LC 373 www.linkedindustries.com.au Position Structural, Mechanical and Piping Supervisor Location Ormeau, QLD / FIFO Qualifications and Memberships Trade in Mechanical Fitting and Turning Confined Space Ticket D6 Inspectors Certificate Working at Height Ticket D5 Supervisors Certificate IIF Certification Peer on Peer Training 7 Modules in Cert 4 Frontline Management People Leadership Certification SHE Leadership Certification Key Skills Numerous Years in the Construction Industry Numerous years in Piping & Mechanical Supervisory roles Experience in the oil and gas industry Significant experience in the fibreglass Piping industry Flange management for a variety of piping sizes, applications and materials Industry Experience Job Title SMP Supervisor Dates Nov 2019 Present Company Water Treatment Upgrade, Canberra, ACT Key Responsibilities: Installation of steel structures, pumps, valves, various piping system and supports Job Title SMP Supervisor Dates Jul 2017 Oct 2019 Company UGL Mt Pleasant Coal Mine Wash Plant Project Orica Shutdown, Newcastle, NSW New Century Mine / Karumba Port QLD Key Responsibilities: Installation of steel structures, pumps, valves, various piping system and supports

LC - 373€¦ · LC#!!373" !!!! Position" Structural,)Mechanical)and)Piping)Supervisor" Location"Ormeau,!QLD!/FIFO! Qualifications,and,Memberships! Trade&in

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LC - 373€¦ · LC#!!373" !!!! Position" Structural,)Mechanical)and)Piping)Supervisor" Location"Ormeau,!QLD!/FIFO! Qualifications,and,Memberships! Trade&in

 

   

LC  -­‐  373  

www.linkedindustries.com.au  

 

 

 

Position  

Structural,  Mechanical  and  Piping  Supervisor  

Location   Ormeau,  QLD  /  FIFO  

Qualifications  and  Memberships  

Trade  in  Mechanical  Fitting  and  Turning   Confined  Space  Ticket  

D6  Inspectors  Certificate   Working  at  Height  Ticket  

D5  Supervisors  Certificate   IIF  Certification    

Peer  on  Peer  Training   7  Modules  in  Cert  4  Frontline  Management  

People  Leadership  Certification     SHE  Leadership  Certification  

Key  Skills    

• Numerous  Years  in  the  Construction  Industry  • Numerous  years  in  Piping  &  Mechanical  Supervisory  roles  • Experience  in  the  oil  and  gas  industry  • Significant  experience  in  the  fibreglass  Piping  industry  • Flange  management  for  a  variety  of  piping  sizes,  applications  and  materials  

Industry  Experience    

Job  Title   SMP  Supervisor   Dates   Nov  2019  –  Present   Company    

Water  Treatment  Upgrade,  Canberra,  ACT  Key  Responsibilities:  

• Installation  of  steel  structures,  pumps,  valves,  various  piping  system  and  supports  

Job  Title   SMP  Supervisor   Dates   Jul  2017  –  Oct  2019   Company   UGL  

Mt  Pleasant  Coal  Mine  Wash  Plant  Project  Orica  Shutdown,  Newcastle,  NSW  New  Century  Mine  /  Karumba  Port  –  QLD  Key  Responsibilities:    

• Installation  of  steel  structures,  pumps,  valves,  various  piping  system  and  supports            

Page 2: LC - 373€¦ · LC#!!373" !!!! Position" Structural,)Mechanical)and)Piping)Supervisor" Location"Ormeau,!QLD!/FIFO! Qualifications,and,Memberships! Trade&in

 

     www.linkedindustries.com.au  

LC  -­‐  373  

UGL  for  BHP  Billiton  -­‐  Execution  Supervisor  –  Olympic  Dam  SCM17  Shutdown,  SA  Overseeing  contractors  such  as  Downers,  Monodelphous  in  the  Construction,  Installation  and  Commissioning  of:  

• Various  piping  and  pump  systems  •  Tank  Re-­‐lines  •  Heat  exchangers,  Hyd.  Units,  Dryer  coil  and  Larox  filter  re-­‐builds  •  Structural  steel  and  conveyor  install  

Job  Title   SMP  Supervisor   Dates      Feb  2017  to  June  2017   Company   Oceanic  Resources  

Knauf  Plasterboard  Project,  Bundaberg  QLD  Key  Responsibilities:  

• Installation  of  steel  structures,  pumps,  conveyers,  various  piping  system  and  supports  

Job  Title   Commissioning  Leading  Hand  Mechanical  Fitter  

Dates   Feb  2016  -­‐  Dec  2016   Company   UGL  

Ichthys  LNG  Project,  Darwin  NT  Key  Responsibilities:  

