Karnataka’s Energy Mix: Computational
Model for Energy Planning
Final Report
Submitted by: Center for Study of Science, Technology and Policy (CSTEP)
For the Energy Department,
Funded by the Planning Department, Government of Karnataka
August, 2018
Center for Study of Science, Technology and Policy (CSTEP) is a private, not-for-profit (Section 25) Research
Corporation registered in 2005.
Designing and Editing by CSTEP
Disclaimer
While every effort has been made for the correctness of data/information used in this report, neither the authors
nor CSTEP accepts any legal liability for the accuracy or inferences for the material contained in this report and
for any consequences arising from the use of this material.
© 2018 Center for Study of Science, Technology and Policy (CSTEP)
For private circulation only.
August, 2018
Center for Study of Science, Technology and Policy
#18, 10th Cross, Mayura Street,
Papanna Layout, Nagashettyhalli, RMV II Stage,
Bangalore-560094 Karnataka, INDIA
Tel.: +91 (80) 6690-2500
Fax: +91 (80) 2351-4269
Email: [email protected]
Website: www.cstep.in
Acknowledgements
The authors would like to express their gratitude to Shri Ravikumar P., Additional Chief
Secretary, Government of Karnataka for his continued support and encouragement for
conducting this study. We are grateful to Shri Govindaraju K., Additional Director, Technical
Monitoring, Energy Department, Government of Karnataka for his overall support and
coordination of the project. The financial support of the Government of Karnataka for this
study is gratefully acknowledged.
The support and data provided by Karnataka Power Transmission Corporation Limited
(KPTCL), State Load Dispatch Centre (SLDC), Karnataka Renewable Energy Development
Limited (KREDL) and Power Corporation of Karnataka Limited (PCKL) were critical for the
success of the study. In particular, we would like to thank Shri K.V. Shivakumar, Director
(Transmission), Shri Raghavendra, Superintending Engineer (Elec.), Shri
Hanumantharayappa, Chief Engineer (Electy.) and Smt. Gayathri H. B., Ex-Superintending
Engineer (Elec.) from KPTCL for their invaluable support for executing the project. We would
also like to thank Shri Chetan D., Executive Engineer (Elec.); Smt. Divya Prabha H., Assistant
Executive Engineer; and Smt. Meetha C. Jadav, Assistant Engineer from KPTCL for their
continuous guidance and prompt clarifications during the project.
We would like to thank Shri Manjunath M. T., Chief Engineer (Electy.) of SLDC for his kind
support in executing the project. This project would not have been possible without the active
cooperation of Shri Chandrashekar, Executive Engineer (Elec.) and Shri Madhu B. P., Assistant
Executive Engineer from SLDC. We also acknowledge the data provided by Shri T. Maruti
(Assistant General Manager, KREDL), Shri A. Selvaraj (Assistant General Manager, KREDL),
Shri Bharatheesh Rao (Joint Director – Projects, PCKL) and Shri Pradeep (Assistant Director
– Projects, PCKL) without which this project could not have proceeded.
The report benefitted from inputs provided at various stages by colleagues at CSTEP. We are
grateful to Dr Anshu Bharadwaj, Executive Director for his continued support and
encouragement. We sincerely thank Mr Sumanth Shankar Rao, Advisor and Dr S. S. Krishnan,
Advisor, for sharing their valuable technical feedback and insights during the course of the
study. We are immensely thankful to Dr Jai Asundi, Research Coordinator, and Dr Gaurav
Kapoor, Principal Research Scientist. We also thank Merlin Francis, Devaditya Bhattacharya,
Abhinav Misra and Aswathy Shivaji for providing editorial support and graphics inputs.
Executive Summary
The Government of India has ambitious targets of achieving 175 GW of renewable energy by
2022. Karnataka had a renewable capacity share of around 35% out of 20 GW of the installed
generation capacity mix, as of March 2017. This is further expected to increase as the state
(KREDL) aims to have 6.86 GW of solar and 4.9 GW of wind generation capacity by FY19.
Increasing our renewable generation capacity is necessary, considering various policy targets
driven India’s Nationally Determined Contributions. However, the intermittent nature of solar
and wind raises fundamental technical challenges for the power system. Thus, careful planning
of the transmission network is critical for efficiently enabling high level of renewable energy
penetration.
This study looks into the impact of planned renewable energy addition, up to FY 2018-19, on
the Karnataka grid. Detailed power flow analyses were conducted for each of the financial
years 2017-18 and 2018-19. The analyses were conducted for six different scenarios, for these
two years, in order to capture the variation in solar and wind generation, and the state’s total
demand. Solar generation plants are predominantly concentrated in Tumakuru, Chitradurga,
Bidar, Ballari, and Raichur districts, while wind generation plants are concentrated in
Vijayapura, Gadag, Chitradurga, Davanagere and Belagavi.
The study also looked into the effect that taluk-level limits on RE capacity had on the grid.
Such limits for solar (200 MW) are already in place, while they are still being planned for wind
(100 MW) and solar-wind hybrids (100 MW). For the purposes of this study, a total of 15 taluks
were selected, five each for solar, wind and solar-wind hybrid capacity, to test the effect of
these limits.
Key takeaways from this study include:
The additions projected for FY 2018-19 are likely to overload 18 transmission lines and
3 substations. In order to avoid this, network strengthening is recommended. Setting up
of a new transmission line from Bidadi to Vrushabhavati substation, strengthening of
NRS – Peenya corridor and upgradation of Dambal substation are some measures that
can be taken towards network augmentation.
It was found that in two out of five selected taluks, increasing solar capacity to 200 MW
resulted in network overloading. In contrast, all the selected taluks were able to
successfully integrate 100 MW of wind. Increasing solar-wind hybrid plant capacity to
100 MW per taluk also did not cause network overloading in any of the chosen taluks.
A detailed analysis is required to arrive at technically feasible limits on renewable
capacity addition at the taluk-level.
An illustrative investment analysis was conducted based on a comprehensive
assessment of the different scenario results. The study suggests upgradation of a total
of 21 network elements at a cost of around INR 645 crore.
A Geographical Information System (GIS) enabled, web-based energy planning
platform has been developed to visualise power flow scenarios. The visualisation
platform allows users to better understand the impact of high renewable energy capacity
deployment in Karnataka.
A thorough network analysis in Bangalore Metropolitan Area Network (BMAN) area
should be undertaken in order to plan network strengthening for future load growth.
Abbreviations and Acronyms
Abbreviation Expansion
AC Alternating Current
API Application Programming Interface
BMAN Bangalore Metropolitan Area Network
CEA Central Electricity Authority
CGS Central Generating Station
CAGR Compounded Annual Growth Rate
D/C Double Circuit
DPR Detailed Project Report
EPP Energy Planning Platform
ESCOM Electricity Supply Company
ETAP Electrical Transient Analyser Program
FY Financial Year
GIS Geographical Information System
GoK Government of Karnataka
GT Generator Transformer
GW Gigawatt
HVDC High Voltage Direct Current
ICT Interconnecting Transformer
JNNSM Jawaharlal Nehru National Solar Mission
KEA Karnataka Evaluation Authority
KERC Karnataka Electricity Regulatory Commission
KPCL Karnataka Power Corporation Limited
KPTCL Karnataka Power Transmission Corporation Limited
KREDL Karnataka Renewable Energy Development Limited
kV kilo Volt
kVA kilo Volt Ampere
LGBR Load Generation Balance Report
LILO Loop In Loop Out
LDPH Linganamakki Dam Power House
MGHE Mahatma Gandhi Hydro-Electric station
MW Megawatt
MVA Mega Volt Ampere
NCEP Non-Conventional Energy Plants
PCKL Power Corporation of Karnataka Limited
PGCIL Power Grid Corporation of India
PHES Pumped Hydro-Electric Storage
PPA Power Purchase Agreement
PV Photovoltaic
RE Renewable Energy
RPO Renewable Purchase Obligation
S/C Single Circuit
SCADA Supervisory Control and Data Acquisition
SLDC State Load Dispatch Centre
SRLDC Southern Regional Load Dispatch Centre
var Volt-Ampere reactive
XLPE Cross-linked Polyethylene
Contents
1. Introduction ......................................................................................................................................................... 1
2. Log Frame/Theory of Change/Programme Theory ............................................................................ 2
3. Progress Review ................................................................................................................................................. 4
4. Problem Statement ............................................................................................................................................ 9
5. Scope, Objectives and Evaluation Questions .......................................................................................... 9
6. Evaluation Design ........................................................................................................................................... 11
7. Evaluation Methodology .............................................................................................................................. 13
8. Data Collection and Analysis ...................................................................................................................... 19
9. Findings and Discussion ............................................................................................................................... 27
10. Recommendations ..................................................................................................................................... 43
11. Reflection and Conclusion ...................................................................................................................... 49
12. References ..................................................................................................................................................... 50
Annexure I – Existing Network ........................................................................................................................... 53
Annexure II – Base Case Network Validation with SCADA Flows ...................................................... 173
Annexure III – Proposed Network ................................................................................................................... 181
Annexure IV – CGS Share Allocation and Transmission System Asset Cost Data ........................ 218
List of Figures
Figure 1: Karnataka's fuel-wise installed capacity (MW) ................................................................................ 4
Figure 2 : RE growth in the state from FY12 to FY17 ........................................................................................ 7
Figure 3: Source-wise RE Installed Capacity Mix in FY17 (MW) .................................................................. 8
Figure 4: KPTCL transmission loss (%) from FY12 to FY17 (Source: Data obtained from KERC
Tariff Orders) ..................................................................................................................................................................... 9
Figure 5: Karnataka transmission map (Source: CSTEP Analysis, data from KPTCL) ...................... 10
Figure 6: Evaluation Methodology ......................................................................................................................... 13
Figure 7: RE plants in Karnataka as on March 31, 2018 ............................................................................... 23
Figure 8: Snapshot of ETAP model of Karnataka network in 2017-18 ................................................... 24
Figure 9: Power flow in Shantigrama 400kV substation .............................................................................. 27
Figure 10: ETAP One-line view of overloaded line .......................................................................................... 33
Figure 11: CSTEP Karnataka EPP – Visualisation of generation units..................................................... 37
Figure 12: CSTEP Karnataka EPP – Static network elements ..................................................................... 38
Figure 13: CSTEP Karnataka EPP – Scenario analysis .................................................................................... 38
List of Tables
Table 1: Log Frame .......................................................................................................................................................... 3
Table 2: Voltage bus limits ......................................................................................................................................... 12
Table 3: Data Matrix ..................................................................................................................................................... 20
Table 4: Scenario dates chosen ................................................................................................................................ 25
Table 5: KPTCL load generation balance report (May 5, 2017, 10:09AM) ............................................ 26
Table 6: Load generation balance for FY 2017-18 (MW) .............................................................................. 28
Table 7: Power flow study results for FY 2017-18 .......................................................................................... 31
Table 8: Load generation balance for FY 2018-19 (MW) .............................................................................. 34
Table 9: Power flow study results for FY 2018-19 .......................................................................................... 36
Table 10: Taluk-wise solar limit feasibility ........................................................................................................ 40
Table 11: Taluk-wise wind limit feasibility ........................................................................................................ 41
Table 12: Taluk-wise solar-wind hybrid limit feasibility .............................................................................. 42
Table 13: Network elements to be strengthened ............................................................................................. 45
Table 14: Illustrative cost analysis: Upgrading transmission lines for 2018-19 ................................ 48
Table 15: Illustrative cost analysis: Upgrading substations for 2018-19 .............................................. 48
Table 16: Details of conventional generations as on March 31, 2017 ..................................................... 53
Table 17: Details of solar generation as on March 31, 2017 ....................................................................... 55
Table 18: Details of wind generation as on March 31, 2017 ....................................................................... 61
Table 19: Details of KPTCL substation as on March 31, 2017................................................................... 107
Table 20: Details of transmission lines in Karnataka as on March 31, 2017 ...................................... 139
Table 21: Details of installed reactors in KPTCL grid as on March 31, 2017 ...................................... 171
Table 22: Transmission line parameters considered in this study ......................................................... 172
Table 23: ETAP Transmission line power flow comparison with SCADA snapshot ........................ 173
Table 24: ETAP bus voltage comparison with SCADA snapshot .............................................................. 180
Table 25: Details of proposed conventional generations for FY 18 and FY 19 .................................. 181
Table 26: Details of proposed solar generations for FY 18 and FY 19 .................................................. 182
Table 27: Details of proposed wind generations for FY 18 and FY 19 .................................................. 194
Table 28: Details of proposed mini hydro generations for FY 18 and FY 19 ...................................... 195
Table 29: Details of proposed Co-generations for FY 18 and FY 19 ....................................................... 199
Table 30: Details of proposed biomass generations for FY 18 and FY 19 ............................................ 203
Table 31: Details of proposed KPTCL substations for FY 18 ..................................................................... 205
Table 32: Details of proposed KPTCL substations for FY 19 ..................................................................... 207
Table 33: Details of proposed KPTCL transmission lines for FY 18 ....................................................... 209
Table 34: Details of proposed KPTCL transmission lines for FY 19 ....................................................... 211
Table 35: Details of proposed KPTCL transformer augmentations for FY 18 and FY 19 .............. 213
Table 36: Details of proposed PGCIL substation for FY 18 ........................................................................ 216
Table 37: Details of proposed PGCIL transmission lines for FY 18 ........................................................ 216
Table 38: Details of proposed PGCIL substation for FY 19 ........................................................................ 217
Table 39: Details of proposed PGCIL transmission lines for FY 19 ........................................................ 217
Table 40: Details of proposed reactors in KPTCL grid for FY 18 and FY 19 ....................................... 218
Table 41: Details of CGS share allocation for Karnataka ............................................................................. 218
Table 42: Transmission system asset cost data considered in this study............................................ 219
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 1
1. Introduction
Renewable Energy (RE) is a crucial component of the future energy mix, as a pathway for
energy access and energy security. The Government of India has announced an ambitious target
of 175 GW of RE by 2022. The targets announced include 100 GW of solar and 60 GW of
wind.
RE sources will contribute significantly to Karnataka’s energy mix. As of March 2017,
Karnataka’s installed capacity mix consisted of the following components: thermal (8,680
MW), hydro (3,629 MW), nuclear (880 MW) and renewable (7,278 MW) (Central Electricity
Authority, 2017). RE generators thus constitute nearly 35% of the installed capacity mix today.
In addition, the state plans to bring the solar installed capacity to 6.86 GW and wind installed
capacity to 4.9 GW by the end of FY 2019.
While rising penetration levels of RE is necessary, the intermittent nature of RE means that
grid integration is a crucial challenge for the state. High level of RE penetration requires careful
planning.
In this context, the Center for Study of Science, Technology and Policy (CSTEP) has
undertaken this study to analyse the transmission network’s ability to absorb RE at the end of
FY 2019, through power systems power flow studies.
Since RE resources are geographically dispersed, mapping of RE sites and analysis of
availability of evacuation transmission infrastructure is crucial towards integrating RE into the
grid. The core objective of this study is to develop a Geographical Information System (GIS)
enabled, web-based computational model, which can assist the state in planning for a high RE
transition. Such an analysis will help policy makers make informed decisions with regard to
planning of transmission infrastructure.
Key state agencies involved in planning, managing and operating the transmission
infrastructure are: the Karnataka Power Transmission Corporation Limited (KPTCL), State
Load Despatch Centre (SLDC), Karnataka Renewable Energy Development Limited (KREDL)
and Power Corporation of Karnataka Limited (PCKL).
1.1. KPTCL
KPTCL, incorporated in 1999, is a state owned company, responsible for supplying power to
the Electricity Supply Companies (ESCOMs) in Karnataka and to the consumers directly
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 2
connected to the KPTCL power transmission grid. It looks after the construction and
maintenance of substations and transmission lines at 400/220/110/66kV voltage level.
1.2. Karnataka SLDC
Karnataka’s SLDC is the nodal agency for grid management under KPTCL. The SLDC is
responsible for load dispatch functions at day-ahead and real-time, in addition to operation and
maintenance of the Supervisory Control and Data Acquisition (SCADA) system.
1.3. KREDL
KREDL was established in 1996 to promote non-conventional energy sources and initiate all
necessary actions for energy conservation in the state. The company advises the Government
of Karnataka (GoK) on policies for harnessing RE sources to ensure a systematic and balanced
approach.
1.4. KPCL
KPCL is a state-run company, incorporated in 1970, involved in power generation for
Karnataka. It builds, operates, and maintains generating capacity including thermal, hydro-
electric, solar and wind generators.
