Resolution No. 2014-R-01
Katy of North MortRESOLUTION 2014-R-01
New Hope Community Church
A Special Exception to enable the existing New Hope CommunityChurch to become a conforming use, and to allow for expansion of the
church's activities on the remainder of their property.
A RESOLUTION OF THE CITY OF NORTH PORT, FLORIDA GRANTING ASPECIAL EXCEPTION APPROVAL PURSUANT TO SECTION 53-123 and53-259 OF THE CITY OF NORTH PORT UNIFIED LAND DEVELOPMENTCODE; PROVIDING FOR FINDINGS; PROVIDING FOR CONDITIONS;PROVIDING FOR SEVERABILITY; PROVIDING FOR CONFLICTS; ANDPROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, pursuant to Sections 53-123 and 53-259 of the City's Uniform Land DevelopmentCode ("ULDC"), Robert Doerrfeld, on behalf of New Hope Community Church, submitted on January 30,2014, to the North Port Neighborhood Development Services Department, an application for a SpecialException, SPX-13-075, to enable the existing church to become a conforming use, and to allow for atwo-phased expansion of the church's activities elsewhere on the subject property; and
WHEREAS, the subject property is ± 3.7 acres and is located at 5600 South Biscayne Drive, northof US 41; and
WHEREAS, the subject property described above is currently zoned Residential Single Family andhas a future land use designation of Activity Center #1; and
WHEREAS, churches are neither specifically allowed nor specifically prohibited in a ResidentialSingle Family zone; and
WHEREAS, Section 53-123 of the City's Unified Land Development Code, as amended, states,"Any use not specifically permitted and not specifically prohibited in this zoning district may file for aspecial exception permit in accordance with Article XXII of this chapter, provided that the use applied forcontributes to the intent of the zoning district as stated in the City's Comprehensive Plan and thisUnified Land Development Code."; and
WHEREAS, the existing church was built in 1964 prior to adoption of the City's zoningregulations in 1965, and therefore, never went through a Special Exception review process as requiredfor churches in residential zones under the City's current land development regulations; and
1
Resolution No. 2014-R-01 New Hope Community Church
WHEREAS, the church plans to build or locate accessory structures on the subject property toaccommodate an expansion of church activities, which first requires Special Exception approval; and
WHEREAS, after consideration of a Staff Report from the North Port Planning and ZoningDivision, incorporated herein by reference as "Exhibit A", the North Port Planning and Zoning AdvisoryBoard, at its regular meeting of April 3, 2014, held a duly noticed public hearing and found that therequest of Robert Doerrfeld, representing New Hope Community Church, met the requirements of theUnified Land Development Code Section 53-259, subject to conditions, and recommended approval ofthe Special Exception; and
WHEREAS, after consideration of a Staff Report from the North Port Planning and ZoningDivision, incorporated herein by reference as "Exhibit B", the City Commission, at its regular meeting ofApril 28, 2014 held a duly noticed public hearing and found that the petition of Robert Doerrfeld,representing New Hope Community Church, met the requirements of ULDC Section 53-259, subject toconditions.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF NORTH PORT,FLORIDA, TO WIT:
SECTION 1- FINDINGS:1.01- The North Port City Commission hereby finds that the petition for a Special Exception to
enable the existing church to become a conforming use and to allow for the potential expansion ofchurch activities meets all of the requirements of Section 53-259 of the City of North Port's UnifiedLand Development Code.
SECTION 2 - GRANT OF SPECIAL EXCEPTION:2.01 - A Special Exception is hereby granted to New Hope Community Church, for the existing
church building at 5600 South Biscayne Boulevard, and to allow for the potential expansion of churchactivities on the subject property, which will be reviewed through the Major Site Development process.
2.02 - The approval includes a waiver to the waterway buffering requirements for Phase 1.
2.03 - A copy of the master plan related to the existing use and general locations for theproposed expansion areas for Phases 1 and 2, attached hereto and incorporated herein by reference as"Exhibit C".
2.04 - Pursuant to Section 53-263 of the City of North Port's Unified Land Development Code,special exceptions granted by the City Commission remain with the applicant of the special exceptionthat was granted and do not transfer with ownership.
SECTION 3 - CONDITIONS:3.01 - The special exception herein granted is subject to the conditions in Section X of the staff
report, attached hereto and incorporated herein as "Exhibit B."
SECTION 4 - SEVERABILTY:4.01 - If any section, subsection, sentence, clause, phrase or portion of this Resolution is held
invalid or unconstitutional by any court of competent jurisdiction, such portion shall be deemed a
2
Resolution No. 2014-R-01 New Hope Community Church
separate, distinct, and independent provision and such holding shall not affect the validity of theremaining portion thereof.
SECTION 5 - CONFLICTS:5.01- If there is any conflict between the provisions of this Resolution and any other resolution
or portions thereof, the provisions of this Resolution shall prevail to the extent of such conflict.
SECTION 6 - EFFECTIVE DATE:6.01- This Resolution shall take effect immediately upon its adoption.
PASSED AND DULY ADOPTED by the City Commission of the City of North Port, Florida, this
~~ day of April, 2014.
CITY OF NORTH PORT, FLORIDA
Attest:
HELEN M. RAIMBEAU, MMCCITY CLERK
Approved as to form and correctness:
ROBERT K. ROBINSONCITY ATTORNEY
3
NEIGHBORHOOD DEVELOPMENT SERVICES DEPARTMENTPlanning Division
STAFF REPORTSpecial Exception with Requested Waivers (SPX-13-075)
Existing church and two-phased expansion on the site of New Hope Community Church
To: Planning and Zoning Advisory Board
Thru: Scott Williams, Director
Michele Norton, Planning Manager
From: Heather Hansen, Planner
Date: March 14, 2014
1. GENERAL INFORMATION
Project: New Hope Community Church's existing structure built in 1964, Phase 1
addition of three temporary modular units, and Phase 2 future constructionof a new building; Petition No. SPX-13-075; Resolution 2014-R-01
Request: Approval of a Special Exception
Applicant: RJ Doerrfeld, President Trustee, Agent for New Hope Community Church
(ATTACHMENT 1)
Owner(s): New Hope Community Church
Location: 5600 South Biscayne Drive
Property Size: ± 3.7 acres
II. SUMMARY
A Special Exception is requested for the existing church and for a two-phased expansion that
will provide additional space for worship and youth and adult programs (See Section V). The
existing church was built in 1964 prior to the City's zoning regulations. The use and the site arenonconforming. The use will be considered conforming after the approval of a Special
Exception. The site has several nonconformities, including landscaping, parking lotimprovements and architectural design elements. The church is also requesting two waivers:
one related to landscape buffers and the other for the design elements for Activity Center #1.
Ill. RECOMMENDATION
That the Planning and Zoning Advisory Board (PZAB) recommend that the City Commission
APPROVE with conditions Petition No. SPX-13-075 by Resolution 2014-R-01.
Page 1 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
IV. MAP SET
$0A 3:ft- f~ i l[~~UrER I8ff iL wHwiB
I w 1•mc d I.V WUSh %laffig F &.!*mFavored a 1y!"" Owmad
Il[tf [I titt: snit fIN r lc~'j [[-ltr[~i [ Ptae~lta~~a.yt et'6
fh1Q'YIN/1~{IiYdl" l~[hl
~Ipr1 I 9&, /ilr~tir W16>y~llWfa HlAF 1W4 ffIlAYffYN~ 4Y~lWi11t7Y[
YIi~IWd~Wi~Mof~MJr Wy tYPiNbi1 f11YYfY(Itlltt
~~i M ~t ~ ~ ~ ~~t{ FllR ff~lil pdact'Pdf.CA II ~C[Mdf.aav.xf[/wn[llwasf F3s4 r rf[ lar i~'dMG LnR~IS1] WlOOyidFORiat~[~er
Page 2of16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
kigh
v M
k Qlc~n R
4 c>undt. I T I-~t~l ii
P,. nnu ¢i I! [JOR-14>nnlap Witzf",
d,liYeri ar~wbar~aks4~r>•..-WVi/ WlretsrW~aiY,r/1a aiiM,tSduW4lyi~~~f~Yk eIIiIP~Ar~Ir+leYeWf Mwrwr~.~~i4~narr~ws.,r-wa~r.er.~rrWI~rfe b-ft r M. d~W7wa Y,Ymi~ra,rrra t..w v .,er Im e~,o u,xAio,a
pr4if "Utut7i•:.Hxa{h tucal I Cn@pa lvUlm GSatlas~[ lerel4t Ixalid Wit 4 1,0WASUSIOLOW SMM We6t FWA& WaW t 1 Wft 7811 l4 M
W.am i am,+n=n ~~.s,i n:F:. u.,,ar,~m.w ~z to:ec. nnvsat4r=.,e, ~wswumxwero«~I ~rnm~om~x~smattac®a
Page 3 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
han 12EMU
~ U *6 ' `t ,,
641
Feet
;OWt`tr pntc €t ty ttt+.crPlKnrdnt! Is &WI)
Ivanse41M" Dww
MMEh4.2M4us: anu: -a+ svrsr prpnr
4rtM AO iM+d7h ~+UM4A1n~d1-a"do wft tbw IUWM ac.
fiW.MHMft la 111+r111YsiUWftM*ON4M/nMOF "111A 111 -11!!+1W~+eliii1d1~1tlY(MrYr~dm1M.k.G h ..ft
..ft Y!}ryr kmdbga ~H
r~q Yrs.
