L3 Filtering: status and plans
D Computing Review Meeting:
9th May 2002
Terry Wyatt,
on behalf of the L3 Algorithms group.
For more details of current status of individual tools/filters
see, e.g., L3 talk at trigger workshop:http://www-d0.fnal.gov/computing/algorithms/level/docs/L3_workshop.ppt
Design rates:
L1 L2 L3 tape 10kHz 1kHz 20-50Hz
Functions of L3 system:
• Event building (not discussed further here)• Filtering:
• Partial event reconstruction• Select which events to be recorded• Define streams • Monitoring
L3 farm has 100 x 1 GHz P3 CPUsTime budget for L3 i/o, event building, filtering 100/1000 = 0.1 s
Within weeks:
L1 L2 L3 tape 500 Hz 30-40Hz
Currently:L1 L3 tape . 100 Hz 20-30 Hz
• Factor ~ 5 rejection needed
• Calorimeter-based filtering only (jets, electrons, taus)
• Next steps (p11.06, p11.07 releases) to commission:
• Muons, global tracking, track-based primary vertexing.
• “Offline” quality geometry and unpacking for tracking and calorimeter.
and we shall have a much better idea of how much cpu is needed for filtering
For each L1/L2 trigger that fires:
• One or more L3 filter scripts run
• Each script calls the filters/tools necessary for the trigger decision
Details of:
• which scripts called for each L1/L2 trigger
• which filters/tools are called by each script
– performed by ScriptRunner
– determined by the triggerlist database
Other tools in development
• cft-only tracking• missing ET
• tools to associate objects in different detectors (e.g. track to muon)
• cps and fps cluster finding and unpacking• b-tag: impact parameter, secondary vertex• tools to calculate "physics" quantities
– (e.g., inv. mass, delta_eta)
• tools to identify physics event types – (e.g., W, Z, stream definitions)
Standard certification and verification requirements:http://www-d0.fnal.gov/computing/algorithms/level3/meetings/talks/certification.html
L3 Monitoring Now
• L3 filter statistics for each trigger available to shift crew via daq_monitor
• L3 reconstruction results written out with the raw data• l3fanalyze program: produces rootuple
– Used offline for:• testing new code versions• checks of data quality
L3 Monitoring Needed
• A lot more work to do here! – implement shadow nodes– run l3fanalyze online as ‘examine’
• fill monitoring histograms from rootuple
– macros to define/display monitoring histograms– common job submission on standard test samples to
exercise all the L3 tools/filters migration to online
– "bit-wise" on/offline check – matching L3 objects to MC/L1/L2/reco objects
Try to pool efforts as much as possible with other groups, especially L2.
Extra manpower needed for L3 central infrastructure
Scriptrunner + central L3 code infrastructure, release management
1.5
Streaming 0.5
Monitoring 1.5
Calibration/alignment technical infrastructure 1.0
Development of "user" and "physics analysis" tools >1
L3 thumbnail 0.5
+ a lot of work to develop and test L3 tools and filters and work out how best to use them for physics!
There are many open questions
• How to handle redundancy in trigger, e.g., leptons– many L3 filter scripts – one L3 filter script (with details stored in L3 data)
• Are 256 L3 triggers enough?• What else can we do in L3?
– more sophisticated monitoring?– technical and/or physics measurements on rejected
events?– define “not for reco” stream?
Trigger Simulation
Level 1“hardware”
triggerrequires full simulation
Level 2
Level 3
“software”
trigger
(C++ code)
run same software online and in simulator
run on raw data or
Monte Carlo
• algorithm development• efficiency/rejection estimates• technical software checks
– e.g. memory/cpu consumption
Level 2 Simulator
The currently available L2 preprocessors are:• calorimeter jet• calorimeter electromagnetic tested• muon central on data• muon forward• calorimeter missing Et• central preshower• central track trigger (silicon + fibre tracker)
(STT soon to be integrated)
+ L2 global essentially complete
Trigger List
Trigger Database
.xml file
COOR COORSIM
download D0TrigSim online
RawDataChunk
Monte Carlo Datafile(d0sim)
Manpower Requirements
Topic Number of FTE required
D0TrigSim executable 1
L1 subsystems + coordination
3
L2 simulation 2
L2 offline verification +
analysis tools
1