Key Bridge Exhibition

Embed Size (px)

Citation preview

  • 7/29/2019 Key Bridge Exhibition

    1/9

    WelcomeWelcome to the consultation on theredevelopment o Keybridge House,Vauxhall.

    Keybridge House is owned by BT and theplanning application process is being managedby their property partner Telereal Trillium.

    The purpose o this exhibition is to show localresidents the proposals or the redevelopmento the site beore the submission o a planningapplication to Lambeth Council this summer.

    This is an opportunity or residents to providecomments and eedback, which will beconsidered as the scheme is worked up in detail.

    BTs intention is to leave a positive legacy orVauxhall and Lambeth. However BT is not aproperty developer, so will not be undertakingthe redevelopment itsel. Instead it is intendingto sell the site on the open market in 2014/15with the benet o detailed planning permission.

    BackgroundKeybridge House is now over sized or modernrequirements and is in the process o beingdecommissioned and partly relocated.

    The current building does not respond in anyway to its local context and is a monolithicstructure which presents the same exterior onevery side.

    1

    Keybridge House

    The site today

    Aerial view o the site

    today (outlined in red)

  • 7/29/2019 Key Bridge Exhibition

    2/9

    Keybridge House

    St GeorgTower

    US Embassy

    Embassy Quarter -Ballymore

    Tideway Wharf -St James Group

    Nine ElmsParkside -Royal Mail Group

    OPPORTUNITY AREABOUNDARY

    Sainsburys -Sainsburys plc

    MI6

    New Covent GardenMarket -Covent Garden MarketAuthority

    Spring Mews

    Vauxhall Square

    e

    Keybridge House

    Banham Security

    Vauxhall Sky Gardens

    Island Site

    Market Towers

    BatterseaPowerStation

    Vision | Design rationale2Keybridge House occupies a location betweentwo contexts.

    1. It is located within the Vauxhall, Nine Elms,Battersea (VNEB) Opportunity Area, which has beenidentied an area o major regeneration by the GLAand Lambeth and Wandsworth Councils. It will includethe regeneration o the whole area rom Battersea toLambeth Palace and includes a cluster o tall buildingsat Vauxhall.

    2. It is located adjacent to the Vauxhall ConservationArea, which includes Vauxhall Park, a number o listedbuildings, and generally a lower scale o building.

    The scheme has thereore been developed to actas a link between the uture context o the VNEBOpportunity Area and the existing context o the

    conservation area.

    The emerging

    context to the north

    and the existing

    context to the south

    Section showing how the new scheme

    compares to the emerging VNEB context

  • 7/29/2019 Key Bridge Exhibition

    3/9

    Wyv il R o

    ad

    v a u x h a l l

    g R i f f i n

    p u b

    W y v i l p R i m a R y s c h o o l

    m a i s o n e t t e s

    R e s i d e n t i a l

    m a n s i o n b l o c k s

    R e s i d e n t i a l

    m a n s i o n b l o c k s

    R e s i d e n t i a l

    t o W e R

    R e s i d e n t i a l

    b l o c k

    s i t e f o R

    s c h o o l

    g a R d e n s

    s q u a R e

    r e t a i l o n

    g r o u n d

    f l o o r

    r e t a i l o n

    g r o u n d

    f l o o r

    e m p l o y m e n t

    o n g r o u n d

    f l o o r

    e m p l o y m e n t

    o n g r o u n d

    f l o o r

    v a u x h a l l

    p a R k

    south

    l

    ambeth

    Road

    mil es stReet

    s t a n n e & a l l

    s a i n t s c h u R c h

    Rail

    Way

    via

    duct

    Masterplan Proposals

    The current proposals are or a mix o newdwellings supported by other uses includingsmall local shops and work units.

    The scheme being consulted on includes:

    379 apartments & maisonettes with sizes varyingrom studio and 1 bed fats to 4 bed maisonettesacross the site

    5 new shops on South Lambeth Road and26,400 sq t o new work space

    As well as providing the new homes, the scheme willprovide space or approximately 250 ull time retailand oce jobs

    1.12 acres o open space

    The Masterplan or the site also proposes to make thearea more accessible by improving the connectionsthrough the site. It will also create greater activity onthe street, particularly along South Lambeth Road.