t` A.:a17rl:A:Itlgn.nsNitAM.aarN+aa ldrCvr.aiHal:i:f:29F1 TIOtrlrV.lYR-:rtr.ta~roraYlwOaeeY111QA1M49d
Page 4 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
---- -- --- - - F~Til~C FANB ~f i iHA%
l:.tS41Vd1 I ORM, Itil h'll 1, U1 HAIt IM 111*1141.5'+1.141.€POI4AGFUWLTURAI. EBTATEB UT ITY 11ID48TRAL CORRIDORI CYA 111-10MV ltl :tlrH Nlbi~ c-cwR Iw7i Rv I IU+4 M In IIw+LM DENBITf REBCENTML CONBERVATION (MR BENDMIG ZDWI.II IA41M 1313lall Y 141 81t WAIT IN ld-0,11 :111018(4'1 i1 ,, .{:I (TIt.4 .<I I{tbli![+ 7Lr~il ]MAW DENWIFY ENTM RECREATIONX>PM SPAM (TOR REMNG ZONE)I IKAI Ilt U*IrIt' Ri k1ul 10 IN I'l IN £:MGIi DEM8ITYMRIDENTML PUBLICIWOM"KIN0.1 OI 1145 W"IMIlkY >:1 It'll 1. ill 4i I;1 Sr h ,•J(, 701{1 ! Ri'I 1'1 Ati> IPRORMIONAL OFFM ACTHRIY CENTER (MR RECEIVING ZONE - EXCEPT AG-3)1`10MMURVII61 X11 IMitecoma mAL VLLAreIMMI8I1 IAl 111Aik4/ tire,MDU87RM PEEM Alm
P
1 ")
I rq,WrIf Iq 14118,1 1,1IF ly II11 okoPIe71 and tMINOWNWAN OWIMM
11141 X14
1%aieY~w~ ,hE. re11• b m. rr6unu vw:.1. siltibYert 1i11IMMWW .resr~eliM IMMMIll,WIV: f{itEt [LAt•{:hl{14CYf Bk cl0ONt-GIIY147PRNla4il1)INl;ili3Nlrlr{ItYO-- I ' it 00"- ,qfi y(~yriyrW ~y~y
NOTE: tlsY O6RI,A{RI{Ct x4ft we .Uh tliu 11~11Y
MUM_ 11Y ORDKAWS " 4 1l~~111~~11Yesy6lrr 41r•Mf! Id1~lYlsN0. SNIf A8 BAiE WAY E ANE3OED FROM 771E TOTWE. ~ Arm t nr ~
vrr,n2cnvler.u.,.lrr.sri..z,`rmrvt~rll~1.1.ro.upn ,at _v*_~lua, as
Page 5 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
SOf99~,1t1~C4YNG "flltfYEwsvcr +ux't+
s -.
.ice:W;11 i,71 ;1110'6, -01 K 0
PHASE 1PROJECT AREA
STAFF NOTE:Exact location of the
modular units willbe determined
during the NIASprocess
6
,vpp z-
tN.9fjv Ctyll~4lM
L1HU E _
Page 6 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
VI. SITE INFORMATION
Land Use
Adopted Future Land Use Map Designation: Activity Center #1
Adopted Zoning Map Designation: Residential Single Family 2 (RSF2)
Existing Land Use(s): Institutional - Church
Surrounding Land Uses:
Future Land Use Map Zoning MapDirection Existing Land Uses
Designation Designation
North Institutional-Academy for Professional Office Office, Professional &Early Learning Institutional
South Vacant (owned by mortuary Activity Center #1 Residential Single Family 2
to south)
West S. Biscayne Blvd; Single- Medium Density Residential Single Family 3family across street Residential
East Drainage R-O-W; Utility Activity Center #1 Drainage R-O-W; Government
facilities across drainage Use across drainage
Services and Facilities
Potable Water: North Port Utilities
Sanitary Sewer: North Port Utilities
Transportation: South Biscayne Drive
Environmental
Conservation: N/A
Flood Zone: Zone B, Panel 120279 0010 B
VII. BACKGROUND
The existing church was built in 1964 prior to the City's zoning regulations. The church propertywas previously owned by First Presbyterian Church. The church property was originally 4.5
acres. In 2003, First Presbyterian Church sold the southern 0.78 acres to Farley Funeral Home.
The remaining 3.7 acres with the church building was sold to New Hope Community Church in2008.
The applicant reports that since 2008 the church's congregation has grown to the extent thatthe existing building can no longer support all of the church's activities. New Hope's statedvision is to ultimately construct additional facilities to accommodate its current and futurecongregation and ever expanding ministries and community services it supports.
Page 7 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
In 2013, the applicant purchased three former modular classrooms to be temporarily locatedon their property until construction of new facilities could be funded. They placed the modular
units on their property without building permits or land use review.
Phase 1 includes the general
location of the threetemporary modular units;Phase 2 includes the generallocation for their new facility;both will ultimately bereviewed as a Major Site and
Development (MAS) prior toissuance of building permits.
The use and the site arecurrently nonconforming. The
use would be consideredconforming upon the approval of a Special Exception. The site has several nonconformities,including landscaping, parking lot improvements, and architectural design elements.
In the application narrative, the applicant asserts that since the property is within ActivityCenter #1, which specifically identifies houses of worship as an allowable use, they should not
be required to request a Special Exception.
- Staff Response: Activity Center #1 (AC#1) is the future land use for the property, not the
official zoning district. The intent of Unified Land Development Code (ULDC) Chapter 55-Activity Center Design Regulations is to ensure that the development within Activity Centers
have identifying characteristics and design that are consistent with the Comprehensive Plan
Goals. The permitted uses listed in Chapter 55 would also come into play if a rezone were
requested, which would need to be consistent with this chapter.
ULDC Chapter 53-Zoning Regulations, Part 1-General Provisions, Section 53-3-General
Requirements, Subsection Q states "if the use is not expressly permitted or prohibited in azoning district, it shall be required to apply for a special exceptions permit." The property iszoned Single-Family Residential and houses of worship are neither permitted norprohibited, therefore a Special Exception is required.
VIII. STAFF ANALYSIS
This section includes ULDC citations, ULDC criteria relevant to the request is in bold, followed
by findings of fact and conclusions related to each criterion in italics.
A. Special Exception
ULDC Chapter 53-Zoning Regulations, Article XXII-Special Exceptions, Section 53-259-Findings
states "Before any special exception shall be recommended for approval, the Planning andZoning Advisory Board shall make a written report and recommendation that:
Page 8 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
1. The granting of the special exception will not adversely affect the public interest, health,
safety and general welfare.
Applicant: Since the City Commission adopted Chapter 55, Article 1, "Mediterranea (Activity
Center #1)"; Section 55-15(8), ULDC, wherein the City Commission listed "Houses of
Worship" on a minimum two (2) acre parcel as a "permitted principal use and structure"; it
must be presumed as a matter of law that the granting of a special exception so that New
Hope may continue to use its property and expand its existing use as a House of Worship,
will not adversely affect the public interest, health, safety and general welfare. If such use
would be expected to adversely affect the public interest, health, safety or general welfare,
the City Commission would have exceeded its "police power" authority in designating a
House of Worship as a permitted principal use and structure.
Staff: Activity Center #1 (AC#1) is the future land use for the property, not the official zoning
district. ULDC Chapter 53-Zoning Regulations, Part 1-General Provisions, Section 53-3-
General Requirements, Subsection Q states "If the use is not expressly permitted or
prohibited in a zoning district, it shall be required to apply for a special exceptions permit."
The property is zoned Single-Family Residential and houses of worship are neither
permitted nor prohibited, therefore a Special Exception is required.
There has been a church on this site since the 1960s. The site is approximately 3.7 acres so
there is sufficient space to expand the use without adverse impact to the public.
- Staff concludes that this criterion is met.
2. That the specific requirements in the Schedule of District Regulations (Part 2) governing
the individual special exception, if any, have been met by the petitioner.
Applicant: There are no specific requirements in the Schedule of District Regulations
pertaining to Houses of Worship. Therefore, this requirement is satisfied.
Staff: ULDC 53-Zoning Regulations, Article IX-RSF Residential Single Family District, Section
53-120-Intent states "Certain structures and uses designated to serve governmental,
educational, religious, noncommercial recreation and other immediate needs of such areas
are permitted or permissible as special exceptions within such districts, subject to
restrictions and requirements necessary to preserve and protect their residential single-
family character." For Phase 1, the applicant is proposing to place three temporary modular
units until such time they are able to construct their Phase 2 facility. Phases 1 & 2 will be
reviewed through the MAS process.
- Staff concludes that the Special Exception can meet this criterion with the following
conditions:
Condition 2.1: If the modular units are still in place in two years, the Special Exception
will expire and the applicant will need to request an extension of the Special Exception,
which must be approved by the Commission.
Condition 2.2: The temporary modular structures must be removed prior to occupancy
of the Phase 2 facility.
And that the following standards, where applicable, have been met:
Page 9 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
3. The proposed use shall be consistent with the intent, goals, objectives, policies andprograms of the City of North Port Comprehensive Plan and the intent of the zoningdistrict as defined in this Unified Land Development Code for the area in which theproperty is located.
Applicant: Since the City Commission adopted Chapter 55, Article 1, "Mediterranea (ActivityCenter #1)", Section 55-15(B), ULDC, wherein the City Commission listed "Houses ofWorship" on a minimum two (2) acre parcel as a "permitted principal use and structure"; itmust be presumed as a matter of law that this standard has been met.
Staff: The future land use of the property is Activity Center #1, which allows houses ofworship within the mix of allowed uses. The residential zoning was in place prior to theadoption of the City's Activity Centers. Single-family development is not an allowed use inActivity Center #1. Therefore, the intent of the zoning district is inconsistent with theComprehensive Plan. The church use is, however, consistent with the future land use ofActivity Center #1 and will be consistent with the zoning district upon approval of theSpecial Exception.
- Staff concludes that this criterion is met.
4. The density or intensity of the proposed use shall be consistent with the intended futureuse of the designated land use area in which the property is located, in accordance withthe provisions of the Future Land Use Plan Map contained in the Comprehensive Plan.
Applicant: Since the City Commission adopted Chapter 55, Article 1, "Mediterranea (ActivityCenter #1)", Section 55-15(B), ULDC, wherein the City Commission listed "Houses ofWorship" on a minimum two (2) acre parcel as a "permitted principal use and structure"; itmust be presumed as a matter of law that this standard has been met.
Staff: The future land use is Activity Center #1, which allows houses of worship on parcelsthat are two acres or more. The subject property is approximately 3.7 acres and anydevelopment will need to meet the maximum lot coverage, minimum setback requirements,and maximum building height for the Residential Single Family zoning district, therefore theSpecial Exception is consistent with the intended future land use.
- Staff concludes that this criterion is met.
5. The proposed use, singularly or in combination with other previously approved specialexceptions, must not be detrimental to the health, safety, welfare, morals, order,comfort, convenience, appearance or prosperity of the neighborhood or adjacent uses;and shall be an economic benefit to the economy of the City.
