LED SCALE-UP: Connected Lighting – Investing in the Future In partnership with December 11, 2019

LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

LED SCALE-UP: Connected Lighting –Investing in the Future

In partnership with

December 11, 2019

Page 2: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

THE CLIMATE GROUP

OUR GOAL is a world of no more than 1.5°C of global warming and greater prosperity for all.

HOW WE DO IT• We bring together powerful networks of businesses and

governments, which shift global markets and policies, towards this goal.

• We act as a catalyst to take innovation and solutions to scale. And we use the power of communication to build ambition and pace.

• We focus on the greatest global opportunities for change.

Page 3: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

AGENDALED Scale-Up introduction (5 mins)

Toby Morgan - LED Program Manager

The Climate Group

Utility company perspective (12 mins)

Justin Harmond - Assistant to the Executive Vice President

Georgia Power

Regional Street Lighting Procurement Program (12 mins)

Michael S. Fuller – President Keystone Lighting Solutions/consultant

Delaware Valley Regional Planning Commission

Private financing initiatives (12 mins)

David J. Clamage - Managing Director

Saulsbury Hill Financial and Consultant to Generate Capital

Moderated discussion and questions (15 mins)

Page 4: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

LED Scale-Up

We are working to transform the way we light our world.

Lighting accounts for nearly 6% of global CO2 emissions.

We can make a considerable dent in emissions by making

lighting more energy efficient..

Page 5: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

WHY LEDs?

This is unprecedented for a direct replacement technology.

Page 6: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

In 2015, in partnership with Signify (formerly Philips Lighting), we launched an ongoing global consultation toaddress regional barriers and help accelerate scale-up of LEDs in cities around the globe.

LED CONSULTATIONS

Page 7: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Connected, Smart

lighting controls can

serve as a platform for

future smart city

services and the IoT.

Smart cities are

anticipated to have a

market value of over $2

trillion by 2025*

FLEXIBILITY + INTEROPERABILITY +

FUTURE SCALABILITY + SECURITY

OUTDOOR LIGHTING

*Frost & Sullivan, 2018

Page 8: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

SMART CITIES & CONNECTIVITY

Offers integration of city services.

New data opportunities with potential for future revenues.

But who owns city data ?

CMS Centralized Management

System

STREET LIGHTING

PEDESTRIAN MONITORING

CCTV SECURITY MONITORING

WEATHER SENSORS

RADIATION MONITORING

SMOKE / FIRE SENSORS

TRAFFIC MONITORING

EVENT RESPONSE

EMERGENCIES

POLLUTION MONITORING

Eg. GUNSHOT TRIANGULATION

Page 9: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

SUPPORT AT STATE AND REGIONAL LEVEL A KEY DRIVER FOR LED ADOPTION

Page 10: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

UTILITY COMPANY PERSPECTIVE

Justin Harmond Assistant to the Executive Vice President

Georgia Power

10

LED Scale-UP

Page 11: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Georgia Power’s Approach to

Lighting as a Service

Justin Harmond

Page 12: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

A little about us…We are Georgia Power, A Southern Company

Provides electric service to

2.6 million customers in the state of Georgia

One of the most active utilities in the US in expanding

non-carbon generation, including solar, wind, and nuclear

Electricity rates are 16% below the national average

Own, operate and maintain nearly 1 Million street and area

lights within the regulated and unregulated business

Page 13: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

A Utility that Operates at the Speed of a Startup

27 COMMISSIONED

STATEWIDE SALES EMPLOYEES

AS A SERVICE BUSINESS MODEL

NO UPFRONT INVESTMENT

UNREGULATED MARKET PRICING

SELF CONTAINED BUSINESS

INCLUDING - SALES, DESIGN,

ENGINEERING, PROCUREMENT, CONSTRUCTION,

BILLING

$300 MILLION IN ANNUAL REVENUE

SUCCESS PROVIDED

OPPORTUNITY FOR PRODUCT

EXPANSION

Lighting & Smart Services

Page 14: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Georgia Power’s Lighting Assets

• Changing HID municipal roadway lighting to LED with Smart Controls

• 500,000 LEDs installed in the field

• 300,000 NLCs installed in the field

Infrastructure

• 3000K Roadway 4000K Area

• Reduce light pollution/light trespass

• All Roadway LED fixtures equipped with smart controls

• No up front cost; no increase in service costs

Requirements

• Our customers wanted it!

