OVERVIEW2
SCHEDULE OF MILESTONES
• September 1, 2020: Schematic Design Approval
• October, 2020: Increment 1 Submittal to Division of the State Architect (DSA)
• December, 2020: Increment 2 Submittal to Division of the State Architect (DSA)
• August, 2022: Target Occupancy
3
PROCESS4
SCHEMATIC DESIGN PROCESS• March 19th until Today• Core Group Meetings (5)• Specialist Meetings (2 per Specialist)• City of Elk Grove Meeting• Review of Schematic Design Package
– Mechanical/Plumbing– Low Voltage/Electrical– Custodial Staff– Grounds– Hardware/Locksmiths– Food & Nutrition Services
• Board Approval
5
ACKNOWLEDGEMENTS: CORE GROUP
• Janet Anderson, Director, Elementary Ed• Martin Fine, Director, Elementary Ed• Michael Gulden, Principal, Robert J. McGarvey ES• Lisa Levasseur, Program Specialist, Education Services• Aimee Morgan Lopez, Teacher, Robert J. McGarvey ES
• Susan Bell, Chief Facilities Officer, EGUSD• Bill Heinicke, Director, Planning, EGUSD• Kim Williams, Planning Manager, EGUSD
• Laura Knauss, Principal/Planner, Lionakis• Brian Bell, Principal/Project Manager, Lionakis• Claire Seger, Architect, Lionakis
6
ACKNOWLEDGEMENTS: SPECIALISTS
– Kindergarten/TK• Gina Bishop (Joseph Sims ES)• Michal Dallas (Arthur C. Butler ES)• Erin Maudlin (Raymond Case ES)• Julie Rokser (Robert J. McGarvey ES)• Felicia Womack-Suine (Sunrise ES)
– Primary/Intermediate• Luisa Regalado (PALSS, Joseph Sims ES)• Barb Roth (Joseph Sims ES)• Jim Bentley (Foulks Ranch ES)• Elaine Stralen (Joseph Sims ES)
– Library• Danielle Anderson (Arthur C. Butler ES)• Dottie Gregoire (Isabelle Jason ES)• Katheryn Wood (Franklin ES)
– Maintenance & Operations• Tony Almeida• Bill Hartin
– School Office• Patte Grinnel (Robert J. McGarvey ES)• Terri Jones (Arthur C. Butler ES)• Angela Pena (Robert J. McGarvey ES)• Deidra Wood (Pleasant Grove ES)
– Special Education• Jonathan Briggs (Elitha Donner ES)• Ashley Newton (Arlene Hein ES)• Melissa Stoneman • Alicia Wilson
– Food & Nutrition Services• Michelle Drake• Ron Pierce• Tanya Raines• Michelle Shaw
– Safety/Security• Joe Airoso• Rich Lozano 7
New Educational Specifications, New Prototype 8
THIS SLIDE IS A VIDEO
REAL TIME DESIGN RESPONSE: Using Virtual Meeting 9
ONLINE POLLING: Design Preference Results
Insert online poll results/graphic
10
QR CODES: Review 3D Models of Project Progress
K-Play
“The Grove” Outdoor Learning
Staff Parking (84 Spaces)
Soccer Field
Hardcourt Area
ServiceBefore/After
School
SpEdDrop-Off
AB
C
11
DESIGN12
Site Boundary
Poppy Ridge
13
Proposed Site Plan
Outdoor Dining
K-Pl
ay
“The Grove” Outdoor Learning
Staff Parking (84 Spaces)
Publ
ic P
arki
ng (1
9 Sp
aces
)
Soccer FieldWith Track
Outdoor Stage/
Amphitheater 1-6 Play
Hardcourt Area
Service
Dro
p-of
f
Before/After School
(5 S
pace
s)
SpEd Drop-Off
Fast Facts:
• 850 Students• 70,000 Square Feet• 10 Acres• 100 Parking Spaces• Growth Classrooms• After School Space
14
3 Concept Options
Theme: The Oak Environment
• Kindergarten – Roots• 1st/2nd - Animals• 3rd/4th - Plants• 5th/6th - Canopy
15
Rendering: Campus Entry 16
Rendering: Amphitheater and Multi-Purpose Building 17
Rendering: View to Library from Oak Grove 18
Design Concept: Classroom Collaboration Space 19
Design Concept: Administration 20
Design Concept: Multi-Purpose 21
Design Concept: Library 22
Fly Through 23
Scan code for video link