David H. Dowell Injector Update [email protected]. edu October 12-13, 2004 LCLS Injector Update D. H. Dowell, SLAC FAC Review, October 12-13, 2004 •Injector Performance Requirements •Conventional Facilities Update –Shield Wall Installed –Sector 20 Alcove •Title I complete •Title II begun •RF Design Update •Drive Laser Update •Injector Physics Update •Summary

LCLS Injector Update D. H. Dowell, SLAC FAC Review, October 12-13, 2004

  • Upload
    cleave

  • View
    53

  • Download
    2

Embed Size (px)

DESCRIPTION

LCLS Injector Update D. H. Dowell, SLAC FAC Review, October 12-13, 2004. Injector Performance Requirements Conventional Facilities Update Shield Wall Installed Sector 20 Alcove Title I complete Title II begun RF Design Update Drive Laser Update Injector Physics Update Summary. - PowerPoint PPT Presentation

Citation preview

Page 1: LCLS Injector Update D. H. Dowell, SLAC FAC Review, October 12-13, 2004

David H. Dowell

Injector Update [email protected]

October 12-13, 2004

LCLS Injector UpdateD. H. Dowell, SLAC

FAC Review, October 12-13, 2004

•Injector Performance Requirements•Conventional Facilities Update

–Shield Wall Installed–Sector 20 Alcove

•Title I complete•Title II begun

•RF Design Update •Drive Laser Update•Injector Physics Update•Summary

Page 2: LCLS Injector Update D. H. Dowell, SLAC FAC Review, October 12-13, 2004

David H. Dowell

Injector Update [email protected]

October 12-13, 2004

Parameter Value Peak current 100 A Charge 0.1 – 1 nC Normalized transverse emittance projected/slice

1.2 / 1.0 m rms

Rate 120 Hz Energy 135 MeV Energy spread @ 135 MeV projected/slice

0.1 / 0.01 % rms

Gun laser timing stability 0.50 ps rms Booster mean rf phase stability 0.1 rms Charge stability 2.0 % rms Bunch length stability 5 % rms

LCLS Injector Performance Requirements:

Page 3: LCLS Injector Update D. H. Dowell, SLAC FAC Review, October 12-13, 2004

David H. Dowell

Injector Update [email protected]

October 12-13, 2004

LCLS Injector Configuration

PORCU

PINE CATHODE

HOLDE

R

UHV A

LL METAL

GATE VALVES

SPOOLS FRO

M VALVE

SEAL

LONG B

ELLOWS

ASSEM

BLY

TREATMEN

T CHAM

BER

VACUU

M PUMPS

SLAC Main Linac Beamline

Transverse RF Cavity

Laser Heater & Chicane

35o Bend

Straight Ahead Spectrometer

L0-1 & L0-23-m SLAC Sections

Electro-Optic Diagnostic

OTR Emittance DiagnosticsRadiation Shield Walls

RF Gun & Solenoid

Load Lock

Gun Diagnostics

Page 4: LCLS Injector Update D. H. Dowell, SLAC FAC Review, October 12-13, 2004

David H. Dowell

Injector Update [email protected]

October 12-13, 2004

S20 Floor Plan

23 24 25 26 27 28 29 323130

4 'x 6 '

6 'x 1 5 '6 'x 1 5 '

3210M e t e rs

I N C H E S1 0 08 06 04 02 00 P20-17P20-16

FRONT

3'-6"

FRONT

P20-15P20-14

MODULATORSTA 20-8(EXISTING)

KLYSTRON

CONTROLS RACK (EXISTING)

RF CONTROL RACKS (NEW)

LKG-01LKG-02

LKG-03LKG-04

LKG-05LKG-06

FRONT

I&C CONTROL RACKS (NEW)

LKG-07LKG-08

LKG-09LKG-10

LKG-11LKG-12

LKG-13LKG-14

LKG-15LKG-16

LKG-17LKG-18

LKG-19LKG=20

LKG-21LKG-22

LKG-23LKG-24

6' 8"

5'-1

1"

2'-4

"

20'-0"

14

'-0"

20'-0"

12'-8"

10'-0"

19'-10"60'-1"

11'-2"

22'-11"

36'-9"

19'-10"

11'-6"

10'-0"typ.