• 50% Energy Reduction – CO2 Reduction

• Better visual acuity with LED than HPS

• Aging fleet of HID fixtures

Justification

Page 15: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Smart Controls are Smart Lighting

Installation of smart controls on all LED Fixtures

• Auto-commissioning via DALI drivers

• GPS location auto populates mapping

• Control acquires fixture characteristics from driver and reports to

Centralized Management System

Asset Management

• Allows a better public experience with lights / fewer lights out

• Identification of issue before light goes out

• Actively rolling trucks on self reported outages

Maintenance

• All outdoor lighting energy consumption will be metered

• Time of Use Rate – Early off savings and reduced cost while

dimming

Capturing Usage Data

Page 16: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Geographic Information Systems

• Mobile Inspections

• Submeter Location Accuracy

• Realtime GIS data updates

• Storm Restoration

Page 17: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Lights, Cameras, Antennas Oh My!

• Colocation and Connectivity

• Cameras are 24/7 providing priceless peace of mind and valuable evidence.

Parking

Attach cameras / sensors to provide on-street parking surveillance and analytics

Gunshot Detection

Attach audio sensors to detect gunshots and provide notification

Digital Signage

Attach digital signs

to provide advertising

and notification capabilities

Traffic

Attach sensors to provide traffic surveillance with video data and analytics

Colocation – Monetizing Space

Page 18: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

2015“Smart Grid” Street Light

▪ Network Lighting Control

▪ 0-100% Dimming

▪ On-Demand Light Levels

SiteView

(Security Surveillance)

2017

2018 Colocation

(small cells)

City of Atlanta

Smart Cities Pilot

2018

2019

Fiber for

Colocation

Digital Signage

Gunshot Detection

Traffic management

Smart Parking

Smart

Solutions

2019

Monetizing our vertical assets

Community Collaboration – Expand Product Offerings – Economic Development

It’s Not Just a Light Pole Anymore…

2020+Water/ Environmental

Detection

Concealed Placement Speaker (CPS) TM

Public Wi-Fi

EV Charging

Page 19: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

• Accurate Energy Billing

• Customer Service and Enhanced Products and Services

• Reduce Overall Maintenance Costs

Construct a Clear Vision

• Maintenance Savings are REAL!

• Fewer Complaints to Call Centers

• Real-Time Asset Management

Growing Profitability

• Emphasize Energy Savings

• Public Safety and Customer Service

• Accurate Metering and the ability to offer a Time of Use Rate

Collaborate with Customers and Regulators

Insights and Recommendations

Page 20: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

IF YOU DON’T DECIDE HOW,

SOMEONE ELSE WILL DECIDE

FOR YOU!

Page 22: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

23

LED Scale-UP

DVRPC - REGIONAL STREET LIGHTING PROCUREMENT PROGRAM

Michael S. Fuller

President - Keystone Lighting Solutions/consultant

Page 23: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are
Page 24: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Delaware Valley Regional Planning Commission (DVRPC)

25

Metropolitan Planning Organization

for Greater Philadelphia Region

Bi-state, nine counties surrounding

and including Philadelphia.

5.6 million residents

Planning areasTransportation Planning, Air

Quality, Smart Growth Planning,

Environmental Planning, Housing

and Economic Development,

Population and Employment

forecasts, Long Range Planning,

Energy Planning

Page 25: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Municipal Energy Management

Challenges:

Where do I start?

Who do I trust?

What solutions are right for me?

How do I pay for it?

How do I convince my elected officials this is a

good idea?

How do I track the progress?

