LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007

Status of the Status of the TRD at CERNTRD at CERN

as of July 2007as of July 2007

TRD GroupTRD GroupPhysikalisches InstitutPhysikalisches Institut

Universität HeidelbergUniversität Heidelberg

LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007

TRD sector 08TRD sector 08

There is There is 1 TRD super module1 TRD super module

installed in sector 08 installed in sector 08 since October 2006.since October 2006.

LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007

TRD sector 08 statusTRD sector 08 status

This TRD super module isThis TRD super module isoperational since end of March 2007.operational since end of March 2007.

LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007

What TRD prepares for in What TRD prepares for in 20072007

Services will beServices will beprepared assumingprepared assumingthe TRD detectorthe TRD detectorwill consist of 4 SMwill consist of 4 SMby end of 2007 :by end of 2007 :

• sector 00sector 00• sector 08sector 08• sector 09sector 09• sector 17sector 17

20072007 0008

0917

Next 3 SM installationNext 3 SM installationslot is scheduled for slot is scheduled for Sept/Oct 2007.Sept/Oct 2007.

LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007

TRD-O-MeterTRD-O-Meter

http://alice.uni-hd.de/trd-o-meterhttp://alice.uni-hd.de/trd-o-meter

The The TRD-O-Meter TRD-O-Meter

gives an gives an overview on overview on the status the status of the TRD of the TRD

infrastructure infrastructure at Point 2.at Point 2.

LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007

Sector 08 full cabling on C-Sector 08 full cabling on C-sideside

is 2-3 days of workis 2-3 days of work

mounting and testingmounting and testing

LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007

19

SP

D

17

2415

15

1911

18

0

10

8

11

0 8 9 16 17 25 33 3734

EXD4/29

EX

D5

/29

MT

R

MT

R

MT

R

MT

R

TO

F

TO

F

TO

F

TR

D

TR

D

TR

D

TP

C

Sniffers

Sniffers

T0

T0

TS

/EL

AC

O

AC

O

FM

D

TR

D

TR

D

TO

F

TO

F

TO

F

7 0

MT

R

TO

F

TO

F

SP

D

EX

D2

/29

MCH

MCH

MCH

MCH12

15 TPC

TPC

16

18 TRD

TRD

TRD

20

23 TRI

TRI

TRI24

27

EX

D3

/29

35 28

Beam

Vacuum

36

39 MCH

MCH

MCH

MCH

0 8 9 16 17 24 25 33 3734

EXD6/29

EX

D7

/29

MT

R

MT

R

MT

R

MT

R

TO

F

TO

F

TR

D

TR

D

TR

D

TP

C

SS

D

SS

D

SP

D

TR

D

TR

D

TO

F

TO

F

TO

F

HM

P

SS

D

SS

D

TS

/EL

HM

P

HM

P

PHS

SPD

TPC

TPC

TPC

TPC

PMD

PMD

TR

D

TO

F

TO

F

TR

D

TO

F

Sniffers

TP

C

TO

F

SDD

SPD

CPV

SSD

SSD

21 SSD

EXD1/29

TR

D

SD

D

TR

D

TS/EL

Vacuum

TS

/EL

V0

TS

/EL

Beam

TRI

EM

C

MT

R

TRI

TRI

TRI

TRI

MC

H

MC

H

LV

LV

CP

GP

LV

LV

LV

SP

RO

LHV

LHV

LV

LV

LV

LV

LV TR TR RO LV

LV LV

TR LV LV LV LV LV LV HV CO LV LV CO LHV LHV CO LV LV LV LV LV LV LV LV SP RO RO RO RO

SP LV CO LVLV LV LV HV GAS LVPWR SIG LV LV LV LV LV

SP

LV LV SP RO RO RO RODET DET SP SP

CP

GP

LV

LV

CTP

LV

LV

CTP

CTP

CTP

CTP

CTP

mult

mult

CT

CT

CT

LV

LV

LV

LV

TRD Racks in UX25

A

I

O

C

L3 Magnet

LV

TRD racks

LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007

LV power supply installationLV power supply installation

• 78/89 power bins are 78/89 power bins are installed at Point 2installed at Point 2• 26/90 Wiener power 26/90 Wiener power supplies are mountedsupplies are mounted• 09/90 Wiener power09/90 Wiener power supplies are operatingsupplies are operating