1.5. PCKL
PCKL was set up by GoK in August 2007 as a special purpose vehicle, to supplement the
efforts of KPCL in capacity addition and long-term procurement of power for ESCOMs. PCKL
also facilitates short-term power purchase from energy exchanges and bilateral transactions for
ESCOMs.
2. Log Frame/Theory of Change/Programme Theory
As the power output from RE sources is variable in nature, a robust transmission grid
infrastructure is required to ensure secure and reliable supply of electricity. Therefore, it is
crucial to analyse the implication of adding RE technologies to the network. Table 1 provides
a log-frame detailing the scope, outcomes, baselines and stakeholders of the project activities.
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 3
Table 1: Log Frame
Purpose Scope Objective Expected Outcome Base line Stakeholders
GIS Mapping To aid in better
visualisation of
existing and
upcoming RE plants,
along with evacuation
infrastructure
Karnataka State Mapping of existing
and planned solar and
wind capacities, along
with the substation
connectivity
Digitised and
updatable data in the
form of GIS map for
RE plants, along with
evacuation
infrastructure in
Karnataka
Latitude and
Longitude of
available datasets
for existing solar
and wind plants and
substations
KREDL
Power Flow
Studies
To analyse the
capability of network
infrastructure to
handle generation and
demand (factoring
expansion plans until
FY 2019)
Transmission
network: 110 kV and
above
Identification of
transmission network
constraints in lieu of RE
additions
Synchronised
planning transmission
infrastructure and RE
additions. Framework
for assessing
transmission
expansion plans.
Network mapping of
110 kV for
Karnataka
KPTCL
Integrated planning
framework
To provide a
visualisation platform
that can be used for
planning RE
deployment/expansion
Karnataka State Develop GIS-enabled
web-based
computational model to
assist the state in
planning for a high RE
transition
Enable visualisation
of various scenarios
of interest for the
energy planning
department. The
integrated platform
developed for
Karnataka can be
replicated for other
states
CSTEP developed
modules for an
Integrated Resource
Planning (IRP)
framework for
Karnataka, which
provides analysis of
potential RE sites in
the state along with
multi-criteria
analysis for siting
and zoning.
KPTCL, Energy and
Planning Departments
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 4
3. Progress Review
Karnataka is ranked third, after Tamil Nadu and Maharashtra, in terms of RE with installed
capacity of 7.3 GW as of March 2017. Renewable sources contributed to around 35% of the
state’s installed capacity as of March 2017 (Figure 1). This compares with Tamil Nadu, the
top-ranking RE-rich state, with an RE capacity of 10.6 GW, followed by Andhra Pradesh, with
a capacity of 6.2 GW, and Telangana with 1.5 GW (Central Electricity Authority, 2017).
Figure 1: Karnataka's fuel-wise installed capacity (MW)
To promote growth of RE, the GoK introduced various policies and initiatives.
3.1. Karnataka’s RE Policies
Karnataka’s Renewable Energy Policy 2009-14 (Government of Karnataka, 2010), was
launched in 2010, for systematic and faster development of RE sources in the state. The state
aimed to achieve RE capacity of 6.6 GW by 2014, by adding 1 GW each year. Considering
Karnataka’s high RE potential (estimated to be 24.7 GW (Government of Karnataka, 2014)),
the government wanted to make Karnataka the leading RE state in the country. In view of this,
the government issued the new RE policy (2016-2022). This policy covers wind, solar-wind
hybrid, small hydro, biomass, cogeneration, tidal energy and waste-to-energy technology.
Some key objectives of the new policy are listed below (Government of Karnataka, 2017):
Achieve a minimum capacity addition of 4 GW by 2022 in a phased manner.
Promote new programmes for development of RE such as:
o Re-powering of old wind power plants
o Introducing hybrid RE projects with a combination of wind and solar
8,680
3,629880
7,278
Thermal Hydro Nuclear Renewable
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 5
o Encouraging farmers to set up wind power projects on their land
o Introducing gross metering for various categories of consumers.
Set up pumped storage based hydro plants for grid management considering huge
penetration of RE into the grid.
Set up a dedicated “Project Monitoring Cell” enabling improved project planning,
coordination and monitoring.
Establish a “Renewable Energy Center of Excellence and Incubation Center” at the state
level for promoting innovation in technology, skill development and research and
development.
3.2. Karnataka Solar Policies
Karnataka government decided to implement a dedicated ‘Karnataka Solar Policy 2011-16’ for
the development of solar projects (both solar thermal and solar photovoltaic) in the state,
including captive and bundled plants(Government of Karnataka, 2011). This was in line with
the Government of India’s Jawaharlal Nehru National Solar Mission (JNNSM), which targeted
an increase in solar energy consumption from 0.25% in 2011 to 3% of the total energy
consumption, by 2022 (Press Information Bureau, Government of India, 2011).
The policy targeted all forms of solar deployment: rooftop Photovoltaic (PV) systems, off-grid
systems, solar farms and large solar parks1. However, by FY14, only 31 MW of solar grid
connected capacity was installed in the state, as opposed to a 120 MW target by FY 2013-14
(“Details of Year wise Commissioned Projects of Renewable Category in MW,” 2018).
In light of the technological developments and pursuant to achieve 3% solar generation of the
total energy consumption, GoK reviewed the earlier Karnataka Solar Policy 2011-16 and issued
a new Karnataka Solar Policy 2014-21, in May 2014. The new policy aims for 6 GW of solar
generation projects by 2021, out of which 2.4 GW would be grid connected rooftop solar
generation projects. Further, the policy aimed for addition of 400 MW of rooftop solar capacity
every year, from 2014-2018. In an effort to achieve these targets, the Karnataka Electricity
Regulatory Commission (KERC) exempted RE projects from wheeling and banking charges
for the first 10 years of operation. Meanwhile, in line with National Tariff Policy amendment
in 2016, Karnataka aims for solar energy generation to contribute to 8% of consumed energy,
excluding hydropower (Press Information Bureau, Government of India, 2016) in 2022.
1 Solar parks utilise uneven wastelands with common facilities like watch and ward to encourage developers to
deploy solar generation on a plug-and-play model.
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 6
3.3. Taluk-wise Limits
The Solar Policy 2014-21 (as amended on Jan 12, 2017) mandates that the total grid-connected
solar generation under all schemes would be subject to a 200 MW per taluk limit. This limit
excludes rooftop solar generators, as well as canal-top solar plants and grid-connected projects
that hybridise solar with other RE generators. It is thus applicable to all utility-scale solar farms,
captive solar generation, bundled power generation by conventional generators and off-grid
solar distributed generation.
3.4. Renewable Purchase Obligation in Karnataka
Renewable Purchase Obligation (RPO) is a means to ensure that distribution companies, open
access consumers and captive power producers purchase a minimum quantity of their energy
consumption from RE sources. KERC issued the “Procurement of Power from Renewable
Sources” regulation in March 2011. As per this regulation, all the distribution companies, in
Karnataka as well as captive and open access consumers in the state had to source a certain
portion of their energy consumption from RE.
The regulation has undergone various amendments. The latest (fifth) amendment (Karnataka
Electricity Regulatory Commission, 2011) which was made on Feb 20, 2018, increased the
solar RPO targets for the state from 1.75% to 6% in 2018-19. The non-solar RPO currently
ranges from 7% to 13% for different ESCOMs.
3.5. Karnataka’s RE Trend
Over a period of 6 years i.e., from FY 2011-12 to 2016-17, the RE capacity in Karnataka has
seen significant growth with a Compound Annual Growth Rate (CAGR) of 15%. This steep
increase in RE addition was due to the creation of the Solar Policy in 2011. The growth in
installation of solar generation capacity was around 162%, the highest among all renewables,
during the same period. Out of the RE installed capacity of 7278 MW in FY 2016-17, wind
energy contributes the most (52%), followed by co-generation (19%), solar (15%), small hydro
(12%) and biomass (2%).
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 7
Figure 2 depicts the growth in RE in the state from FY 2011-12 to FY 2016-17 (“Details of
Year wise Commissioned Projects of Renewable Category in MW,” 2018). Figure 3 illustrates
the source-wise break-up of renewable capacities in the state as of FY 2016-17.
Figure 2 : RE growth in the state from FY12 to FY17
0
1
2
3
4
5
6
7
8
FY12 FY13 FY14 FY15 FY16 FY17
Inst
alle
d c
apac
ity
(G
W)
Financial Year
WIND SOLAR SMALL HYDRO BIOMASS CO-GENERATION
0
1
2
3
4
5
6
7
8
FY12 FY13 FY14 FY15 FY16 FY17
Inst
alle
d c
apac
ity
(G
W)
Financial Year
WIND SOLAR SMALL HYDRO BIOMASS CO-GENERATION
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 8
Figure 3: Source-wise RE Installed Capacity Mix in FY17 (MW)
3.6. Karnataka’s Transmission Growth
KPTCL’s network was upgraded to 220 kV with the commission of the first 220 kV line of
361km between Sharavathi – Shimoga – Peenya in 1965. The first inter-state 220 kV line of
162 km was commissioned in 1965 between Peenya and Singarpet (Government of India &
Government of Karnataka, 2016).
At the end of FY 2011-12, KPTCL owned around 30,539 circuit kilometres (ckms) of
transmission lines, 46,273 MVA of transformation capacity and 966 substations at different
voltage levels in the state (Karnataka Electricity Regulatory Commission, 2013); its
transmission loss was around 3.91% (Karnataka Electricity Regulatory Commission, 2013).
Over the next 6 years, KPTCL’s transmission line capacity grew at a CAGR of 2.83%
(Karnataka Power Transmission Corporation Limited, 2017), and is now around 35,119 ckms
(Karnataka Electricity Regulatory Commission, 2018). Similarly, the number of substations
under KPTCL increased to 1,127 (Karnataka Power Transmission Corporation Limited, 2017)
at different voltage levels, with CAGR of 3.13% (Karnataka Electricity Regulatory
Commission, 2013). As a result of periodic capacity addition over the last six years,
Karnataka’s transmission loss reduced to 3.28% in FY 2016-17.
Figure 4 illustrates the reduction in KPTCL’s transmission losses from FY 2011-12 to 2016-
17.
3,799
1,116
843
134
1,386
WIND SOLAR SMALL HYDRO BIOMASS CO-GENERATION
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 9
Figure 4: KPTCL transmission loss (%) from FY12 to FY17 (Source: Data obtained from KERC Tariff Orders)
4. Problem Statement
Integration of high level of RE to the state’s transmission network
By FY2019, around 6.86 GW of solar and 4.9 GW of wind capacity is expected to be
commissioned in Karnataka. Since RE sources are intermittent and variable in nature,
absorbing electricity from RE generators at higher capacities, along with meeting rising
demand, is likely to cause network constraints. These network constraints can be in the form
of under-voltage, over-voltage and/or overloading of grid elements. Hence, power flow
analysis to assess the impact of high RE on the grid is imperative. The simulation of future
scenarios with varying high RE penetration levels and load conditions will aid in planning for
grid strengthening requirements and associated investments.
5. Scope, Objectives and Evaluation Questions
5.1. Scope
Reference Period: The main scope of the study is to examine the implication of existing and
planned RE capacity additions, for FY 2017-18 and FY 2018-19, by undertaking power flow
studies.
Geographical coverage: The study covers the entire state of Karnataka at 110 kV and above
level. A snapshot of KPTCL’s Karnataka transmission map as on March 31, 2018 is shown in
Figure 5.
3.913.81
3.88
3.66
3.53
3.28
3.1
3.3
3.5
3.7
3.9
4.1
4.3
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
Per
cen
tage
Financial Year
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 10
Figure 5: Karnataka transmission map (Source: CSTEP Analysis, data from KPTCL)
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 11
5.2. Objective
The core objective of this study is to develop a GIS enabled, web-based energy planning
platform which can assist the state in planning for high levels of RE integration. The study
assesses the level of planned RE capacities that can be absorbed by Karnataka’s transmission
grid.
5.3. Evaluation Question
This study primarily evaluates three questions:
1. How will planned addition of RE (up to FY 2019) along with conventional generation
sources, impact the transmission infrastructure?
2. How will taluk-wise RE addition schemes impact the transmission network?
3. What level of transmission infrastructure upgrades, if any, will be required and what are
the associated investments required?
CSTEP team conducted detailed power flow studies at voltage levels of 110 kV and above to
answer the above questions2. Key outputs of this study, based on specific scenarios and
assumptions, include:
Number of overloaded lines/substations
Network elements that need to be strengthened
Impact of taluk-level limits on RE capacity
Network strengthening costs
Integrated Energy Planning Platform
6. Evaluation Design
The planning, design and operation of power systems require calculations to analyse the
performance and study the effects of changes in network configuration, under various operating
conditions. The study is focused on performing power system simulation of Karnataka’s
transmission network in view of planned addition of RE capacity to the grid. The results of
power flow studies are then integrated into the visualisation and planning platform. The core
techniques used in this study are described below.
6.1. Data and Information Sources
The study begins with collection of system data at voltage levels of 110 kV and above, which
includes sub-stations, generation, transmission lines and load-related information. The primary
sources of information for conducting the studies were government departments including,
2 With support and feedback/inputs from KPTCL and SLDC officials
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 12
KPTCL, SLDC, PCKL, KREDL and the Southern Region Load Dispatch Centre (SRLDC),
and Central Electricity Authority (CEA). Table 3 provides details of data sources.
6.2. Research Methods
The primary research method used in this study is the power flow simulation. A power flow
simulation determines the state of the power system with respect to a given load and generation
schedule. The objective is to obtain the voltage magnitude and phase-angle at each bus3, along
with power flow in each line, given the demand and generation level at each bus. It is a common
computational procedure used in power system analysis. These power flow (also called load
flow) solutions are obtained using computer programs designed specifically for this purpose.
Computer programs to solve power flows are divided into two types: planning (offline) and
operational (real-time). Most power flow studies for system analysis are based on offline
network models. Operational power flows (real-time) that incorporate data input from the
actual networks are typically used by utilities in SCADA systems. In this study, steady-state
offline power flow analyses are performed using a commercial software package – Electrical
Transient Analyser Program (ETAP).
6.3. Evaluation Criteria
The impact of addition of RE, as well as demand variations in the grid have been assessed using
power flow studies. The indicators that were used to evaluate the results of the analysis were:
number of overloaded lines/substations, number of lines that need to be strengthened and
voltage profile of buses. Bus voltages have both upper and lower limits, while branches have
upper flow limits. Branch flows are conventionally expressed as percentages of their rated
capacity (maximum transfer); thus, 100% is the upper limit for flows in branches. Voltage
limits for buses depend upon the specific type of bus. The relevant bus limits are given in Table
2 (Central Electricity Authority, 2013).
Table 2: Voltage bus limits
Nominal voltage (kV) Min Voltage (kV) Max Voltage (kV)
400 380 420
230 202 240
220 202 240
110 101 120
3 In a power system, a bus is a component that acts as an interconnection point to which electrical elements like
generators, transformers, loads and transmission lines are connected.
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 13
7. Evaluation Methodology
The main scope of the analysis is to undertake power flow studies for examining the implication
of existing and planned RE capacity additions, for years FY 2017-18 and FY 2018-19. A
systematic methodology was worked out to achieve the expected results (Figure 6).
Figure 6: Evaluation Methodology
A detailed explanation of the components is provided below.
7.1. Data
The following datasets were sought from the relevant agencies (Table 3):
1. Existing and proposed: Transmission line, substation, generation (thermal, hydro and
nuclear), bus/line reactor4 details up to 2018-19
2. Existing and proposed: RE generator details (solar, wind, biomass, co-generation and
small hydro) up to 2018-19
3. Grid connectivity details of RE plants
4. SCADA snapshots for network validation
5. Power purchase data up to 2018-19
6. GIS locations of existing substations, and generators (both conventional and RE).
4 Reactors are inductive elements used in Alternating Current (AC) grids for voltage control.
Base case
GenerationTransmission networkSCADA snapshots
Expansion plans
Scenarios
Generation • RE • Conventional Transmission network
Power Flow Analysis (ETAP)
Projected demand
Validated base case
Year-wise expansion plans
Visualisationplatform
Branch flowsBus voltages
Network constraints+
Investments required
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 14
7.2. Network Modelling
In this study, network was considered at 110 kV and higher voltage level. 110 kV substations
along with associated transformers were considered (including 110/33 kV, 110/11 kV,
220/110/66 kV substations). The loads and generations at 66 kV substations were lumped at
the nearest upstream higher voltage substations (110 kV and 220 kV). Details about
transmission network were gathered from KPTCL, SLDC and SRLDC (Annexure I).
