Lake Houston Dam Lake Houston Dam Comprehensive Evaluation of Comprehensive Evaluation of an Ambursen Dam an Ambursen Dam ASDSO ASDSO September 10, 2008 September 10, 2008 John Rutledge John Rutledge - - Freese & Nichols, Inc. Freese & Nichols, Inc. Chuck Easton Chuck Easton - - Freese & Nichols, Inc. Freese & Nichols, Inc. Janis Murphy Janis Murphy - - Freese & Nichols, Inc. Freese & Nichols, Inc. Bob Ringholz Bob Ringholz Fugro Consultants Fugro Consultants Ron Waters Ron Waters

Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Embed Size (px)

Citation preview

Page 1: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Lake Houston Dam Lake Houston Dam Comprehensive Evaluation of Comprehensive Evaluation of

an Ambursen Daman Ambursen Dam

ASDSOASDSOSeptember 10, 2008September 10, 2008

John Rutledge John Rutledge --

Freese & Nichols, Inc.Freese & Nichols, Inc.Chuck Easton Chuck Easton --

Freese & Nichols, Inc.Freese & Nichols, Inc.Janis Murphy Janis Murphy --

Freese & Nichols, Inc.Freese & Nichols, Inc.Bob Ringholz Bob Ringholz ––

Fugro ConsultantsFugro ConsultantsRon WatersRon Waters

Page 2: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Lake Houston DamLake Houston Dam

Designed by Ambursen, completed in 1954Designed by Ambursen, completed in 1954Flat slab and buttress spillwayFlat slab and buttress spillwayMaximum height 66 feetMaximum height 66 feet12,10012,100’’ longlongUncontrolled spillway of 3,077Uncontrolled spillway of 3,077’’Four gates Four gates –– two radial ( 18 x 20) and two flashboards (18 x two radial ( 18 x 20) and two flashboards (18 x 5)5)Two earthen embankmentsTwo earthen embankments

San Jacinto River northeast of Houston, TexasSan Jacinto River northeast of Houston, TexasOwned By City of Houston, operated by Coastal Water Owned By City of Houston, operated by Coastal Water Authority (CWA)Authority (CWA)

Page 3: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway
Page 4: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway
Page 5: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Typical Buttress SectionTypical Buttress Section

158 Spillway buttresses158 Spillway buttresses2020’’ on centerson centers3 rows of sheetpiles3 rows of sheetpiles

Page 6: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway
Page 7: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway
Page 8: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway
Page 9: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Comprehensive EvaluationComprehensive Evaluation

Review of DocumentsReview of DocumentsSite Inspection Site Inspection Update of Probable Maximum Flood Update of Probable Maximum Flood Alignment Survey Alignment Survey Identification of Dam Safety IssuesIdentification of Dam Safety IssuesAnalysis/Resolution of Dam Safety IssuesAnalysis/Resolution of Dam Safety Issues

Page 10: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Update of PMF Update of PMF

Update was performed to include:Update was performed to include:New Texas Design Storm GuidelinesNew Texas Design Storm GuidelinesUpdate methodology to new hydraulic unsteady flow Update methodology to new hydraulic unsteady flow model (HECmodel (HEC--RAS) to improve accuracyRAS) to improve accuracy

Page 11: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway
Page 12: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

CalibrationCalibration

Page 13: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

PMF ResultsPMF Results

Elev. 55.3 vs. 57.9 in previous reportElev. 55.3 vs. 57.9 in previous reportOf 2.6Of 2.6’’ difference, 0.5difference, 0.5’’ due to new TCEQ Guidelinesdue to new TCEQ GuidelinesOf 2.6Of 2.6’’ difference, 2.1difference, 2.1’’ due to unsteady HECdue to unsteady HEC--RASRAS

Peak Discharge of 578,500 cfs vs. 700,000 cfsPeak Discharge of 578,500 cfs vs. 700,000 cfsCompares to 50.8 in 1994Compares to 50.8 in 1994

400 yr event400 yr event> 50% of the PMF> 50% of the PMF

Page 14: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Issue IdentificationIssue Identification

32 potential dam safety issues32 potential dam safety issuesIdentified in document research and site investigationIdentified in document research and site investigation

13 routine maintenance items13 routine maintenance itemsReviewed and analyzed each issueReviewed and analyzed each issue

Develop a resolution, orDevelop a resolution, orDevelop a plan to resolve in future phasesDevelop a plan to resolve in future phases

Page 15: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

32 Dam Safety Issues32 Dam Safety Issues

2 Issues resolved with no action needed2 Issues resolved with no action needed13 Issues and 13 Maintenance Items Resolved 13 Issues and 13 Maintenance Items Resolved with remedial action needed by CWA:with remedial action needed by CWA:17 Issues addressed in second phase17 Issues addressed in second phase

Page 16: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Issue ResolutionIssue Resolution Remaining 17 IssuesRemaining 17 Issues

