Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
GF
AM
AR
PLANT SCHEDULE
SYMBOL SPECIES No. Pot Size Mat. Hgt. Stake COMMON NAME
Sapphire Buffalo Turf
TJ
SM
DS
SS
LT
PX
PG
AM
(hedged)
Glochidion ferdinandi 1 75ltr 8m yes Cheese Tree
Zamia furfuracea 10 5ltr 1m no Cardboard Palm
Cycas revoluta 2 5ltr 1.2m no Sago Palm
PS
CR
ZF
Trachelospermum jasminoides 24 5ltr climber trellis Star Jasmine
Lomandra longifolia 'Tanika' 24 150mm 0.5m no Dwarf Mat Rush
Philodendron 'Xanadu' 36 150mm 0.7m no Dwarf Philodendron
Dichondra 'Silver Falls' 23 150mm g/cover no Silver Dichondra
Archontophoenix sp. 3 75ltr 7m yes Bangalow Palm
Pittosporum 'Stephens Island' 26 5ltr 2m no Pittosporum
Sedum seiboldii 14 150mm 0.3m no October Stonecrp
Sedum morganianum 13 150mm g/cover no Donkeys Tails
PS
Alpinia malaccensis 'Giant Pink' 6 5ltr 2.5m no Pink Shell Ginger
Pittosporum 'Golf ball' 16 150mm 0.8m no Golf Ball Pittosporum
CR
PG
Typical brick edge
Existing trees to be retained
Turf
Drying area
Selected Tiles
Stepping stones
Stormwater lines and pits
Retaining walls
drying
typical flush brick edging to allgarden beds adjoining lawn
outlook privacy planting toboundary with pebbles foroccasional maintenanceaccess
selected finish to drivewayto Architects details
redundant driveway crossingsto be removed
letterbox
STUDY
LOUNGE
FORMAL LIVING
BUTLERSPAN
KITCHEN
DINING
OUT DOOR DINING
DRIVE WAY
LIFT
L'DRY/LIN
F
LS
POOLWATER LEDGELOUNGER
FBED 5
BATH
OUT DOORSITTING AREAWITH FIRE PLACE
B.I.RMUDROOM
ENS
POOL PUMPEQUIPMENT
SPA
BALINESESHOWER
BM CUT IN KERBRL 21.48 AHD
CO
NC
RET
E KE
RB
& G
UTT
ER
TELSTRA
21.80
SMH21
.87
21.58
VKC21
.55
TK
21.52
TK
21.48
VKC21
.56
HYD21
.71
BM21
.48
EC
EC
21.67
EC
21.73
EC
21.79
EC
21.89
EC21
.87
NS
NS
21.71
NS22
.30NS
22.23
NS
22.15NS
22.07NS
22.00
NS
21.97
NS
21.79
NS21
.84
NS21
.97
NS21
.86
NS
21.86
NS22
.20 NS
22.48NS
22.28 NS
23.10
NS
22.53NS
22.48
NS22
.58 NS
22.77
NS
22.80
NS
22.70
NS22
.72
NS21
.85 NS21
.90 NS
21.97
DRV
21.60
DRV
21.54
DRV
21.83
MYE
E A
VEN
UE
50.29
15.2
4
15.24
50.29
(A)HYDRANT
0.4 D5 H5 S
SEWERMANHOLE
TELSTRA
CONCRETEDRIVEWAY
0.2 D8 H4 S
0.2 D8 H4 S
0.2 D8 H4 S
0.2 D8 H4 S
bin storebelow
maximum 1800mm high timberpaling or colorbond fencing toside and rear boundaries
RWT
RL 22.20
RL 22.20RL 22.00PX PX PX
pool compliantmaintenance gate
900
non climbable accentplants to pool zone
decorativepebbles
21 PXtrellis wire to be attached tofence to provide climbing framefor plants
maximum 1800mm high timberpaling or colorbond fencing toside and rear boundaries 16 TJ
decorative pebbles togarden surrounds
1 CR3 ZF
CR
ZF
FL 22.750
RL 22.700
RL 22.700
drying
slim line drying line'Versa line' or similar
