Upload
jane-porter
View
212
Download
0
Embed Size (px)
Citation preview
8/16/2019 LCR Site Selection
1/7
8/16/2019 LCR Site Selection
2/7
8/16/2019 LCR Site Selection
3/7
From: Zhang, Wayne
To: Barnes, Vannessa
Subject: RE: City of Raleigh Pb_Cu Monitoring sites
Date: Tuesday, February 09, 2016 7:56:05 AM
Attachments: Raleigh new Lead and Copper Sites for Benton Plant (New Sites).pdf Copy of 2010 Pb Cu Monitoring Sites_w_names_and_Zones.xls
Vannessa,
Please see the attached map for Raleigh’s Pb_Cu monitoring sites (including the proposed sites served by DEB).
To select the new sites, I was following two criteria:
1. The house or building was constructed around 1984 (categorized as Tier 1), right before December 1985 when NC lead ban for
structures that contain copper pipes with lead solder, lead pipes, or are served by a lead service line. The construction year of
the buildings can be found in County’s property parcel GIS database.
2. Source of supply – in the last round of Pb_Cu site update, City decided to add new sites supplied by DEB. The information of
supply source was decided from the modeling output, as showing in the map.
Please let me know if I can provide further assistance.
Thanks,
Wayne Zhang, PhD, PE
Ass oc iate | Hazen and Sawyer 4035 Ridge Top Road, Suite 400, Fairfax, VA 22030
703- 537-7901 (direct) | 703-218-2040 (fax)
[email protected] | hazenandsawyer.com
From: Barnes, Vannessa [mailto:[email protected]]
Sent: Monday, February 08, 2016 3:05 PM
To: Zhang, Wayne
Subject: RE: City of Raleigh Pb_Cu Monitoring sites
Importance: High
Hey Wayne,
Could you email me a copy of a map showing our lead and copper sites in the distribution system.
Also, when we updated the Lead and Copper sites in 2010 how did you select the sites?
Thanks,
Vannessa P. Barnes
Laboratory Supervisor
City of Raleigh
EM Johnson Water Plant
Office: 919-996-3175
Mobile: 919-868-3736
From: Barnes, VannessaSent: Tuesday, January 26, 2010 11:02 AMTo: 'Zhang, Wayne'Subject: RE: City of Raleigh Pb_Cu Monitoring sites
Thanks Wayne, I did get the maps.
Thanks!
Vannessa P. Barnes
Laboratory Supervisor
City of Raleigh
mailto:[email protected]:[email protected]:[email protected]:[email protected]://www.hazenandsawyer.com/http://www.hazenandsawyer.com/mailto:[email protected]:[email protected]:[email protected]
8/16/2019 LCR Site Selection
4/7
EM Johnson Water Plant
Phone: 919-870-2870
Fax: 919-870-2893
From: Zhang, Wayne [mailto:[email protected]]Sent: Tuesday, January 26, 2010 9:42 AMTo: Barnes, VannessaSubject: RE: City of Raleigh Pb_Cu Monitoring sites
Vannessa: I left the hard copies in the basket outside your office. Please let me know if you don’t find them. Wayne
From: Barnes, Vannessa [mailto:[email protected]]Sent: Monday, January 25, 2010 11:38 AMTo: Zhang, WayneCc: Wang, MichaelSubject: RE: City of Raleigh Pb_Cu Monitoring sites
Thanks Wayne!
Vannessa P. Barnes
Laboratory Supervisor
City of Raleigh
EM Johnson Water Plant
Phone: 919-870-2870
Fax: 919-870-2893
From: Zhang, Wayne [mailto:[email protected]]Sent: Monday, January 25, 2010 11:08 AMTo: Barnes, VannessaCc: Wang, MichaelSubject: RE: City of Raleigh Pb_Cu Monitoring sites
Vanessa: I will deliver the hard copies to you this afternoon. Wayne
From: Barnes, Vannessa [mailto:[email protected]]Sent: Monday, January 25, 2010 10:59 AMTo: Zhang, WayneCc: Wang, MichaelSubject: RE: City of Raleigh Pb_Cu Monitoring sites
Thank Wayne,
Everything looks good. Please make some hard copies so that I can submit to PWS.
Thanks!
Vannessa P. Barnes
Laboratory Supervisor
City of RaleighEM Johnson Water Plant
Phone: 919-870-2870
Fax: 919-870-2893
From: Zhang, Wayne [mailto:[email protected]]Sent: Monday, January 25, 2010 10:09 AMTo: Barnes, VannessaCc: Wang, MichaelSubject: RE: City of Raleigh Pb_Cu Monitoring sites
Vanessa: Please see the attached PDF map. Let me know if you have questions.
mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]
8/16/2019 LCR Site Selection
5/7
Thanks, Wayne
From: Barnes, Vannessa [mailto:[email protected]]Sent: Friday, January 22, 2010 3:23 PMTo: Zhang, WayneCc: Wang, MichaelSubject: RE: City of Raleigh Pb_Cu Monitoring sites
Thanks Wayne,
Everything looks good. Could you add two more sites? Then we will have 15 sites for DE Benton.
Again Thanks!