One Primary IssueOne Primary IssueSliding Stability of Spillway StructuresSliding Stability of Spillway Structures

Nine Secondary IssuesNine Secondary IssuesDependent on results of Stability AnalysisDependent on results of Stability Analysis

Seven Other Issues Seven Other Issues Unrelated to StabilityUnrelated to StabilityAttempted to resolve in second phaseAttempted to resolve in second phase

Page 17: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Sliding StabilitySliding StabilityNo visual evidence of stability concerns. However:No visual evidence of stability concerns. However:

History of Ambursen DamsHistory of Ambursen DamsDid not know actual uplift forces acting on hearth slabDid not know actual uplift forces acting on hearth slab

No existing instrumentationNo existing instrumentationDesign was based on undrained shear strengthsDesign was based on undrained shear strengths

Would likely show tendency for reduced strength over timeWould likely show tendency for reduced strength over timeCurrent practice would be to use drained strengthsCurrent practice would be to use drained strengths

Drained shear strengths data available from previous Drained shear strengths data available from previous analyses was limitedanalyses was limitedDid not have soil strength tests from samples directly Did not have soil strength tests from samples directly under slabsunder slabs

Page 18: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Sliding StabilitySliding Stability

Factors of Safety from Previous EstimatesFactors of Safety from Previous EstimatesOriginal Ambursen Design (1951) Original Ambursen Design (1951) –– 1.481.481994 Study 1994 Study –– 1.90 Used original design strength 1.90 Used original design strength parameters.parameters.2001 2001 –– 1.60 (1.35 when duplicated)1.60 (1.35 when duplicated)

Recommended ValuesRecommended Values2.0 for new construction2.0 for new constructionProbably 1.5 for existing structure with good Probably 1.5 for existing structure with good knowledge of foundationknowledge of foundation

Page 19: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Field ExplorationField Exploration

15 Borings and 20 piezometers in spillway area15 Borings and 20 piezometers in spillway area5 borings, 10 piezometers in hearth5 borings, 10 piezometers in hearth

““shallowshallow”” and and ““deepdeep”” piezometerspiezometers

6 borings and piezometers under spillway6 borings and piezometers under spillway4 borings and piezometers downstream from gates4 borings and piezometers downstream from gates

Samples taken from boringsSamples taken from boringsPiezometric data tracked from August 2007Piezometric data tracked from August 2007

Page 20: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Plan of Borings

Page 21: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway
Page 22: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway
Page 23: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway
Page 24: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway
Page 25: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Piezometric Data Piezometric Data ––

Buttress 66Buttress 66

0

5

10

15

20

25

30

35

40

45

50

1-A

ug-0

7

8-A

ug-0

7

15-A

ug-0

7

22-A

ug-0

7

29-A

ug-0

7

5-Se

p-07

12-S

ep-0

7

19-S

ep-0

7

26-S

ep-0

7

3-O

ct-0

7

10-O

ct-0

7

17-O

ct-0

7

24-O

ct-0

7

31-O

ct-0

7

7-N

ov-0

7

14-N

ov-0

7

21-N

ov-0

7

28-N

ov-0

7

5-D

ec-0

7

12-D

ec-0

7

19-D

ec-0

7

Wat

er E

leva

tion

(feet

msl )

-10

-8

-6

-4

-2

0

2

4

Rai

nfal

l (in

ches

)

Precipitation Lake Level A (-18.75 to -23.75) B Shallow (9.5 to 1.5) B Deep (-14.5 to -24.5)

2

0

4

Page 26: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Piezometric Data Piezometric Data ––

Buttress 36Buttress 36 Nov. 18 Nov. 18 ––

Dec. 20, 2007Dec. 20, 2007

10

15

20

25

30

18-N

ov-0

7

19-N

ov-0

7

20-N

ov-0

7

21-N

ov-0

7

22-N

ov-0

7

23-N

ov-0

7

24-N

ov-0

7

25-N

ov-0

7

26-N

ov-0

7

27-N

ov-0

7

28-N

ov-0

7

29-N

ov-0

7

30-N

ov-0

7

01-D

ec-0

7

02-D

ec-0

7

03-D

ec-0

7

04-D

ec-0

7

05-D

ec-0

7

06-D

ec-0

7

07-D

ec-0

7

08-D

ec-0

7

09-D

ec-0

7

10-D

ec-0

7

11-D

ec-0

7

12-D

ec-0

7

13-D

ec-0

7

14-D

ec-0

7

15-D

ec-0

7

16-D

ec-0

7

17-D

ec-0

7

18-D

ec-0

7

19-D

ec-0

7

20-D

ec-0

7

21-D

ec-0

7

22-D

ec-0

7

23-D

ec-0

7

24-D

ec-0

7

Adj

uste

d T

ailw

ater

Ele

vatio

n (fe

et m

s

38.038.338.538.839.039.339.539.840.040.340.540.841.041.341.541.842.042.342.542.843.043.343.543.844.044.3