• Combined  Cycle  Power  Plant  

Job  Title   D6  Inspector  /  D5  Piping  and  Hydro  Supervisor  

Dates   Jan  2013  -­‐  Dec  2015   Company   Leighton  Contracting  

Ichthys  LNG  Project,  Darwin  NT  Key  Responsibilities:  

• Fibreglass,  HDPE  and  Gal  Vent  pipe  install  and  flange  management  

Gorgon  LNG  Project,  Barrow  Island,  WA  Key  Responsibilities:  

• Fibreglass,  HDPE  and  Carbon  Steel  pipe  install,  flange  management  

Job  Title   SMP  Supervisor   Dates   2010  –  2012     Company   Thiess  Degremont  

Desalination  Project,  Wonthaggi  Vic  Key  Responsibilities:  

• SMP  Supervisor  onsite  installation  of  GRP  /  GRE,  HDPE,  Stainless  steel  and  structural  steel  as  well  as  Pipe  supports  and  pump  systems,  Flange  management  

• Pre  -­‐  Site  Works  -­‐  Working  in  China  and  India  Supervising  GRP  /  GRE  pipe  manufacturing,  pre-­‐spooling  and  QA  including  flange  management  of  pre-­‐packaged  work  prior  to  shipping  to  Australia  

• Prioritising  piping  systems  first  required,  which  involved  producing  spooling  to  a  tight  schedule  without  compromising  quality  

Job  Title   SMP  Supervisor   Dates   2008  –  2010     Company   Southern  Aurora  Contracting  

Bluewater  Desalination  Project,  Sydney  NSW  Key  Responsibilities:  

• GRP/GRE  (above  and  underground),  Stainless  Steel,  HDPE  Pipe  and  Pipe  Support  installation  and  flange  management  of  Valves  and  piping,  Installation  of  structural  Steel  

   

Page 3: LC - 373€¦ · LC#!!373" !!!! Position" Structural,)Mechanical)and)Piping)Supervisor" Location"Ormeau,!QLD!/FIFO! Qualifications,and,Memberships! Trade&in

 

     www.linkedindustries.com.au  

LC  -­‐  373  

Job  Title   SMP  Supervisor   Dates   2007  -­‐  2008   Company   Southern  Aurora  Contracting  Pty  Ltd  

Gold  Coast  Desalination  Project,  Tugun  Qld  Key  Responsibilities:  

• GRP/GRE,  HDPE  (above  and  underground),  and  Stainless  Steel  pipe  installation,  as  well  as  installation  of  pipe  supports  

• Monitoring  Quality  Assurance  documentation  • Flange  management  of  valves  and  piping  

Further  Experience  

Southern  Aurora  Contracting  Pty  Ltd  -­‐  2006  –  2007  Tallawarra  Power  Station,  NSW    

• Supervisor  Installation  and  flange  management  of  cooling  water  GRP  pipe  work  

Derek  Gee  -­‐2006  (5  Months)  Roxby  Downs,  Olympic  Dam  

• Supervisor  Installation  and  flange  management  of  GRP  pipe  work  and  Pipe  Supports  

Lifese  Engineering  Pty  Ltd  -­‐  2005  –  2006  Kogan  Creek  Power  Station,  Qld  

• Supervisor  of  the  installation  and  flange  management  of  Stainless  Steel,  Carbon  steel  and  GRE  pipelines  

Ron  Gee  Enterprises  -­‐  2004  –  2005  Roxby  Downs  –  Maintenance  Manager  Olympic  Dam  

• Supervisor  GRP/GRE  maintenance  and  flange  management  

Ron  Gee  Enterprises  -­‐2003  –  2004    Roxby  Downs  –  Olympic  Dam  

• Supervisor  Installation  and  flange  management  of  GRP,  Stainless  Steel  pipe  work  and  supports  in  SX  Re-­‐Build  

Ron  Gee  Enterprises  -­‐  2002  –  2003  Orica  Chemical  Plant  Project  –  Laverton  Victoria  

• Leading  Hand  Pipe  Fitter  of  the  installation  and  flange  management  of  GRP/GRE  lines  

Ron  Gee  Enterprises  -­‐  1999  –  2001  Phosphate  Hill  Project  -­‐  OLD    

• Leading  Hand  Pipe  Fitter  of  the  installation  and  flange  management  of  GRP  and  stainless  steel  lines  

JR  Engineering  -­‐  1996  –  1999  Kalgoorlie  –  WA  

• Shut  down  and  maintenance  fitter  (mechanical  and  pipe)  at  various  mines