• sector 08 operatingsector 08 operating• sector 09 installedsector 09 installed• sectors 00,17 sectors 00,17 available till end Julyavailable till end July

• GTU power operatingGTU power operating• PCU commissionedPCU commissioned

LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007

HV power distributionHV power distribution

• 2 TRD SM can be2 TRD SM can be operated operated standalonestandalone from ISEG cratesfrom ISEG crates using patch boxes using patch boxes as temporary as temporary HVDSHVDS replacementreplacement

• new 32ch ISEG new 32ch ISEG HV modules for HV modules for 4 TRD SM will 4 TRD SM will be delivered bybe delivered by end of Augustend of August (ATLAS Calo Type)(ATLAS Calo Type)

LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007

LV Patch Panel for SMLV Patch Panel for SM

• mounted on themounted on the SM end capSM end cap

• connects fromconnects from LV patch panelsLV patch panels in Back-/Baby-in Back-/Baby- frame to SMframe to SM

• LV patch chordLV patch chord cabling iscabling is simplified andsimplified and quickerquicker

LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007

DCS network monitoring DCS network monitoring toolstools

We developed monitoring tools for status control of:We developed monitoring tools for status control of:• Wiener power suppliesWiener power supplies• Netgear switchesNetgear switches• DCS boardsDCS boards

LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007

Detector Control SystemDetector Control System

LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007

Installed at P2mid April 07

SSDSPD TPC TRD TOF HMP PHO CPV MCH MTR FMD T0 V0 PMD ZDC ACO EMC DCS

stan

dard

se

mi

speci

fic

HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV

MON

LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV

MONMON

MON

MON MON

BOM

RCK

MON

FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE

CPU

GPS

VHVLV

LEDLIQ

GMS

LAS

THR

MOV

HAL

RAD

SFM

MON

CCO

LED

FEE

NMR

HVDHVD APD

COO

VME VME VME VME VME VME VME VME VME VME

COO COO COO COO COO COO COO VEN

GAS GAS GAS GAS GAS GAS

VME

Central effort

MON

VME

VEN

GAS

MON

VME

GAS

THR

IAS

GTU

PCU

PTU

TRG

GAS

VME

COO

VAC

DSS

TCOAPD

LVDFELLAS

CAM

MIR

SYN

GPU

SDD TRG

VEN

PVSSFSMConfigured

DVMDVM

TOR

TRU

LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007

11stst Cosmic TRD-Events at P2 Cosmic TRD-Events at P2

• 11stst event taken on event taken on

12 May 2007 12 May 2007

• presently 5k cosmics presently 5k cosmics

takentaken

• signal, reconstructed signal, reconstructed

clustersclusters

• TRD-chamber time-0 TRD-chamber time-0

planesplanes

LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007

OutlookOutlook

Complete Services for 4 SMComplete Services for 4 SM (Jul 2007)(Jul 2007) GTU commissioning with SM-IGTU commissioning with SM-I (Jul 2007)(Jul 2007) Pre-trigger commissioningPre-trigger commissioning (Jul (Jul

2007)2007) SM-II commissioningSM-II commissioning (Aug (Aug

2007)2007) Comm. w/ CTP and trigger detectorsComm. w/ CTP and trigger detectors (Aug (Aug

2007)2007)

Cosmics data taking w/ SM-I and IICosmics data taking w/ SM-I and II (Aug 2007)(Aug 2007) in total 4 SM installedin total 4 SM installed (Oct 2007)(Oct 2007)