7.3. Base Case
The next step was consolidation of power system data file, analysing the data and validating it
with the SCADA snapshots provided by SLDC. The network details for the benchmark year
(2016-17) were acquired from the state transmission utility. This included network
connectivity, details of the transmissions lines, connecting substations, locations of generating
stations and load centres. KPTCL’s existing transmission network (up to 110 kV) was modelled
in ETAP. The SCADA snapshot was obtained from the SLDC to validate and match the flows
of the network for a particular instant. This was used to validate the base case network. Upon
finalising the base case, power flow analysis was carried out for FY 2017-18 and FY 2018-19.
Different scenarios were considered to capture the variation in RE generation and system
demand and their effect on the transmission network.
7.4. Demand Estimation
The demand data corresponding to the instants at which the state peak and off-peak load
occurred were captured from the state’s hourly demand data for years 2011 through 2017.
Using linear regression, demand for all scenarios were forecast for FY 2017-18 and FY 2018-
19. The aggregate demand forecast for the state was then apportioned at the substation level
assuming the same ratio as observed in the validation SCADA snapshot.
7.5. Expansion Plans
The FY 2017-18 and FY 2018-19 transmission and generation expansion plans were collected
from KPTCL, PCKL, KREDL and CEA. These plans were collated into uniform datasets,
which were then modelled in ETAP as generators, transformers and transmission lines.
7.6. Interstate Generation
The entire Indian grid is an interconnected network that encompasses all state networks,
regardless of operational control and ownership. At the same time, Karnataka, like most states,
has substantial generation capacity under its own ownership and operation. The Central
Generating Stations (CGS) have a fixed quota of their generating capacity assigned to the state
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 15
in which they are physically located and to some nearby states as well. These stations are
normally run at full capacity. Karnataka hosts two CGS: Kaiga Atomic Power Station and
Kudgi Super Thermal Power Station. Karnataka is also assigned a share from multiple CGS
stations in Tamil Nadu, Andhra Pradesh and Odisha. These details along with capacity shares
assigned are listed out in the Annexure IV5.
7.7. Scenario Cases
The study considered six scenarios in order to cover various grid conditions at different times
of the year, when varying load and peak/off-peak solar and wind generation have a significant
impact. The cases were analysed to check the strength of the upstream transmission lines and
transformers. The purpose of undertaking this analysis was to indicate if the transmission assets
are stressed or under-utilised, while respecting the system operation limits (voltage magnitude,
transmission line limits). The following scenarios were analysed for FY 2017-18 and FY 2018-
19.
Scenario 1: State peak load condition
Scenario 1(a): State off-peak load condition
Scenario 2: Peak solar generation
Scenario 2(a): Off-peak solar generation
Scenario 3: Peak wind generation
Scenario 3(a): Off-peak wind generation
Following the base case validation, the impact of these scenarios on the transmission network
was assessed.
7.8. Applicability of Pumped Hydro Storage
There are many methods to store energy in a power system, of which pumped hydro storage
forms the vast majority (>99%) the world over (Bianchi et al., 2015). Karnataka currently does
not have any pumped hydro plants in operation. CEA regularly surveys and assesses potential
pumped hydro sites. In the 1987 reassessment of pumped hydro sites, there were 4 potential
project sites identified in Karnataka: Kollur, Minhole, Sitanadi and Hulagi. However, all the
four plans were later scrapped as the sites are situated in the ecologically sensitive Western
5 Data obtained from PCKL
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 16
Ghats and were not granted permissions on environmental grounds (Japan-India Cooperation
Agency, n.d.).
Other pumped hydro projects that have been proposed in Karnataka are:
Sharavathi: A pre-feasibility study for pumped hydro in Sharavathi valley was carried
out by WAPCOS Limited(Karnataka Power Corporation Limited, 2017). The largest
hydro generating station in the state is situated on the Sharavathi river. The Sharavathi
Generating Station (SGS) utilises water from the Talakalale reservoir. In 2017, a
prefeasibility study for setting up a pumped hydro station on the same river was carried
out by WAPCOS Limited (Karnataka Power Corporation Limited, 2017). The study
has since obtained environmental approval (“Activists up in arms as Sharavathi power
project gets green clearance,” 2017) and a Detailed Project Report (DPR) is under
preparation. The project proposes to set up a pumped hydro powerhouse of capacity 2
GW with reversible turbine-generator sets of 250 MW capacity each. The project
proposes to utilise the existing Talakalale reservoir as its upper reservoir, and
Gerusoppa reservoir (also existing) as the lower reservoir.
Kalinadi (Japan-India Cooperation Agency, n.d.): This proposal envisions using the
existing Kadra reservoir as the lower reservoir. A new upper reservoir is proposed to
be built on a nearby hilltop. The powerhouse is proposed to be of either 600 MW or
1,000 MW. The project is currently in the pre-feasibility evaluation stage.
Varahi (Japan-India Cooperation Agency, n.d.): This proposal envisions using the
existing Varahi pickup reservoir as the upper reservoir. A new lower reservoir is
proposed to be constructed downstream of the tailrace outlet of the existing Varahi
hydro-electric power plant. The powerhouse is currently proposed to be of capacity 700
MW, although 250 MW, 600 MW, and 1,000 MW are also options under consideration.
While a pre-feasibility report has been prepared and a DPR is under preparation, the
project site may be affected by some environmental issues.
Since none of the projects have a DPR, it is unlikely that any pumped hydro plants would be
coming up in the next five years. For this reason, this project does not consider any pumped
hydro generators in the power flow analysis.
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 17
7.9. Outputs
7.9.1. Strengthening required and associated cost
Based on the results of the power flow analyses, the study identified strengthening measures
such as addition of new transmission lines and augmentation or addition of substations. The
study also provided investment estimates for such proposed network elements.
7.9.2. Taluk-wise analysis
Taluk-level limits of 200 MW for solar, 100 MW for wind, and 100 MW of Hybrid RE (solar
+ wind) were imposed on all taluks by the Karnataka State Solar Policy 2014-2021 (amended
on 12th January 2017). The study looked into the impact of taluk-wise limits on the grid for
the selected taluks.6 From within solar and wind rich zones, five taluks each were selected for
solar limits, wind limits and hybrid limits7. These analyses were conducted for FY 2018-19.
For modelling the solar and wind limits, each taluk was individually considered and the
installed solar/wind capacity within that taluk increased to reach the upper limit. For modelling
Hybrid RE limits, an equal mix of solar and wind capacity was preferred unless existing
capacity was too high. This increase in capacity was not simultaneously considered for more
than 1 taluk at a time. The method followed is described below in detail.
1. Solar limit feasibility: The installed solar capacity within that taluk is increased to 200
MW. The state peak solar scenario conditions were considered for this simulation.
2. Wind limit feasibility: The installed wind capacity within that taluk is increased to 100
MW. The state peak wind scenario conditions were considered for this simulation.
3. Hybrid limit feasibility: Hybrid limit feasibility analysis involved subjecting the
selected taluks to limit levels of both solar and wind generation simultaneously. The
limit was checked in both state peak solar and peak wind conditions.
a. If each is less than 50 MW limit: Both were increased to 50 MW
b. If solar is more than 50 MW limit: Wind is increased so that total hybrid
capacity in the taluk is 100 MW
c. If wind is more than 50 MW limit: Solar is increased so that total hybrid capacity
in the taluk is 100 MW.
6 Wind and Hybrid limits were considered as per discussions with Energy department, GoK 7 Based on discussions with Energy department, GoK
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 18
7.9.3. Integrated Energy Planning Platform
CSTEP has developed a user-friendly, integrated Geospatial Information System (GIS) based
visualisation platform to view various scenarios of RE penetration. The GIS software system
can store, analyse and display geographical location information pertaining to conventional
plants, RE plants, transmission lines and substations.
In order to prepare the data for the Energy Planning Platform (EPP), each dataset was cleaned
and normalised; multiple publicly available data sources were referred to and the datasets were
given unique identifier serial codes for easier handling. All point elements such as substations
and generators were assigned locations.
The platform utilises two types of data; static data including network elements, grid
connectivity and generators (of all types); and scenario data including actual power generated
from different generators and service status of network elements. Each set of static data is
shared across all the scenarios for a given study year. Scenario data is generated separately for
each scenario as an output from the power flow analysis.
The following steps were followed for populating the planning platform:
Step 1: Databases were populated with static data (network elements and generating
stations) after being normalised
Step 2: Tables with geographical data (generating stations, substations and transmission
lines) were converted to shapefiles
Step 3: Shapefiles were plotted on the web platform with GIS software libraries
Step 4: Power flow reports were generated for individual scenarios
Step 5: Results from power flow reports were populated in the web platform
The EPP was developed using the (Model, View, Controller) MVC design pattern:
Model contains business logic and rules to manipulate data.
Controller handles the client requests, processes data from models and returns data to
the views for presentation on the user interface.
View contains the application's user interface acting as the application front end.
The backend of the platform was written in the Ruby language (version 2.2.2) using the Rails
framework (version 5.0.6) The EPP uses the Postgres database (version 9.0) along with the
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 19
PostGIS extension. The frontend of the platform uses AngularJS for the user interface and
OpenLayers (version 2) for GIS functionality.
8. Data Collection and Analysis
This study assesses the transmission network for FY 2017-18 and FY 2018-19, using FY 2016-
17 as a baseline year. Data was primarily obtained from KPTCL, KREDL and SLDC. Also,
published reports were referred to for expansion plans and planning parameters. Details of
sources referred to are given in Table 3.
Further, this section also covers assumptions pertaining to resource mapping, network
modelling, scenario selection, and base case analysis.
8.1. Data sources
Table 3 details the various datasets collected from different agencies.
Karnataka’s Energy Mix: Computational Model for Energy Planning
20 www.cstep.in © CSTEP
Table 3: Data Matrix
Category Data Type Data collection method Dataset
RE data Primary data Interaction with
KREDL officials
1. Existing solar plants (Capacity & Location)
2. Existing wind plants (Capacity & Location)
3. Proposed/Planned wind plants for 2017-18 & 2018-19 in Karnataka
4. Proposed/Planned solar plants for 2017-18 & 2018-19
5. Existing & Proposed co-generation plants
6. Existing & Proposed biomass plants
7. Existing & Proposed small hydro plants
Interaction with
KPTCL officials
1. Substation connectivity for existing solar plants (partial)
2. Substation connectivity for existing wind plants (partial)
Network
data
Primary
Data
Interaction with
KPTCL officials
1. Existing transmission line data – 110 kV and above voltage level (Line
connectivity, line length, type of conductor, number of circuits, etc.)
2. Substation data – 110 kV and above voltage level buses (Name of substation,
voltage level, number of transformers, etc.)
3. Transmission network geographical map
4. GIS locations for substations (Latitude and Longitude along with pin code)
5. Proposed transmission network up to 2018-19
6. Conventional generators – (thermal, hydro, nuclear)
7. Reactor details (partial)
Interaction with SLDC 1. SCADA snapshots of transmission network for validation
2. Transmission line parameters along with line lengths
3. Interstate transmission lines
4. Scenario dates
5. Grid reactors
Interaction with PCKL
officials
1. Existing & proposed central generating stations
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 21
Category Data Type Data collection method Dataset
Secondary
data
From CEA reports 1. Status of transmission lines under construction details in Karnataka along with
proposed lines
2. Details of status of substation under construction in Karnataka along with proposed
substation
3. Commissioning status of thermal plants
4. Central Generating Station details
5. Transmission line parameters and rating for different types of conductors
6. Permissible maximum and minimum voltage limits for planning studies
7. Power factor to be considered for grid connected RE (solar & wind) plants
8. Transmission network connectivity data for proposed solar park at Pavagada
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 22
8.2. Resource Mapping
Figure 7 shows a map of the complete set of geo-located solar and wind plants in Karnataka,
as of March 31, 2018.
The following assumptions were considered due to limitations in the collected data:
KREDL datasheet on solar and wind projects was used to obtain village and taluk
names, date of commissioning and sanctioning scheme.
Google location API was used to obtain the latitude and longitude of the nearest village.
The centroid of taluk was considered wherever village name was not available or not
found.
KREDL datasheet on commissioned small hydro projects was used to obtain location,
taluk and river names.
Project developer websites and satellite based online maps were used to obtain
coordinate related information for small hydro plants.
For plants where substation connectivity was not available, plants were connected to
the nearest substation at the appropriate voltage level.
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 23
Figure 7: RE plants in Karnataka as on March 31, 2018
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 24
8.3. Transmission Network
Figure 8 depicts a snapshot of Karnataka’s electric grid as modelled in ETAP.
Figure 8: Snapshot of ETAP model of Karnataka network in 2017-18
Assumptions that have been made during the modelling exercise are listed below:
1. Talcher-Kolar HVDC link is considered as a slack bus.
2. CGS generators are scheduled to their rated capacity negating auxiliary consumption.
3. Auxiliary consumption of 8.5% is considered for both thermal and nuclear generators
and 1% is considered for hydro generators.
4. Power factor of 0.98 (absorbing) is considered for RE plants.
5. Inter connecting transformer (ICT) impedance is considered as 12.5% on its own MVA
base.
6. Interstate import/export lines are modelled as lumped generators/loads.
7. Loads are modelled at 66/33/11 kV buses of 220 kV and 110 kV substations with 0.95
PF lag.
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 25
8. Wherever grid connectivity data of RE plants was not available, those plants were
connected to nearby 110 kV or 220 kV substations based on their geographical location.
9. To supply the power demand, conventional generators are given last priority for
scheduling considering the primary contribution from RE plants and CGS power share
for Karnataka.
8.4. Scenarios
In the study, network, generation and load growth data were consolidated for FY 2016-17 (base
year), FY 2017-18 and FY 2018-19 from data provided by KPTCL, SLDC, KREDL and PCKL.
In order to perform steady state analyses, the following instants (Table 4) were chosen to
account for varying loading and RE resource availability conditions, based on discussions with
SLDC.
Table 4: Scenario dates chosen
# Scenario Day Calendar
Year (FY
2017-18)
Calendar Year
(FY 2018-19)
Time
1 State peak load March 30 2018 2019 10 AM
1(a) State light load October 15 2017 2018 3 AM
2 Peak solar generation February 16 2018 2019 1 PM
2(a) Off peak solar generation February 16 2018 2019 7 PM
3 Peak wind generation July 15 2017 2018 3 PM
3(a) Off peak wind generation May 5 2017 2018 12 PM
The next section provides a detailed description of the base case and its validation process.
8.5. Base Case Scenario
The base case here refers to the KPTCL network considered at a specific instant of time in the
simulation software. In this study, the KPTCL network condition as on May 05, 2017,
10:09AM was considered as base case. The SCADA snapshot for this instant was collected
from SLDC to assign the loads for substations and to schedule the generation. Power
import/export from Karnataka was modelled as equivalent generation/load. The KPTCL load
generation balance considered for this case is given in Table 5.
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 26
Table 5: KPTCL load generation balance report (May 5, 2017, 10:09AM)
Base case – LGBR snapshot
Particular Power in MW
Conventional & Nuclear 5,852.8
Non-Conventional Energy Plants
(NCEP)
500.6
Import* 5,911
Total power available 12,264.4
Load 8,739.4
Loads supplied by NCEP at lower
voltage level (<110 kV)
500.6
Export* 2,736
Loss 288.4
Total power consumed 12,264.4
* Sum of all interstate transmission line power flows at this time (Import/Export)
8.6. SCADA Flow Validation
It is necessary to validate the modelled network to ensure that the model closely matches with
the physical network. In this study, the existing network of KPTCL was validated by comparing
the power flow simulation results of ETAP with the SCADA snapshot (for the same instant
May 5, 2017, 10:09AM). The comparisons were made in terms of bus voltages and branch real
power flows. A sample snapshot showing power flow in and around Shantigrama 400 kV
substation is given in Figure 9. However, the power flows through 400 kV and 220 kV
transmission lines and voltages at 400 kV buses are compared with SCADA data and the details
are given in Annexure II.
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 27
Figure 9: Power flow in Shantigrama 400kV substation
From the base case analysis, it can be seen that the line flows match SCADA values with less
than 10% difference for around 82% of 400kV lines and 91% of 220kV lines. Bus voltages
match SCADA values with less than 4% difference.
9. Findings and Discussion
This section describes the results of the analyses for FY 2017-18 and FY 2018-19.
