1
Sub-Station Mystic Park Edify Energy 300MW Approved Stage 1 Complete Acciona 40MW Approved CleanGen 60MW Approved Greenswitch 50MW Approved CleanGen 60MW Approved KIG Energy 100MW Application in Development Grey Box Energy Field 30MW Approved New Sky 1000MW Proposed Development 30MW Proposed Development Addtional 500MW with Upgrade Addtional 500MW with Upgrade 220KV 220KV 220KV 220KV 220KV 220KV 220KV 66KV 66KV 66KV 66KV 66KV 66KV 66KV Large Scale Solar Power Property Options Overview F Legend 220KV Transmission Line 66KV Transmission Line Unsealed Roads Sealed Road Major Council Road Vicroads Highway Potential Future Development Green Switch 50MW Acciona 40MW CleanGen 60MW/60MW Edify Energy 300MW KIG Energy 100MW New Sky 1000MW Proposed 30MW Grey Box Energy Field 30MW Substation 0 6 12 3 Kilometers Kerang Cohuna Leitchville

Kerang Cohuna - Shire of Gannawarra · Sub-Station Mystic Park Edify2 Energy 300MW Approved Stage V1 Complete Acciona 40MW Approved CleanGen 60MW App roved Greenswitch 50MW Approved

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Sub-Station

Mystic Park

Edify Energy300MW

ApprovedStage 1 Complete

Acciona40MW

Approved

CleanGen60MW

Approved

Greenswitch50MW

Approved

CleanGen60MW

Approved

KIG Energy100MWApplication in Development

Grey Box Energy Field30MW

ApprovedNew Sky1000MW

Proposed Development

30MWProposed Development

Addtional 500MWwith Upgrade

Addtional 500MWwith Upgrade

220K

V

220KV

220K

V

220KV

220KV

220KV

220KV

66KV

66KV

66KV

66KV

66KV

66KV

66KV

Larg

e Sca

le So

lar Po

wer

Prop

erty O

ption

sOv

erview F

Legend220KV Transmission Line

66KV Transmission Line

Unsealed Roads

Sealed Road

Major Council Road

Vicroads Highway

Potential FutureDevelopment

Green Switch 50MW

Acciona 40MW

CleanGen 60MW/60MW

Edify Energy 300MW

KIG Energy 100MW

New Sky 1000MW

Proposed 30MW

Grey Box Energy Field30MW

Substation

0 6 123Kilometers

Kerang

Cohuna

Leitchville