outlook privacy planting; trelliswire to be attached to fence toprovide climbing frame for plants
8 TJ
lawn 22.700
LT LT
LT
LT
1.2m pool fence
screen hedge to rearboundary
no tree planting withindrainage easement
8 PS
AMAM
AM
PX
PX
PX
PX
PS
PS
20 LT
AR
low retaining wall belowfence to maintainboundary levels
ARAR
feature nativepalms in lawn
3 AR
non climbable accentscreen plants
6 AC15 PX4 LT
sloping lawn to follow natural ground levels
PS PS
DS DS
DS DS
privacy screen hedge toboundary
9 PS11 DS
trailing ground coversover driveway walls
CRDS
1 CR5 DS
PG PG ZF
10 PG7 DS
1 ZF
lawn NGL
path
privacy hedge toboundary
PS PS
GF
PG
ZF
PG
minimum 1x native tree tofront setback inaccordance with Councilrequirements
1 GF9 PS6 PG6 ZF
typical flush brick edge tofrontage gardens
existing lopped street treeto remain and be protectedfrom damage duringconstruction
nature strip areas to beregraded and returfed asnecessary followingconstruction works
No.18
No. 22
lawn NGL+
FORM SHALLOW DISH TOBASE OF PLANT100mm DEPTH MULCHAS PER SPECIFICATION
HOLE TO BE 150mmLARGER THAN POT SIZEON ALL SIDES
PLANTING MIX AS PERSPECIFICATION
RIP BASE TO 150mm
TYPICAL PLANTING DETAIL nts
150
100
COPYRIGHT TO ZENITH LANDSCAPE DESIGNS
HARDWOOD STAKE3x50x2000mm INSTALLEDVERTICALLY FOR TREESPECIES; 50mm WIDTH HESSIANTIE SECURED TO STAKES
COPYRIGHT TO ZENITH LANDSCAPE DESIGNSSTEEL TRELLIS ON FENCE DETAIL nts
FENCING AS SPECIFIED ONPLAN
WIRING FOR CLIMBERS TO BE3.2mm STAINLESS STEEL WIRECABLE AT 400mm CENTRES
ALL EYES, SWAGES, THIMBLES,BOTTLESCREW TENSIONERSTO BE MARINE GRADESTAINLESS STEEL
GROUNDLINE
AS S
PEEC
IFIE
D
100
400m
mMAX 1500mm
STAINLESS STEEL CABLEASSEMBLY
WALLMOUNT UNIT
SINGLE CABLE ELEVATION
TURFING DETAIL nts
TOPSOIL AND FILL GAPS WITHIMPORTED AND SCREENED TOPSOIL
RIP TO 100MM DEPTH WHEREREQUIRED
GRADE EXISTING SITE SOIL TOPREVENT PONDING
50mm THICK APPROVED IMPORTEDTOPSOIL
TURF TO BE FINISHED LEVEL WITHSURROUNDING SURFACES
COPYRIGHT TO ZENITH LANDSCAPE DESIGNS
150
100
PLANTING TO BE STAGGERED
MASS PLANTINGSETOUT DETAIL ntsCOPYRIGHT TO ZENITH LANDSCAPE DESIGNS
REFER TO PLANT SCHEDULEFOR SPECIES AND QUANTITIES
HARDWOOD STAKE3x50x2000mm INSTALLEDVERTICALLY FOR TREESPECIES; 50mm WIDTH HESSIANTIE SECURED TO STAKES
PLAN HESSIAN TIES ntsCOPYRIGHT TO ZENITH LANDSCAPE DESIGNS
Cheese Tree
STANDARD BRICK EDGE DETAIL nts
STANDARD BRICK OR PAVER LAID WITHMAXIMUM 10mm MORTAR JOINT
MORTAR BED - MINIMUM 50mm DEPTHBELOW BRICK
CONSOLIDATED SUB-GRADE
COPYRIGHT TO ZENITH LANDSCAPE DESIGNS
min. 150mm
GROUND LEVEL TO FINISH FLUSHWITH BRICK
100mm MULCHREFER TO SPECIFICATION
DIG OVER AND RAKE SITESOIL TO AN EVEN FINISHINCORPORATING 'DYNAMICLIFTER' FERTILISER OREQUIVALENT ATMANUFACTURER'SRECOMMENDED RATES.