Applicant: Since the City Commission adopted Chapter 55, Article 1, "Mediterranea (ActivityCenter #1)'; Section 55-15(B), ULDC, wherein the City Commission listed "Houses ofWorship" on a minimum two (2) acre parcel as a "permitted principal use and structure"; itmust be presumed as a matter of law that this standard has been met.
Staff: The existing church has been on the subject property since the 1960s, the adjacentuses are commercial and industrial in nature, and the 3.7-acre site can potentiallyaccommodate an expansion of the use in a manner that is acceptable to the residential
Page 10 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
neighborhood across the street. Churches cannot be expected to provide economic benefitto the economy of the City.
- Staff concludes that this criterion is met with the addition of the Special ExceptionConditions 2.1 and 2.2 above and Waivers Condition 1.1 in the section that follows.
6. The intensity of the proposed use shall be harmonious with the character of other uses inthe neighborhood.
Applicant: Since the City Commission adopted Chapter 55, Article 1, "Mediterranea (ActivityCenter #1)"; Section 55-15(8), ULDC, wherein the City Commission listed "Houses ofWorship" on a minimum two (2) acre parcel as a "permitted principal use and structure"; itmust be presumed as a matter of law that this standard has been met.
Staff: The surrounding uses include a private school to the north, drainage and industrialuse to the east, vacant lot and funeral home to the south, and a road and residential areato the west. There are other structures that are commercial in nature adjacent to theabovementioned uses. In addition, the Phase 1 modular units are intended to be temporary,and both phases will be reviewed in more detail through the MAS process.
- Staff concludes that this criterion is met with the addition of Special ExceptionConditions 2.1 and 2.2 above, as well as Waiver Condition 1.1 in the section thatfollows.
7. The height and orientation of any proposed structure(s) shall be compatible with existingneighboring structures and uses.
Applicant: The maximum height permitted with the RSF-2, Residential, Single-Family zoningdistrict is 35 feet. The height of the three temporary modular units is substantially less thanthe maximum permitted height, and is less than the height of the existing structure on thesubject property. Thus, this standard has been met.
Staff: The height of the Phase 1 modular units is reported as 12 feet by the applicant. Theexisting church and structures on adjacent properties are as tall or taller than the proposedmodular units. The units are also at the back of the property oriented toward the existingparking lot, which diminishes their appearance from the perspective of the street.
- Staff concludes that this criterion is met.
8. The subject parcel shall be adequate in shape and size to accommodate the proposed useand provide for appropriate separation between neighboring uses.
Applicant: The subject parcel consists of 162,130 square feet, or 3.7 acres. The subjectparcel is more that adequate in shape and size to accommodate the proposed use andprovide for appropriate separation between neighboring uses. Thus, this standard has beenmet.
Staff: The lot is approximately 3.7 acres with dimensions of approximately 550' long and350' deep. This size and shape is adequate for accommodating the proposed accessorystructures while providing appropriate separation between neighboring uses.
- Staff concludes that this criterion is met.
Page 11 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
9. The proposed use shall be adequately screened and buffered to effectively separatetraffic, light and noise from existing or intended nearby uses.
Applicant: The proposed use complies with all applicable screening and bufferingrequirements applicable within "Mediterranea (Activity Center #1). Thus, this standard hasbeen met.
Staff: The lot to the north is zoned Office, Professional, Institutional and the existing use isinstitutional. No buffering or screening is required between similar uses. The vacant lot tothe south is zoned residential, however, because of the size and shape of that lot (60' wide,350' deep), and the fact that it is owned by the adjacent commercial use (funeral home), itis unlikely it will be developed for residential use. NOTE: The applicant requested a waiverto the requirements for buffering, which is addressed in Section 8 of this Staff Analysis.
- Staff concludes that this criterion is met with Condition 1.1 in the Waiver Requestssection.
10. The loading and/or refuse areas shall not impose negative visual, odor or noise impactson abutting uses or thoroughfares.
Applicant: As reflected on the submitted Site Plan, there is adequate area on the subjectparcel to ensure that loading and/or refuse areas shall not impose negative visual, odor ornoise impacts on abutting uses or thoroughfares. Thus, this standard has been met.
Staff: No additional loading or refuse areas are proposed.
- Staff concludes that this criterion is not applicable.
11. The size and location of proposed sign(s) shall be in compliance with Chapter 29, SignRegulations of these regulations, and shall be compatible with the character of theexisting neighboring uses.
Applicant: No new signs are proposed by New Hope. Thus, this standard has been met.
Staff: There are no additional signs proposed. Any additional signs would be reviewedunder a separate building permit.
- Staff concludes that this criterion is not applicable.
12. Exterior lighting shall be harmonious with the character of existing neighboring uses, interms of glare, and required footcandles.
Applicant: Lighting shall be provided as per the requirements of all applicable regulations.Thus, this standard has been met.
Staff: There is existing lighting on the site. No information was provided regarding thelighting for Phases 1 & 2. Per the ULDC Chapter 53-Zoning Regulations, Section 53-3-General Requirements, (O) Lighting will be required to provide a minimum of 0.9footcandles in all parking and pedestrian areas related to new development prior tooccupancy of the Phase 1 & 2 structures. Lighting will be reviewed in more detail during theMAS process.
- Staff concludes that this criterion has been met.
Page 12 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
13. The ingress and egress to the subject parcel and any structure involved shall notadversely affect traffic flow, safety or control.
Applicant: New Hope is not proposing any change in existing ingress and egress to thesubject parcel or to the three temporary modular units. Thus, there are no changes toexisting conditions which will affect traffic flow, safety, or control. Thus, this standard hasbeen met.
Staff: The City's infrastructure engineer, Ben Newman, reviewed the Special Exception andhad 'no objection'. Ingress and egress, as well as off-street parking, will be reviewed inmore detail during the MAS process.
- Staff concludes that this criterion is met.
14. The access and internal circulation shall be adequate in case of fire or emergency.
Applicant: New Hope is not proposing any change in existing access and internal circulationof the subject parcel or to the three temporary modular units. As reflected on the submittedSite Plan, there is adequate area on the subject parcel to ensure that access and internalcirculation shall be adequate in case of fire or emergency. Thus, this standard has beenmet.
Staff: The City's Fire Marshall, Michael Frantz, reviewed the proposal and determined thatthe Special Exception 'meets requirements'. Approval of this petition does not includeapproval of the location of the temporary modular structures. These issues will be reviewedin more detail during the MAS process.
- Staff concludes that this criterion is met.
15. The proposed use shall not adversely affect traffic flow, safety or control on thesurrounding roadway system.
Applicant: There will be no increase in the number of trips to and from its property as aconsequence of the installation of the three temporary modular units. Thus, this standardhas been met.
Staff: The City's infrastructure engineer, Ben Newman, reviewed the Special Exception andhad 'no objection'. Traffic impact will be reviewed in more detail during the MAS process.
- Staff concludes that this criterion is met.
16. The location, type and availability of proposed potable water systems shall be adequatefor the proposed use and shall not adversely affect neighboring potable water systems.
Applicant: The subject property is already served by a potable water system. New Hopedoes not anticipate any significant change in its existing potable water system as aconsequence of the installation of the three temporary modular units. Thus, this standardhas been met.
Staff: Water service is available to the site (ATTACHMENT 2).
- Staff concludes that this criterion is met.
Page 13 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
17. The location, type and availability of proposed wastewater systems shall be adequate forthe proposed use and compatible with drainage conditions in the area and neighboringuses.
Applicant: The subject property is already served by a wastewater system. New Hope does
not anticipate any significant change in its existing wastewater system as a consequence of
the installation of the three temporary modular units. Thus, this standard has been met.
Staff: Wastewater service is available to the site (ATTACHMENT 2).
- Staff concludes that this criterion is met.
18. The proposed use shall not cause or intensify flooding of neighboring uses."
Applicant: A SWFWMD exemption permit has already been granted for the modular units,
and therefore will meet this standard.
Staff: The entire lot is in Flood Zone 8 on the current FEMA Flood Insurance Rate Maps (Sept
2, 1981). Zone 8 is considered a moderate risk area by FEMA. The City's stormwater
manager, Elizabeth Wong, reviewed the Special Exception and deemed that it 'meetsrequirements.' Storm water and floodplain issues will be reviewed in further detail duringthe MAS review process.
- Staff concludes that this criterion is met.
B. Waivers
ULDC Article XXII-Special Exceptions: Section 53-254(8) states "The City Commission may
approve special exceptions, subject to appropriate safeguards. When appropriate, the CityCommission may waive or modify specific regulations contained in the Unified LandDevelopment Code Ordinance No. 90-28 on a case-by-case basis to ensure comfort,convenience, appearance, prosperity or general welfare. Such uses may be permissible in azoning classification or district as a special exception if specific provision for such a specialexception is made in these zoning regulations. However, such uses are not deemed to beappropriate within a zoning district without demonstration by the petitioner that the specialexception complies with this section."
The applicant is requesting two waivers; one related to landscape buffers and the other for thedesign elements for Activity Center #1. The applicant asserts that neither waiver should berequired.
1. Waiver Request #1- Landscape Buffers: The applicant points out that the language in ULDC
Chapter 53-Zoning Regulations, Part 1-General Provisions, Section 53-3(K)-Buffers states"When a non-residential development abuts a residential development, adequatebuffering shall be placed between the uses, see Chapter 21, Landscape Regulations."
Chapter 21-Landscape Regulations, Section 21-9-Landscaping the perimeter of abutting landuses, (D) Determination of perimeter buffer requirements addresses the proposeddevelopment relative to abutting existing uses. The proposed expansion areas are adjacent
to a vacant residential parcel to the south, and an institutional use to the north.
Page 14 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
- Staff concur that the buffer requirements do not apply on the northern and southernboundaries of the property.
Item W-Landscape along waterways and parks from the same section, requires a 10 foot
buffer along the side that abuts a waterway. The eastern boundary is along a waterway,however, there is existing vegetation that provides a buffer, albeit mainly from an invasivespecies. The City Arborist, Ryan Pieper, feels that the existing buffer is adequate for the
Phase 1 expansion area. The waiver can be applied to Phase 1 of the Special Exception only.