    At the outset, consideration was given to whetherthe existing structure could be re-used. However, itsoon became clear that as Keybridge House was builtto house specialist equipment, it would be extremelydicult and expensive and would result in a verycompromised building which presents the same exterioron every side.

    3

    Keybridge House

    The proposed masterplan

    The proposed masterplan

  • 7/29/2019 Key Bridge Exhibition

    4/9

    This part o the scheme responds to the existing localcontext o the conservation area, and in particulara number o local brick built buildings such as ParkMansions, Victoria House and Victoria Mansions alongSouth Lambeth Road, along with the surrounding shopsand Wyvil Primary School.

    The proposal is thereore or mansion blocks alongSouth Lambeth Road which will complement theexisting.There will be terraced houses on Wyvil Road to respondto the school on the other side and to provide a moreappropriate context or the Grin pub.

    The scheme will also include some small ground foorlevel shops and caes along South Lambeth Road, tocomplement and enhance the existing shops on theother side.

    Responding to the existing context4Keybridge House | The Masterplan

    View north along South

    Lambeth Road

    Architectural reerences: Brick Mansion Blocks and Warehouses Mansion block elevation

    on South Lambeth Road

  • 7/29/2019 Key Bridge Exhibition

    5/9

    Responding to the emerging contextThe new development also needs to recognise andrespond to the emerging high rise context o the VNEBOpportunity Area.

    Acting as a link between the scale o the tallestbuildings in the Vauxhall cluster, and the lower scaleo the Vauxhall Conservation Area to the East o therailway, the tallest element o the scheme will becomparable with the intermediate sized buildingsproposed at Vauxhall Sky Gardens and 30-60 SouthLambeth Road.

    Employment

    At ground level, the area nearest the railway archwayswill provide urther employment opportunities,responding to the commercial uses within the existing

    arches. A series o two storey employment use spacesare proposed in a mews arrangement with the existingarches. These have a dual aspect into the centralgarden area o the scheme.

    5

    Keybridge House | The Masterplan

    View rom the corner o

    Fentiman Road and South

    Lambeth Road on the edge

    o Vauxhall ParkBrick tower elevation Study

  • 7/29/2019 Key Bridge Exhibition

    6/9

    Central to the success o the new development willbe the new public and private outside spaces and theway they are linked internally and with the rest o thecommunity.

    The site will be opened up by a series o pedestrianroutes crossing through the site with new spacescreated including:

    A new public square alongsideSt Anne and All Saints Church

    A new publicly accessiblegarden area through the centre o the site

    Raised communal courtyard gardens and terraces orthe mansion blocks

    As St Anne and All Saints Church is sometimesovershadowed by the existing building, one o theobjectives is to provide the church with its own space

    in order to allow it to have a stronger presence withinthe local area.

    Spaces6

    Permeability diagram

    View south through the scheme towards the school site (illustrative only)

    Frontages diagram

    View into the new public square with the church on the right (illustrative only)

    Keybridge House | The Masterplan

    Wyv il R o a

    d

    v a u x h a l l

    g R i f f i n

    pu b

    W y v i l p R i m a R y s c h o o l

    m a i s o n e t t e s

    R e s i d e n t i a l

    m a n s i o n b l o c k s

    R e s i d e n t i a l

    m a n s i o n b l o c k s

    R e s i d e n t i a l

    t o W e R

    R e s i d e n t i a l

    b l o c k

    s i t e f o R

    s c h o o l

    g a R d e n s

    s q u a R e

    v a u x h a l l

    p a R k

    south

    lambeth

    Road

    mil es stReet

    s t a n n e & a l l

    s a i n t s c h u R c h

    Rail

    Way

    via

    duct

  • 7/29/2019 Key Bridge Exhibition

    7/9

    Site or a new primary school7

    The London Borough o Lambeth recently identiedin the drat Vauxhall SPD a need or a new two ormentry primary school within the local area.

