9
D D Some D0 Meeting April 2001 Level 1 Muon Trigger Status Ken Johns University of Arizona for the L1 Muon Group

Level 1 Muon Trigger Status

  • Upload
    janice

  • View
    20

  • Download
    0

Embed Size (px)

DESCRIPTION

Level 1 Muon Trigger Status. Ken Johns University of Arizona for the L1 Muon Group. L1MU Status. L1MU triggers verified with detector hits L1MU and L3MU tested L1MU triggers for 36x36 A.C scintillator Octant 1 A.C scintillator Octant 2 A.C # A.B scintillator Octant 6 - PowerPoint PPT Presentation

Citation preview

Page 1: Level 1 Muon  Trigger Status

DD

Some D0 MeetingApril 2001

Level 1 Muon Trigger Status

Ken JohnsUniversity of Arizona

for theL1 Muon Group

Page 2: Level 1 Muon  Trigger Status

DD

Some D0 MeetingApril 2001

L1MU Status

L1MU triggers verified with detector hits

L1MU and L3MU tested L1MU triggers for 36x36

A.C scintillator Octant 1 A.C scintillator Octant 2 A.C # A.B scintillator Octant 6

Testing of production power supplies (VICOR) in progress They work but 3.3V remote sense

does not work with programmable load

L1MU data “analyzed” (print dump) using l1muo_analyze First step towards examine

1 new Grad student to Fermi in May

Page 3: Level 1 Muon  Trigger Status

DD

Some D0 MeetingApril 2001

L1MU A.C Octant 1

Page 4: Level 1 Muon  Trigger Status

DD

Some D0 MeetingApril 2001

L1MU A.C Octant 2

Page 5: Level 1 Muon  Trigger Status

DD

Some D0 MeetingApril 2001

L1MU Oct2.Oct6

Page 6: Level 1 Muon  Trigger Status

DD

Some D0 MeetingApril 2001

L1MU Card Status

CARD ASSEMBLED STATUS

MTCM Done Testing

MTCxx 26/ 62 Testing

MTC05 Done Testing

MTC10 10/ 28 Testing

MTM Done Testing

MCEN 50/ 65 Testing

MCPB Done Testing

MCCM PreprodDone

Testing

MSPLI T Done Testing

Page 7: Level 1 Muon  Trigger Status

DD

Some D0 MeetingApril 2001

L1MU Card Status

But card testing (at AZ) is slow MTFB cards have numerous

shorted pins on their connectors that must be located and removed

Shorted pins also slow MTCxx testing

MCCM may need a production run but BU working hard to use preproduction cards

Page 8: Level 1 Muon  Trigger Status

DD

Some D0 MeetingApril 2001

Shutdown Tasks

Install (hopefully) 6 central 05 (scintillator) octants 6 central 10 (wire) octants 2 north 05 octants 2 south 05 octants 1-4 MCEN octants

Update DPM control and L2/L3 message building logic

Complete no-L1CFT logic for above

Install production power supplies and gain final ORC

Complete cabling at detector front-ends

Complete cabling at L1MU trigger crates?

Page 9: Level 1 Muon  Trigger Status

DD

Some D0 MeetingApril 2001

Shutdown Tasks

And lots of software L1MU examine L1MU monitoring COOR-L1MU communication Power supply control and

monitoring