9.1. Power Flow Analysis for FY 2017-18
The installed generation capacity considered was around 25,286 MW, of which the state sector
thermal generation had a major share (7,080 MW) followed by wind (4,602 MW), solar (4,473
MW), hydro (3,629 MW), CGS (3,280 MW), co-generation (1,229 MW), small hydro (831
MW) and biomass (131 MW). The total CGS import share for Karnataka was 2835 MW and
export share around 1676 MW, resulting in a net power import of around 1160 MW.
9.1.1. Load-Generation Balance
Power flow analysis was carried out for all the six scenarios as described in Section 8 of this
report. The system loading, losses and generation schedule for the scenario instants considered
for year FY 2017-18 is given in Table 6.
Under the peak solar and peak wind conditions, to maintain Karnataka CGS share, scheduling
priority was given to central sector thermal and nuclear generation such that state conventional
generations were backed down. For instance, in Scenario 1(a) i.e., state off peak load condition,
state thermal generators were not scheduled (in the power flow simulation) due to reduced state
SCADA Flows ETAP Flows
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 28
demand. Similarly, in Scenario 2 (peak solar), state thermal generators were not scheduled
since solar generation was around 90% of its installed capacity which was sufficient to supply
the demand of the state. It can be seen from Table 6 that power generated by RE sources in FY
2017-18 varied from 713 MW to 5519 MW across the scenarios. Hence, the state thermal
generation was reduced by 71%–100% in order to absorb RE generation. Similarly, the hydro
generation had to be reduced by 27%–95%. Despite reduction in generation, it was observed
from power flow simulations that some 220 kV and 110 kV transmission lines and substations
were overloaded (Table 7).
Table 6: Load generation balance for FY 2017-18 (MW)
# Particulars (Total
installed capacity)
Scenario
1
Scenario
1(a)
Scenario
2
Scenario
2(a)
Scenario
3
Scenario
3(a)
State
peak
load
State off
peak load
Peak
solar
Off peak
solar
Peak
wind
Off peak
wind
1 State hydro (3,629) 2,647 596 353 1,626 182 823
2 State thermal
(7,080) 1,959 0 0 2,050 0 1,793
3
CGS -
Nuclear+Thermal
(3,280)
3,001 1,196 1,593 3,001 805 3,001
4 Solar (4,473) 1,610 0 4,026 0 671 1,922
5 Wind (4,602) 230 414 1,427 1,012 3,682 13
6 Co-generation
(1,229) 37 61 37 37 37 47
7 Biomass (131) 3 3 12 12 4 3
8 Small Hydro (831) 33 235 17 17 133 42
9 RE total
(4+5+6+7+8) 1,913 713 5,519 1,078 4,527 2,027
10 Import 4,342 3,965 3,889 4,260 3,840 3,945
Total power available
(1+2+3+9+10) 13,862 6,470 11,354 12,015 9,354 11,589
11 Load 10,679 3,663 8,623 8,915 6,674 8,803
12 Export 2,724 2,724 2,424 2,724 2,424 2,453
13 Losses 459 83 307 376 256 333
Total power consumed 13,862 6,470 11,354 12,015 9,354 11,589
9.1.2. Study results
The key findings from the power flow analyses for FY 2017-18 under different scenarios are
described below.
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 29
1. In state peak load scenario, the 220 kV transmission network in and around Bengaluru
city is critically loaded. Overloading could be attributed to insufficient transmission
infrastructure in Bengaluru city to match its increasing power demand. Overloading is
mainly observed in lines associated with the 220 kV substations like Hebbal,
Yelahanka, Naganathpura, Nelamangala, Peenya and NRS (New Receiving Station).
The list of 220 kV lines in the Bengaluru city that are overloaded are given below:
The 220 kV corridor between Nelamangala-Peenya-NRS substations are
overloaded since Nelamangala is the major source for supplying loads at Peenya
and NRS substation. The 220 kV S/C line from Peenya to NRS substation,
especially, is overloaded by 28.5% of its rated capacity.
Somanahally to Naganathpura and Somanahally to HSR Layout 220 kV lines are
overloaded by 8.4% and 13%, respectively.
Hebbal to Yelahanka 220 kV S/C line is overloaded by 2.4% of its rated capacity.
This overloading issue may be resolved once the construction of Manyata 220 kV
substation, which can reduce the loading of Hebbal 220 kV substation, is completed.
As per KPTCL’s plan, the Manyata 220 kV substation will be connected to
Devanahalli 400 kV substation with LILO (Loop In Loop Out) arrangement of
Manyata to Hoody 220 kV D/C line. Thus, Devanahalli 400 kV substation will act
as a new source for supplying loads in areas surrounding Hebbal and Manyata
substation.
2. In peak solar scenario, few 110 kV lines in Bijapur and Bidar districts are loaded more
than their rated capacity. A list of such overloaded lines are given below:
110 kV S/C line from Bhutnal to Bijapur E is overloaded by 26.1%. This is because
around 150 MW of RE Plants are connected at Tikota, Tekkalaki and Bhutnal 110
kV substations. All these substations are radially connected to Bijapur E substation
through 110 kV S/C line. Since the local load in these substations is only around 13
MW, the power generated during peak solar condition will flow to Bijapur E
substation through the 110 kV S/C corridor. This would overload Bhutnal to Bijapur
E 110 kV S/C line. It is important to note that outage of any one line in this 110 kV
transmission corridor would result in disconnection of RE generators from the grid.
110kV S/C line from Santpur to Halbarga is overloaded by 88.2% of its rated
capacity. This is because around 146 MW of RE plants are connected at Santpur
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 30
and Dongargaon. Santpur and Dongargaon substations are radially connected to
Halbarga 220 kV substation through 110 kV S/C corridor. Power generated during
peak solar condition will flow to Halbarga 220 kV substation as the local loads in
Santpur and Dongargaon substations are only around 12.2 MW; thus overloading
Santpur to Halbarga 110 kV S/C line. It is important to note that outage of any one
line in this 110 kV transmission corridor would result in disconnection of RE
generators from the grid.
3. In peak wind scenario, the 110 kV transmission corridor between Gadag-Sambapur-
Dambal-Mundaragi along with Gadag 220/110 kV substation (with 3×100 MVA
transformation capacity) is overloaded. This is because around 258 MW of RE plants
are connected to the above mentioned substations. These substations are radially
connected to Gadag 220 kV substation. Since the local load in this area is only around
12.6 MW, power generated during peak wind condition has to be evacuated through
this 110 kV transmission corridor which causes overloading of the corridor.
The summary of the study results for all the six scenarios is provided in Table 7.
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 31
Table 7: Power flow study results for FY 2017-18
Scenario
# Condition Instant Inputs to the model Findings
Scenario
1
State peak
load
March
30,2018,
10:00AM
Ex-bus peak demand of 11,138 MW(1)
Generation mix
hydro – 27.8%, thermal – 43.6%, nuclear – 8.5%,
solar – 16.9%, wind – 2.4%, other RE(2) - 0.8%
9 numbers of 220 kV lines and 3 numbers of 110 kV lines
are overloaded.
Hebbal 2×100 MVA, 220/66 kV substation is overloaded
by 5.7%.
Scenario
1(a)
State off-
peak load
October
15, 2017,
03:00AM
Ex-bus peak demand of 3,746 MW
Generation mix
hydro – 23.7%, thermal – 15.6%, nuclear – 32.2%,
solar – 0.0%, wind – 16.5%, other RE - 11.9%
All the transformers and transmission lines are loaded
within their rated capacity.
With the existing reactors in KPTCL system, all the bus
voltages are within the acceptable limits.
Scenario
2
State peak
solar
Feb 16,
2018,
01:00PM
Ex-bus peak demand of 8930MW
Generation mix
hydro – 4.7%, thermal – 10.6%, nuclear – 10.8%,
solar – 53.9%, wind – 19.1%, other RE – 0.9%
1 number of 220 kV line and 7 numbers of 110 kV lines
are loaded more than their rated capacity.
All the transformers are loaded within their rated capacity.
Scenario
2(a)
State off-
peak solar
Feb 16,
2018,
07:00PM
Ex-bus peak demand of 9291MW
Generation mix
hydro – 21.0%, thermal – 54.8%, nuclear – 10.4%,
solar – 0.0%, wind – 13.0%, other RE – 0.8%
Peenya to NRS 220 kV S/C line and Netlamadnur to
Kanoje 110 kV S/C line are overloaded.
All the transformers are loaded within their rated capacity.
Scenario
3
State peak
wind
July 15,
2017,
03:00PM
Ex-bus peak demand of 6930MW
Generation mix
hydro – 3.3%, thermal – 0.0%, nuclear – 14.6%,
solar – 12.2%, wind – 66.8%, other RE – 3.2%
9 numbers of 110kV lines are overloaded.
Gadag 3×100 MVA, 220/110 kV substation is overloaded
by 31.7%.
Scenario
3(a)
State off-
peak wind
May 05,
2017,
12:00PM
Ex-bus peak demand of 9136MW
Generation mix
hydro – 10.8%, thermal – 52.2%, nuclear – 10.5%,
solar – 25.1%, wind – 0.2%, other RE – 1.2%
3 numbers of 220 kV lines are overloaded.
All the transformers are loaded within their rated capacity.
Note: (1) Peak demand has been considered from CEA LGBR for year 2017-18.
(2) Other RE includes co-generation, biomass and small hydro.
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 32
9.2. Power Flow Analysis for FY 2018-19
The installed generation capacity considered for FY 2018-19 is around 28,900 MW, of which
state thermal generation had a major share (7,450 MW) followed by solar (6,860 MW), wind
(4,921 MW), hydro (3,629 MW), CGS (3,280 MW), co-generation (1,757 MW), small hydro
(841 MW) and biomass (131 MW). A notable change is the addition of the 370 MW combined
cycle gas power plant at Yelahanka. The total CGS export share for Karnataka remained the
same as for 2017-18, but the import share increased by 71 MW8. This results in a net power
import of around 1230 MW.
9.2.1. Load-Generation Balance
Power flow analysis was carried out for all the six scenarios as described in section 8 of this
report. The load generation balance considered for year 2018-19 is given in Table 8. As an
example, a snapshot of an overloaded line from the one-line diagram in ETAP software is
shown below in Figure 10.
8 This is due to 7% share from NLC New TPP-U#1 and U#2
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 33
Figure 10: ETAP One-line view of overloaded line
Similar to the scenarios of FY 2017-18, scheduling priority was given to central sector thermal
and nuclear generation such that state conventional generators were backed down. Thus, in
Scenario 2, no conventional generators were scheduled. Similarly, in Scenario 3, due to high
wind generation, state thermal generators have not been scheduled. It can be seen from Table
8 that power generated by RE sources in FY 2018-19 varied from 778 MW to 7,782 MW across
the scenarios. Hence, the state thermal generation was reduced by 64%-100% in order to absorb
RE generation. Similarly, the hydro generation had to be reduced by 56%-100%. Despite
reduction in generation, it was observed from power flow simulations that some 220 kV and
110 kV transmission lines and substations were overloaded (Table 9).
Line over loaded (57%)
Peak Solar Condition
(Feb 16, 2019) at 1 PM
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 34
Table 8: Load generation balance for FY 2018-19 (MW)
# Particulars (Total
installed capacity)
Scenario
1
Scenario
1(a)
Scenario
2
Scenario
2(a)
Scenario
3
Scenario
3(a)
State
peak
load
State off
peak
load
Peak
solar
Off peak
solar
Peak
wind
Off peak
wind
1 State hydro (3,629) 1,586 488 0 1,528 286 1,183
2 State thermal –
coal (7, 080) 2,602 0 0 2,199 0 732
3
CGS-
Nuclear+Thermal
(3,280)
3,001 3,001 0 3,001 805 3,001
4 Solar (6,860) 2,470 0 6,174 0 1,029 2,950
5 Wind (4,921) 246 443 1,526 1,083 3,937 14
6 Co-generation
(1,757) 53 88 53 53 53 70
7 Biomass (131) 3 3 12 12 4 4
8 Small Hydro (841) 34 244 17 17 135 42
9 RE total
(4+5+6+7+8) 2,806 778 7,782 1,165 5,158 3,080
10 State thermal – gas
(370) 100 100 0 100 56 100
11 Import 4,397 4,109 4,127 4,296 4,211 4,201
Total power available
(1+2+3+9+10+11) 14,492 8,476 11,909 12,289 10,516 12,297
12 Load 11,325 5,596 8,911 9,223 7,535 9,327
13 Export 2,724 2,724 2,724 2,724 2,724 2,724
14 Losses 443 156 274 342 257 246
Total power consumed 14,492 8,476 11,909 12,289 10,516 12,297
9.2.2. Study results
Key findings from the power flow analysis for FY 2018-19 under different scenarios are
described below:
1. Under peak load scenario it is observed that, the addition of PGCIL Singanayakanahalli
400/220 kV substation and its associated line to Yelahanka 220/66 kV (FY 2018-19)
resolves the overloading of 220 kV Nelamangala to Peenya, Hebbal to Yelahanka,
Somanahally to HSR Layout and Somanahally to Naganathpura lines would get
resolved. The new PGCIL Singanayakanahalli 400/220 kV substation will act as a new
source for supplying the Bengaluru city demand. To an extent, commissioning of this
new substation would relieve the loading of 220 kV lines emanating from Nelamangala
and Somanahally substation to Bengaluru city. On the other hand, it was observed that
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 35
a few more 220 kV lines within the Bengaluru city will continue to overload in FY
2018-19 despite the new Singanayakanahalli substation. Such overloaded lines include:
Peenya to NRS 220 kV S/C line, overloaded by 47.6%
ITI to Hoody 220 kV S/C line, overloaded by 47.8%
Somanahally to Tataguni 220 kV S/C line, overloaded by 2.3%
2. In peak solar scenario, few 110 kV lines in Bijapur, Bidar and Koppal districts are
loaded than their rated capacity. Such 110 kV overloaded lines include:
Bhutnal to Bijapur E 110 kV S/C line, overloaded by 57%
Kustagi to Yelburga 110 kV S/C line, overloaded by 8.4%
Santpur to Halbarga 110 kV S/C line, overloaded by 87.4%
3. If all the wind plants planned for FY 2018-19 in Mundaragi, Dambal, Sambapur and
Gadag area get commissioned, 110 kV transmission corridor from Mundaragi upto
Gadag will be overloaded along with Gadag 220/110 kV (3×100 MVA transformation
capacity) substation under peak wind condition.
The summary of the study results for the scenarios are provided in Table 9.
Karnataka’s Energy Mix: Computational Model for Energy Planning
36 www.cstep.in © CSTEP
Table 9: Power flow study results for FY 2018-19
Scenario
# Condition Instant Inputs to the model Findings
Scenario
1
State peak
load
March
30, 2019,
10:00AM
Ex-bus peak demand of 11,768 MW(1)
Generation mix
hydro – 15.7%, thermal – 48.5%, nuclear – 8.0%,
solar – 24.5%, wind – 2.4%, other RE(2) - 0.9%
3 numbers of 220 kV lines and 6 numbers of 110 kV lines are
overloaded.
Hebbal 2×100 MVA, 220/66 kV and Naganathpura 2×100
MVA, 220/66 kV substation is overloaded by 13.3% and
1.3%, respectively.
Scenario
1(a)
State off
peak load
October
15, 2018,
03:00AM
Ex-bus peak demand of 5,752 MW
Generation mix
hydro – 11.2%, thermal – 52.6%, nuclear – 18.4%,
solar – 0.0%, wind – 10.1%, other RE – 7.7%
All the transformers and transmission lines are loaded within
their rated capacity.
With the existing reactors in KPTCL system, all the bus
voltages are within the acceptable limits.
Scenario
2
State peak
solar
Feb 16,
2019,
01:00PM
Ex-bus peak demand of 9,185 MW
Generation mix
hydro – 0.0%, thermal – 0.0%, nuclear – 0.0%,
solar – 79.3%, wind – 19.6%, other RE – 1.0%
2 number of 220 kV line and 3 numbers of 110 kV lines are
overloaded.
All the transformers are loaded within their rated capacity.
Scenario
2(a)
State off
peak solar
Feb 16,
2019,
07:00PM
Ex-bus peak demand of 9,565 MW
Generation mix
hydro – 19.1%, thermal – 56.2%, nuclear – 10.1%,
solar – 0.0%, wind – 13.5%, other RE – 1.0%
Peenya to NRS 220 kV S/C line and ITI to Hoody 220 kV
S/C line are overloaded by 16.3% and 13% respectively.
All the transformers are loaded within their rated capacity.
