KEPCO’s Smart GridTechnology
June, 2010
ⅠⅠⅠⅠ KEPCO’s Smart Grid TechnologyKEPCO’s Smart Grid Technology
1/24
ⅡⅡⅡⅡ The future of KEPCO’s Smart Grid
ⅠⅠⅠⅠ. KEPCO’s Smart Grid TechnologyⅠⅠⅠⅠ. KEPCO’s Smart Grid Technology
765/345kV 154kV22.9kV
Energy StorageRenewable Plants PV, V2G, Wind, etc.
©KRP
CO2
1. Themes of Smart Grid Technology1. Themes of Smart Grid Technology
3/24
• AMI / RTP / DR
• HAN/Smart appliances
• Green buildings
• DG/Storages
• (PH)EV, V2G
• New Customer Services
• Information Security
• Distribution Automation
• Micro-grid
• DC Distribution
• DG Interconnection
• Electricity Storage
• PLC / Comm. Network
• Digital Substation/IED
• FACTS, HVDC
• WAMAC, Self Healing
• Real-time diagnosis
• DG Interconnection
• Electricity storage
• Equipment diagnosis
& management
Facility UseS/A, Smart Distribution, WAMAC, SCADA,
EMS, Renewables
RTP, AMI, DR Resources Management
Categories Core Technologies
2. Core Technologies2. Core Technologies
4/24
ICT InfraCyber Security, High-Speed/Two-way Comm.
Integrated Solution based on IP
Energy ConsumptionRTP, AMI, DR Resources Management
Charging Infra for EVs, Electricity Storage
Smart GridPresentTechnology Level
Facility Use OptimizationFacility Use Optimization
AMI, Self Healing, DistributedSmartSmart
Unmanned Substation,
Remote Control
Automatic Fault Restoration,
Fault Prevention & DiagnosisS/AS/A 75%
3. Present Level of Core Tech.3. Present Level of Core Tech.
5/24
AMI, Self Healing, DistributedSource Accessibility Increase
AMR, DASSmartSmart
DistributionDistribution75%
Low-capacity Distributed
Resources ConnectionOptimized Connectivity,
Two-way OperationRenewablesRenewables 25%
Wide System Protection,
Coordinative ControlEach Facility Protection,
Remote ControlWAMACWAMAC 50%
Smart GridPresentTechnology Level
Energy Consumption OptimizationEnergy Consumption Optimization
Supplier & Consumers
Participation SystemTOU, DR for SupplierRTP, DRRTP, DR 50%
3. Present Level of Core Tech.3. Present Level of Core Tech.
6/24
Large-scale Storage Device, Distributed Source Connection Capacity Increase
Small-scale Storage
Device DevelopmentPower Power
StorageStorage25%
Tech. Development for
Charging Infra.Rapid (High-capacity)Charging InfrastructureEVsEVs 25%
Smart GridPresentTechnology Level
ICT InfrastructureICT Infrastructure
Multi-Layer SecurityLimited Information
Security
InformationInformation
SecuritySecurity50%
3. Present Level of Core Tech.3. Present Level of Core Tech.
7/24
SecuritySecuritySecurity
Individual Systems for
SupplierIntegratedIntegrated
SolutionSolution25%
High-speed / Two-way
IP Communication Network
Low and medium-speed /
One-way communicationNetworkNetwork 50%
Integrated System for both
Supplier and Consumers
4. DMS(Distribution Management System) 4. DMS(Distribution Management System)
NDISNDISDASDAS
DMSDMSDMSDMSDistribution Automation System New Distribution Information System
8/24
AMRAMR DTMSDTMS
DMSDMSDMSDMSDistributionDistributionDistributionDistributionDistributionDistributionDistributionDistribution
Management SystemManagement SystemManagement SystemManagement SystemManagement SystemManagement SystemManagement SystemManagement System
Distribution Automation System
Advanced Metering Infrastructure
New Distribution Information System
Distribution Tr. Management System
5. DAS(5. DAS(Distribution Automation System) Distribution Automation System)
Network Reliability ImprovementNetwork Reliability ImprovementNetwork Reliability ImprovementNetwork Reliability Improvement
Safe WorksSafe WorksSafe WorksSafe WorksOperation Costs ReductionOperation Costs ReductionOperation Costs ReductionOperation Costs Reduction
DASIntroduction
9/24
Power Quality Power Quality Power Quality Power Quality ImprovementImprovementImprovementImprovement
Maintenance Costs ReductionMaintenance Costs ReductionMaintenance Costs ReductionMaintenance Costs Reduction
Loss ReductionLoss ReductionLoss ReductionLoss ReductionDAS
Introduction
6. DAS 6. DAS Time Synchronizer ·Monitor ·Raid Cluster ·
·
·
·
Server1Server2History Server FEP2 HMI 1·
·