238 municipalities

average population of 10,220

2.5 million people (44% of region’s population)

Page 26: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Municipal Energy Management

Streetlight conversion projects present a particular challenge to municipalities:

▪ Visible, long-term project

▪ Design considerations▪ Controls

▪ Color temperature

▪ Illumination levels

▪ Distribution types

▪ High upfront cost

▪ For some communities, taking on Operations and Maintenance

Page 27: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Regional Streetlight Procurement Program

▪ >90% of municipalities in southeast PA own their streetlights

▪ Streetlight service is unmetered, and Utility has a straightforward billing update process based on algorithm allowing savings to easily be achieved.

▪ Incentives or funding streams available from local utility and through state transportation agency▪ Don’t solve “upfront cost” but do allow stream

for long-term payment

Page 28: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Regional Streetlight Procurement Program

Small-medium sized municipalities in southeastern PA pool their decision making and purchasing power to convert their entire street lighting

systems to LED by utilizing DVRPC-led/provided procurements, standardized contracting, finance,

and technical assistance

RSLPP Round One (2015- present):

▪ 35 municipalities

▪ >25,000 streetlights + Traffic signals

(5,700), Exterior (1K), 1 network

control system

▪ $13.9 M total project size

RSLPP Round Two (November 2018- ?):

▪ 26 municipalities

▪ ~15,000 streetlights + traffic signals,

exterior, wireless controls

▪ $4.9 M estimated project size

Page 29: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

RSLPP – How it Works Turnkey: ability to access all aspects of an LED conversion process (designer, manufacturer, distributor, installer), access to financing, and post-conversion operation and maintenance support, will be available.

All solicitations are issued jointly by DVRPC so municipalities do not procure services, products, or labor on their own.

Pooled purchasing power results in best products and service solutions at lowest possible price provided to the program.

Products & services are evaluated and managed by experts –munis achieve highest quality at the lowest possible price.

Transparency on all products, labor, pricing, and design strategies can boost municipal decision making confidence.

Common timeline of project steps will ensure munis can confidently proceed through the LED conversion process.

Page 30: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

LEDs in the Region: Before and After the RSLPP

County

%LED

Pre-

RSLPP

% LED

Post –

RSLPP R1

Bucks 1% 36%

Chester <1% 25%

Delaware <1% 15%

Montgomery <1% 41%

Total <1% 28%

Page 31: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are
Page 32: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Structuring the RSLPP

RSLPP Round One (2015- 2018):

Energy Performance Contracting: DVRPC issues RFP

for an ESCO that contracts with each muni and

executes project.

▪ Turnkey for DVRPC – only needs to identify an ECSCO for municipalities and ESCO manages all subcontracting processes.

▪ Municipalities hold a “Guaranteed Savings Agreement” with the ESCO (some also have a third-party owners agent)

RSLPP Round Two (Nov. 2018- Dec 2020):

Design-bid-Build: DVRPC hires a “Design Services

Professional” who designs each project under

contract with munis and works with DVRPC to

develop and manage vendor solicitations

▪ Construction contracts are managed by Design Services Professional

▪ Explained on next slide…

Page 33: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Development of Construction Contract (RSLPP Round 2)

Final Project Scope of Work

Mfg. Material Distribution

Financing

Preferred Bill of Material

Installation

• Performance Specifications

• Mfg. Solutions• Pricing• TCO+ Evaluation

• Required Services & Reporting

• Material Markup

• Preferred Products• Mfg. Pricing + Dist. Markup• Integrated into Installation

Contract

• Installation Pricing by Fixture Type• Typical Service Adders• Full Responsibility for Material & Labor• Installation Reporting Requirements

Page 34: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are
Page 35: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

RSLPP Financing

Value Proposition to Financial Partner(s)▪ Establish relationships and exposure to new municipal customers

▪ Secure investment:

▪ Straightforward and reliable equipment replacement w/long-term warranties expected.

