Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
S
h
i
n
g
l
e
A 9
(T
)
4
4
9
m
M
a
s
t
449m
4
4
8
m
4
5
0
m
D
aln
aspid
al S
tation
K
e
e
p
e
r
s
C
o
t
t
a
g
e
G
l
e
n
G
a
r
r
y
T
r
a
c
k
A
llt
C
o
ir
e
M
h
ic
-
s
it
h
G
a
r
r
y
v
i
e
w
P
o
n
d
4
4
2
m
G
e
n
e
r
a
l
W
a
d
e
'
s
M
i
l
i
t
a
r
y
R
o
a
d
T
h
e
O
l
d
S
c
h
o
o
l
h
o
u
s
e
(dis
used)
L
a
y-b
y
Lay-by
TIE-IN
EXISTING
ROCK CUT
O
P
-
4
0
0
k
V
-
E
L
E
-
O
H
O
P
-
4
0
0
k
V
-
E
L
E
-
O
H
O
P
-
4
0
0
k
V
-
E
L
E
-
O
H
O
P
-
4
0
0
k
V
-
E
L
E
-
O
H
O
P
-
4
0
0
k
V
-
E
L
E
-
O
H
O
P
-
4
0
0
k
V
-
E
L
E
-
O
H
OP-400kV-ELE-OHOP-400kV-ELE-OH
OP-400kV-ELE-OHOP-400kV-ELE-OH
OP-400kV-ELE-OHOP-400kV-ELE-OH
O
P
-4
0
0
k
V
-E
L
E
-O
H
O
P
-4
0
0
k
V
-E
L
E
-O
H
EXISTING ALLT COIRE
MHIC-SITH UNDERBRIDGE
EXISTING
TELECOMMUNICATION
MAST
NEW SUDS
BASIN
NEW SUDS
BASIN
NEW SUDS
BASIN
NEW FOOTPATH
LINK TO NCN7
NEW ALLT COIRE MHIC-SITH
SIDE ROAD BRIDGE
DATUM=432.000m.
PROPOSED LEVEL
ORIGINAL GL
HORIZONTAL ALIGN.
VERTICAL ALIGN.
CHAINAGE
LONG SECTION
P07 ML L NB SCALE 1:2500H/1:500V
DATUM=432.000m.
PROPOSED LEVEL
ORIGINAL GL
HORIZONTAL ALIGN.
VERTICAL ALIGN.
CHAINAGE
LONG SECTION
P07 ML L NB SCALE 1:2500H/1:500V
DATUM=432.000m.
PROPOSED LEVEL
ORIGINAL GL
HORIZONTAL ALIGN.
VERTICAL ALIGN.
CHAINAGE
LONG SECTION
P07 ML L NB SCALE 1:2500H/1:500V
EXISTING ALLT COIRE
MHIC-SITH UNDERBRIDGE
NEW DALNASPIDAL JUNCTION
UNDERBRIDGE
4
4
7
m
4
3
7
m
L
a
y-b
y
TIE-IN TO
EXISTING
NCN7
O
P
-4
0
0
k
V
-E
L
E
-O
H
O
P
-4
0
0
k
V
-E
L
E
-O
H
O
P
-4
0
0
k
V
-E
L
E
-O
H
NEW SHARED
NCN7 AND
MAINTENANCE
ACCESS
NEW SUDS
BASIN
DATUM=438.000m.
PROPOSED LEVEL
ORIGINAL GL
HORIZONTAL ALIGN.
VERTICAL ALIGN.
CHAINAGE
LONG SECTION
P07 ML L SB SCALE 1:2500H/1:500V
DATUM=438.000m.
PROPOSED LEVEL
ORIGINAL GL
HORIZONTAL ALIGN.
VERTICAL ALIGN.
CHAINAGE
LONG SECTION
P07 ML L SB SCALE 1:2500H/1:500V
DATUM=438.000m.
PROPOSED LEVEL
ORIGINAL GL
HORIZONTAL ALIGN.
VERTICAL ALIGN.
CHAINAGE
LONG SECTION
P07 ML L SB SCALE 1:2500H/1:500V
PROJECT 07
GLEN GARRY TO DALWHINNIE
DMRB STAGE 3
PLAN AND PROFILE
R VILLALAIN
16/11/16
B.TIGHE B OKUNFOLAMI
A9P07-CFJ-HML-L_ML000_ML-DR-RD-0001
1:2500 at A1 (1:5000 at A3)
1 7 P03 S4
R GRAY
A9P
07-C
FJ-H
ML-L_M
L000_M
L-D
R-R
D-0001.dw
g
495298
D
B
A
C
2 3 4 51
of
PROJ:
DATE:
SHEET:
DWG:
GENERAL NOTES
SUIT DESCRIPTION APPBYREV
REVISION:
Reproduced by permission of Ordnance Survey on behalf of Her
Majesty's Stationery Office, © Crown copyright and database right 2016.
All rights reserved. Ordnance Survey Licence Number: 100046668.
SUITABILITY:
DATE
DESIGN: DRAWN: CHK: APP:
Reproduced by permission of Ordnance Survey on behalf of Her
Majesty's Stationery Office, © Crown copyright and database right 2016.
All rights reserved. Ordnance Survey Licence Number: 100046668.
CÒMHDHAIL ALBA
1. ALL DIMENSIONS IN METRES UNLESS STATED OTHERWISE.
CH2M HILL Fairhurst JV
C/O: City Park 368 Alexandra Parade Glasgow G31 3AU
Tel +44 (0)141 552 2000 Fax +44 (0)141 552 2525
CULVERTS / WATERCOURSE STRUCTURE
LEGEND:
RIVER / STREAM / LOCH
CFJV FLOOD MAPPING (1:200 YEAR)
EXISTING ROAD / FOOTPATH / CYCLE ROUTE
BUILDINGS
RAILWAY
UTILITIES
OP-400Kv-ELE-OH
BEAULY TO DENNY POWER LINE,
PYLONS AND EXCLUSION ZONE
KEY ENVIRONMENTAL CONSTRAINTS
SSSI (SNH)
SAC (SNH)
SPA (SNH)
ROAD
ROAD
EARTHWORKS CUTTING
EARTHWORKS EMBANKMENT
CARRIAGEWAY
SLOPE BETWEEN CARRIAGEWAYS
CENTRAL RESERVE / VERGE
FOOTPATH
2. THE MAINLINE ALIGNMENTS INCORPORATE VARIED
EARTHWORKS SLOPES. WHERE POSSIBLE
EARTHWORKS SLOPES HAVE BEEN ADJUSTED TO
ACCOMMODATE LANDSCAPING CONSIDERATIONS. IN
ADDITION, EARTHWORKS SLOPES HAVE BEEN
STEEPENED WHERE NECESSARY TO MINIMISE IMPACTS
ON ADJACENT CONSTRAINTS SUCH AS THE AQUEDUCT,
RAILWAY AND WHERE ROCK CUTS ARE ANTICIPATED.
INSERT A