FEP1COTHUB
·
·
CROMSMCUGatewayT/S·
·
·
10/24
HMI 1Communication NetworkCommunication Network
OPT, Lease line, TRS, CDMA(GPRS)OPT, Lease line, TRS, CDMA(GPRS)
Overhead S/W Underground S/W Underground CB Recloser
6. Distribution IT Center6. Distribution IT Center
� DLP Cube 50 inch × 21 (7/3)
� Control Server
� UPS, Air conditioner
� Intelligent Briefing System
with Miracle screen
� Call Center connection
� Screen Configuration
� Network Diagram
� Control panel
11/24
� Control panel
� DIS/CIS
� Network Diagram
� Weather/News
� AMI/DTMS
� CCTV
7. AMR(Automatic Meter Reading)7. AMR(Automatic Meter Reading)
12/24
Management Cost Reduction , Real-time Consumption Analysis
New Services for Customers, Distribution Optimization
Energy Management, Various Network(PLC, CDMA, ZigBee)
AMR Server System
AMR FEP
7. AMR 7. AMR -- DiagramDiagram
13/24
Integrated AMRPLC Zigbee
Meter
PTE
ⅡⅡⅡⅡ. The Future of KEPCO’s Smart GridⅡⅡⅡⅡ. The Future of KEPCO’s Smart Grid
’09 ’10 ’11 ’12
Remote controlled Switches in D/L (%)
71 78.8 88.3 99.5
1. Short1. Short--term Goals term Goals
15/24
AMI Deployment (%) - 3 8 14
UnmannedSubstations (%)
79.0 80.4 81.7 82.5
22. Electronic Meter. Electronic Meter
Classification Introduction Purpose Portion(EA)
High Voltage ’94~ TOU Customer 99.9%(157,000)
Low Voltage ’01~ Midnight Power Service,
Power Factor Measurement2.8%(506,000)
16/24
Electronic
(99.9%)
Electronic
(99.9%)
Mechanical
(0.1%)
Mechanical
(0.1%)
Mechanical
(97.2%)
Mechanical
(97.2%)
Electronic
(2.8%)
Electronic
(2.8%)
High Voltage Low Voltage
Type Target Portion Features
E-type[2009]
Residential
[below 300kWh/month]
55%
[10 million]
Active power Metering
AMR
TOU, RTP(hourly basis)
G-type
Residential
[over 300kWh/month] 44%
E-type +
Power Factor Measurement
33. Smart Meters. Smart Meters
17/24
G-type[2010]
[over 300kWh/month]
Commercial, small
factories
44%
[7.9 million]
Power Factor Measurement
Peak Metering
RTP, CPP
S-type[2010]
Special-purpose -
G-type +
Remote Controlling ON/OFF
Power Quality Management
Remote Firmware Upgrade
* E-type : Economical, G-type : General, S-type : Superior
4. Digital Substation4. Digital Substation
Feature
ClassificationBefore
Digital SubstationAfter
Digital Substation
Function
Relay, Aux Ry, F/R …
• Measurement
• Monitoring
• Control
IED
• Integrated Functions
• Information Sharing
18/24
• Control
• Protection, and etc.
• Information Sharing
Compo
n e n t s
Communications
WireHard Wire Fiber-optic Wire
Data
ProcessingAnalog Type Digital Type
CircuitElectrical Sequence
Mechanical SequenceLogical Program
4. Digital Substation4. Digital Substation
Configuration
DigitalSubstation
Operator
HMI
Operation
System
154kV Seongsan S/S
19/24
Firewall
Prevention &
Diagnosis
Sysgtem
5. KEPCO’s EV Infra. Diagram5. KEPCO’s EV Infra. Diagram
20/24
5. KEPCO’s EV Chargers5. KEPCO’s EV Chargers
Charging Stand Quick Charger
○ Max Power: 50kW
○ Max Current: 110A
○ Max Voltage: DC 450V
○ Charging Time : < 30min.
(Up to 80%)
○ Max Power: 7.7kW
○ Max Current: 35A
○ Max Voltage: AC 220V
○ Charging Time : ~5hrCommon Feature
○ Payment: - Membership RFID Card(Adv.-Payment & Monthly. Billing)
21/24
(Adv.-Payment & Monthly. Billing) - Credit Card (Deferred-Payment)
○ Display: - Charging & Payment States - Customer Instruction
○ Communication: - CAN (Charger<->EV) - TCP/IP, PLC to Op. Server Sys.
○ Safety:- Emergency Switch - Circuit Breakers for :
- Over V or C - Leak C
5. Current Status5. Current Status
Seminar on Standardization
Development of Chargers
in December 2009
Pilot Operation
in August 2010
22/24
‘09.11
‘09.12
MOU with Hyundai Motors
in October 2009
Seminar on Standardization
in November 2009
(with TEPCO)
5. Development of EVs and Chargers 5. Development of EVs and Chargers
’11 ’12 ’13 ’14 ’15 ’16 ’17 ’18 ’19 ’20 SUM
EV
number100 400 500 1,000 5,000 8,000 12,000 20,000 40,000 65,000 152,000
* National Smart Grid Road Map (‘‘‘‘09. 12. 16)
Annual EV Deployment Plan
23/24
’20 SUM (‘11~’20)
1300 4,300
6,500 15,200
65,000 152,000
Quick Charger
Charging Stand
Home Charger
Expectation of Chargers
24/24