2
WSH SYMPOSIUM ON CRANES 25 JAN 2019
by: Victor Ng
(GS E&C T301 WSH Manager)
Construction of 4 in 1 Rail and Bus Depot and Reception Tunnels for Thomson – East Coast Line
Lifting Personnel Assessment System and
Other Initiatives for Safe Lifting Operation
25th January 2019
Outline of Presentation:
1. Project Introduction
- Brief on LTA Contract T301
2. Lifting Personnel Assessment System
3. Competence and requirement of Lifting Engineer(LE)
and Crane Maintenance Supervisor (CMS)
4. Crane Operation Safety Practices
5. Conclusion
East Coast Integrated Depot:
❖ The 1st in the world to integrate 3 train depots and 1 bus depot
within a single site.
1. Project Introduction
Thomson-East Coast Line Contract T301 …..3 GS E&C
1. Project Introduction
Thomson-East Coast Line Contract T301 …..4 GS E&C
6 Category of Key Lifting Personnel:-
• Lifting Engineers
• Crane Maintenance Supervisor
• Lifting Supervisor
• Crane Operator
• Rigger
• Signalman
2. Assessment System of Lifting Personnel
Thomson-East Coast Line Contract T301 …..6 GS E&C
2. Assessment System of Lifting Personnel
Competency is one of the key areas for improvement
Thomson-East Coast Line Contract T301 …..7 GS E&C
LTA General Specifications
2. Assessment System of Lifting Personnel
Thomson-East Coast Line Contract T301 …..8 GS E&C
Crane Operators shall undergo Health Checks
❖ The health of each Crane Operator is critical to ensure Crane Safety.
❖ Any impairment due to medical conditions, can affect their ability to perform Safe
Lifting Operations.
2. Assessment System of Lifting Personnel
Thomson-East Coast Line Contract T301 …..9 GS E&C
Lifting Personnel with certificates
from Training Provider whose
approval are cancelled by MOM will
be required to go for re-certification
from an approved training provider
List of MOM ACCREDITED Training Provider (ATP) with Approval cancelled by MOM
2. Assessment System of Lifting Personnel
Thomson-East Coast Line Contract T301 …..10 GS E&C
2. Assessment System of Lifting Personnel
Verifications of Competency
Applicants are required to register & retake
their certifications by attending courses
with an Approved Training Provider before
issue of Letter of Appointment
Thomson-East Coast Line Contract T301 …..11 GS E&C
2. Assessment System of Lifting Personnel
Competency Assessment of Lifting Team
Thomson-East Coast Line Contract T301 …..12 GS E&C
• We try to maintain same group of
lifting team in order to build trust and
rapport which is beneficial for
effective communication and effective
lifting operations.
• Any inclusion or changes to the lifting
team would requires assessment on
knowledge and competency by lifting
engineer before Letter of Appointment
(LOA) is issued
Competency Based Assessment & Written Test are conducted for
Key Lifting Personnel .
2. Assessment System of Lifting Personnel
SCORE < 50% . Candidate to attend retraining and retest
Score =50-69 : Provisional LOA with Probation
Score : 70 and above ; Issued with Letter of
Appointment
Thomson-East Coast Line Contract T301 …..13 GS E&C
Competency Based Assessment – Rigger
2. Assessment System of Lifting Personnel
Thomson-East Coast Line Contract T301 …..14 GS E&C
Assessment Test – Rigger
2. Assessment System of Lifting Personnel
Thomson-East Coast Line Contract T301 …..15 GS E&C
2. Assessment System of Lifting Personnel
Letter Of Appointment
Thomson-East Coast Line Contract T301 …..16 GS E&C
Identification of Lifting Team Members
Lifting Supervisor Signalman (3 Yellow Strips)Rigger
2. Assessment System of Lifting Personnel
Thomson-East Coast Line Contract T301 …..17 GS E&C
LTA General Specifications
3. Competency and Requirement of Lifting Engineers and Crane maintenance Supervisor
LTA Particular Specifications
Thomson-East Coast Line Contract T301 …..18 GS E&C
Lifting Engineer Organization Chart
Ki-Tae, Park
Aiden Jung
Parameswaran
Sutharsanan
Johnny Han Nak-Seung, Paek
Sugit
Jamie, Lee
Hlaing Moe
Rupert Big
Sean Kim
Safety
Team
Rail
Depot
Reception
TunnelBus
Depot
Archi /
E&M
Precast
Team
Construction
Managers
appointed as
Lifting
Engineers in
respective
zones and
trades
3. Competency and Requirement of Lifting Engineers and Crane maintenance Supervisor
Thomson-East Coast Line Contract T301 …..19 GS E&C
LTA General Specifications
3. Competency and Requirement of Lifting Engineers and Crane maintenance Supervisor
Thomson-East Coast Line Contract T301 …..20 GS E&C
3. Competency and Requirement of Lifting Engineers and Crane Maintenance Supervisor
Thomson-East Coast Line Contract T301 …..21 GS E&C
Regular Safety Timeout conducted for Sharing of Industrial Accidents and Lessons Learnt
4. Crane Safety Practices
Regular Communication With Lifting Crew
Briefing was conducted on 14 July to all Lifting Team and Staff by GS and individual
subcontractors regarding the related crane incident
Thomson-East Coast Line Contract T301 …..22 GS E&C
Safety Timeout Agenda
4. Crane Safety Practices
Thomson-East Coast Line Contract T301 …..23 GS E&C
4. Crane Safety Practices
Permit to Mobilize Plant and equipment includes route check and material height check
Mobilisation Plan
Thomson-East Coast Line Contract T301 …..24 GS E&C
Mobilisation Plan
4. Crane Safety Practices
Only Machine operator is allowed to operate/offload the machine from the vehicle.
