Date : 23 September 2014 To : MP3 HSE ENFORCEMENT TEAM From : Allan Caton – CESCO Sb!e"t : Clo#e$%p a"t&on on HSE En'or"ement Team (al)t*ro+* Report ,22 Sept 2014- No &n#pe"t&on an$ no p$ate$ "olor "o$e o' n$er ten#&one$ l&'t&n+ +ear#. S/N o Location Photos taken on site Description Status / Action Party 1. /n$erneat* COA pper $e") 1.C*a&n lo") C %01 3ton (eb Sl&n+ 2 m 2 ton 2.C*a&n lo") C %032 3 ton (eb Sl&n+ 2 m 2 ton SS5 R&++&n+ Store Sper6&#or 5n%"*ar+e Fab&an E#teban 5n#pe"te$ an$ "olor "o$e$ 7*&te. 23Sept.2014 1330 *r#.

Lifting Gears.docx

Embed Size (px)

Citation preview

Date : 23 September 2014

To : MP3 HSE ENFORCEMENT TEAM

From : Allan Caton CESCO Subject : Closed-up action on HSE Enforcement Team Walkthrough Report (22 Sept 2014) No inspection and no updated colour code of under tensioned lifting gears.

S/NoLocation

Photos taken on site DescriptionStatus / Action Party

1.

Underneath COA upper deck

1.Chain Block CB-016 / 3ton

Web Sling 2 x 6m x 2 ton

2.Chain Block CB-032 / 3 ton

Web Sling 2 x 6m x 2 ton

KSSI Rigging Store Supervisor In-charge

Fabian Esteban

Inspected and colour coded white.

23Sept.2014 1330 hrs.

2.

Underneath COA upper deck

Underneath COB upper deck

3.Chain Block DMK-367 / 2 ton

Web Sling 2 x 1.5m x1 ton

4. Chain Block CB-002 / 2 ton

Web Sling 1 x 3m x 1 ton

1.Chain Block KSSI-022 / 2 ton

Web Sling 2 x 3m x 2 ton

Shackle 8 ton

2. Chain Block CB-022 / 3 ton

Web Sling 2 x 3m x 2 ton

Shackle 8 ton

KSSI Rigging Store Supervisor In-charge

Fabian Esteban

Inspected and colour coded white

23Sept.2014 1330 hrs.

KSSI Rigging Store Supervisor In-charge

Fabian Esteban

Inspected and colour coded white

23Sept.2014 1330 hrs.

ACB upper deck

Chain BlockCB-004 / 2 ton

Web Sling( 2 ) 2 x 3m 2 ton

Shackle( 2 ) 8 ton

KSSI Rigging Store Supervisor In-charge

Fabian Esteban

Inspected and colour coded white

23Sept.2014 1330 hrs.