Kenilworth Avenue and Town of Cheverly Industrial Study Briefing
October 10, 2013
The Maryland-National Capital Park and Planning Commission Prince George’s County Planning Department
www.pgplanning.org
Vanasse Hangen Brustlin, Inc.
March 13, 2014
Introduction / Purpose of the Study
Market Analysis
Case Study
Economic Implementation Strategies
Concept Plan
Key Area Strategies and Illustrative Concepts
Conclusion / Next Steps
Agenda
* Note: All concepts shown are for illustration only
Prince George’s County Planning Department - M-NCPPC • Zunilda Rodriguez, Project Leader
• Sam White, Team Member
• Teri Bond, Project Facilitator
Consultant Team (VHB / BAE Urban Economics) • Paul Moyer- Project Manager
• Kevin Keeley – Planner
• Dan Lovas – Transportation Planning
• Geoffrey Morrison-Logan -Urban Design
• David Smith – Environmental
• Nancy Fox – Market Assessment
Introduction
Purpose of the Study
Assess current uses and economic performance
Analysis of existing infrastructure, circulation and visual character
Consider environmental conditions and opportunities for improvement
Determine if and how these areas can be positioned to meet future needs and relate to adjacent areas
Goal of the study is to evaluate and strategies that support recommendations identified during this
process
Study Area
888 acres including all public right-of-ways
Divided by US 50, BW Parkway
Regional open space / river - Anacostia
Wide range of existing uses
Cheverly Metrorail station
CSX rail line
Summary of Strengths and Challenges
Visibility from and access to US 50 and MD 295, Baltimore Washington Parkway
Freight rail lines
Access to transit
High existing building occupancy
Some good quality buildings
Proximity to planned Anacostia River Trail
Strengths
Extensive areas impacted by floodplain and wetlands
High percentage of impervious areas
Limited stormwater management facilities
Poor visual quality Challenging circulation in
some areas Lack of continuous pedestrian
facilities Lack of buffers between
industrial and residential uses
Challenges
Market Analysis: Supply and Demand
Modest demand for close-in industrial space
County’s share of PDR space at the region’s core is growing
County is absorbing new industrial space at region’s core
Rent levels are low compared to Northern VA
Maryland
Comparison of Prince George's County $7.02
Average Asking Rents Cheverly/Hyattsville $6.24
Landover/Largo $9.00
Warehouse/ Lanham $6.75
Manufacturing Space Montgomery County $6.90
Q3 2013 Northern VA
Alexandria $9.60
Annual rent per square foot, NNN Arlington County $10.00
Sources: CBRE; BAE, 2013 Fairfax County $11.69
Study Area
Prince George's Montgomery Washington,
DC
Northern VA -1,000,000
-500,000
0
500,000
1,000,000
1,500,000
Total Net Absorption, Inner Beltway Industrial Space, 2003 - 2013
Source: CoStar, 2013; BAE, 2013
Production, Distribution and Repair (PDR) uses
Support a broad range of industries and economic activity
Seek proximity to region’s center
Current demand drivers
Construction
Wholesale trade
Goods production and distribution
Material recovery
Market Analysis: Supply and Demand
New ways to think about industrial space and making things
Creative and innovative
Entrepreneurial
More diverse mix of commercial uses and amenities
Retail and services
Compatible with existing PDR users
Market Analysis: Land Use Opportunities
Market Analysis: Land Use Opportunities
Retail development
Demand from nearby residents and workers could support additional retail
Traffic and visibility spurs demand
Higher rents for retail space more supportive of conversion and new construction.
Supply an amenity base that can strengthen area
Spending CategoryLow High
Foodservice & Drinking Places 13,000 22,000
Food & Beverage Stores 18,000 42,000
Health and Personal Care Stores 6,000 17,000
Building Material, Garden &
Equipment Stores 7,000 13,000
Total, Select Retail Categories 44,000 94,000
Sources: Claritas/Neilsen; ICSC; BAE, 2013.
