Kick-Off Meeting, Day 2. Apr 12 , 2011 Pullman, Washington. Break-Out Discussions. Potential Topics for Break-Out Discussion. Integration of stand-alone models Cyberinfrastructure Economics Communications and Outreach. Integration of Stand-Alone Models. Degree of integration/coupling - PowerPoint PPT Presentation

Citation preview

Page 1: Kick-Off Meeting, Day 2

Apr 12, 2011Pullman, Washington

KICK-OFF MEETING, DAY 2

Page 2: Kick-Off Meeting, Day 2

BREAK-OUT DISCUSSIONS

Page 3: Kick-Off Meeting, Day 2

POTENTIAL TOPICS FOR BREAK-OUT DISCUSSION

Integration of stand-alone models

Cyberinfrastructure

Economics

Communications and Outreach

Page 4: Kick-Off Meeting, Day 2

INTEGRATION OF STAND-ALONE MODELS

Degree of integration/coupling

1-way (loose coupling)

Iterative coupling

Tight coupling

States/fluxes to pass between various models

Model rebuilding, simplification, or code translation?

Page 5: Kick-Off Meeting, Day 2

MODEL SPACE/TIME DOMAINS

Page 6: Kick-Off Meeting, Day 2

Set Purpose Time period

Model ConfigurationCompute Facility Who When

model input

1

Establish baseline results of models

as they are; model evaluation & calibration

2000to

2009

WRF-Noah reanalysis bluefire WSU first yearoffline CMAQ & MEGAN

modeled meteorology WSU WSUfirst 15 months

offline CropSystobserved meteorology

WSU WSU  modeled meteorology

offline RHESSys

observed meteorology (and deposition?)

 

modeled meteorology, deposition, and ozone

 

modeled meteorology; no deposition, no ozone

 

offline VICobserved meteorology

WSU WSU  modeled meteorology

2

Impacted of integrated WRF-

VIC (without biogeochemistry

modeling)

2000to

2009

WRF- VIC w/o RHESSys/CropSyst

reanalysis bluefire PNNL first year

offline CMAQ & MEGAN

modeled meteorology WSU WSUfirst 18 months

offline CropSystmodeled meteorology, deposition, & ozone

WSU WSU  offline RHESSys  offline VIC-RHESSys-CropSyst

WSU WSU  

3Integrate all model

components

2000to

2009

WRF-VIC with RHESSys/CropSyst coupled to CMAQ & MEGAN

NCEP reanalysisNCAR

WyomingWSU

3rd or 4th year?

4 Future scenario2010

to2050

WRF-VIC with RHESSys/CropSyst coupled to CMAQ and MEGAN + CREM

CCSM4 climateNCAR

WyomingWSU

4th and 5th year

Page 7: Kick-Off Meeting, Day 2

CYBERINFRASTRUCTURE NEEDS

1. Code Versioning Software

subversion, cvs, git

2. Data Storage

DateOne, HDF

3. Cluster Software Support

Virtualization, MapReduce, Hadoop

4. Document Sharing

DropBox, SharePoint, Google Group, code.google.com

5. Videoconferencing

Evo, MeetingPlace, LiveMeeting (MS), BigBlueButton, SharePoint, Elluminate, Adobe Connect, Skype

Refer to details in memo by Joe Vaughan

Page 8: Kick-Off Meeting, Day 2

GROUP DISCUSSION ON PROJECT INTEGRATION

Page 9: Kick-Off Meeting, Day 2

TIMELINE

Major milestones for entire 5-year project duration (see hand-out of project milestones)

Specific milestones for first year: need to determine

Design milestones to match specific objectives

1-way land/atmosphere impacts

2-way land/atmosphere impacts/feedback

Feedbacks with human decision making (economics)

Communications and outreach

Page 10: Kick-Off Meeting, Day 2

WORKING GROUPS

Need to discuss what working groups will look like

Working groups will change throughout project duration

Initial working groups will be formed to accomplish first year milestones

Page 11: Kick-Off Meeting, Day 2

MEETING FREQUENCY

Steering committee meetings

Bi-monthly in early stages, eventually monthly?

All faculty participants invited

Working group meetings: weekly to bi-monthly

All-faculty meetings: quarterly?

All-participant meetings (faculty&students): bi-annually?

E.g., Kick-off meeting, poster presentations, etc..

Peer review meetings: annually?

Outreach Meetings: bi-annually to annually?

Page 12: Kick-Off Meeting, Day 2

CONCLUDING REMARKS