MASS PLANTING BEDPREPARATION DETAIL ntsCOPYRIGHT TO ZENITH LANDSCAPE DESIGNS
200
TYPICAL PLANTER BOX DETAIL ntsCOPYRIGHT TO ZENITH LANDSCAPE DESIGNS
100mm MULCH TO AS PER SPECIFICATIONFINISH FLUSH WITH TOP OF PLANTER BOXWALLS.PLANTER BOXES WALLS TO ARCHITECTSDETAILS
BITUMINOUS SEAL OR APPROVEDWATERPROOFING MEMBRANE APPLIED ASPER MANUFACTURER'S RECOMMENDATIONS.
PLANTER BOX SOIL MIX AS SUPPLIED BYA.N.L. OR EQUIVALENT; SOIL WETTING AGENTTO BE INCORPORATED IN ACCORDANCEWITH MANUFACTURER'S RECOMMENDEDRATES.
DOUBLE WASHED COURSE RIVER SAND
HYDROPHILIC GEOTEXTILE AND'VERSICELL' DRAINAGE CELL OR EQUIV.DRAINAGE INSTALLED TO MANUFACTURER'SSPECIFICATION, MORTAR BED MIN. 1: 60 FALL
SLAB TO ENGINEERS DETAILS
BED TO DRAIN THROUGH SLAB TOSTORMWATER SYSTEM TO HYDRAULICENGINEERS DETAIL.
STEPPING STONES DETAIL nts
30mm MORTAR BED OVER20mm SAND BED BENEATHEACH PAVER TO PROVIDE ALEVEL SURFACE
PEBBLES BETWEEN STEPS
WELLCONSOLIDATEDGROUND
MIN 400x 400x 60mm CONCRETEPAVERS OR SLABS PLACED ATREGULAR INTERVALS AND LAIDFLUSH WITH PEBBLES
COPYRIGHT TO ZENITH LANDSCAPE DESIGNS
MIN 100, MAX 200mm
WEED MATTING BENEATHSTEPPERS AND PEBBLES
Bangalow Palm Pink Shell Ginger Pittosporum Cardboard PalmSago Palm Golf Ball Pittosporum Dwarf Philodendron Dwarf Mat Rush October Stonecrp Silver Dichondra Donkeys Tails Star Jasmine
minimum 450mmdepth planter
MASTER BED
ENS
HIS W.I.R
HER W.I.R DRESSINGTABLE
SS
SS
SM
SM
low maintenancesucculent plants
14 SS13 SM
trailing plants overplanter wall
LANDSCAPE GUIDELINES
1. GENERAL1.1 The Contractor shall familiarise themselves with the site prior to tender.1.2 The Contractor will be held responsible for any damage to utility services, pipes, building structures, paving surfaces, fencing, footways,kerbs, roads and existing plant material.1.3 The site is to be left in a clean and tidy condition at the completion of works to the satisfaction of the Superintendent.1.4 No work involving an extra shall be undertaken unless approval is first obtained from the Superintendent.1.5 No substitute of material shall be made unless approval is given by the Superintendent.1.6 The Contractor shall continuously maintain all areas of the Contract during progress of the works specified.2. SITE PREPARATION2.1 Prepared sub-grade is to be free of stones larger than 100mm diameter, cement, rubbish and any other foreign matter that could hinderplant growth.3. MASS PLANTED AREAS3.1 Once clear of weed growth, grass and debris, sub-grade should be cultivated to a minimum depth of 150mm incorporating 'Dynamic Lifter'or equivalent at the manufacturers recommended rates.3.2 Weeds shall be controlled by a combination of chemical and hand removal techniques.
4. PLANTING4.1 All plant material is to be hardened off, disease and insect free and true to species, type and variety. Plants are to be well grown but notroot bound and shall comply with Natspec - "Guide to Purchasing Landscape Trees".4.2 All plants are to be removed from their containers prior to planting with as little disturbance to the root system as possible.4.3 Planting shall not be carried out in dry soil or extreme weather conditions.4.4 Plants should be planted at the same depth as the plants were in the containers and allow for a shallow saucer of soil to be formedaround the plant to aid the penetration of water.4.5 All plant material should be watered thoroughly immediately after planting.4.6 The Contractor shall be responsible for the failure of plants during construction, except for acts of vandalism.4.7 Labels shall be removed entirely from the plants.