Vannessa P. Barnes
Laboratory Supervisor
City of Raleigh
EM Johnson Water Plant
Phone: 919-870-2870
Fax: 919-870-2893
From: Zhang, Wayne [mailto:[email protected]]Sent: Thursday, January 21, 2010 4:22 PMTo: Barnes, VannessaCc: Wang, MichaelSubject: RE: City of Raleigh Pb_Cu Monitoring sites
Vannessa: Please review the five proposed LCR sampling sites supplied by Benton Plant as listed below and shown in the attached map. Let me know if you have questions. I have more sampling site candidates if you want to replace the proposed ones. After finalized, I will deliver the hardcopies to your office if needed. Thanks, Wayne
City of Raleigh New Lead and Copper Sampling Sites Supplied by D. E. Benton Plant
LocationCode
Address ZipCode
MeterSize
PipeMaterial
BuiltYear
Tier PressureZone
B58 105 Easton Ct 27529 Copper 1984 1 532
C61 104 Glenn Bryan Ct 27529 Copper 1985 1 532
M23 2612 Buffaloe Rd 27529 Copper 1984 1 532
V06 1408 E.Davie St 27601 Copper 1985 1 495
P38 1000 Fayetteville St 27601 Copper 1985 1 495
From: Barnes, Vannessa [mailto:[email protected]]Sent: Friday, January 15, 2010 10:14 AMTo: Zhang, WayneCc: Wang, MichaelSubject: FW: City of Raleigh Pb_Cu Monitoring sites
Hi Wayne,
Yesterday, I met with the state concerning our Pb & Cu monitoring sites. They were okay with the number of sites we had
within the blending zones. They would like for us to increase the number of Tier 1 sites that are located in the area were DE
Benton will be supplying water. From looking at the attached map there were 8 locations for DE Benton, 10 locations for the
blending zones and the remaining locations are being supplied by EMJ. We had a total of 104 sites.
Do you think you could update the map with an additional 4 or 5 locations that are Tier 1 sites, were water is being supplied
by the DE Benton Plant?
I have attached our current monitoring site plan along with our alternate Pb and Cu sites. In the Alternate sites there are 3
locations in Garner that will be supplied by DE Benton.
mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]
8/16/2019 LCR Site Selection
6/7
Thanks for your assistance
Vannessa P. Barnes
Laboratory Supervisor
City of Raleigh
EM Johnson Water Plant
Phone: 919-870-2870
Fax: 919-870-2893
From: Zhang, Wayne [mailto:[email protected]]Sent: Thursday, December 10, 2009 11:01 AMTo: Barnes, VannessaCc: Wang, MichaelSubject: RE: City of Raleigh Pb_Cu Monitoring sites
Vannessa: Please see the attached PDF file for the map for the state. I will deliver the paper maps to you later this afternoon. Thanks, Wayne
From: Barnes, Vannessa [mailto:[email protected]]
Sent: Thursday, December 10, 2009 8:03 AMTo: Zhang, WayneCc: Wang, MichaelSubject: RE: City of Raleigh Pb_Cu Monitoring sites
Thanks Wayne, this is perfect. Please proceed with preparing a formal map with the result. This info will be
submitted to the state.
Thanks!
Vannessa P. Barnes
Laboratory Supervisor
City of Raleigh
EM Johnson Water Plant
Phone: 919-870-2870
Fax: 919-870-2893
From: Zhang, Wayne [mailto:[email protected]]Sent: Wednesday, December 09, 2009 4:25 PMTo: Barnes, VannessaCc: Wang, MichaelSubject: RE: City of Raleigh Pb_Cu Monitoring sites
Vanessa: I have identified 10 sites within Raleigh’s blending zone (Please also see the attached map). After you review, I will prepare a formal map forthe result. Thanks and let me know if you have suggestions about the result. Wayne
Code Address Zip Size Material Built Tier ZONE
J28 2416 Cavalier St. 27603 Copper 1984 1 595
L64 2912 Henslowe Dr. 27603 Copper 1983 1 595
N91 2212 Lawrence Dr. 27603 Copper 1983 1 595
U34 2116 Saturn St. 27603 Copper 1983 1 595
L46 2401 Sierra Dr. 27603 Copper 1983 1 595
T44 2408 Voyager Cir. 27603 Copper 1983 1 595
P71 315 Shepard St. 27607 Copper 1983 1 595
Z38 2608 Dover Rd. 27608 Copper 1984 1 595
X70 1916 St. Mary's St. 27608 Copper 1984 1 495
mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]
8/16/2019 LCR Site Selection
7/7
AA9 867 Dalewood Dr. 27610 Copper 1984 1 495
From: Barnes, Vannessa [mailto:[email protected]]Sent: Tuesday, December 08, 2009 10:45 AMTo: Zhang, WayneSubject: City of Raleigh Pb_Cu Monitoring sites
Hi Wayne,
Attached is the City of Raleigh Lead and Copper Monitoring Sites.
Thanks!
Vannessa P. Barnes
Laboratory Supervisor
City of Raleigh
EM Johnson Water Plant
Phone: 919-870-2870
Fax: 919-870-2893
mailto:[email protected]:[email protected]