- Staff recommends approval of this Waiver Request with the following condition:
Condition 1.1: The waiver to the buffering requirements along the waterway onlyapplies to Phase 1.
2. Waiver Request #2 - AC#1 Desien Elements: The applicant notes that on page 33 under the
APPLICABILTY heading in the US 41 Architectural District section of the Urban Design
Standards Pattern Book, it states "The provision of this Section shall be applicable to aspectsof architecture, lighting, and monument signage for all new commercial developments,buildings, and exterior improvements done in conjunction with substantial improvement(s)of existing developments, buildings, and structures (except single family residential) locatedwithin the US 41 Architectural Guidelines District Boundaries, excluding Trott Circle."AC#1 is
the only Activity Center that specifies that the architectural standards only apply tocommercial development, and given that the existing church was built in 1964, it's notreasonable to expect the accessory structures to adhere to Mediterranean architecturalstandards.
- Staff concur that the AC#1 Architectural Design Standards do not apply to this Special
Exception, therefore, a Waiver is not necessary.
However, the Urban Design Standards Pattern Book APPLICABILITY section also states "The
provisions of the Mediterranean Architectural Color section related to repainting shall beapplicable to all structures." The existing church meets the Mediterranean architecturalcolor requirements; therefore, the accessory structures can be painted to match the primarystructure. The Mediterranean Architectural Color requirements still apply to this SpecialException.
IX. REVIEW PROCESS
A. Staff reviewed this petition for a Special Exception and found this petition met therequirements of Unified Land Development Code Section 53-259, subject to theconditions listed in Section X of this staff report. The following City departments wereinvolved in this plan review and issued the following results (ATTACHMENT 3):
Q Neighborhood Development Services, Arborist - No Objection
Q Neighborhood Development Services, Zoning - Meets Requirements
Q Neighborhood Development Services, Planning - Meets Requirements with
Conditions
Q Fire Rescue District, Fire Prevention & Life Safety- Meets Requirements
Page 15 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
Q North Port Utilities, Potable Water & Sanitary Sewer - No Objection
Q Public Works, Engineering, Stormwater & Environmental - Meets Requirements
Q Public Works, Engineering, Infrastructure - No Objection
Q 1 &T- Meets Requirements
B. Legal has reviewed the resolution for form and correctness.
X. STAFF RECOMMENDATION
Special Exception: Recommend approval to the City Commission with the followingconditions:
Condition 2.1: If the modular units are still in place in two years, the Special Exceptionwill expire and the applicant will need to request an extension of the Special Exception,which must be approved by the Commission.
Condition 2.2: The temporary modular structures must be removed prior to occupancyof the Phase 2 facility.
Waiver Request #1 - Landscape Buffers: Staff concur with the applicant that thelandscape buffer requirements do not apply on the northern and southern boundaries ofthe property, therefore, waivers are not needed along the northern and southernperimeters of the property. However, a waiver is necessary to the buffering requirementsalong the waterway. The existing trees are an adequate buffer for the Phase 1 temporarystructures. Buffering will be revisited for Phase 2 during the MAS process.
Recommend approval to the City Commission with the following condition:
Condition 1.1: The waiver to the buffering requirements along the waterway onlyapplies to Phase 1.
Waiver Request #2 - AC#1 Design Elements: Staff concur that the AC#1 Design Standardsdo not apply to this Special Exception, therefore, a Waiver is not necessary. However, theMediterranean architectural color requirements still apply.
XI. PUBLIC HEARING SCHEDULE
Planning and Zoning Advisory Board April 3, 2014Public Hearing 9:00 AM or as soon thereafter
City Commission April 28, 2014Public Hearing 6:00 PM or as soon thereafter
Page 16 of 16
NEIGHBORHOOD DEVELOPMENT SERVICES DEPARTMENTPlanning Division
STAFF REPORTSpecial Exception with Requested Waivers (SPX-13-075)
Existing church and two-phased expansion on the site of New Hope Community Church
To: City Commission
Thru: Scott Williams, DirectorMichele Norton, Planning Manager
From: Heather Hansen, Planner
Date: April 10, 2014
1. GENERAL INFORMATION
Project: New Hope Community Church's existing structure built in 1964, Phase 1general location for placement of three temporary modular units, and Phase2 general location for future construction of a new building; Petition No. SPX-13-075; Resolution 2014-R-01
Request: Approval of a Special Exception with Waivers
Applicant: RJ Doerrfeld, President Trustee, Agent for New Hope Community Church(ATTACHMENT 1)
Owner(s): New Hope Community Church
Location: 5600 South Biscayne Drive
Property Size: ± 3.7 acres
II. SUMMARY
A Special Exception is requested for the existing church and for a two-phased expansion thatwill provide additional space for worship and youth and adult programs (See Section V). Theexisting church was built in 1964 prior to the City's zoning regulations. The use and the site arenonconforming. The use will be considered conforming after the approval of a SpecialException. The site has several nonconformities, including landscaping, parking lotimprovements and architectural design elements. The church is also requesting two waivers:one related to landscape buffers and the other for the design elements for Activity Center #1.
The City's Planning and Zoning Advisory Board (PZAB) conducted a hearing on the petition onApril 3, 2014. The PZAB voted unanimously to recommend approval of the Special Exceptionwith Conditions, as recommended in the staff report.
Page 1 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
III. RECOMMENDATION
That the City Commission APPROVE with conditions Petition No. SPX-13-075 by Resolution2014-R-01.
IV. MAP SET
AMv&- Ng K affiu%fiff h muffi lat
P:aitl~, S~~I<•NA To Seale
rv,wcai by M(18S ibiar fr*1PkmRimed ~ DNMIOn
Ix.aiel.lrr: ,nl• reM (e hit r N~1N~aa~
aa :r.yBWW. *10h/ny'WIIIFrl~tflrldFnll~~AM WI.W'W9Y {p}a~tli1tlW1riW rN
W1~F& ai6!W1YWr61ik
%,ASA11 •Ltt,Yl..au..r.vw.a`ulna~i[ .9x{.x.li li,nlx:iflMld3~Y~W tl r6!aaeali~la .ider.GworNlFl241MOIWAFWUWs~
Page 2 of 16
Petition No. SPX-13-075
'E•Fl (Syfl 11~a
'~l ~c~ a iary
Project Name: New Hope Community Church Expansion
rm nwll Mf fADRlptylulln0 €%vNmPrevwd lwDhft t>g
vw>`e~K: m.. orldlCfAeadiMc I~~mw:x n,rrws+r+ a~we.swse-.r~srw....w
I I I t e got asa~ee~i~.t~rree i` sr
tittdirde!M*MWW Rk rMr darammauf.b.d testa r W h- .M;0 tlr.0as
NOW, lttl€ntk~:.+rtei6IVF bi I-I€Irkelt Supt ttiistLiSK'lil. n4 DrMicd 21111 IdAidAelUSMMM 5d1@f Vftd Fig" vr" IILl7t l 2DI I AedM
Page 3 of 16
usrxm i,.fe m,rsx~.=~. n.s:.. cs.,,.issrae•w ese~:rangeu-nnm=,~ce.os~ srrorsrox.uasdseressa~aarster
Petition No. SPX-13-075
X
Project Name: New Hope Community Church Expansion
~U8 Ri F1iu~ JWNWil
{f60a A
A
1'11 PI'm ii 1+/ la-M, I P'nif! pt'INenPJgiaredWAXa POMWDlaiil~
MWM4,2M4F)-i"Kula: 'tilt ! It ru fsulos Inqu[r[ tr
~Jlrtyv7rlWfi~ll~e6dkgflr/iBYYY~M1 YI~hLnBWeeYAUI~l~vdep~StlrrikY11l~Iltel`M tl1eY14~Y~1~1tl~N 4f~4
rifel~+ieY~M~dR lydMwl~fe~4GW1 Mtb M rp Ir rieif0 aTSYY®.
V V~YAttr ni.ali[!s rf inri!lnrn Erwri LrrlrTLrlalilNt,/NH9Li 7IhY7SIW7yA2: rftTnc lertAtM~O~Ii~Fa3Wel~Ebt7•C110~1Y~~0
Page 4 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
-3 = Na 1 M u
Jk- 08 E MU S Ehurch %06"g kkwILY
A,; 'IV. L I 1.11{,+J FI<V.ll til Il It Y'Iltr 41RtINld i~LxRF.iUS 9iAGRNS)LTTlRAL. ESTATC$ vnurr INDUSTRIAL CORRIDORI OFf[ I1t P<Stlll' Etl Etlt)t A'fTAI W IM FtWht Kv rfWL, Eat RIdRS• li l;e~l )LOW DENBrrv RESCENTIAL OONBEWATION 1TDR SENDIMM ffiNE)Aft 1*1W 1~ wall Y lit 811 K-N) W III i" 1.1lrAI( ff It £t; li:1 (1111 Eel RI>IR(, ?k>111)MEOWIM CIEN RY RESOIDENTIAL RPOWATIONIOPEN SPACE (TOR SENDING ZONE)
-1 lRrll l 11 itany Ri st-11 IF If.lFBG)i t rT F=lDEpTDLLFstfrl t'1FtgKMl+d {q f [{'6PROFESSIONft OFFICE1".(OWURCIRlOOIiBtC1AL1141AISMI Rl640USTRW
I- = 1
.i
~'1151Y fit 10f R{TT4.€ I (h R+i>!N ?ith`I FXi:I Pi l.:"•iACTEYITY CENTER (OR PAWIVI G2CNE-E%CEPT AC-3)Nll I A44VLLAGEPflilkti.4mPOINM An
1-1-4
F lrT'ul.lt Fry NI1Tlr1`flNMfnp Cr111sksrPEA OlND$Ifl'MMIFS DM91011
M=h 4.21914
NOW: '108UAVONUICUfRF{ot)IfiRFC11Y IMTFRPRE'11-0 IWAI#k11N HItY L>£NOTE: 111{ 1 Aklf O RDINAWN
p"E4 ''r,C BY ORDINANCEN0.97-27, AS SAME WAY TE AMENDED FROM TIME TO TIME.