Estimated Range of
Supportable Square
Footage
Estimated Demand from Resident and Worker
Captured Expenditures
Targeted interventions to leverage existing strengths: create fertile ground for reinvestment
Short term, temporary use opportunities
Work with the area’s industrial character
Collaboration among businesses, residents and government
Market-Based Revitalization Concepts
Foster collaboration among businesses, residents, government
Provide opportunities/platform for businesses to engage with residents and with one another – Increase recognition of area’s value
– Work toward shared solutions to common issues (environmental, aesthetics)
– Build connections
– Broaden marketing opportunities
Economic Development: Implementation
Facilitate development of diverse offering of activities
Modern industrial activities to complement existing industrial uses – Based on strong ties with area businesses
Activities compatible with PDR area – Targeted, manageable efforts that focus on Placemaking
Activities that promote new business development – Partnerships with higher education, research and development,
environmental organizations
Economic Development: Implementation
Encourage incremental change while protecting long term property value
Promote temporary uses with underutilized buildings and land
Work with area businesses to identify and implement practices that preserve or enhance the area’s aesthetics and natural assets
Economic Development: Implementation
Case Study – Port Richmond Industrial Development Enterprise (PRIDE)
Overview
Business improvement district
150 acres, 55 businesses in Northeast Philadelphia
Funded by grants and special assessment
Organized and facilitated by urban industry initiative of local government
Results: millions in new investment, improved security, strengthened relationships, business retention
Lessons Learned
Impact catalyzed by early institutional support, and magnified by involvement in broader industrial initiatives
Shared interests with nearby residential community
Organizing allows the community to more effectively seek resources
Benefits must be worth additional assessment
Suggested Generalized Land Use Plan
Encourage redevelopment of Key Opportunity Sites
Support high quality light industrial uses
Allow for ongoing industrial uses with planned future conversion
Actively encourage mixed-use redevelopment in areas near Metrorail station
1
1
1
2
2
2
3
3
3
4
4
4
4
* Note: All concepts shown are for illustration only
Suggested Land Use
Commercial / Retail Redevelopment
Mixed Commercial / Light Industrial
On-going industrial – future conversion as appropriate
Support on-going high quality light industrial uses
Continue to support mixed-use redevelopment near Metrorail
Strengthen housing / minimize industrial conflicts
* Note: All concepts shown are for illustration only
Suggested Streetscape and Road Improvements
Study ramp configuration
for truck access
Improve access to MD 201
Implement Complete Streets where feasible – Kenilworth Avenue
– Tuxedo Road
– 52nd Avenue
* Note: All concepts shown are for illustration only
Bike and Trail Network
Implement Anacostia Trail Access Study plan
Improve bike / pedestrian circulation in study area
Provide future connection to the north to Cheverly – Euclid park
Improve Columbia Park Bridge and metro to support pedestrian access
* Note: All concepts shown are for illustration only
Existing 52nd / Kenilworth Focus Area
* Note: All concepts shown are for illustration only
Incorporate bike lanes on 52nd Ave.
Pedestrian improvements at Lawrence and Kenilworth
Create visual focus and 52nd and Kenilworth with retail and commercial development
Incorporate bio-retention areas at key locations
Potential 52nd / Kenilworth Focus Area Strategies
* Note: All concepts shown are for illustration only
Potential Streetscape Improvements
After
Before
View of 52nd Avenue from Kenilworth Avenue
* Note: All concepts shown are for illustration only
Existing Kenilworth Junction Focus Area
* Note: All concepts shown are for illustration only
Potential Kenilworth Junction Focus Area Strategies
Stream restoration and Trail
Streetscape Improvements
Retail / Commercial Frontage
Bike Lanes
* Note: All concepts shown are for illustration only
Possible Roadway Circulation Modifications in Kenilworth Junction Focus Area
Existing Road Configuration
Potential Road Configuration
* Note: All concepts shown are for illustration only
Potential Streetscape Improvement Strategies in Kenilworth Junction Area
Before
After
View of Frolich Lane toward Kenilworth Avenue
* Note: All concepts shown are for illustration only
Potential Streetscape Improvement Strategies in Kenilworth Junction Area
Before
After
View of Tuxedo Road from Kenilworth Avenue
* Note: All concepts shown are for illustration only
Next Steps
Revised recommendations based on stakeholder feedback
Prepare Draft and Final Report
Contact: Zunilda Rodriguez, Planning Coordinator (301) 780-2233