Scenario
3
State peak
wind
July 15,
2018,
03:00PM
Ex-bus peak demand of 7,793 MW
Generation mix
hydro – 4.5%, thermal – 0.9%, nuclear – 12.8%,
solar – 16.3%, wind – 62.4%, other RE – 3.0%
6 numbers of 110 kV lines are overloaded.
Gadag 3×100 MVA, 220/110 kV substation is overloaded by
30.8%.
Scenario
3(a)
State off
peak wind
May 05,
2018,
12:00PM
Ex-bus peak demand of 9,572 MW
Generation mix
hydro – 14.6%, thermal – 37.4%, nuclear – 9.9%,
solar – 36.4%, wind – 0.2%, other RE – 1.4%
Peenya to NRS 220 kV S/C line and ITI to Hoody 220 kV
S/C line are overloaded by 21.4% and 15.5%respectively.
All the transformers are loaded within their rated capacity.
Note: (1) Peak demand has been considered from CEA 19th EPS projections for year 2018-19.
(2) Other RE includes co-generation, biomass and small hydro.
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 37
9.3. Integrated Energy Planning Platform
CSTEP has developed the Energy Planning Platform (EPP) for Karnataka state which provides
GIS based network flow visualisations and analysis taking into consideration various planning
scenarios. The platform can be accessed by using this URL: http://darpan.cstep.in/energy_pp/.
EPP application dashboard is composed of the following components:
Generation units (including existing and proposed conventional and RE plants)
Network elements (including existing and proposed substations and transmission lines
at different voltage levels)
Scenario analysis (depicting network constraint violations)
9.3.1. Generation units
The EPP home page contains GIS-based visualisation of generating units with different layers
to select power plants of each type. Details pertaining to each individual plant pop up on
selecting any power plant displayed on the map (screenshot in Figure 11)
Figure 11: CSTEP Karnataka EPP – Visualisation of generation units
9.3.2. Network elements
The EPP features a layered design allowing the user to view the network at different voltage
level(s). The platform displays static network elements including substation, transformers, and
transmission lines with details that pop up on selection (screenshot in Figure 12).
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 38
Figure 12: CSTEP Karnataka EPP – Static network elements
9.3.3. Scenario analysis
The scenario visualisation component of the platform provides network flow visualisation for
different scenarios, namely, peak load, off peak load, peak solar, off peak solar, peak wind, off
peak wind for 2017-18 and 2018-19. Scenario visualisation provides insight about network
flow, overvoltages and undervoltages at substations and overloading of transmission lines for
each scenario (screenshot in Figure 13).
Figure 13: CSTEP Karnataka EPP – Scenario analysis
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 39
9.4. Impact of Taluk-wise Limits
In this section, detailed integration analyses for taluk-wise solar limits, wind-limits and limits
on hybrid RE generation are presented. To check the impact of taluk-wise RE limits, five taluks
each were chosen based on discussion with energy department.
9.4.1. Solar
The taluk-wise solar limit was considered as 200 MW per taluk as per Karnataka Solar Policy.
Here, the transmission network, augmented up to FY 2018-19, is tested to check whether 200
MW of solar per taluk can be evacuated, for five selected taluks. It is observed from Table 10
that three taluk transmission networks can absorb the full solar capacity without having any
network constraints. The existing network of the other two taluks are incapable of evacuating
the solar capacity; thus, the networks need to be strengthened.
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 40
Table 10: Taluk-wise solar limit feasibility
# Taluk Substation
RE capacity
connected
(MW)
Feasibility for
RE evacuation
Reason if not
feasible Suggestion
1 Koppal
Betagera 110 kV 27
Feasible - - Ginigere 110 kV 40
Koppal 110 kV 63
Kerehalli 110 kV 70
2 Sindhanur
Dadesugur 110 kV 40
Feasible - -
Sindhanur 220 kV 40
Sindhanur 110 kV 70
Turvihal 110 kV 40
Walkamdinni 110 kV 10
3 Sedam
Kurkunta 110 kV 53
Not feasible
Sedam 2×100
MVA,
220/110 kV
substation will
be overloaded
Addition of
3rd 100
MVA
transformer
at Sedam
220/110 kV
substation
Sedam 220 kV 147
4 Jewargi
Jewargi 110 kV 90
Not feasible
110 kV S/C
line from
Shahabad to
Jewargi will
be overloaded
New 110 kV
S/C line is
required from
Shahabad to
Jewargi
Mandewal 110 kV 110
5 Lingasugur
Gurugunta 110 kV 20
Feasible - - Hutti 110 kV 16
Lingasugur 220 kV 114
Mudgal 110 kV 50
9.4.2. Wind
The taluk-wise wind limit was considered as 100 MW per taluk, as discussed with the Energy
Department. Here, transmission network for FY 2018-19 is tested to check whether 100 MW
of wind capacity per taluk can be evacuated with the existing transmission network. It is
observed from Table 11 that with the existing network infrastructure, the entire wind capacity
can be evacuated for all five taluks without having any network constraints.
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 41
Table 11: Taluk-wise wind limit feasibility
# Taluk Substation
RE
capacity
connecte
d (MW)
Feasibility for
RE evacuation
Reason if
not feasible Suggestion
1 Belgaum
Belgaum 220 kV 60.4
Feasible - -
Udaymbag 110 kV 9.6
Kanabaragi Layout
110 kV 10
Mache 110 kV 0
Vadagaon 110 kV 10
Suvarna Soudha 110
kV 0
Uchagaon 110 kV 10
Hirebagewadi 110 kV 0
2 Yelburga
Bevoor 110 kV 50
Feasible - - Ganadal 110 kV 50
Yelburga 110 kV 0
3 Basavana
Bagewadi
Basavana Bagewadi
220 kV 261.2
Feasible. Already
335.2 MW of
wind power plants
are planned in this
taluk by end of
FY 2018-19 and it
can be evacuated
without any
network
constraints.
- -
Mukarthihal 110 kV 74
Mattihal 110 kV 0
Nidagundi 110 kV 0
Malghan 110 kV 0
4 Bailahongal
Bailahongal 110 kV 30
Feasible - -
MK Hubli 220 kV 30
MK Hubli 110 kV 20
Kittur 110 kV 10
Udakeri 110 kV 10
5 Ranebennur
Aremallapur 110 kV 30
Feasible - - Ranebennur 220 kV 40
Tumminakatte 110
kV 30
9.4.3. Hybrid (Solar + Wind) RE
The taluk wise Hybrid RE limit was considered as 100 MW per taluk based on discussions
with the Energy Department. Here, FY 2018-19 transmission network is tested to check
whether 100 MW per taluk of solar+wind hybrid capacity can be evacuated with the existing
transmission network. It is observed from Table 12 that with the existing network
infrastructure, the full capacity of Hybrid RE can be evacuated for all five taluks without any
network constraints.
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 42
Table 12: Taluk-wise solar-wind hybrid limit feasibility
# Taluk Substation
RE capacity
connected
(MW)
Feasibility for RE
evacuation
Reason
if not
feasible
Suggest
ion
1 Bellary
Alipura R/S 220 kV 0
Feasible. Around 123.1
MW of RE plants (Solar
+ Wind) are planned in
Bellary taluk by FY
2018-19 and the power
can be evacuated with
existing network
infrastructure without
having any network
constraints.
- -
Bellary (N) 110 kV 0
Bellary (S) 110 kV 0
Kurugod 110 kV 56.1
Moka 110 kV 0
PD Halli 110 kV 43
Somasamudra 110 kV 0
Torangal 110 kV 0
Kudithini 110 kV 0
Halakundi 110 kV 24
2 Bidar
Chidri 110 kV 10
Feasible - -
Habsikote 110 kV 18
Janawada 110 kV 20
Kamthana 110 kV 19
Halbarga 220 kV 18
Kolhar 110 kV 15
3 Indi
Atharga 110 kV 54 Feasible. Already 180.2
MW of wind power
plants are planned in this
taluk by end of FY 2018-
19 and it can be
evacuated without any
constraint in the grid.
- -
Indi 220 kV 126.2
Indi 110 kV 0
Hirebevanur 110 kV 0
Lachyan 110 kV 0
Zalaki 110 kV 0
4 Chikkodi
Ankali 110 kV 0
Feasible. Already 106.45
MW of wind power
plants are planned in this
taluk by end of FY 2018-
19 and it can be
evacuated without any
constraint in the grid.
- -
Bhoj (Galatga) 110 kV 35.85
Boregaon 110 kV 0
Chikkodi 220 kV 0
Chikkodi 110 kV 50
Kabbur (Nagar munnolli)
110 kV 20.6
Nippani 110 kV 0
Sadalaga 110 kV 0
Nanadi 110 kV 0
5 Raibaga
Hidakal 110 kV 0
Feasible - -
Kudachi 220 kV 10
Kudachi 110 kV 10
Raibag 110 kV 4
Itnal 110 kV 66.6
Kagwad 110 kV 0
Sultanpur 110 kV 9.4
Mantur 110 kV 0
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 43
10. Recommendations
10.1. Network Strengthening Required
It is important that the transmission network be strengthened in order to accommodate the
expected influx of RE along with load growth. Augmenting existing lines, adding new lines,
upgrading substation infrastructure are some measures that can be implemented in order to
address network constraints. Specific measures, based on the observations made while
analysing the six scenarios, are discussed below.
1. From the power flow analysis it is observed that 220 kV transmission lines within
Bengaluru city were overloaded due to increase in load and insufficient transmission
infrastructure. Overloading was mainly observed in lines associated with Peenya, NRS,
ITI, Hoody and Somanahally 220 kV substations. The following measures were found
to be able to solve the overloading issue within the Bangalore city:
New 220 kV D/C 1000 sq.mm XLPE cable from PGCIL Bidadi 400/220 kV
substation to Vrushabavathi 220/66 kV substation is suggested to resolve the line
overloading issue associated with Vrushabavathi and Somanahally 220 kV
substations.
Additional S/C line from Peenya to NRS 220 kV substation is suggested to resolve
the overloading of existing 220 kV S/C line.
Addition of 3rd 100 MVA, 220/66 kV transformer at Naganathpura substation is
suggested to resolve the overloading of other transformers in the substation.
2. To resolve the 110 kV transmission line overloading observed in Bijapur, Bidar and
Koppal districts under peak solar scenario, the following lines are suggested:
New 110 kV S/C corridor from Tikota to Bijapur E substation via Tekkalaki, Torvi
and Bhutnal 110 kV substation.
New 110 kV S/C line from Yelburga to Kustagi 110 kV substation.
New 110 kV S/C corridor from Dongargaon to Halbarga substation via Santpur 110
kV substation.
3. During peak wind condition, network overloading was observed in Gadag area.
Following network strengthening is suggested to resolve the overloading issues:
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 44
Upgradation of 110 kV Dambal substation to 220 kV by adding 2×100 MVA
transformers and one 220 kV D/C line connecting to Dhoni 400 kV substation.
A new 110 kV S/C line from Dambal to Mundaragi 110 kV substations.
A new 110 kV S/C line from VSPL to Mundaragi 110 kV substations.
Detailed explanation for the network constraints and possible solutions for the same are
explained in Table 13.
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 45
Table 13: Network elements to be strengthened
# Overloaded element Occurrence Reason(s) Recommendation(s)
1 220 kV S/C line from
Somanahally to Tataguni Scenario 1
Increase in load at Tataguni and Vrushabavathi substations
Providing second source of power by switching ON NRS –
Vrushabavathi 220 kV S/C line (currently switched OFF)
would not resolve the issue since the line is already
overloaded with supplying the load at NRS, A station and
EDC substations.
Setting up a new 220 kV D/C 1000sqmm
XLPE cable from PGCIL Bidadi 400/220 kV
substation to Vrushabavathi 220/66kV
substation would act as a strong alternative
source for Vrushabavathi substation.
2 220 kV S/C line from
Peenya to NRS
Scenario 2,
Scenario 2(a),
Scenario 3(a)
Increase in load at NRS, A station and EDC substation
Setting up an additional 220 kV S/C line from
Peenya substation to NRS would resolve the
issue by sharing the load with the existing
line.
3 220 kV S/C line from ITI
to Hoody
Scenario 1,
Scenario 2,
Scenario 2(a),
Scenario 3(a)
Increase in load at ITI and Hebbal 220 kV substations,
radially fed from Hoody 220 kV substation
Providing second source by switching ON 220 kV S/C line
from Hebbal-tap to Hebbal 220 kV substation would result
in overloading of Yelahanka substation to Hebbal-tap 220
kV S/C line.
ITI 220 kV substation should be radially fed
from Hoody 220 kV substation by keeping ITI
to Hebbal 220 kV S/C line out of service.
Hebbal substation should be fed from
Yelahanka and Nelamangala substations by
keeping Hebbal-tap to Peenya 220 kV S/C line
open.
4
110 kV S/C corridor
from Kavoor to
Baikampady
Scenario 1
Increase in load at Baikampady substation fed by radial 110
kV S/C corridor from Kavoor substation
Many industries are connected to the corridor through radial
tap lines.
110 kV S/C line from Gurupura to Kavoor
substations can be LILO’ed at Baikampady
substation so that second source at
Baikampady substation would be established.
5 110 kV D/C line from
Kemar to Manipal Scenario 1
Increase in load at Manipal, Brahmavara, Hiriyadka,
Mahduvana, Kundapara and Navuda substations fed only by
Kemar substation.
Keeping 110 kV S/C line from Karkala
substation to Hiriyadka substation (currently
switched OFF) in service would help by
sharing the load supplied by 110 kV D/C line
from Kemar substation to Manipal substation.
6 110 kV S/C line from
Sagar to Alkola Scenario 1
Evacuation from Linganamakki Dam Powerhouse (LDPH)
and Mahatma Gandhi Hydro Electric station (MGHE)
110 kV S/C line from MGHE to Sirsi substation is currently
kept out of service.
Keeping 110 kV S/C line from MGHE to Sirsi
substation in service would resolve this issue
by acting as an additional evacuation line from
MGHE.
7
Naganathpura
2×100MVA, 220/66kV
substation
Scenario 1 Increase in load at Naganathpura 220 kV substation
Addition of 3rd 100 MVA transformer at
Naganathpura would resolve the overloading
issue.
Karnataka’s Energy Mix: Computational Model for Energy Planning
46 www.cstep.in © CSTEP
# Overloaded element Occurrence Reason(s) Recommendation(s)
8 Hebbal 2×100MVA,
220/66kV substation Scenario 1 Increase in load at Hebbal 220 kV substation
Early commissioning of Manyata 220/66 kV
substation (currently under construction)
would help in solving this issue by sharing the
load supplied from Hebbal substation.
9 110 kV S/C line from
Bhutnal to Bijapur E Scenario 2
Low load and increase in RE capacity, requiring evacuation
of power to Bijapur E substation
By the end of year 2018-19, around 174 MW of RE plants
are expected to be connected at Tikota, Tekkalakki and
Bhutnal substations. This generation has to be evacuated via
the 110 kV S/C corridor.
Setting up a new 110 kV S/C corridor from
Tikota to Bijapur E substation via Tekkalaki,
Torvi and Bhutnal substations would resolve
this issue.
10 110 kV S/C line from
Kushtagi to Yelburga Scenario 2
Increase in solar generation near Yelburga substation,
requiring evacuation to Kushtagi substation
Around 96 MW of solar plants are expected to be
commissioned near Yelburga 110 kV substation. Evacuating
all this generation via the substation will overload the S/C
line at peak solar condition.
Setting up a new 110 kV S/C line from
Yelburga substation to Kushtagi substation
would resolve this issue.
11 110 kV S/C line from
Santpur to Halabarga Scenario 2
Increase in solar generation at Dongargaon and Santpur
substation, requiring evacuation to Halabarga substation
Around 146 MW of solar plants are expected to be
commissioned near Dongargaon and Santpur 110 kV
substations. Evacuating all this generation via these
substations will overload this line at peak solar condition.
Setting up a new 110 kV S/C line from
Dongargaon substation to Halabarga
substation via Santpur substation would
resolve this issue.
12 110 kV corridor from
Mundargi to Gadag Scenario 3 Increase in RE generation in Gadag district
Around 16 MW of solar, 35.5 MW of co-generation and
252.45 MW of Wind plants are expected to be
commissioned near Mundargi, Shirahatti, Belahatti and
Dambal 110 kV substations. Evacuating all this generation
via these substations will overload the associated lines at
peak wind condition.
1. Upgradation of 110 kV Dambal substation
to 220 kV by adding 2×100MVA transformers
and connecting to Dhoni 400 kV substation
through 220 kV D/C line.
2. A new 110 kV S/C line from Dambal to
Mundargi.