I%aiel,er ll,k Wrap a br rthr.rni t Ir,rNJk dill
1YSipalY.ietrIwli~sMit <Ey1FFr llt,lflMdiFtlIIrIW 4rM1(ItF?3siE~11+6A1Muf~~YlYk iuLAii~GtlYiYY~tl^In\
W.W-d. ap~g
~ ~1p
~~~a tV`d'uf~YIiX S17YtStr+rsaerfkss .M+~ rfkaJi Ci"+J61HQ.U' pf117F.1J{P_:I IImHY~@1RLIRal1
Page 5 of 16
Petition No. SPX-13-075
V. PROPOSED SITE PLAN _
Project Name: New Hope Community Church Expansion
sot~s.utsc~r~re~~i~i%s
PHASE 1PROJECT AREA
STAFF NOTE:Exact location of themodular units will
be determinedduring the MAS
process
-F-,
I
.1
IORMA INGINRFRING
swc-~~LNC rsrrs; e.
a
I Va h esyaµK. _
naava ~~3;is~nw ItA.%Y1
N11 tit3Y CtAVCe,' trNEW FIB ,P#AUNUY
CHH
TrMRM'--pNN[E) fdSNVO! 1
aY ki
RO
tI~
yk ~4
4
PENS1ONS
1
OATE
Page 6 of 16
Petition No. SPX-13-075
VI. SITE INFORMATION
Land Use
Project Name: New Hope Community Church Expansion
Adopted Future Land Use Map Designation: Activity Center #1
Adopted Zoning Map Designation: Residential Single Family 2 (RSF2)
Existing Land Use(s): Institutional - Church
Surrounding Land Uses:
Direction Existing Land UsesFuture Land Use Map Zoning Map
Designation Designation
North Institutional-Academy for Professional Office Office, Professional &Early Learning Institutional
South Vacant (owned by mortuary Activity Center #1 Residential Single Family 2to south)
West S. Biscayne Blvd; Single- Medium Density Residential Single Family 3family across street Residential
East Drainage R-O-W; Utility Activity Center #1 Drainage R-O-W; Governmentfacilities across drainage Use across drainage
Services and Facilities
Potable Water: North Port Utilities
Sanitary Sewer: North Port Utilities
Transportation: South Biscayne Drive
Environmental
Conservation: N/A
Flood Zone: Zone B, Panel 120279 0010 B
Vll. BACKGROUND
The existing church was built in 1964 prior to the City's zoning regulations. The church propertywas previously owned by First Presbyterian Church. The church property was originally 4.5acres. In 2003, First Presbyterian Church sold the southern 0.78 acres to Farley Funeral Home.The remaining 3.7 acres with the church building was sold to New Hope Community Church in2008.
The applicant reports that since 2008 the church's congregation has grown to the extent thatthe existing building can no longer support all of the church's activities. New Hope's statedvision is to ultimately construct additional facilities to accommodate its current and futurecongregation and ever expanding ministries and community services it supports.
In 2013, the applicant purchased three former modular classrooms to be temporarily locatedon their property until construction of new facilities could be funded. The Church asked the City
Page 7 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
for permission to store the modular units onsite because they were under a time crunch to
purchase the units. City staff told the Church representative that they could store them, but
that they would need to be tied down in case of storm, placed an adequate distance from the
existing church, and that they would need to go through a land use review process and obtain
building permits before they could occupy the modular units. The City's Building Official and
Fire Marshall determined that the modular units are out of compliance with several aspects of
the Florida Building Codes, which would all need to be addressed prior to occupancy.
Phase 1 includes the generallocation of the threetemporary modular units;Phase 2 includes the generallocation for their new facility;both will ultimately bereviewed as a Major Site and
Development (MAS) prior to
issuance of building permits.
The use and the site arecurrently nonconforming. The
use would be consideredconforming upon the approval of a Special Exception. The site has several nonconformities,
including landscaping, parking lot improvements, and architectural design elements.
In the application narrative, the applicant asserts that since the property is within Activity
Center #1, which specifically identifies houses of worship as an allowable use, they should not
be required to request a Special Exception.
- Staff Response: Activity Center #1 (AC#1) is the future land use for the property, not theofficial zoning district. The intent of Unified Land Development Code (ULDC) Chapter 55-
Activity Center Design Regulations is to ensure that the development within Activity Centers
have identifying characteristics and design that are consistent with the Comprehensive Plan
Goals. The permitted uses listed in Chapter 55 would also come into play if a rezone were
requested, which would need to be consistent with this chapter.
ULDC Chapter 53-Zoning Regulations, Part 1-General Provisions, Section 53-3-General
Requirements, Subsection Q states "If the use is not expressly permitted or prohibited in a
zoning district, it shall be required to apply for a special exceptions permit." The property is
zoned Single-Family Residential and houses of worship are neither permitted nor
prohibited, therefore a Special Exception is required.
VIII. STAFF ANALYSIS
This section includes ULDC citations, ULDC criteria relevant to the request is in bold, followed
by findings of fact and conclusions related to each criterion in italics.
Page 8 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
A. Special Exception
ULDC Chapter 53-Zoning Regulations, Article XXII-Special Exceptions, Section 53-259-Findingsstates "Before any special exception shall be approved, the City Commission shall determinethat:
1. The granting of the special exception will not adversely affect the public interest, health,safety and general welfare.
Applicant: Since the City Commission adopted Chapter 55, Article 1, "Mediterranea (ActivityCenter #1)"; Section 55-15(8), ULDC, wherein the City Commission listed "Houses ofWorship" on a minimum two (2) acre parcel as a "permitted principal use and structure"; itmust be presumed as a matter of law that the granting of a special exception so that NewHope may continue to use its property and expand its existing use as a House of Worship,will not adversely affect the public interest, health, safety and general welfare. If such usewould be expected to adversely affect the public interest, health, safety or general welfare,the City Commission would have exceeded its "police power" authority in designating aHouse of Worship as a permitted principal use and structure.
Staff: Activity Center #1 (AC#1) is the future land use for the property, not the official zoningdistrict. ULDC Chapter 53-Zoning Regulations, Part 1-General Provisions, Section 53-3-General Requirements, Subsection Q states "If the use is not expressly permitted orprohibited in a zoning district, it shall be required to apply for a special exceptions permit."The property is zoned Single-Family Residential and houses of worship are neitherpermitted nor prohibited, therefore a Special Exception is required.
There has been a church on this site since the 1960s. The site is approximately 3.7 acres sothere is sufficient space to expand the use without adverse impact to the public.
- Staff concludes that this criterion is met.
2. That the specific requirements in the Schedule of District Regulations (Part 2) governingthe individual special exception, if any, have been met by the petitioner.
Applicant: There are no specific requirements in the Schedule of District Regulationspertaining to Houses of Worship. Therefore, this requirement is satisfied.
Staff: ULDC 53-Zoning Regulations, Article IX-RSF Residential Single Family District Section53-120-Intent states "Certain structures and uses designated to serve governmental,educational, religious, noncommercial recreation and other immediate needs of such areasare permitted or permissible as special exceptions within such districts, subject torestrictions and requirements necessary to preserve and protect their residential single-family character." For Phase 1, the applicant is proposing to place three temporary modularunits until such time they are able to construct their Phase 2 facility. Phases 1 & 2 will bereviewed through the MAS process.
- Staff concludes that the Special Exception can meet this criterion with the followingconditions:
Condition 2.1: If the modular units are still in place in two years, the Special Exceptionwill expire and the applicant will need to request an extension of the Special Exception,which must be approved by the Commission.
Page 9 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
Condition 2.2: The temporary modular structures must be removed prior to occupancyof the Phase 2 facility.
And that the following standards, where applicable, have been met:
3. The proposed use shall be consistent with the intent, goals, objectives, policies andprograms of the City of North Port Comprehensive Plan and the intent of the zoningdistrict as defined in this Unified Land Development Code for the area in which theproperty is located.
Applicant: Since the City Commission adopted Chapter 55, Article 1, "Mediterranea (ActivityCenter #1)"; Section 55-15(B), ULDC, wherein the City Commission listed "Houses ofWorship" on a minimum two (2) acre parcel as a "permitted principal use and structure", itmust be presumed as a matter of law that this standard has been met.
Staff: The future land use of the property is Activity Center #1, which allows houses ofworship within the mix of allowed uses. The residential zoning was in place prior to theadoption of the City's Activity Centers. Single-family development is not an allowed use inActivity Center #1. Therefore, the intent of the zoning district is inconsistent with theComprehensive Plan. The church use is, however, consistent with the future land use ofActivity Center #1 and will be consistent with the zoning district upon approval of theSpecial Exception.
- Staff concludes that this criterion is met.
4. The density or intensity of the proposed use shall be consistent with the intended futureuse of the designated land use area in which the property is located, in accordance withthe provisions of the Future Land Use Plan Map contained in the Comprehensive Plan.
Applicant: Since the City Commission adopted Chapter 55, Article 1, "Mediterranea (ActivityCenter #1)"; Section 55-15(B), ULDC, wherein the City Commission listed "Houses ofWorship" on a minimum two (2) acre parcel as a "permitted principal use and structure"; itmust be presumed as a matter of law that this standard has been met.
Staff: The future land use is Activity Center #1, which allows houses of worship on parcelsthat are two acres or more. The subject property is approximately 3.7 acres and anydevelopment will need to meet the maximum lot coverage, minimum setback requirements,and maximum building height for the Residential Single Family zoning district, therefore theSpecial Exception is consistent with the intended future land use.
- Staff concludes that this criterion is met.
5. The proposed use, singularly or in combination with other previously approved specialexceptions, must not be detrimental to the health, safety, welfare, morals, order,comfort, convenience, appearance or prosperity of the neighborhood or adjacent uses;and shall be an economic benefit to the economy of the City.
Applicant: Since the City Commission adopted Chapter 55, Article 1, "Mediterranea (ActivityCenter #1)"; Section 55-15(8), ULDC, wherein the City Commission listed "Houses ofWorship" on a minimum two (2) acre parcel as a "permitted principal use and structure"; itmust be presumed as a matter of law that this standard has been met.
Page 10 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
Staff: The existing church has been on the subject property since the 1960s, the adjacentuses are commercial and industrial in nature, and the 3.7-acre site can potentiallyaccommodate an expansion of the use in a manner that is acceptable to the residentialneighborhood across the street. Churches cannot be expected to provide economic benefitto the economy of the City.