Roll Up Equipment Door

OverheadCrane

8'-0"

Large Equipment Access,Removable Panel, 8 ft wide,floor to ceiling

Injector Vault ControlledEntry Area

Power Supply andControl Racks

Laser BayControlled EntryArea

Load LockRoom

Storage & LocalControl Area

Loading &Work Area

Laser Bay

RF Hut

60.000

1'-0"

1'-0"

120.000

See PRD: Conventional Facilities Specifications For the Sector 20 Alcove

•Cable Plant Specs Defined•Title II Design Started

Page 5: LCLS Injector Update D. H. Dowell, SLAC FAC Review, October 12-13, 2004

David H. Dowell

Injector Update [email protected]

October 12-13, 2004

RF Design ProgressL0-1 Accelerator section

Dual feed RF design completeL0-1 engineering design nearly complete

120 Hz GunSolenoid design completeRF design nearly completeRedesigned coupler holes solved pulsed heating problemAdopted racetrack geometry for full cellHeld technical meetings with prospective vendorsUnresolved issues:

Final design for bulk cooling systemLoad lock deferredDecide how much SLAC vs. vendor engineering and fabrication

Technical review first week of November

Page 6: LCLS Injector Update D. H. Dowell, SLAC FAC Review, October 12-13, 2004

David H. Dowell

Injector Update [email protected]

October 12-13, 2004

Dual Feed RF Gun and Solenoid•Dual Feed/Racetrack Design Corrects RF Fields to Second Order•Solenoid Design Includes Both Dipole and Quadrupole Field Correctors

Page 7: LCLS Injector Update D. H. Dowell, SLAC FAC Review, October 12-13, 2004

David H. Dowell

Injector Update [email protected]

October 12-13, 2004

Gun body stress in Pa

•Localized heating of the RF coupling port. •The heat flux (watts/m2) is shown for the gun operating at 140 MV/m and 120 Hz. •Total dissipated power is 3676 watts.

ANSYS Analysis: John Hodgson and Nancy Yu

Localized Pulsed Heating of RF Coupling Port

•The BNL/SLAC/UCLA gun design has a T of 137oC/pulse at the port.•The redesigned port gives a T of 41oC/pulse.•NLC designs limit T to 50oC/pulse

Pulse Heating Analysis: Zenghai Li and Liling Xiao

Page 8: LCLS Injector Update D. H. Dowell, SLAC FAC Review, October 12-13, 2004

David H. Dowell

Injector Update [email protected]

October 12-13, 2004

L0-1 Structure RF Design

0.0200.20Cross Dual

0.0040.04Race-track dual

0.0630.63Symmetric dual

0.0780.78SLAC Single feed

Head-tail angle (rad/m)

()/m

0.0200.20Cross Dual

0.0040.04Race-track dual

0.0630.63Symmetric dual

0.0780.78SLAC Single feed

Head-tail angle (rad/m)

()/m

Page 9: LCLS Injector Update D. H. Dowell, SLAC FAC Review, October 12-13, 2004

David H. Dowell

Injector Update [email protected]

October 12-13, 2004

L0-1 Structure RF Dual Feed

Page 10: LCLS Injector Update D. H. Dowell, SLAC FAC Review, October 12-13, 2004

David H. Dowell

Injector Update [email protected]

October 12-13, 2004

Drive Laser Update (Details in “Drive Laser Update” Presentation)

Technical Review Committee AssembledC. Barty (LLNL) chairman, M. Babzien (BNL), R. Falcone (Berkeley), Y. Li (ANL)

Review Held July 21, 2004 at SLAC

Committee involved in procurement process

Laser baseline design is diode-pumped Ti:Sapphire based upon extensive discussions with vendors

Request for Proposal ready to submit to vendors

Laser pulse shaping studies underway at BNL/DUVFEL

Developing collaboration with LLNL on both near term and long term laser needs

Page 11: LCLS Injector Update D. H. Dowell, SLAC FAC Review, October 12-13, 2004

David H. Dowell

Injector Update [email protected]

October 12-13, 2004

Injector Physics, see breakoutInjector Physics, see breakout

• Diagnostics and Commissioning– Gun measurements

• Accurate thermal evaluation• Gun spectrometer

– 6D beam characterization at 135 MeV • Simulations

– Low Charge tunings

• RF studies– L01 dual feed, racetrack shape necessary – RF gun dual feed, racetrack shape in full cell– mode 0 studies

• 8MHz mode separation better• klystron pulse shaped

8% modulation

Name r 80 (80 5%)

Nom.,1nC,10ps 1.2 mm 0.9 rad 2.5

1 nC, 17.5 ps 0.85 0.75 1.5

0.2nC,10ps 0.39 0.38 2.5

0.2nC,5ps 0.42 0.37 5

Page 12: LCLS Injector Update D. H. Dowell, SLAC FAC Review, October 12-13, 2004

David H. Dowell

Injector Update [email protected]

October 12-13, 2004

Injector Schedule

•Schedule Coordinated with Shutdowns•Over a Year for Injector Commissioning•Injector Not on Project Critical Path

Page 13: LCLS Injector Update D. H. Dowell, SLAC FAC Review, October 12-13, 2004

David H. Dowell

Injector Update [email protected]

October 12-13, 2004

Summary and Conclusions

Conventional facilities at S20 defined to support Title IIFacilities for two drive lasers

RF design of 120 Hz gun nearly completeSolenoid design with dipole and quadrupole correctors finishedPulsed heating solvedDual RF feed + racetrack full cell

L0-1 accelerator sectionRF design finishedEngineering design in progress

RF design review first week of NovemberBeamline components (magnets) being designedDrive laser specifications defined in Request for Proposal