3. A new 110 kV S/C line from VSPL to
Mundargi.
Would resolve the issue
13 Gadag 3×100 MVA,
220/110 kV substation Scenario 3
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 47 47
10.2. Illustrative Cost Analysis for Strengthening
Illustrative cost analysis for year FY 2018-19 is given below in Table 14 and Table 15. Network
element costs were collected from KPTCL to calculate the investment required for transmission
strengthening. Detailed cost data collected from KPTCL is given in Annexure IV. From the
table, it can be inferred that the investment required for building new transmission line for the
year 2018-19 is around INR 594.9 crore, whereas the investment required for building new
substation is around INR 50 crore. The total investment required for year 2018-19 is INR 644.9
crore.
Under peak wind condition, it was observed from the power flow simulation that Gadag 220
kV substation transformers along with 110 kV wind evacuation lines were overloaded. To
avoid overloading in this condition, upgradation of Dambal substation from 110 kV to 220 kV
is proposed, along with associated 220 kV lines from Dambal to Dhoni 400/220 kV substation.
Other network strengthening proposals to accommodate planned RE additions or load growth
are summarised in Table 13. In addition to the cost incurred due to the reduction in conventional
generation (as explained in Sections 9.1.1 and 9.2.1), the overall power purchase cost may go
up because of fixed costs. This increase in cost depends on the terms of the Power Purchase
Agreement (PPA).
Karnataka’s Energy Mix: Computational Model for Energy Planning
48 www.cstep.in © CSTEP
Table 14: Illustrative cost analysis: Upgrading transmission lines for 2018-19
# Proposed transmission line upgrade Line length
(km)
Line cost (in INR
crore)
No. of
bays
Bay cost (in
INR crore)
Total cost (in
INR crore)
1 New 220 kV D/C 1000 sq.mm XLPE cable from Bidadi 400/220 kV
Substation to Vrishabhavathi 220/66 kV substation 22 506.0 4.0 6.0 512.0
2 New 220 kV S/C line from Peenya 220/66 kV substation to NRS
220/66 kV substation 7 5.0 2.0 3.0 8.0
3 LILO of 110 kV S/C line from Gurupura 110 kV substation to
Kavoor 220 kV substation at Baikampady 110 kV substation 6.62 3.0 2.0 0.8 3.8
4
New 110 kV S/C line from Tikota 110 kV substation to Bijapur E
110 kV substation via Tekkalakki, Torvi and Bhutnal 110 kV
substations
40 12.4 8.0 3.2 15.6
5 New 110 kV S/C line from Yelburga 110 kV substation to Kustagi
110 kV substation 28 8.7 2.0 0.8 9.5
6 New 110 kV S/C line from Dongargaon 110 kV substation to
Halabarga 110 kV substation via Santpur 110 kV substation 70 21.7 4.0 1.6 23.3
7 New 220 kV D/C line from Dambal 220/110 kV substation to Dhoni
400/220 kV Substation 5.5 3.6 4.0 6.0 9.6
8 New 110 kV S/C line from Dambal 220/110 kV substation to
Mundargi 110 kV substation 19 5.9 2.0 0.8 6.7
9 New 110 kV S/C line from Mundargi 110 kV substation to VSPL
(wind generation pooling point) 18 5.6 2.0 0.8 6.4
Total investment required for transmission lines (A) 594.9
Table 15: Illustrative cost analysis: Upgrading substations for 2018-19
# Proposed substation upgrade Transformer addition
(MVA) Total cost (in INR crore)
1 Addition of 3rd 100MVA transformer at Naganathpura 220/66kV substation 100 9
2 Upgradation of existing Dambal 110/11kV substation to 220/110/11kV substation with addition of
2×100MVA, 220/110 kV transformers. 200 41
Total investment required for substations (B) 50
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 49
11. Reflection and Conclusion
The study analysed the capacity of the Karnataka grid to absorb 6.86 GW of solar and 4.9 GW
of wind capacity by FY 2018-19. Based on the analysis of different scenarios, it was observed
that substantial network strengthening is required in order to successfully integrate planned RE
capacity addition to the grid and accommodate current trends of load growth. During the
simulation, it was found that 18 transmission lines and 3 substations (220 kV) were overloaded,
despite backing down conventional generators.
Assuming all the RE plants planned for FY 2018-19 materialise, RE power alone would be
sufficient to meet projected state demand under peak solar and peak wind conditions. In order
to accommodate planned RE plants and also to serve state peak load, without causing network
overload, network strengthening has been proposed. The proposed strengthening envisages a
total investment of INR 645 crores for transmission lines and substations.
The taluk-wise feasibility studies showed that the 200 MW of solar capacity per taluk causes
network overloading in 2 out of 5 selected taluks. On the other hand, 100 MW of wind in the
selected taluks did not cause any network overloading. In the case of Hybrid RE, 100 MW can
be accommodated without any network overloading in all of the five selected taluks.
During state peak load conditions, the Bangalore Metropolitan Area Network (BMAN)
(“Bangalore Metropolitan Area Network,” 2018) was projected to experience load of around
3883.62 MW. Under this condition, 3 transmission lines (220 kV) were overloaded and 12 lines
(220 kV) were loaded to more than 80 % of their rated capacity.
Most of the 110 kV substations in Karnataka are operating radially, which would make it
difficult to maintain reliability under contingency. It is recommended that a ring connected
operation be considered.
A more detailed analysis involving short-circuit and transient stability studies would give a
more accurate picture of network constraints and suitable strengthening plans, in view of RE
generation uncertainty. Further, a thorough network analysis for the immediate future,
especially in BMAN area, should be undertaken in order to avoid any network constraints due
to load growth. A detailed transmission planning study, including the 66 kV network, is
recommended for a deeper understanding of network constraints in view of RE integration.
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 50
12. References
Activists up in arms as Sharavathi power project gets green clearance. (2017, November 30). The
New Indian Express.
Bangalore Metropolitan Area Network. (2018, March 31). Power Transmission Map, Bengaluru:
Karnataka Power Transmission Corporation Limited.
Bianchi, M., Branchini, L., De Pascale, A., Peretto, A., Melino, F., & Orlandini, V. (2015). Pump Hydro
Storage and Gas Turbines Technologies Combined to Handle Wind Variability: Optimal
Hydro Solution for an Italian Case Study. Energy Procedia, 82, 570–576.
https://doi.org/10.1016/j.egypro.2015.11.872
Central Electricity Authority. (2013). Planning Manual.
Central Electricity Authority. (2017). Monthly Installed Capacity.
Details of Year wise Commissioned Projects of Renewable Category in MW. (2018, May 5).
Karnataka Renewable Energy Development Limited.
Government of India, & Government of Karnataka. 24 X 7 Power For All – Karnataka (2016).
Retrieved from
http://powerforall.co.in/AccessFolder/PFA_Document/1_Karnataka_PFA.pdf
Government of Karnataka. Karnataka Renewable Energy Policy 2009-14, Pub. L. No. EN 354 NCE
2008 (2010).
Government of Karnataka. Karnataka Solar Policy 2011-16, Pub. L. No. EN 61 NCE 2011 (2011).
Government of Karnataka. Karnataka Solar Policy 2014-21, Pub. L. No. EN 21 VSC 2014 (2014).
Government of Karnataka. Karnataka Renewable Energy Policy 2016-22 (2017).
Japan-India Cooperation Agency. (n.d.). Data Collection Survey on Power Sector in India (Chapter
5).
Karnataka Electricity Regulatory Commission. KERC (Procurement Of Energy From Renewable
Sources), Fifth Amendment (2011). Retrieved from
http://karnataka.gov.in/kerc/Regulations/Regulations/KERC%20(Procurement%20of
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 51
%20Energy%20from%20Renewable%20Sources)%20(Fifth%20Amendment)%20Regu
lations%2C%202017.pdf
Karnataka Electricity Regulatory Commission. Tariff Order, 2013 (2013).
Karnataka Electricity Regulatory Commission. Tariff Order, 2018 (2018).
Karnataka Power Corporation Limited. (2017). Sharavathy Pumped Storage Project
(Prefeasibility Report).
Karnataka Power Transmission Corporation Limited. (2017). Annual Performance Review 2016-
17.
Press Information Bureau, Government of India. (2011). Amendment in Tariff Policy [Press
Release]. Retrieved from http://pib.nic.in/newsite/PrintRelease.aspx?relid=68901
Press Information Bureau, Government of India. (2016). Cabinet approves amendments in Power
Tariff Policy to ensure 24X7 affordable Power for all [Press Release]. Retrieved from
http://pib.nic.in/newsite/PrintRelease.aspx?relid=134630
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 52
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 53
Annexure I – Existing Network
(Data considered in this Study as existing on March 31, 2017 – includes both KPTCL and
PGCIL network)
Details of Generation Installed Capacity in Karnataka
Conventional generations
Table 16: Details of conventional generations as on March 31, 2017
# Generation name Generation type No of
units
Unit capacity
(MW)
Total capacity
(MW)
State sector
1 Alamatti Hydro 1 15
290 5 55
2 Bhadra Hydro
2 12
39.2 1 2
1 7.2
1 6
3 Ghataprabha Hydro 2 16 32
4 Gerusoppa Hydro 4 60 240
5 Kadra Hydro 3 50 150
6 Kodsalli Hydro 3 40 120
7 Linganamakki (LDPH) Hydro 2 27.5 55
8 Mani DPH Hydro 2 4.5 9
9 MGHE Hydro 4 21.6
139.2 4 13.2
10 Nagjhari/Kali Hydro 6 150 900
11 Shimsha Hydro 2 8.6 17.2
12 Shivanasamudra Hydro 4 6
42 6 3
13 Sharavathi Hydro 10 103.5 1,035
14 Supa Hydro 2 50 100
15 Varahi Hydro 4 115 460
Subtotal (State sector hydro) - A 3,628.60
1 Bellary TPS Thermal
1 700
1,700 1 500
1 500
2 Raichur TPS Thermal 7 210
1,720 1 250
3 Yeramarus Thermal 2 800 1,600
Subtotal (State sector thermal) - B 5,020
Toal state sector generation - C=A+B 8,648.6
Central sector
1 Kudgi Thermal 2 800 1,600
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 54
# Generation name Generation type No of
units
Unit capacity
(MW)
Total capacity
(MW)
2 Kaiga Nuclear 4 220 880
Total central sector generation - D 2,480
Private sector
1 UPCL Thermal 2 600 1,200
2 JSW Thermal 2 300 600
2 130 260
Total private sector generation - E 2,060
Total RE generation - F 7,278
Total installed capacity in Karnataka C+D+E+F 20,466.60
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 55
Non conventional generations
Solar generation
Table 17: Details of solar generation as on March 31, 2017
# Developer Village Taluk District
Installed
capacity in
MW
Connected
substation
1 Welspun renewables energy pvt ltd - - - 16 C R patna 220
2 Bidar solar - - - 10 Chitapur 110
3 Dosti reality - - - 10 UAS dharwad
110
4 Clean solar power - - - 10 C R patna 220
5 Vedang solar(ravikumar) - - - 3 Thallak 220
6 Renew saur urja pvt ltd - - - 100 Ittagi 220
7 Burnish solar - - - 3 Hiryur 220
8 P somachandra - - - 12 Chitradurga 220
9 Jindal Aluminium Ltd Kalamarhalli Challakere Chitradurga 10 Hiryur 220
10 Sharda Construction and Corporation Private Ltd Satpur Aurad Bidar 6 Santpur 110
11 Dr. Vijaya Shankar (Sirawar Renewable Energy Pvt
Ltd siravara manvi raichur 2 Sirwar 110
12 Mourya Seelam (Mourya seelam power project
(MSPP). Ballari) karekallu Bellary Bellary 3 PD halli 110
13 BLDE University bhoothanala bijapura Bijapur 3 Bhutnal 110
14 BLDE Association bhoothanala bijapura Bijapur 3 Bhutnal 110
15 Panchaksharaiah kolagunashi soraba shivamogga 1 Shrilkoppa 110
16 N Sushma Venkatapura Pavagada Tumkur 1 Madhugiri 220
17 Sridevi W/o. Gurappa Haladakeri bidar bidar 2 Habsikote 110
18 M Phanendra Babu siraguppa bellary Bellary 3 Siraguppa 110
19 Latha V Naik (M/s Venkat Energy) Thalavatti Hiriyur Chitradurga 3 Chitradurga 220
20 Waa Solar Private Limited_Tumkur1 Kolihal Yelburga Koppal 5 Bevoor 110
21 T Yathiraju (M/s Samyama Jyothi Energy Pvt Ltd) madanayakanahalli chitradurga Chitradurga 3 Chitradurga 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
56 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity in
MW
Connected
substation
22 R D Seetharama Rao (M/s SolarFlux RDS Energy
LLP) kaparahalli challakere Chitradurga 1 Hiryur 220
23 B Somashekar thalavatti Hiriyur Chitradurga 3 Chitradurga 220
24 A V Nagaraja Reddy (Mepgen Solar Private Ltd) Dyamadavvanahalli Chithradurga Chitradurga 2 Chitradurga 220
25 Manasa Gaddikeri Hagaribommana
halli Bellary 3 Ittagi 220
26 Rejiya Saleem Gaddikeri Hagaridommana
halli, Bellary 3 Ittagi 220
27 Shrinath Malagi Gaddikeri Hagaridommana
halli Bellary 3 Ittagi 220
28 Latha Sandeep gaddikeri hagaridommana
halli Bellary 2 Ittagi 220
29 Ajith Kumar B Kuchnur bidar jamakhandi Bagalkot 1 Shirbur 110
30 Lakshimi Bai Sagareppa Dalawai halagani Babaleshwara Bijapur 1 Babaleshwar
110
31 Waa Solar Private Limited_Tumkur2 Kolihal Yelburga Koppal 5 Bevoor 110
32 G.Vishwanatha Reddy Lokikere kudligi Bellary 1 Ittagi 220
33 R.H.Jayaram Reddy Dalavayi hosa halli Bangarapete Kolar 3 Malur 220
34 Kallappa Lakshmappa Nyamagoudar Malali Mudhol Bagalkot 1 Hassan 220
35 Basavarajaiah (M/s Sunishka Solar ) Tungani Kanakapura Ramnagar 1 Kanakapura 220
36 Ramappa Sidappa Talewad jambagi.K.D Mudhol Bagalkot 1 Jambagi K D