Total Height =4m< 4.5m
Thomson-East Coast Line Contract T301 …..25 GS E&C
Pre-Mobilisation Check by Crane maintenance Supervisor
Before any crane is
accepted onto site for use
it must undergo a thorough
mechanical check by the
Crane Maintenance
Supervisor.
4. Crane Safety Practices
Thomson-East Coast Line Contract T301 …..26 GS E&C
4. Crane Safety Practices
REFRESHER TRAINING FOR LIFTING RELATED PERSONNEL
Thomson-East Coast Line Contract T301 …..27 GS E&C
Safety Bulletin for communicating Safe Work Practices & Safety Information
4. Crane Safety Practices
Thomson-East Coast Line Contract T301 …..28 GS E&C
4. Crane Safety Practices
PE Design access & Permit to Move (PTM) System
Permit-to-Move required for movement of heavy
machinery on PE certified platform consisting of steel
plates resting on hardcore.
Thomson-East Coast Line Contract T301 …..29 GS E&C
4. Crane Safety Practices
Laying of Steel Plate for Crane movement
Thomson-East Coast Line Contract T301 …..30 GS E&C
Only Approved crane contractors and approved erectors are allowed to conduct any
installation, repair or dismantling of relevant cranes.
4. Crane Safety Practices
Thomson-East Coast Line Contract T301 …..31 GS E&C
Verifying The Approved Crane Contractor / Erector
4. Crane Safety Practices
Thomson-East Coast Line Contract T301 …..32 GS E&C
Safety School with Stations Simulating Actual Construction Hazards
Simulation on Experience of Crushed by
Heavy machinery
Simulation on varying loads exerted on lifting
gears just by varying the sling angle of Lifting
Gears
4. Crane Safety Practices
Thomson-East Coast Line Contract T301 …..33 GS E&C
4. Crane Safety Practices
Thomson-East Coast Line Contract T301 …..34 GS E&C
Lifting plan to include Lifting radius
and physical obstructions.
Lifting plan are endorsed
4. Crane Safety Practices
Rigging details clearly specified for easy
understanding
LIFTING PLAN
Thomson-East Coast Line Contract T301 …..35 GS E&C
Rear View Camera
4. Crane Safety Practices
Thomson-East Coast Line Contract T301 …..36 GS E&C
Lightning Alert Warning System
4. Crane Safety Practices
Thomson-East Coast Line Contract T301 …..37 GS E&C
Using of WhatsApp's to share Daily TBM Topic that was brief every day during mass ToolBox Meeting
4. Crane Safety Practices
Thomson-East Coast Line Contract T301 …..38 GS E&C
4. Crane Safety Practices
Weekly Joint Inspection with LTA
TELCP6 Management and T301
Project & Safety Management
Ad Hoc Joint Inspection with LTA
Safety Division
Weekly GS Management
Inspection
Corporate HSE Audit
Various Category of Audit & Inspections
Thomson-East Coast Line Contract T301 …..39 GS E&C
Cross Audit by TEL Contract 6
4. Crane Safety Practices
Night Inspection carried by Top management
Various Category of Audit & Inspections
Thomson-East Coast Line Contract T301 …..40 GS E&C
Phone booth for Authorised
Mobile User
Machine operator are not allowed
to use Mobile devices while at
work.
4. Crane Safety Practices
Thomson-East Coast Line Contract T301 …..41 GS E&C
4. Crane Safety Practices
Monthly Award & Recognition for Most Safety Conscious
Crane Operator & Lifting Crew
Thomson-East Coast Line Contract T301 …..42 GS E&C
Near Miss Reporting Award Every Month
4. Crane Safety Practices
Thomson-East Coast Line Contract T301 …..43 GS E&C
Monthly Health Check of Crane Operators by In-House Nurse
4. Crane Safety Practices
Thomson-East Coast Line Contract T301 …..44 GS E&C
Weekly boom down inspection & scanning of wire rope using diagnostic scanner conducted by
Crane Maintenance Supervisor
4. Crane Safety Practices
NDT Test by Crane Maintenance Supervisor
Thomson-East Coast Line Contract T301 …..45 GS E&C
Step access with edge protection during unloading from delivery trailer
4. Crane Safety Practices
Thomson-East Coast Line Contract T301 …..46 GS E&C
❖ Monthly inspections by the Crane Maintenance Supervisor to mitigate
the risks of component failures.
4. Crane Safety Practices
Thomson-East Coast Line Contract T301 …..47 GS E&C
❖Lifting Operations is a high risk operations in
construction projects
❖Continuous attempt to educate and ensure
competent lifting crew is a key strategy for
ensuring safe lifting operations.
5. Conclusion
Thomson-East Coast Line Contract T301 …..48 GS E&C
Thank YouLead by Example, Towards ZERO HARM…