- Staff concludes that this criterion is met with the addition of the Special ExceptionConditions 2.1 and 2.2 above and Waivers Condition 1.1 in the section that follows.
6. The intensity of the proposed use shall be harmonious with the character of other uses inthe neighborhood.
Applicant: Since the City Commission adopted Chapter 55, Article 1, "Mediterranea (ActivityCenter #1)"; Section 55-15(8), ULDC, wherein the City Commission listed "Houses ofWorship" on a minimum two (2) acre parcel as a "permitted principal use and structure°, itmust be presumed as a matter of law that this standard has been met.
Staff: The surrounding uses include a private school to the north, drainage and industrialuse to the east, vacant lot and funeral home to the south, and a road and residential areato the west. There are other structures that are commercial in nature adjacent to theabovementioned uses. In addition, the Phase 1 modular units are intended to be temporary,and both phases will be reviewed in more detail through the MAS process.
- Staff concludes that this criterion is met with the addition of Special ExceptionConditions 2.1 and 2.2 above, as well as Waiver Condition 1.1 in the section thatfollows.
7. The height and orientation of any proposed structure(s) shall be compatible with existingneighboring structures and uses.
Applicant: The maximum height permitted with the RSF-2, Residential, Single-Family zoningdistrict is 35 feet. The height of the three temporary modular units is substantially less thanthe maximum permitted height, and is less than the height of the existing structure on thesubject property. Thus, this standard has been met.
Staff: The height of the Phase 1 modular units is reported as 12 feet by the applicant. Theexisting church and structures on adjacent properties are as tall or taller than the proposedmodular units. The units are also at the back of the property oriented toward the existingparking lot, which diminishes their appearance from the perspective of the street.
- Staff concludes that this criterion is met.
8. The subject parcel shall be adequate in shape and size to accommodate the proposed useand provide for appropriate separation between neighboring uses.
Applicant: The subject parcel consists of 162,130 square feet, or 3.7 acres. The subjectparcel is more that adequate in shape and size to accommodate the proposed use andprovide for appropriate separation between neighboring uses. Thus, this standard has beenmet.
Page 11 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
Staff: The lot is approximately 3.7 acres with dimensions of approximately 550' long and350' deep. This size and shape is adequate for accommodating the proposed accessorystructures while providing appropriate separation between neighboring uses.
- Staff concludes that this criterion is met.
9. The proposed use shall be adequately screened and buffered to effectively separatetraffic, light and noise from existing or intended nearby uses.Applicant: The proposed use complies with all applicable screening and bufferingrequirements applicable within "Mediterranea (Activity Center #1). Thus, this standard hasbeen met.
Staff: The lot to the north is zoned Office, Professional, Institutional and the existing use isinstitutional. No buffering or screening is required between similar uses. The vacant lot tothe south is zoned residential, however, because of the size and shape of that lot (60' wide,350' deep), and the fact that it is owned by the adjacent commercial use (funeral home), itis unlikely it will be developed for residential use. NOTE: The applicant requested a waiverto the requirements for buffering, which is addressed in Section 8 of this Staff Analysis.- Staff concludes that this criterion is met with Condition 1.1 in the Waiver Requests
section.
10. The loading and/or refuse areas shall not impose negative visual, odor or noise impactson abutting uses or thoroughfares.
Applicant: As reflected on the submitted Site Plan, there is adequate area on the subjectparcel to ensure that loading and/or refuse areas shall not impose negative visual, odor ornoise impacts on abutting uses or thoroughfares. Thus, this standard has been met.
Staff: No additional loading or refuse areas are proposed.
- Staff concludes that this criterion is not applicable.
11. The size and location of proposed sign(s) shall be in compliance with Chapter 29, SignRegulations of these regulations, and shall be compatible with the character of theexisting neighboring uses.
Applicant: No new signs are proposed by New Hope. Thus, this standard has been met.
Staff: There are no additional signs proposed. Any additional signs would be reviewedunder a separate building permit.
- Staff concludes that this criterion is not applicable.
12. Exterior lighting shall be harmonious with the character of existing neighboring uses, interms of glare, and required footcandles.
Applicant: Lighting shall be provided as per the requirements of all applicable regulations.Thus, this standard has been met.
Staff: There is existing lighting on the site. No information was provided regarding thelighting for Phases 1 & 2. Per the ULDC Chapter 53-Zoning Regulations, Section 53-3-General Requirements, (O) Lighting will be required to provide a minimum of 0.9footcandles in all parking and pedestrian areas related to new development prior to
Page 12 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
occupancy of the Phase 1 & 2 structures. Lighting will be reviewed in more detail during theMAS process.
- Staff concludes that this criterion has been met.
13. The ingress and egress to the subject parcel and any structure involved shall notadversely affect traffic flow, safety or control.
Applicant: New Hope is not proposing any change in existing ingress and egress to thesubject parcel or to the three temporary modular units. Thus, there are no changes toexisting conditions which will affect traffic flow, safety, or control. Thus, this standard hasbeen met.
Staff: The City's infrastructure engineer, Ben Newman, reviewed the Special Exception andhad 'no objection'. Ingress and egress, as well as off-street parking, will be reviewed inmore detail during the MAS process.
- Staff concludes that this criterion is met.
14. The access and internal circulation shall be adequate in case of fire or emergency.
Applicant: New Hope is not proposing any change in existing access and internal circulationof the subject parcel or to the three temporary modular units. As reflected on the submittedSite Plan, there is adequate area on the subject parcel to ensure that access and internalcirculation shall be adequate in case of fire or emergency. Thus, this standard has beenmet.
Staff: The City's Fire Marshall, Michael Frantz, reviewed the proposal and determined thatthe Special Exception 'meets requirements'. Approval of this petition does not includeapproval of the location of the temporary modular structures. These issues will be reviewedin more detail during the MAS process.
- Staff concludes that this criterion is met.
15. The proposed use shall not adversely affect traffic flow, safety or control on thesurrounding roadway system.
Applicant: There will be no increase in the number of trips to and from its property as aconsequence of the installation of the three temporary modular units. Thus, this standardhas been met.
Staff: The City's infrastructure engineer, Ben Newman, reviewed the Special Exception andhad 'no objection'. Traffic impact will be reviewed in more detail during the MAS process.- Staff concludes that this criterion is met.
16. The location, type and availability of proposed potable water systems shall be adequatefor the proposed use and shall not adversely affect neighboring potable water systems.Applicant: The subject property is already served by a potable water system. New Hopedoes not anticipate any significant change in its existing potable water system as aconsequence of the installation of the three temporary modular units. Thus, this standardhas been met.
Staff: Water service is available to the site (ATTACHMENT 2).
Page 13 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
- Staff concludes that this criterion is met.
17. The location, type and availability of proposed wastewater systems shall be adequate for
the proposed use and compatible with drainage conditions in the area and neighboring
uses.
Applicant: The subject property is already served by a wastewater system. New Hope does
not anticipate any significant change in its existing wastewater system as a consequence of
the installation of the three temporary modular units. Thus, this standard has been met.
Staff: Wastewater service is available to the site (ATTACHMENT 2).
- Staff concludes that this criterion is met.
18. The proposed use shall not cause or intensify flooding of neighboring uses."
Applicant: A SWFWMD exemption permit has already been granted for the modular units,
and therefore will meet this standard.
Staff: The entire lot is in Flood Zone 8 on the current FEMA Flood Insurance Rate Maps (Sept
2, 1981). Zone 8 is considered a moderate risk area by FEMA. The City's stormwater
manager, Elizabeth Wong, reviewed the Special Exception and deemed that it 'meetsrequirements.' Storm water and floodplain issues will be reviewed in further detail during
the MAS review process.
- Staff concludes that this criterion is met.
B. Waivers
ULDC Article XXII-Special Exceptions: Section 53-254(8) states "The City Commission mayapprove special exceptions, subject to appropriate safeguards. When appropriate, the CityCommission may waive or modify specific regulations contained in the Unified LandDevelopment Code Ordinance No. 90-28 on a case-by-case basis to ensure comfort,convenience, appearance, prosperity or general welfare. Such uses may be permissible in azoning classification or district as a special exception if specific provision for such a specialexception is made in these zoning regulations. However, such uses are not deemed to beappropriate within a zoning district without demonstration by the petitioner that the special
exception complies with this section."
The applicant is requesting two waivers; one related to landscape buffers and the other for thedesign elements for Activity Center #1. The applicant asserts that neither waiver should berequired.
1. Waiver Request #1- Landscape Buffers: The applicant points out that the language in ULDC
Chapter 53-Zoning Regulations, Part 1-General Provisions, Section 53-3(K)-Buffers states"When a non-residential development abuts a residential development, adequatebuffering shall be placed between the uses, see Chapter 21, Landscape Regulations."
Chapter 21-Landscape Regulations, Section 21-9-Landscaping the perimeter of abutting land
uses, (D) Determination of perimeter buffer requirements addresses the proposeddevelopment relative to abutting existing uses. The proposed expansion areas are adjacentto a vacant residential parcel to the south, and an institutional use to the north.
Page 14 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
- Staff concur that the buffer requirements do not apply on the northern and southernboundaries of the property.
Item W-Landscape along waterways and parks from the same section, requires a 10 footbuffer along the side that abuts a waterway. The eastern boundary is along a waterway,however, there is existing vegetation that provides a buffer, albeit mainly from an invasivespecies. The City Arborist, Ryan Pieper, feels that the existing buffer is adequate for thePhase 1 expansion area. The waiver can be applied to Phase 1 of the Special Exception only.
- Staff recommends approval of this Waiver Request with the following condition:
Condition 1.1: The waiver to the buffering requirements along the waterway onlyapplies to Phase 1.
2. Waiver Request #2 - AC#1 Desian Elements: The applicant notes that on page 33 under theAPPLICABILTY heading in the US 41 Architectural District section of the Urban DesignStandards Pattern Book, it states "The provision of this Section shall be applicable to aspectsof architecture, lighting, and monument signage for all new commercial developments,buildings, and exterior improvements done in conjunction with substantial improvement(s)of existing developments, buildings, and structures (except single family residential) locatedwithin the US 41 Architectural Guidelines District Boundaries, excluding Trott Circle."" AC#1 isthe only Activity Center that specifies that the architectural standards only apply tocommercial development, and given that the existing church was built in 1964, it's notreasonable to expect the accessory structures to adhere to Mediterranean architecturalstandards.