110
37 Siddappa F Tigaddi Murgudu Savadatti, Belgaum 3 Saundatti 220
38 T Gowranna Kondlahally Molakalmuru Chitradurga 1 Thallak 220
39 Prakash Sindagi Athani Athani Belgaum 1 Athani 220
40 Girija B Hatiholi Madamagiri Savadathi Belgaum 3 Saundatti 220
41 Channaraj B HatiholiHattiholi Basargi KM Savadthi Belgaum 3 Saundatti 220
42 Rajashekar S Nadagouda Jalageri Bijapur Bijapur 3 Tekkalaki 110
43 Ulhas Siddramappa Arakeri Hunashyala Bijapura Bijapur 3 Atharga 110
44 RH Kasturi Dalavayi Hosa Halli Banagarpete Kolar 1 Malur 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 57
# Developer Village Taluk District
Installed
capacity in
MW
Connected
substation
45 R Lakshmidevamma Kaluve Challakere Chitradurga 2 Thallak 220
46 R Krishnappa Kaluve Challakere Chitradurga 2 Thallak 220
47 Raghu Infra Structure Pvt Ltd (Asian fabtec Ltd ) Bevinahalli &
Sankaour Sira Tumkur 3 Hiryur 220
48 United Telecoms Ltd (M/s United Surya Energy Pvt
Limited) Bandethimalapura
TalakuHobli,
Challakere taluk Chitradurga 3 Thallak 220
49 Emami Power Limited Neralakunte &
Dommathamri Pavagada Tumkur 10 Madhugiri 220
50 Azure Power India Private Limited Halagaladdi Hiryur Chitradurga 10 Hiryur 220
51 Interocean shipping pvt ltd Nagalamadike Pavagada Tumkur 3 Madhugiri 220
52 Clean MaxHarsh Solar LLP(SP) Tondihatti Madhugiri Tumkur 5.5 Madhugiri 220
53 Clean MaxHarsh Solar LLP(SP) Tondihatti Madhugiri Tumkur 5 Madhugiri 220
54 RNS infrastructure Vadrevu ,
naagalamadike hobli pavagada Tumkur 9 Madhugiri 220
55 Atria Power Corporation Ltd (IPP Solar thermal) Nelvagalu Ranibenuru Haveri 3 Shimoga 220
56 Atria Brindavan Power Private Ltd (M/s C.S.Sundar
Raju) Ryapte pavagada Tumkur 20 Madhugiri 220
57 Sharda Construction and Corporation Private Ltd Chatnal and Santpur Aurad Bidar 4 Santpur 110
58 Starkraft BLP Neralakunte pavagada Tumkur 4 Munirabad ph
220
59 Jindal Aluminium Ltd Bhavihallu mayakonda Davanagere 10 Chitradurga 220
60 Clean MaxHarsh Solar LLP(SP) Tondihatti Madhugiri Tumkur 13.88 Madhugiri 220
61 Kanva Diagnostic Services Pvt Ltd Halagalladi Hiriyur Chitradurga 1 Hiryur 220
62 Belagavi (KPCL) Itnal Chikodi Belgaum 3 Kerur 110
63 Kolar (KPCL) Yelasandra Bangarpet Kolar 3 Malur 220
64 Raichur (KPCL) Yapaladdini Raichur Raichur 3 Ganadhal 110
65 Mandya (KPCL) Shimshapura Belakwadi Mandya 5 T K Halli 220
66 Welspun Solar Kannada Private Ltd. - Molakalmuru Chitradurga 7 Thallak 220
67 K.K.Rao Green Energy Pvt Ltd Kodambal Humnabad Bidar 3 Chittaguppa 110
68 KBJNL (Bagalkot) Canal top Rampur Bagalkot Bagalkot 1 Rampur 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
58 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity in
MW
Connected
substation
69 Mandya (KPCL) - Malavalli Mandya 10 T K Halli 220
70 Welspun Renewables Energy Pvt Ltd Rajapur Molakalmuru Chitradurga 34 Hiryur 220
71 Welspun Renewables Energy Pvt Ltd Rajapur Molakalmuru Chitradurga 50 Thallak 220
72 Bhoruka Power Corporation Ltd Kanajanahally Hiriyur Chitradurga 20 Hiryur 220
73 Asian fabtec Ltd Bevanahalli Sira Tumkur 5 Hiryur 220
74 Photon suryakiran Pvt Ltd (M/s. Today Green Power
Pvt. Ltd.) Varavu challakere Chitradurga 10 Thallak 220
75 Photon suryakiran Pvt Ltd (M/s. Today Green Power
Pvt. Ltd.) Neelagattanahatty Challakere Chitradurga 20 Thallak 220
76 Azure Sunrise Power Ltd (Azure power India Pvt Ltd Hulikunte Challakere Chitradurga 50 Hiryur 220
77 ESSEL Infrastructure Ltd. Nimbal Indi Bijapur 5 Indi 110
78 Azure Sunrise Power Ltd (Azure power India Pvt Ltd Golahalli Challakere Chitradurga 40 Hiryur 220
79 Azure Sunrise Power Ltd (Azure power India Pvt Ltd Kopparahalli Challakere Chitradurga 40 Hiryur 220
80 Photon suryakiran Pvt Ltd (M/s. Today Green Power
Pvt. Ltd.) Varavu Challakere Chitradurga 20 Thallak 220
81 Photon suryakiran Pvt Ltd (M/s. Today Green Power
Pvt. Ltd.) Varavu Challakere Chitradurga 10 Thallak 220
82 Kavit Industries Limited Hunasihal Yalburga Koppal 5 Bevoor 110
83 M/s. Surana Telecom and Power Limited (M/s
Celestail Solar Solutions Pvt Ltd)
Changamangathanaha
lli Challakere Chitradurga 10 Hiryur 220
84 Sun Edison Energy Holdings Singapore Pte Ltd Nayakanahatty Challakere Chitradurga 30 Thallak 220
85 Sun Edison Energy Holdings Singapore Pte Ltd
(M//s SEI Diamond Pvt Ltd) Nelagettanahatty Challakere Chitradurga 30 Thallak 220
86 Sun Edison Energy Holdings Singapore Pte Ltd (M/s
SEI Aditi Power Pvt Ltd) Nagalamadike Pavagada Tumkur 30 Madhugiri 220
87 Sun Edison Energy Holdings Singapore Pte Ltd (M/s
SEI Bheem Pvt Ltd) Pallavali Pavagada Tumkur 30 Madhugiri 220
88 ESSEL Infrastructure Ltd. Nimbal Indi Bijapur 5 Indi 110
89 Sun Edison Energy Holdings Singapore Pte Ltd (M/s
SEI Suryashakthi Power Pvt Ltd) Nagalamadike Pavagada Tumkur 30 Madhugiri 220
90 Asian fabtec Ltd Bevanahalli Sira Tumkur 10 Hiryur 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 59
# Developer Village Taluk District
Installed
capacity in
MW
Connected
substation
91 Renew Solar Power Pvt Ltd (Renew Wind energy
(Karnataka 3) Pvt Ltd) Ladha Bhalki Bidar 20 Ladha 110
92 Renew Solar Power Pvt Ltd [ M/s Tarun kiran
bhoomi pvt ltd] Kadaganchi Alland Kalburgi 20 Kadaganchi 110
93 Renew Solar Power Pvt Ltd ( Renew Agni Power Pvt
Ltd ) Tekkalakote Siraguppa Bellary 20 Tekkalkote 110
94 Renew Solar Power Pvt Ltd [Renew wind
energy(karnataka 4) pvt ltd] Nirna Humnabad Bidar 20
Manna-e-khelli
110
95 Jindal Aluminium Ltd Bhavihallu mayakonda Davanagere 10 Chitradurga 220
96 United Telecoms Limited Vijalapura Mulabagal Kolar 3 Kolar KP 220
97 M/s Chikku Energy Pvt Ltd (Srinivas Shetty Reg.No-
16) Devasamudra Molakalmuru Chitradurga 3 C R patna 220
98 Anupkumar.K. Hanchinal Byalavadagi Mundaragi Gadag 1 Mundargi 110
99 M/S Mallige Education Foundation Huralichikkanahalli Bengalure north Bengaluru 1 Peenya 220
100 M/s CBM Enterprise ltd (B Gopal Reddy Reg - no
134) Devasamudra Molakalmuru Chitradurga 3 C R patna 220
101 Sri Aruna Mougli (M/s Guttur Solar Power LLP Guttur Yelburga Koppal 1 Bevoor 110
102 Sri Veeranagouda S/o Rudragouda Patil (M/s VR
patil Vividh Vidyuth Nirman Pvt Ltd) Neljeri Yelburga Koppal 3 Bevoor 110
103 Sri Shekarappa S/o Erappa Kavaroor Halavarthy Koppal Koppal 1 Koppal 110
104 Sri Sharanagouda Patil Chandragiri Koppal Koppal 1 Munirabad ph
220
105 Smt Lakshmi Devi (M/s Chandragiri Power & Infra
LLP) Chandragiri Koppal Koppal 1
Munirabad ph
220
106 Sri T R Bheemaneedi (M/s Ramapriya Energy Pvt
Ltd) Nanivala Challakere Chitradurga 2 Chitradurga 220
107 Prema Vijeyendra Nagalamadike Pavagada Tumkur 1 Madhugiri 220
108 T Chandra Shekar (M/s Niketan Solar Solutions) Gaddigere Hagari bommana
halli Bellary 3 Ittagi 220
109 S L Nagaraj Shetty (M/s Sri Sai shivanagere solar
power pvt ltd) Kallukotte Sira Tumkur 1 Hiryur 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
60 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity in
MW
Connected
substation
110 Ajit C Desai (Arete elena energy pvt ltd) Murgudu Savadatti Belgaum 3 Yaragatti 110
111 M. V. Subramanya (Sree Jnanakshi Renewable
Energy Pvt Ltd) Virajipura Malavalli Mandya 2
Vajamangala
220
112 B Lakshmi Bai (Ahaska Aryaa Solar ) Akkirampura kortagere Tumkur 1 Madhugiri 220
113 Tippamma (SGTRS Solar Power Pvt Ltd) Kampallisagar Challkere Chitradurga 3 Thallak 220
114 Hosamani Shekaraj (Green impact Solar Power
(Shirol) Pvt Ltd ) Shirola Mundargi Gadag 1 Mundargi 110
115 Welspun Solar Kannada Pvt Ltd Nagasamudra Molakalmuru Chitradurga 10 Thallak 220
116 Srikant b kabadi Betageri gadag gadag 1 Uppin Betagere
110
117 A V Anjaneya Prasad Honnakatti Bagalkot Bagalkot 1 Sigikere 110
118 M V Rajaiha (GORICH Energy pvt ltd) Mukkadahalli Chamarajanagara Chamarajanagara 1 C Rnagara 220
119 Ravikumar H (Saketh Solar Energy LLP) Gundegala Kolegala Chamarajanagara 3 Madhuvanahally
220
120 Suhas S (Suragi Power Pvt Ltd) Devanooru Nanjangoodu Mysore 2 Kadakola 220
121 V Muniraju (P.V.Power Pvt Ltd) Nagalamadike Pavagada Tumkur 1 Madhugiri 220
122 H S Mallikarjun (SS solar Energy) Hurasagundagi shahapura yadagiri 2 Khanapur MK
110
123 Bhoruka Power Corporation Limited Rangen halli Hiriyur Chitradurga 10 Hiryur 220
124 H G Jayalakshmi Kutavadi Hunasuru Mysore 1 Hootagalli 220
125 M Rammappa Katuvadi - Mysore 1 Hootagalli 220
126 Seetabai G Desai benakoppa gadag gadag 3 Uppin Betagere
110
127 Avvanneppa Sonnad (Ravateshwar solar pvt ltd) thodalabaagi jamakkandi Bagalkot 2 Todalbagi 110
128 Srinivas Khadaranagara Bidar Bidar 3 Halabarga 110
129 Ashok Kumar Nithasha Humnabad Bidar 3 Manna-e-khelli
110
130 P.Satyanarayana (Satyanarayana Power LLP) Bassapura Sindanooru Raichur 1 Dadesugur 110
131 P.Venkateswara Rao ( PVR Solar Energy LLP) Bassapura Sindanooru Raichur 2 Dadesugur 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 61
# Developer Village Taluk District
Installed
capacity in
MW
Connected
substation
132 Y.Vishnuvardhan Rao (Vishnu Vardhan Solar
Energy LLP) Maladini Sindanooru Raichur 2 Dadesugur 110
133 Y.Suryavathi (Suryavathi Energy LPP) Dhadesaguru Sindanooru Raichur 3 Dadesugur 110
134 Azure Power Karnataka Private Limited Halagalahaddi Hiriyur Chitradurga 10 Hiryur 220
135 P.Sudhakar (Sudhakar Power LLP) Bassapura Sindanooru Raichur 1 Dadesugur 110
136 P Krishnakumari (Krishnakumari Power LLP) Bassapura Sindanooru Raichur 1 Dadesugur 110
137 Deveindrappa Gouda M Biradar Gowdagere Shurapura Bagalkot 2 Shorapur 110
138 T G Yeriswamy Yarangalige Bellary Bellary 2 Kurugodu 110
139 Rayappa Poojari chikkalakki jamakhandi Bagalkot 1 Todalbagi 110
140 K.T.Hema Reddy Chithranayakana halli Challakere Chitradurga 2 Thallak 220
141 C L Lakshmana Reddy chikkanayakanahalli challakere Chitradurga 2 Thallak 220
142 T Laxman Reddy Chitranayakanahalli Challakere Chitradurga 2 Thallak 220
143 Hanji Fakirappa (Vinsol (Hubli) energy Pvt Ltd) Govanala Laksheshwara Gadag 2 Laxmeshwar
110
144 Girija Kamma (NT Power Projects Pvt Ltd) Rajeshwara basava kalyana bidar 2 Rajeshwar 110
145 Pristine Solar Park Pvt Ltd Oolvadi , kasaba
hobli Chintamani Chikkaballapura 3 Chintamani 220
Wind generation
Table 18: Details of wind generation as on March 31, 2017
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
1 Victory Glass And Industries Ltd Kappatagudda Mundargi Gadag 1.35 Guttal 110
2 R P G Telecom Ltd. Hanumasagar Kustagi Koppal 1.92 Hanamsagar
110
3 Jindal Aluminium Ltd. Madhakaripura Chitradurga Chitradurga 2.3 Chitradurga 220
4 Jindal Aluminium Ltd. Madhakaripura Chitradurga Chitradurga 1.84 Chitradurga 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
62 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
5 ICICI Bank Ltd. Girgoan Chikkodi Belgaum 3 Chikkodi 110
6 Indo Wind Energy Ltd. Malasamudra Gadag Gadag 1.8 Gadag Road
110
7 Indo Wind Energy Ltd. Malasamudra Gadag Gadag 0.25 Gadag Road
110
8 Indo Wind Energy Ltd. Belathadi Gadag Gadag 0.4 Bellahatti 110
9 Indo Wind Energy Ltd. Belathadi Gadag Gadag 0.225 Bellahatti 110
10 Indo Wind Energy Ltd. Belathadi Gadag Gadag 0.225 Bellahatti 110
11 Indo Wind Energy Ltd. - Gadag Gadag 0.4 Gadag Road
110
12 Indo Wind Energy Ltd. Belathadi Gadag Gadag 0.4 Bellahatti 110
13 Indo Wind Energy Ltd. Belathadi Gadag Gadag 0.4 Bellahatti 110
14 BSES Limited Bharampura Holalkere Chitradurga 7.59 Chitradurga 220
15 ICICI Bank Ltd. Bharampura Chikkodi Belgaum 0.5 Chitradurga 220
16 Nuzveedu Seeds Limited, Biderekere Jagalur Davangere 3.75 Chitradurga 220
17 Topaz Investments Pvt. Ltd., Nandipura Chitradurga Chitradurga 1.2 Chitradurga 220
18 CEPCO Industries Pvt. Ltd. Kurumardigere &Kennedlu/ Chitradurga Chitradurga Chitradurga 3 Chitradurga 220
19 Dee Dee Enterprises, Nandipura/Chitradurga Chitradurga Chitradurga 0.6 Chitradurga 220
20 Topaz Investments Pvt. Ltd., Nandipura/Chitradurga Chitradurga Chitradurga 0.6 Chitradurga 220
21 CEPCO Industries Pvt. Ltd. Kurumardigere &Kennedlu/ Chitradurga Chitradurga Chitradurga 5.4 Chitradurga 220
22 Lovely Fragrances Bharampura/ Chitradurga Chitradurga Chitradurga 0.6 Chitradurga 220
23 J.N.Investments & Trading
Compnay Pvt. Ltd. Nandipura/ Chitradurga Chitradurga Chitradurga 0.6 Chitradurga 220
24 Manipal Academy of Higher
Education, Kurumardigere Chitradurga Chitradurga 3.75 Chitradurga 220
25 Indo Wind Energy Ltd. Kurumardigere Chitradurga Gadag 0.9 Chitradurga 220
26 Ghodawat Pan Masal Productrs
(India) Pvt. Ltd. Kenndlu,Nandipua & Doddapura Chitradurga Chitradurga 3.6 Chitradurga 220
27 Sanjay D Ghodawat Nandipua Chitradurga Chitradurga 0.6 Chitradurga 220
28 Encon Service Ltd., (NEG) Chikkasiddavvanahalli Hiriyur Chitradurga 3 Chitradurga 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 63
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
29 Prabhat Agri- Bitech Pvt. Ltd.
(NEG) Chikkasiddavvanahalli Hiriyur Chitradurga 0.75 Chitradurga 220
30 Enercon Windfarms (India) Ltd., Kenndlu,Chitradurga Chitradurga Chitradurga 4.2 Chitradurga 220
31 Savitha Chemicals Ltd.(NEG) Chikkasiddavvanahalli Hiriyur Chitradurga 0.75 Chitradurga 220
32 Ghodawat Pan Masal Productrs
(India) Pvt. Ltd. Kenndlu, Nandipua& Doddapura Chitradurga Chitradurga 1.8 Chitradurga 220
