LEAN COMMISSIONING: MAKING YOUR COMPANY’S PROCESS MORE EFFICIENT & EFFECTIVE ACG 9 th Annual Conference April 18, 2013 Chicago, IL Derek De Jesús, CxA, LEED AP BD+C National Commissioning Manager KJWW Engineering

Lean Commissioning: Making Your Company’s Process More Efficient & Effective

  • Upload
    jewell

  • View
    39

  • Download
    2

Embed Size (px)

DESCRIPTION

Lean Commissioning: Making Your Company’s Process More Efficient & Effective. ACG 9 th Annual Conference April 18, 2013 Chicago, IL. Derek De Jesús, CxA , LEED AP BD+C National Commissioning Manager KJWW Engineering. Introduction. Introduction. SHARE , SUPPORT , LEARN - PowerPoint PPT Presentation

Citation preview

Page 1: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

LEAN COMMISSIONING:MAKING YOUR COMPANY’S PROCESSMORE EFFICIENT & EFFECTIVE

ACG 9th Annual ConferenceApril 18, 2013Chicago, IL

Derek De Jesús, CxA, LEED AP BD+CNational Commissioning ManagerKJWW Engineering

Page 2: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

Introduction

Page 3: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

IntroductionSHARE, SUPPORT, LEARN

1. “Lean” – What, Why and How2. Applying “Lean” ideas to Commissioning

Page 4: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

What does “lean” mean?• Webster

• to incline, deviate, or bend from a vertical position• Weight Watchers

• Reduce weight through healthy eating and exercise• Toyota

• The two focal points of the principles are continuous improvement and respect for people

• Motorola• aimed at minimizing variability in manufacturing through the

standardization of product defect measurement….optimizing customer value and reducing waste

Page 5: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

Why do we get “lean”?• Cut waste• Get to our goal quicker• Save money, Increase profit

http://www.lean.rit.edu/about.aspx

Page 6: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

How do we get “lean”• Identify waste• Listen to your client• Integrate and adapt

http://www.lean.org/WhatsLean/Principles.cfm

Page 7: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

Apply “lean” thinking to Commissioning

http://www.novaces.com/lean-six-sigma-implementation.php

Page 8: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

Apply “lean” thinking to Commissioning

Project

Programming

DesignOccupancy

Acceptance Construction

Page 9: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

Programming Phase• Earlier the better…but why?

• Integrate, Collaborate, Document

• Owner’s Project Requirements• How effective is this tool?• Who is really driving the project?

• Establish Commissioning Process

Page 10: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

Design Phase• Design Reviews

• Don’t be afraid to talk, converse• How do you do this on a D/B/B vs D/B?

• Specifications• Purpose….contract for the contractors• Get rid of the duplicative redundant duplication

Page 11: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

Design Phase• Commissioning Plan

• What is your definition?• What do you use this tool for?• Living document…hardly

• Use it, preach it, enforce it

• Incorporate spec language to reduce duplication

• How do people learn?

Page 12: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

Design Phase• Actions Log

• Change the nomenclature• The MOST IMPORTANT TOOL!• Document EVERYTHING!

• Database vs Excel vs text file• Relationships, macros, filters, reports, etc…

Page 13: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

Construction Phase• Submittal reviews

• Does a concurrent review really work?

• Process is completely different for D/B vs D/B/B

• Site Observations, Meetings• Get to the point already• Invite only those needed

Page 14: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

Construction Phase• Actions Log

• Demand action

• Pre-Functional Checklist• The 2nd worse document in Commissioning History

• What is your goal with this?• Who is doing it and how?• Manage, document

• Extract the right information• Require only the requisite information

Page 15: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

Acceptance Phase• Scheduling

• Pull method

• IPD and D/B are easiest

• Not static but not rocket science either

• Be productive by making known your goals

Page 16: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

Acceptance Phase• Functional Performance Test

• When are these documents developed?• How is it developed?

• Collaboration is required

• Get the contractor to perform as part of the PFC

Page 17: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

Occupancy Phase and Beyond• O&M Manuals

• Electronic…duh, but what about interactive…?

• How will the owner use them?• Does the staff have laptops, tablets?• Building have wifi for access online documents?

• Sale to the Owner early O&Ms that are more than pdfs

• Create a true Systems Manual as a standard, your building will thank you

Page 18: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

Occupancy Phase and Beyond

http://www.deloitte.com, 2012 Study, page 8

Page 19: Lean Commissioning: Making Your Company’s Process More Efficient & Effective

Wrap Up