▪ Municipalities receive significant project management support during and post construction

▪ Municipalities have a low default rate, streetlights are highly visible

▪ Low-risk and straightforward Savings: PECO bill updates and maintenance savings demonstrated with past LED streetlight projects in this region.

Page 36: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

RSLPP FinancingRSLPP financing goals:▪ Flexible and extended financing terms: Municipalities choose term of loan so that

energy and maintenance cost savings meet or exceed the finance payments each year

▪ Subject to appropriation debt: Does not count against a municipality’s debt limit - no need for state approval

▪ Keeps program moving quickly.▪ Low cost of borrowing▪ Removes barrier to entry for non-rated, fiscally strapped municipalities

▪ Low and fixed interest rates ▪ No risk for another community’s default▪ Reimbursement of upfront consulting, design and auditing costs associated

with the project.▪ Ability to lend to un-rated munis, and/or munis with small project sizes

Page 37: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Challenge of Achieving Finance Goals

But achieving these goals…▪ Private lenders may be unable or unwilling to unable to provide some

of these aspects, such as extended finance terms on subject to appropriation debt

▪ Arranging a pool of financing this way is challenging from a timing perspective: municipalities in the program will likely not be able to decide on financing until they bring the decision to enter into a construction contract before their elected bodies – meaning that your program must identify a financial partner before it can guarantee municipal participation

▪ Smaller project size

Page 38: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

RSLPP Financing (What we did)RSLPP Round 1:

▪ Pennsylvania Sustainable Energy Finance Program (PennSEF): A partnership between PA Treasury and the Foundation for Renewable Energy And the Environment. ▪ PennSEF was designed to partner with organizations to facilitate use of Energy Performance

Contracting, including financing▪ Establish program goals▪ Took lead for program in structuring financing▪ Support from Pennsylvania Treasury in helping meet some aspects of financing goals that

could not be provided by private lenders

RSLPP Round 2: ▪ Financial Partner: Delaware Valley Regional Finance Authority (DelVal)DelVal was

created by Bucks, Chester, Delaware, and Montgomery Counties in 1985 to provide funding for projects of local government units

▪ DelVal has originated more $3.3 billion loans (525 loans to 200 local governments)

Page 39: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

RSLPP FinancingAll Program finance goals met. Reliance on unique partnership with financing team

RSLPP Round 1:

▪ Pennsylvania Sustainable Energy Finance Program ▪ Arranged private loans through Univest Bank (2.95%)▪ PA Treasury agreed to finance longer-term loans at 12 years (3.05%)▪ PennSEF arranged all underwriting requirements and closing paperwork,

charged nominal fee to munis

RSLPP Round 2: ▪ Delaware Valley Regional Finance Authority (DelVal)

▪ DelVal provided GO financing to counties who served as as a “conduit”. Counties provided “subject to appropriation debt” to its municipalities

▪ First transaction achieved 1.57% interest rates

Page 40: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Bucks

DelVal

Chester MontCoDelaware

muni muni muni muni

Financing Structure

G.O. Debt

Subject to Appropriation Loans

Wells Fargo Bank

Paym

ents

Page 41: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

1.500%

1.750%

2.000%

2.250%

2.500%

2.750%

3.000%

3.250%

3-Aug-1

8

2-Sep-1

8

2-Oct

-18

1-Nov-

18

1-Dec-

18

31-Dec-1

8

30-Jan-1

9

1-Mar

-19

31-Mar-1

9

30-Apr-1

9

30-May-

19

29-Jun-1

9

29-Jul-1

9

DelVal Loan Rates for the Past Year, Level Debt Amortization

20-year maturity, fixedrate, 10 year option

15-year maturity, fixed

rate, 7 year option

10-year maturity, fixed

rate, 5-year option

5-year maturity, fixed

rate, no option

Variable loan rate

Page 42: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

RSLPP Finance Outcomes

Round One Outcomes:

▪ 24 out of 35 municipalities utilized financing (11 used internal funds)

▪ Total Program Cost: ~$15 Million

▪ Total finance pool: $9.9 Million

▪ Finance rate: 2.95% for <12 years, 3.05% > 12 years

▪ Individual project cost ranged from $24K - $2.2M

▪ Payback range:

▪ 3-20 yrs.