Lak

e L

evel

(fee

t-msl)

Tailwater in Hearth Uplift Lake Level

Page 27: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Stability AnalysisStability Analysis

158 Spillway buttresses158 Spillway buttresses2020’’ on centerson centers3 rows of sheetpiles3 rows of sheetpiles

Typical Buttress Section:Typical Buttress Section:

Page 28: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Normal Pool Stability AssumptionsNormal Pool Stability Assumptions

ConsultantConsultant CohesionCohesion Friction Friction AngleAngle

Ambursen (1951)Ambursen (1951) 1370 psf1370 psf 0 deg0 deg

19941994 1370 psf1370 psf 0 deg0 deg

20012001 670 psf670 psf 22 deg22 deg

Freese and Freese and Nichols / FugroNichols / Fugro

400 psf400 psf 18 deg18 deg

Page 29: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Normal Pool Stability ResultsNormal Pool Stability ResultsAnalysisAnalysis Headwater/Headwater/

TailwaterTailwaterUpliftUplift(msl)(msl)

Factor of Factor of SafetySafety

Ambursen (1951)Ambursen (1951) 42.5/10.642.5/10.6 2525 1.481.48

19941994 42.5/10.642.5/10.6 2525 1.901.90

20012001 42.5/10.642.5/10.6 2525 1.351.35

Freese and Nichols / Freese and Nichols / FugroFugro

42.5/10.642.5/10.642.5/10.642.5/10.642.5/42.5/--0.60.6

141420201414

1.261.261.031.030.930.93

Maximum Uplift – To be tested whether feasibleDrained Hearth Conditions – Not recommended

Page 30: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Needed ImprovementsNeeded Improvements

Increase sliding resistance of both spillways to:Increase sliding resistance of both spillways to:1.50 for normal conditions1.50 for normal conditions1.25 for drained hearth conditions1.25 for drained hearth conditions

Improve drainage and pressure relief systemsImprove drainage and pressure relief systemsAddress excessive uplift under slab downstream Address excessive uplift under slab downstream from gated spillwayfrom gated spillwayFocus of next phase should be to focus on tailwater Focus of next phase should be to focus on tailwater and uplift relationship to confirm or reduce the and uplift relationship to confirm or reduce the maximum uplift assumption.maximum uplift assumption.

Page 31: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Potential AlternativesPotential Alternatives

Uncontrolled Spillway:Uncontrolled Spillway: (Gated similar)(Gated similar)Anchors not viableAnchors not viableConcrete OverlayConcrete Overlay

22’’ in spillway, 5in spillway, 5’’ on hearthon hearth

Improved Drainage Improved Drainage –– Reduce Uplift PressuresReduce Uplift PressuresHave to keep uplift below elevation 9.0Have to keep uplift below elevation 9.0

Permanently Increase TailwaterPermanently Increase TailwaterIncrease to elevation 19.1Increase to elevation 19.1Will not help with drained conditionsWill not help with drained conditions

Page 32: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Potential AlternativesPotential Alternatives

Combination Example: Combination Example: (Gated similar)(Gated similar)Concrete Overlay Concrete Overlay -- 11’’ in spillway, 2in spillway, 2’’ on hearthon hearthImproved Drainage Improved Drainage –– Reduce max. uplift to elev. 15.5Reduce max. uplift to elev. 15.5Permanently Increase Tailwater to elev. 14.0 Permanently Increase Tailwater to elev. 14.0 Will have Factor of Safety of 1.5Will have Factor of Safety of 1.5Reduce uplift to 9.5 to keep Factor of Safety to 1.25 for a fullReduce uplift to 9.5 to keep Factor of Safety to 1.25 for a fully y drained hearth.drained hearth.Combination not optimized Combination not optimized –– to be done as part of next phase to be done as part of next phase $8 to $12 Million$8 to $12 Million

Page 33: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Final Design of ImprovementsFinal Design of Improvements

Design of Stability ImprovementsDesign of Stability ImprovementsLikely a combination of concrete overlay, permanently Likely a combination of concrete overlay, permanently increased tailwater, and improved drainage systemincreased tailwater, and improved drainage systemOverlay and drains installed in sections as hearth is Overlay and drains installed in sections as hearth is draineddrainedWhile drained:While drained:

Clear debrisClear debrisVisual inspectionVisual inspectionGeophysicalGeophysical testing for voids testing for voids -- RepairRepairImprove protection for existing piezometersImprove protection for existing piezometers

Design Repairs to slab downstream from gated Design Repairs to slab downstream from gated spillwayspillway

Page 34: Lake Houston Dam Comprehensive Evaluation of an … · Lake Houston Dam Designed by Ambursen, completed in 1954. Designed by Ambursen, completed in 1954 Flat slab and buttress spillway

Questions?Questions?