5. STAKING5.1 Ties should be firmly attached to the stakes, in a way to avoid damage to the stem while allowing a small degree of movement.6. TURF AREAS6.1 Turf areas should be cultivated before turfing by ripping or harrowing.6.2 At the completion of turfing the whole area shall be thoroughly soaked and kept moist till the completion of landscape works.7. MULCH7.1 Mulch for all general mass planted beds shall be 'Droughtmaster' mulch as supplied by A.N.L. or similar.SOIL MIXES8.1 Soil mix for mass planted areas shall be 3 parts site soil to 1 part 'Organic Garden Mix' as supplied by A.N.L. or equivalent.8.2 Soil mix for planter boxes and planting over slab shall be 'Planter Box Mix' as supplied by A.N.L. or equivalent.
9. FEATURE PEBBLES9.1 Feature pebbles shall be 20mm Nepean River Gravel or similar laid to a minimum 50mm depth.
M A I N T E N A N C E
1. These works shall be in addition to the construction contract.2. The Contractor shall commence and fully implement the short term maintenance after Practical Completion has been confirmed by the
Superintendent.3. The Contractor shall carry out maintenance works for a minimum period of 26 weeks4. Maintenance works shall include the following works :
a. Mow lawns and trim edges each 10 days in summer and each 14 days in winter.b. Water all planting and lawn areas in order to ensure adequate soil moisture at all times.c. Remove any weed growth from all planting areas.d. Spray and control pests and diseases as required.e. Replace plants which fail with plants of similar size and quality as originally planted.f. Adjust ties to trees as necessary.g. Make good any erosion or soil subsidence which may occur.h. Maintain all mulched areas in a clean and tidy condition to the depth as originally specified.i. Make good any defects or faults arising from defective workmanship.
Note: The Contractor is not to be held responsible for the theft or vandalism of any plants during the maintenance period5. Advanced trees shall be individually inspected at least once a month in order to determine their health and vigour. Should the trees exhibit any
signs of disease, pest infestation or poor growth then a qualified arborist shall be consulted within 14 days in order to determine the mostappropriate course of action. Recommended treatment shall then be commenced within 7 days and shall continue until the problem iseliminated.
6. When the maintenance period is completed the Contractor shall notify the Superintendent. The site shall then be inspected and if to thesatisfaction of the Superintendent the responsibility will be handed over to the Client for on-going maintenance.
0
1
2
3
45
10m
Legend
GROUND FLOOR PLAN 1:100
DISCLAIMEREvery effort is made to ensure the accuracy of these documents, however theyshould be thoroughly checked before being issued to any other persons orauthority or used for construction purposes. Any inaccuracies, omissions ordiscrepancies should be referred back to Zenith Landscape Designs immediately.
These drawings maybe printed in whole. The drawings and parts thereof remainthe intellectual property of Zenith Landscape Designs and may not be used in partor whole for any other purpose without the prior permission of Zenith LandscapeDesigns.
NOTES1. Vehicular pavement, fencing and built structure details shall be to Architect'sspecification.2. All surface and sub-surface drainage requirements shall be to Engineers details.3. Numeric dimensions should be taken in preference to scaling.4. All dimensions should be checked on-site prior to commencing construction.5. Contractors shall verify the location of all site features prior to commencing works.6. Soil testing has not been undertaken as part of the preparation of this design;Contractors shall determine the need for soil testing prior to any planting works.7. A search of underground services has not been undertaken as part of thepreparation of this design; it is recommended that Contractors contact DIAL BEFOREYOU DIG ON 1100 prior to commencing any works.8. This plan is to be read in conjunction with the architectural and engineering plans9. It is recommended that an approved root barrier be installed to manufacturersrecommendations to all tree planting in the vicinity of structures, walls and hardpavement areas.
A1BEFORE YOU DIGwww.1100.com.au
SHEET 1 OF 1
Description:
SCALES:
REVISION:
DATE:Ph: 9545 5200 [email protected]
DRAWING No.
STATUS:
TITLE:
LAN DS C AP E D E SI GN SZENITH
DRAWN:ARCHITECT:
HYDRAULIC:
SURVEY:
ARBORIST:Rev. no. Date:Description:Rev. no. Date:
CHECKED: 20 MYEE AVENUE
STRATHFIELDLANDSCAPE PLANDA 1:100MFGMAG21.06.2021 21-4473 LO1ZTA
SSCE
URBAN SURVEYORS
FIRST FLOOR PLAN