▪ 10.4 yr. average

Round Two Estimated Outcomes:

▪ 5 – 8 out of 26 municipalities will utilize program-arranged financing

▪ $45K to $1.4M

▪ Finance rate (first 3) = 1.57%

▪ Reasons for lower participation rate compared to Round 1:

▪ Lower Upfront cost: Round 2 achieved ~18% lower pricing due to more transparent procurement method/low service costs

▪ Smaller overall project size

▪ Clarity on state funding

Page 43: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Finance Takeaways

▪ Out of the box partnerships are required for financing multi-municipalities and small projects

▪ Pooling helps achieve economies of scale and lowers cost of borrowing

▪ Look to local partners

Page 44: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Thank you!

Liz Compitello Manager, Local Initiatives

DVRPC215.238.2897

[email protected]/rslpp

Michael S. FullerPresident

Keystone Lighting Solutions, LLC814.237.0091 (o)814.880.7747 (c)

[email protected]

Lucien Calhoun Delaware Valley Regional Finance Authority

Calhoun Baker Inc.(215) 402-0270

[email protected]://delval.us/

Page 45: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

46

LED Scale-UP

PRIVATE FINANCING INITIATIVES

David J. Clamage Managing Director

Saulsbury Hill Financial and Consultant to Generate Capital

Page 46: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

This material is confidential and proprietary to Saulsbury Hill Financial, LLC.

• The MUSH Market• Municipal University School & Hospital

• Bundled Solutions• MUSH

• Market Diversity• Solutions & Customers

David J. ClamageSAULSBURY HILL FINANCIAL

Page 47: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Government

State and Local Governments

•All shapes and sizes

•Cities

•Counties

•School Districts

•Special Districts

•Higher Education

•50 States = 50 Sets of Rules

155,057 Governments

•3,050 Counties

•16,220 Municipalities

•18,919 Townships

•108,579 School Districts

•8,229 Special Districts

Page 48: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Important Concepts

•Non-appropriation

If the monies allocated to a project, debt, lease, etc. are no

longer available due to a budget contraction,

non-appropriation – termination - is their right!

Government

State and Local Governments

Page 49: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Key Benefits

•Low Tax-Exempt Interest Rates

•No voter requirement

•Special accounting treatment

•Cash flow matching

•Prepayable

•$1 Purchase Option

•Very High Approval Rate

•Administratively efficient

Government

State and Local Governments

Page 50: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Conduit Finance for Non-Profits

“They might be non-profit but, they’re not tax-exempt”

• Tax Exempt• The concept of tax-exemption for the interest

income a lender/lessor receives from a financing is reserved for state and local governments

• The Conduit is the Alternative for a 501(c)(3)• A non-recourse lease or loan to a government

or authority• A sub-lease or loan to the non-profit

• Two Sets of Documents• Three Sets of Attorneys• Two Public Hearings• 2% Fee Cap

Page 51: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

“As A Service” – Off Balance Sheet

• OpEx v. Cap Ex

• Debt v. Service

• Guaranty the “nameplate” or “cut sheet”

• Continuing O&M

• Cash Sale

• Customer Retention

Page 52: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

“As A Service” – OpEx vs. CapEx

The Basics really are simple…

Page 53: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Some IMPORTANT Resources

http://www.dsireusa.org/

http://www.naseo.org/

Page 54: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Thank you!

David J. Clamage 303-880-4033 x102

[email protected]

Page 55: LED SCALE-UP · 2020-01-04 · Municipalities receive significant project management support during and post construction Municipalities have a low default rate, streetlights are

Thank you for listening.

Any Questions?

For more information on the program please contact:

Toby Morgan – LED Program Manager

Email: [email protected]

www.TheClimateGroup.org

Follow us -LED consultation handout

In partnership with