisor Before any crane is accepted onto site for use it must undergo

Thank YouLead by Example, Towards ZERO HARM…