    As a result BT instructed the team to explore thepossibility o providing a site or the school as part othe redevelopment.

    I permission is granted, a cleared site will be handedover to Lambeth Council or uture use as a primaryschool, to provide the education authority with asmuch fexibility as possible.

    The images shown in the exhibition and those

    that will be submitted with the application are todemonstrate that a school, which meets all the spaceand design standards required, could be deliveredon the site. The images are thereore or illustrativepurposes only.

    Ground foor plan: Main access

    Classrooms and internal playground

    An illustrative cross

    section demonstrating

    how a school could be

    laid out

    Lower ground foor plan: Sport Halls

    Roo plan: Playground

    Keybridge House | The Masterplan

    Examples o another urban school (Hampden Gurney Primary School)

    A selection o foorplans illustrating how a school could be laid out

  • 7/29/2019 Key Bridge Exhibition

    8/9

    Access, Parking and Sustainability08

    TransportThe impact the proposed scheme will have on transportin the local area is being careully assessed by the team.The scheme will include a new vehicular access intothe basement via a ramp o Wyvil Road, which willaccommodate both car parking spaces and delivery bays.

    The basement area will also include cycle parking, aswell as 5% disabled car parking in line with the currentdesign standards. Cycle access to the basement will belocated next to the main access o Wyvil Road.

    Consideration or school parking will be made once theschools requirements are known.

    SustainabilityA detailed sustainability strategy is being preparedin order to make sure the proposed scheme meetsthe strict sustainability standards set out by the

    Department or Communities and Local Governmentwith the support rom the Building ResearchEstablishment

    Some o the main principles o the wider strategy areset out below:

    Ensure a good internal environment in the residentialunits in terms o acoustics, daylight and air quality;

    Follow Secured by Design and Lietime Homesprinciples, where appropriate;

    Create public realm and private amenity spaces;

    Provide acilities to recycle waste in line with currentlocal targets.

    The proposals would include measures to reducepotable water demand and improve waterconservation.

    The materials specied would be careullyconsidered to ensure that their environmental impactis as low as possible and the materials would belocally sourced, where easible.

    Peregrine FalconsThe site is used by peregrine alcons and is activelymonitored by London Peregrines and the LondonPeregrine Partnership.

    Key stakeholders, such as Natural England, RSPB,London Peregrines and the London Peregrine

    Partnership, are being consulted in order to determinethe best way to retain the value o the site or theperegrine alcons.

    As a result, replacement opportunities are beingconsidered within the new buildings, to provideperching and nesting opportunities.

    Demolition works to the tower will commence outsideo the peregrine alcons breeding season (between

    September and January) when the birds are unlikely tobe present.

    Keybridge House

    Basement Plan Showing

    Access and Car parking

  • 7/29/2019 Key Bridge Exhibition

    9/9

    Programme / Your views09

    Programme Public exhibition

    20th March & 23rd March 2013

    Feedback deadline8th April 2013

    Application submissionJuly 2013

    Your viewsTo ensure we understand the views o the localcommunity, we would be grateul i you could take a ewminutes to ll in a questionnaire and provide your views.

    You can either hand it in today or send it back to us atthe Freepost address (envelopes are provided).

    Alternatively you can log on to www.keybridgehouse.co.uk and ll in the online orm and where you will alsobe able to keep up to date with progress.

    I you have any urther questions about this site or anyissue raised during this exhibition please contact ususing the methods below:

    The teamArchitects

    Allies and Morrison

    Planning & Communications Consultants

    GL Hearn

    Structural, Transportation, Sustainability

    Watermans

    Rights to Light & Daylight / Sunlight

    GVA Schatunowski Brooks

    Marketing Agents

    CBRE

    Email: [email protected]

    Telephone Thomas Whiffen on:

    0844 225 0003

    Community Engagement on behalf of

    BT/Telereal Trillium

    As more information becomes available it

    will be posted on the new project website:

    www.keybridgehouse.co.uk

    The view rom inside the

    scheme towards the listed

    building on the other side o

    South Lambeth Road

    Keybridge House