- Staff concur that the AC#1 Architectural Design Standards do not apply to this SpecialException, therefore, a Waiver is not necessary.
However, the Urban Design Standards Pattern Book APPLICABILITY section also states "Theprovisions of the Mediterranean Architectural Color section related to repainting shall beapplicable to all structures." The existing church meets the Mediterranean architecturalcolor requirements, therefore, the accessory structures can be painted to match the primarystructure. The Mediterranean Architectural Color requirements still apply to this SpecialException.
IX. REVIEW PROCESS
A. Staff reviewed this petition for a Special Exception and found this petition met therequirements of Unified Land Development Code Section 53-259, subject to theconditions listed in Section X of this staff report. The following City departments wereinvolved in this plan review and issued the following results (ATTACHMENT 3):
Q Neighborhood Development Services, Arborist - No Objection
Q Neighborhood Development Services, Zoning - Meets Requirements
Q Neighborhood Development Services, Planning - Meets Requirements withConditions
Q Fire Rescue District, Fire Prevention & Life Safety- Meets Requirements
Page 15 of 16
Petition No. SPX-13-075 Project Name: New Hope Community Church Expansion
Q North Port Utilities, Potable Water & Sanitary Sewer- No Objection
Q Public Works, Engineering, Stormwater & Environmental - Meets Requirements
Q Public Works, Engineering, Infrastructure - No Objection
Q 1 & T- Meets Requirements
B. Legal has reviewed the resolution for form and correctness.
X. STAFF RECOMMENDATION
Special Exception: Recommend approval to the City Commission with the followingconditions:
Condition 2.1: If the modular units are still in place in two years, the Special Exceptionwill expire and the applicant will need to request an extension of the Special Exception,which must be approved by the Commission.
Condition 2.2: The temporary modular structures must be removed prior to occupancyof the Phase 2 facility.
Waiver Request #1 - Landscape Buffers: Staff concur with the applicant that thelandscape buffer requirements do not apply on the northern and southern boundaries ofthe property, therefore, waivers are not needed along the northern and southernperimeters of the property. However, a waiver is necessary to the buffering requirementsalong the waterway. The existing trees are an adequate buffer for the Phase 1 temporarystructures. Buffering will be revisited for Phase 2 during the MAS process.
Recommend approval to the City Commission with the following condition:
Condition 1.1: The waiver to the buffering requirements along the waterway onlyapplies to Phase 1.
Waiver Request #2 - AC#1 Desien Elements: Staff concur that the AC#1 Design Standardsdo not apply to this Special Exception, therefore, a Waiver is not necessary. However, theMediterranean architectural color requirements still apply.
XI. PUBLIC HEARING SCHEDULE
Planning and Zoning Advisory Board April 3, 2014Public Hearing 9:00 AM or as soon thereafter
City Commission April 28, 2014Public Hearing 6:00 PM or as soon thereafter
Page 16 of 16
STAFF REPORT ATTACHMENT 1
AFFIBif
too II 13tn aurYlf~re .
enl 6 g rr.g ioue twit' .a t I gm ut,csrlF(.c~'> f .1 \' 0 1111~`~It)}j(1DY 7'" ,)l LlE'\' 2 $ 2lrr 'tJTF, j/ r ~ flr~U~y 5y p pr5yy[@ ~ I S 2L ey6 ~T~ r
tierGY,l fQ.SY"~h~7Y~,lr*'~!};~ tiCaRl~~ L1Y~~~-~): rf' Fi5 j ftF2 f~G.t7,'q d+~75 ._. -,B dFrttsetx ~slecseExrm,r~`rifrrnrrmraoo'tahnnr•,~„ ''rixro}nrenra4N
i7,=4°.. rF, nZ~r,• i' `. ~
xtes, rp5ldrfwf l,nt,rs,
vd-v r:ron wYawaccess51Wn-e'id,xtSlibe'rl-1;01`,.n_th:, " ~ ,rr• F'`l, e9aom and subsrrihad h,.r I me this -
SiktatumofARK-mri46 Qhodredrlyrul
!,d!', af =~-
Nrme and Title AN 3:12014
9fInI ti IJ
.-t ry CWT ,,or of 'S-,t rl isrAim o _ tCS ra - OW M or - ( 1111-1>
crry OF NORTH PORTcmrrivFn
~t ~̀ mss ~"
PLANNING#"~'t I':a•,,r,_-',.?;5[~;~ 're: F th 3. C 1.~.t r.3 ~4 r
vledgrrf ~~y me this ~-zs ---ti ay :if "` -*,~.4`~ i'i~~'7"- ~ 7n~~ ItYThe,Epr~®nin~Instr , a~ ~ ̀ ~~ a~
whoi . fr..v3n.# I( n0Yln5o.r-eu,hmywd U sed_
th -4, tt at ldrntifr zrtiun, and whoLnft,,p 1, Oart
did/didnRiilae an oath.-\
;Fi(fOWNER WIN*
N,`.c ,- / R3 J ,~-" ; L',~•- h ~t-, tea' •[7F"=; ^nnr,
~Vrd I.w6~~-~`6 Urn RI poF IY GYmE~S).
here6yaut{suneG "et['J.-Qbertfe"Tr?' -- - - to act asprnt un um UehalF
I ;' Pf,NL-t, 9 ,z t ratde 4
• rtoArsNlyfrbtl,e.pr0WnQnINproperly dc.-.0Wdas(legtdescrtptten).. .,, jjLgr"l•.,
,I t•.•asa;kro4-ledged hymn Ihis
a-;e_ir S
_ _ ;'In; r`' ~rSC QQdqU~~yy~ ~~rrS++ry,er~rfr r,, dc,~;u~.Np
,7lfifer'"'+1~Y,r'FCI'!nti` --?RLT
-Datea*r
rln ~hn ~Irlt:~r~r4e1~~ tf)~ ues~t ns In thLs ~ I~4 ~ pn~~
1tt~IrtTf p _I?tLgfL,,ap~a~,~ ft,r h in'~~,ca r~ t~y,yyi~rr~~yy~~ y,~e`t A ,50,06*,r~CettCR ~tlt hT y 5r, E•[• j~N ~pp~ z ~p ~~lu n~k
~~
;py~'.V[f{'{ g~~4,ur.v" ) N ~~p , iBhAm-)i StdI'n"v-- l
~ 1 s-4 e1
tvhn:s pe: na 6 ifna,rm to me t r has p:FIdUcx d
"- ̀ - as tdenttih ar irrnr artd who did
STAFF REPORT ATTACHMENT 2
1^[email protected] 15:°2 3~1d265i9°3
CAL l t
N P UTxLITIES
.Air= f4a= -~[7-L64+
Ikitz' Servjw.. is rat
S'Wcr 8` eiWi4a_ is { } la not
U 1,11,ff
I£ s~ - n +i~: ' ° § ''!}c€ i ,r-ii~te a i r a ~ T,hii6, v*l01 ~v rOPiesemt00h- Oda a e k ,+~ t i~! r j3p), d>~3 $. tie ;ate ~~f i3_ ] ~t, F.ass} .
w key adtit~,$eiS;l a tua?r~i_a! wttt~ ti7 iQp r I,uvrfiett:, is dat ms esati$ed persod, 5 re r~s~v'atiom vuY l ba auk an~tvnid:11011 n t}ie pre yui
Pleitm rope: rti it ever ui tli;~ e ~Gtt t WJ it 'tine c$p tiity £ews erepa-d. No (I~jwent will bi. ti cUO edwithoiit Uni foim.
If ye`siiav anv rzstisis, ~ilns3c c'o pa4 Fr,tt®'~e sc con=ac.t tier nffice.
~w9[5.tiTF[il LTf.T'FS
XCE V8.2. ONLY
P.I.eci
1'yy of 6ust-&atia.n ~J set ij-il16lt 0 pt)t:eh
R:viS7d rirrnr~
STAFF REPORT ATTACHMENT 3
PROJECT DESCRIPTION: NEW HOPE COMMUNITY CHURCH MODULAR UNITSPBERCMIA~
4 ~ id iii - „iiigff 64188- iF. iW pwoii - (444) -
2. IfffaliN61no.20, 2014
^ Meets Requirements
^ Resubmittal Required
® No Objection
NONE
NONE
IYIifIFIE
Will address at MAS stage
^ Meets Requirements with Conditions
^ Does Not Meet Requirements
^ Please call to schedule a meetingwith Review before Resubmitting
NEW HOPE COMMUNITY CHURCH MODULAR UNITSSPX-13-075
PROJECT DESCRIPTION: NEW HOPE COMMUNITY CHURCH MODULAR UNITS
hf[4144.. WAR - iwwj 44i~~Vy99 8 _ n8h 1kh66 - 4i4ig"-i211 oil
1. f8gif I BI B: February 20, 2014
2. ROWER AETI :® Meets Requirements ^ Meets Requirements with Conditions
^ Resubmittal Required ^ Does Not Meet Requirements
^ No Objection ^ Please call to schedule a meetingwith Review before Resubmitting
None
(1) Stand-alone Building Permits are required on the Primary Structure, signs, walls,fences, dumpster corrals, street lighting, irrigation systems, lift stations and anyother accessory structures.
(2) Setbacks to all property lines from all structures are required on all site plans.(3) Parking Lot Calculations required on site plans.(4) "Impact Fees are based on Land Use Type. They are calculated based on the City
Impact Fee Ordinance in effect when your Building Application is submitted to theBuilding Department. They are due prior to the issuance of the TemporaryCertificate of Occupancy, the Certificate of Completion for a shell building, or thePermanent Certificate of Occupancy." If you need more information about impactFees please contact the Building Department at 941-429-7044. Thank You.
(5) Project may require additional permits from the Department of EnvironmentalProtection (DEP) and South Florida Water Management District (SWFMD).
NEW HOPE COMMUNITY CHURCH MODULAR UNITSSPX-13-075
F MAL NOMITTAL 68MM €M~a 4i4A' Hi g i 4iEdi k WiW
1. T891 1 BO: Februa 13, 2014
2. KEE 8 R ENBEB ARM:
® Meets Requirements with Conditions
II:~VI!'!!:1~:i3!I!I~~y9!it!!l:7!I!1:~~-}Yyil°J~!I~IS~~r,r~l\I~
None
ME OBIRM.None
FIBN
1. Engineered Fire Sprinkler drawings, hydraulic calculations and productinformation sheets are required for review and approval with a Building Permitapplication. The fire sprinkler system shall be installed by a Florida licensed firesprinkler contractor.
2. A complete fire alarm system, with fire sprinkler monitoring, manual pull stationsand ADA compliant audio-visual devices is required. This system shall beelectronically monitored 24 hours a day by a UL listed central station.
NEW HOPE COMMUNITY CHURCH MODULAR UNITSSPX-13-075
€MAL H§MITfAL E®MM€bf§
1. T891 ~ Bill: February 19, 20142. RED MEMBEB ARM:
^ Meets Requirements ^ Meets Requirements with Conditions
^ Resubmittal Required ^ Does Not Meet Requirements
® No Objection ^ Please call to schedule a meeting withReview before Resubmitting
-iS`NI'R`J~1`Zvi-~v`I\\T1`1~~17r`I~1-~'1'~~\..
No comments
NEW HOPE COMMUNITY CHURCH MODULAR UNITSSPX-13-075
F89MA6 MMITTAE EBM €Nf§
M 11 A i~w0b6kW&6- wi6~ iW8 i A 4 11 11 ke"V'4wkWi;,w; iiiiigiik w8h - Mij i4U -bii
1. f8910 Bits: February 20, 2014
2. NFEB MEMBEBARM:® Meets Requirements ^ Meets Requirements with Conditions
^ Resubmittal Required ^ Does Not Meet Requirements
^ No Objection ~ 018916 E2 1118 tEhEgul8 as M88TIR witoFtLv is w
The following comments relate to later MAS submittal:1. Please address all comments previously provided in the pre-application
notes dated June 27, 2013.
2. Please note that the City has plans to replace the collapsed storm pipelocated near the southern boundary of the project site. The City may beasking the property owner for a drainage easement for this pipereplacement.
3. Also a water line is proposed across the alignment of the collapsed pipe. In
order to coordinate the construction work, please indicate the proposedschedule for installation of this water main.
4. Please schedule a meeting with the Stormwater manager to discuss theabove items prior to a Major Site and Development application submittal.
5. A mandatory pre-construction meeting shall be held just prior to the start of anyconstruction. The applicant will be responsible for coordinating the meeting withthe Stormwater Manager who can be contacted at 941-240-8321 or by e-mail
The Stormwater Manager will be responsible forcoordinating the meeting with City representatives. This meeting will be held onsite or another location within the City limits. The applicant will submit at thepreconstruction meeting:
• Names and phone numbers and emergency phone numbers for personnel involved(i.e. owner, developer, project manager, contractor(s) and consultant).
• For all construction sites larger than 1 acre, provide a copy of the NPDES
Stormwater Pollution Prevention Plan (SWPPP) and copy of the response letter from
the Department of Environmental Protection that they have received the Notice ofIntent.
• Proof of the contractor training on best management practices such as the Florida
mc
NEW HOPE COMMUNITY CHURCH MODULAR UNITSSPX-13-075
Department of Environmental Protection (FDEP) Erosion Sedimentation and Erosion
Control certificate if available.• if required, provide a copy of the SWFWMD ERP permit and a copy of the final
SWFWMD approved stamped set of plans.• A Southwest Florida Water Management District (SWFWMD) "Notice of
Authorization to Commence Work" should be conspicuously displayed at the projectsite.
• Best management practices training will be provided at the pre-construction meetingby the City to the selected contractor.
NEW HOPE COMMUNITY CHURCH MODULAR UNITSSPX-13-075
OF MAL HNFAL 68MM €af§a ql~iki Uil p hilig j kg~Ww C~ p
,2, kW9eN1&; 864! WA 0ii iia--98 i
1. T891 ~ BO: Februa 18, 20142.10~e MEMBEB ARM:
^ Meets Requirements ^ Meets Requirements with Conditions
^ Resubmittal Required ^ Does Not Meet Requirements
® No Objection
~ngllwnq
Imliging U V
Please call to schedule a meeting with Review
1. Please call to set up a meeting with the Utility Dept. the proposed water serviceand fire line design will not be accepted by the Utility Dept.
NEW HOPE COMMUNITY CHURCH MODULAR UNITSSPX-13-075
F MAL HIMITTAL 68MM €NT€
1. f8giA Bim February 18, 2014
2. I IENIVIEaBEB ARM:
^ Meets Requirements ® Meets Requirements with Conditions
^ Resubmittal Required ^ Does Not Meet Requirements
^ No Objection ^ Please call to schedule a meeting withReview before Resubmitting
_I! L.\~~7L1~11L1M `IftWI!IMAM"!JMS!iT: A I } ~ .- A
- . 1. 1 \ ;1L I . .!•ME- •\ ~1WAW1T1M1-~\W)_1 -I I 1\ T PL)• E I ~~ w1~~. I -V l'~~ MRS
RR8 N 1i R8FRO18I8; IRS P8§8 I tom~8F8F~ FR89818F§ FRU4 138F8R1849 OF18F t8 8RR8O8RR~ 8f M6 13110 1 1381181RI:
3: R8 800F8018§0IF8§ IR i SM: If N 1311M I W1 08F8F~ NN E N itill8R91M, 8A 6MR918R FRB { 138 F8EI89499; F64089; 8R9 800F08913~ IN8NFRIHIBR:
4: RE 948 R8RW 139 OF81F8FRFR89 t8 8118W BRA W18§ tk8t will Fgg81F8 FR8F8WR §8 131MR1 iolffl:
4: RE WRIM 1811181308FIRI NEI80RISM 8 18 RJ MWw%9 9889 R8t 8001t8 Nag@ i
PJANNI NONR IRI 0888 001188 800F&H M8 M 81 1118 OF8i8ft R81 IN908180FRM 010; Nig RF8 800F089 i8OlF8i81~ 111F88911 8 MROF §48 889W8180FRW
All 0898§tFiBR 8FM illd NO & 8 FRIRIFRBRI 8f :9 f88t RBR918:
It i§ IN 98418001 F8908R§ikllit~ t8 8R§8F8 III@ OF818R 891109 t8 111 84; §W68R9 F698FR1 §8R91F99:
NEW HOPE COMMUNITY CHURCH MODULAR UNITSSPX-13-075
§tI4 9FIM 8 F8§81 WR 8ng 90119 it 18F W I8 w k~ Eif~ ARFn8~;§tIff WFit8i 918 084 ! RE 1 89IRI INS §08EI8I 10011 8 n MI LA N ENISFI8, I`lRbli8ng E8nE18910, FORIM989 €8RA18P 8f PRO; Ing F8E8mm8R018n18 888F84 8F OR§Ilff i~1i8~818§ 88 11E 1;8RFI R § MA PS P MUR Ing iffin~ ~~v1§8~ ~8~rg(HA8J, 8ng Eh Mm1§§18n , E8mm1§ 18n,At 1884 Mon gm 8F18F 18 INS N81Hni n811E8 8f ME WOW '19 881 AS9 inINS 18FAI RSM02O8F; Ing R811ES 19 m8118918111 ORM 8 8r88ER wOIR
1,H8 f881 Elf INS §8OR 8 OIR k88RAR"'HAR A88FIRI 1§ N819 8ng IM 888F9 m2k8§ I FORIFRER92 BR t8 MEE s mAHI ;E8mm19918n N88F1Rj li N819 Ing 8 98E1918n ii m298 18 WON OWN 8FwwitkHt 09M8RO; 8F 98R:if E8 mmi §i18n I8 FUR I M948F §4 Ing 68v818RM F18R (Mi ERR k89AR11118918 INS E4 f8F FBIN Ing 800F801; 8ngME INS MA§ 19 IRF8vO, k8ilgini 08F09 ERR k8 !M89 f8F 018F8m8RI 8fINS m89812F URP:
NEW HOPE COMMUNITY CHURCH MODULAR UNITSSPX-13-075
PROJECT DESCRIPTION: NEW HOPE COMMUNITY CHURCH MODULAR UNITS
R A EP~INIOII R[00 1710 M@Nf§
WiR g gigki: I if Wil4Rigki kgvl w
1. i A BM: Janua 30, 20142. KEE8 MENBEB A MN:
® Meets Requirements ^ Meets Requirements with Conditions
^ Resubmittal Required ^ Does Not Meet Requirements
^ No Objection ^ Please call to schedule a meeting withReview before Resubmitting
~19~rl:i~~ll:i,~lr!'!'7~:13!1!13-~y~!rts!l'7!I!1:13•~~yGl~~!1"IIy\\~.\~l~l.l\'11~~~_\~.~~~~~l A~~~~-1 ~~~_\~I •I.~~>•~~~1.~.1~
The data in the CAD drawings must have coordinates in at least 4 corners of the petitionarea. The Coordinate system must be: A Projected Coordinate System, State Plane,NAD 1983 StatePlane Florida West FIPS 0902 (US Feet).
NEW HOPE COMMUNITY CHURCH MODULAR UNITSSPX-13-075
SOUTH BISCAYNE DRIVE
PHASE 1 PROJECT AREA
STAFF NOTE: EXACT
POCPown ro• of
Sl6.EC7 /M4CFI.
I1111IIIIII t.11 1
~y$ e
'I tl~&kt %II
11 111flIfII IJI1111
3 LOCATION OF MODULAR
j UNITS WILL BE DETERMINED j
{ DURING MAS PROCESS
iJ`----------
t----------- ----J
L----------!
!
!
ylR~r,7
v o
I- t- I.---- - ----------JIB
---------- --- awo_----._J
u pa _ ~ S o075'%" W %J 13' (0.40)
sum • ~ ~aa'a I
FLDRID,~-ENDINEERf4iG
SURVEYING LLC
DI AINAGE RIGHT-OF-NAY
omEN EwaNEEa
ZMCA L HEW. P E
"WA 10 AlWN N0;
75
1}%%I '0 f' \'NSW HgP4,,0p,M lUN1TY
CHURCH
-IILRIIhPUIIT.'-ftd11M1-'AtOEBFyIdB~00..'
I
lY1L•f~ 1 IILC YLtilr
NO REIASIONS DATE