33 Prime Lable (P) Ltd., -PWL Kurumardigere Chitradurga Chitradurga 0.25 Chitradurga 220
34 Jindal Aluminium Ltd.-EIL NandanaHosur Holalkere Chitradurga 3 Chitradurga 220
35 Mohite & Mohite (engineers &
Contractor), NandanaHosur Holalkere Chitradurga 2.4 Chitradurga 220
36 Texmo Industries NandanaHosur & Horakeredevarapura Holalkere Chitradurga 1.8 Chitradurga 220
37 Shriram Investments Ltd. Budipura / Nakikere Holalkere Chitradurga 4.2 Chitradurga 220
38 Shriram Transport Finance Co.
Ltd. Budipura / Gundikere Holalkere Chitradurga 4.2 Chitradurga 220
39 Shriram City Union Finance Ltd. Budipura / Gundikere Holalkere Chitradurga 1.8 Chitradurga 220
40 Jindal Aluminium Ltd.-EIL NandanaHosur Holalkere Chitradurga 2.4 Chitradurga 220
41 Jindal Aluminium Ltd-EIL NandanaHosur Holalkere Chitradurga 0.6 Chitradurga 220
42 MSPL Ltd.-1 (NEG) G.R.Halli/Gonur Chitradurga Chitradurga 0.95 Chitradurga 220
43 Kamal Trading Co., Pvt. Ltd., Madakaripura Chitradurga Chitradurga 0.23 Chitradurga 220
44 Sharp Pumps Pvt Ltd., Madakaripura Chitradurga Chitradurga 0.23 Chitradurga 220
45 Mayura Steels Pvt Ltd., Madakaripura Chitradurga Chitradurga 0.23 Chitradurga 220
46 RSM Autokast Ltd., Madakaripura Chitradurga Chitradurga 0.46 Chitradurga 220
47 Rajinikanth Foundation, Madakaripura Chitradurga Chitradurga 0.23 Chitradurga 220
48 VXL Systems. Madakaripura Chitradurga Chitradurga 0.46 Chitradurga 220
49 Shilpa Medicare Limited Madakaripura Chitradurga Chitradurga 0.46 Chitradurga 220
50 Nuzveedu Seeds Limited, Biderekere Jagalur Davangere 8.25 Chitradurga 220
51 Texmo Precision Castings. Madakaripura Chitradurga Chitradurga 1.2 Chitradurga 220
52 Dee Dee Enterprises, Mathighatta (jogimatti in Wind zone) Chitradurga Chitradurga 0.6 Chitradurga 220
53 Royal Energy Company, Thalya (Jogimatti in Wind Zone) Chitradurga Chitradurga 0.6 Chitradurga 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
64 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
54 Siddaganga Oil Extractions Ltd., Mathighatta (jogimatti in Wind zone) Chitradurga Chitradurga 1.2 Chitradurga 220
55 Fiza Developers & Inter-Trade Pvt.
Ltd,
Mathighatta and Thalya (jogimatti in Wind
zone) Chitradurga Chitradurga 1.2 Chitradurga 220
56 CEPCO Industries Pvt. Ltd. Kumminaghatta (Jogimatti in Wind Zone Chitradurga Chitradurga 0.6 Chitradurga 220
57 Ghodawat Pan Masala Products (I)
Pvt Ltd.,
Janakal and Janakal (Jogimatti Wind
Zone) Chitradurga Chitradurga 5.4 Chitradurga 220
58 Panama Business centre, Kumminaghatta (Jogimatti Wind Zone) Chitradurga Chitradurga 0.6 Chitradurga 220
59 Suttati Enterprises Pvt Ltd., Kumminaghatta (Jogimatti Wind Zone) Chitradurga Chitradurga 1.2 Chitradurga 220
60 Jindal Aluminium Ltd.-EIL Kumminaghatta (Jogimatti Wind Zone) Chitradurga Chitradurga 0.6 Chitradurga 220
61 Friends associate Power Projects. Madakaripura Chitradurga Chitradurga 0.23 Chitradurga 220
62 Supreme Power Company Mattighatta/ Holakere Holalkere Chitradurga 0.6 Chitradurga 220
63 Enercon Windfarms (India) Ltd., Yarehalli, Thekalavatti &Kolahalu Chitradurga Chitradurga 7.2 Chitradurga 220
64 Elveety Industries Ltd. Gonur Chitradurga Chitradurga 0.5 Chitradurga 220
65 NEG Micon (I) Pvtl. Ltd G.R.Halli/Gonur Chitradurga Chitradurga 3.8 Chitradurga 220
66 BSES Limited Gundikere & Budhuipura Chitradurga Chitradurga 1.8 Chitradurga 220
67 Nuziveedu Seeds Ltd Biderekere Jagalur Davangere 4.75 Chitradurga 220
68 Panama Credit & Capital Pvt. Ltd. Horakeredevarapura Chitradurga Chitradurga 0.6 Chitradurga 220
69 Balasaheb M. Ladkat Horakeredevarapura Chitradurga Chitradurga 0.6 Chitradurga 220
70 Shilpa Medicare Limited Kumminaghati Chitradurga Chitradurga 0.6 Chitradurga 220
71 Enercon Windfarms (India) Ltd., Yarehalli, Thekalavatti &Kolahalu Chitradurga Chitradurga 13.8 Chitradurga 220
72 Pallavi Green Power (FIZA) Kanchignhal Chitradurga Chitradurga 0.75 Chitradurga 220
73 Nuzveedu Seeds Limited, Biderekere Jagalur Davangere 1.9 Chitradurga 220
74 Ramgad Mineral and mining Pvt.
Ltd-1 (NEG) G.R.Halli/ Gonur Chitradurga Chitradurga 1.9 Chitradurga 220
75 MSPL--2 (NEG) GRHalli Chitradurga Chitradurga 4.75 Chitradurga 220
76 Associate Autotex Ancillaries (P)
Ltd., Elladakere Hiriyur Chitradurga 0.6 Chitradurga 220
77 Sanja D Ghodawat (HUF) Kennedlu, Nandipura Chitradurga Chitradurga 0.6 Chitradurga 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 65
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
78 Shardha Constructions Enginners
and Contractors Elladakere Hiriyur Chitradurga 4.2 Chitradurga 220
79 VXL Systems. Elladakere Hiriyur Chitradurga 0.6 Chitradurga 220
80 Star Flexi Pack Industries Elladakere Hiriyur Chitradurga 0.6 Chitradurga 220
81 Sanjay D Ghodawat (Individual) Kennedlu, Nandipura Chitradurga Chitradurga 0.6 Chitradurga 220
82 Ghodawat pan Masala products (I)
Pvt., Ltd., Kennedlu, Nandipura Chitradurga Chitradurga 4.2 Chitradurga 220
83 CEPCO Industries Pvt. Ltd. Elladakere Hiriyur Chitradurga 1.2 Chitradurga 220
84 MSPL Ltd. Jogimatti Chitradurga Chitradurga 3.75 Chitradurga 220
85 Prime Labels Ltd. - PWL Palavanahalli Chitradurga Chitradurga 0.64 Chitradurga 220
86 Suresh Productions(FIZA) G.R.Halli Chitradurga Chitradurga 0.75 Chitradurga 220
87 MSPL-7 (NEG) Chikapanahalli Chitradurga Chitradurga 2.85 Chitradurga 220
88 MSPL Jogimatti Chitradurga Chitradurga 2.5 Chitradurga 220
89 MSPL-5 (FIZA) G.R.Halli Chitradurga Chitradurga 2.25 Chitradurga 220
90 MSPL-4 G.R.Halli Chitradurga Chitradurga 1.5 Chitradurga 220
91 Eswari Garements (FIZA) G.R.Halli Chitradurga Chitradurga 0.75 Chitradurga 220
92 Esawi knittings (FIZA) G.R.Halli Chitradurga Chitradurga 1.5 Chitradurga 220
93 Sanghvi Movers Ltd., (FIZA) G.R.Halli Chitradurga Chitradurga 0.75 Chitradurga 220
94 MSPL-8 (FIZA) G.R.Halli Chitradurga Chitradurga 0.95 Chitradurga 220
95 Eswari Textiles (FIZA) G.R.Halli Chitradurga Chitradurga 1.5 Chitradurga 220
96
Shraddha Constructions & Power
Generation (P) Ltd., (Formerly
Shardha Constructions Enginners
and Contractors)
Elladakere Hiriyur Chitradurga 0.6 Chitradurga 220
97 Madras Cements Ltd., Elladakere Hiriyur Chitradurga 0.6 Chitradurga 220
98 Madras Cements Ltd., Elladakere Hiriyur Chitradurga 0.6 Chitradurga 220
99 Associated Autotex Ancillaries (P)
Ltd., Elladakere Hiriyur Chitradurga 0.6 Chitradurga 220
100 Nuziveedu Seeds Ltd. Jagalur Jagalur Davangere 6 Chitradurga 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
66 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
101 B.S.C.Textiles Cloth Merchants, Elladakere Hiriyur Chitradurga 0.6 Hiryur 220
102 Nuziveedu Seeds Ltd.7 Jagalur Jagalur Davangere 3 Chitradurga 220
103 B.S.Chanabasappa and sons., Elladakere Hiriyur Chitradurga 0.6 Hiryur 220
104 Meghna Automotives Pvt. Ltd. Elladakere Hiriyur Chitradurga 0.6 Hiryur 220
105 MSPL-5 (FIZA) G.R.Halli/ Gonur Chitradurga Chitradurga 1.5 Chitradurga 220
106 MSPL-4 G.R.Halli/ Gonur Chitradurga Chitradurga 2.85 Chitradurga 220
107 MSPL-8 (FIZA) G.R.Halli/ Gonur Chitradurga Chitradurga 0.95 Chitradurga 220
108 Eswari Textiles (FIZA) G.R.Halli/ Gonur Chitradurga Chitradurga 1.5 Chitradurga 220
109 Victus Associate (FIZA) G.R.Halli/ Gonur Chitradurga Chitradurga 0.75 Chitradurga 220
110 Patel Shanti Steels Pvt. Ltd, Elladakere Hiriyur Chitradurga 0.6 Hiryur 220
111 P.Vijay Kumar., Elladakere Hiriyur Chitradurga 0.6 Hiryur 220
112
Rohit surfactants Pvt Ltd.,
(Formerly Shri Mahadeo Soap
Industries Pvt. Ltd., )
Elladakere Hiriyur Chitradurga 3 Hiryur 220
113 Cooper Foundary (P) Ltd., Elladakere Hiriyur Chitradurga 1.2 Hiryur 220
114 Primtex Apparels India (P) Ltd., Elladakere Hiriyur Chitradurga 0.6 Hiryur 220
115 Rajesh Construction Company Kurumardikere Chitradurga Chitradurga 1.25 Chitradurga 220
116 Ferromar Shipping (P) Ltd., Kurumardikere Chitradurga Chitradurga 1.25 Chitradurga 220
117 Gangadhar Naringadas Agarwal
(HUF) Kurumardikere Chitradurga Chitradurga 1.25 Chitradurga 220
118 Cooper Foundary (P) Ltd., Elladakere Hiriyur Chitradurga 1.2 Hiryur 220
119 Rajesh Construction Company Kurumardikere Chitradurga Chitradurga 1.25 Chitradurga 220
120 Mineral Enterprises Ltd., Elladakere Hiriyur Chitradurga 1.2 Hiryur 220
121 World Institute of Sustainable
Energy Elladakere Hiriyur Chitradurga 1.2 Hiryur 220
122
Rohit surfactants Pvt Ltd.,
(Formerly Shri Mahadeo Soap
Industries Pvt. Ltd., )
Elladakere Hiriyur Chitradurga 3 Hiryur 220
123 Enercon Windfarms (Krishna)
Ltd., Kappatagudda Mundargi Gadag 15 Guttal 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 67
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
124 MSPL-2 Jogimatti Chitradurga Chitradurga 5 Chitradurga 220
125 Mantri Developer Jogimatti Chitradurga Chitradurga 3.75 Chitradurga 220
126 Amitronics Jogimatti Chitradurga Chitradurga 1.25 Chitradurga 220
127 Navalakhas Travles Jogimatti Chitradurga Chitradurga 1.25 Chitradurga 220
128 SE Investements Vanivilasagar Hiriyur Chitradurga 2.4 Hiryur 220
129 Shri Jintendra D Majethia Vanivilasagar Hiriyur Chitradurga 0.6 Hiryur 220
130 Unnathi Projects Vanivilasagar Hiriyur Chitradurga 0.6 Hiryur 220
131 Patel Shanti Steels Pvt. Ltd, Vanivilasagar Hiriyur Chitradurga 0.6 Hiryur 220
132 Brindavan Agro Industries (P)
Ltd., Vanivilasagar Hiriyur Chitradurga 1.2 Hiryur 220
133 Gem Crafts Vanivilasagar Hiriyur Chitradurga 0.6 Hiryur 220
134 Enercon Windfarms (India) Ltd., Kappatagudda Mundargi Gadag 3.2 Guttal 110
135 Ramgad Minerals & Mining Pvt.
Ltd, Sogi Huvinahadagalli Bellary 7.5 Ittagi 220
136 P.Venganna Setty & Bros. Sogi Huvinahadagalli Bellary 7.5 Ittagi 220
137 MSPL Sogi Huvinahadagalli Bellary 5 Ittagi 220
138 Jivraj Tea Ltd., Jogimatti Chitradurga Chitradurga 1.25 Chitradurga 220
139 Abishek Exports Jogimatti Chitradurga Chitradurga 1.25 Chitradurga 220
140 Sanjana Powers Jogimatti Chitradurga Chitradurga 1.25 Chitradurga 220
141 International conveyors Vanivilasagar Hiriyur Chitradurga 0.6 Hiryur 220
142 IGE India Vanivilasagar Hiriyur Chitradurga 0.6 Hiryur 220
143 Unnathi Projects Vanivilasagar Hiriyur Chitradurga 1.8 Hiryur 220
144 Amrith Bottlers Vanivilasagar Hiriyur Chitradurga 1.2 Hiryur 220
145 Sanjana power Vanivilasagar Hiriyur Chitradurga 0.6 Hiryur 220
146 Shilpa Medicare Limited Vanivilasagar Hiriyur Chitradurga 1.2 Hiryur 220
147 Swaraj Pipes Vanivilasagar Hiriyur Chitradurga 0.6 Hiryur 220
148 MSPL Jajikalgudda Harpanahalli Davangere 16.25 Ittagi 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
68 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
149 Ramgad Minerals & Mining Pvt.
Ltd, Jajikalgudda Harpanahalli Davangere 10 Ittagi 220
150 MSPL Jajikalgudda Harpanahalli Davangere 2.5 Ittagi 220
151 Maris Power Supply Company
Ltd.,(FIZA) Gonur Chitradurga Chitradurga 5.25 Chitradurga 220
152 Bellary Iron Works Pvt.,
Ltd.,(CWEL) G.R.Halli/ Gonur Chitradurga Chitradurga 0.95 Chitradurga 220
153 S.Kumar (CWEL) G.R.Halli/ Gonur Chitradurga Chitradurga 0.95 Chitradurga 220
154 Savitha chemicals Ltd.(CWEL) G.R.Halli/ Gonur Chitradurga Chitradurga 1.9 Chitradurga 220
155 Bellad and Company (CWEL) G.R.Halli/ Gonur Chitradurga Chitradurga 0.95 Chitradurga 220
156 MKAgrotech Vanivilasagar Hiriyur Chitradurga 1.2 Hiryur 220
157 Peenya Power Company (P) Ltd., Betadarangenahalli Chitradurga Chitradurga 0.5 Chitradurga 220
158 Peenya Power Company (P) Ltd., Bettedanagenahalli Chitradurga Chitradurga 0.5 Chitradurga 220
159 Ramgad Minerals & Mining
Pvt.Ltd-4 Jajikalgudda Harpanahalli Davangere 6.25 Ittagi 220
160 MSPL Limited-6 Jajikalgudda Harpanahalli Davangere 1.25 Ittagi 220
161 Ramgad Minerals & Mining
Pvt.Ltd-3 Jajikalgudda Harpanahalli Davangere 1.25 Ittagi 220
162 MSPL Limited-6 Jajikalgudda Harpanahalli Davangere 1.25 Ittagi 220
163 Ramgad Minerals & Mining
Pvt.Ltd-4 Jajikalgudda Harpanahalli Davangere 3.75 Ittagi 220
164 Bellary Iron Ores Co.Pvt.Limited
(NEG) Gonur Chitradurga Chitradurga 0.95 Chitradurga 220
165 Savitha Chemicals Limited
(CWEL) Gonur Chitradurga Chitradurga 1.9 Chitradurga 220
166 Ramgad Minerals & Mining
Pvt.Ltd-3 Jajikalgudda Harpanahalli Davangere 2.5 Ittagi 220
167 Bellad and Company (CWEL) Gonur Chitradurga Chitradurga 0.95 Chitradurga 220
168 Mysore Mercantile Company Ltd., Mattighatta Holalkere Chitradurga 1.6 Chitradurga 220
169 Mysore Mercantile Company Ltd., Mattighatta Holalkere Chitradurga 2.4 Chitradurga 220
170 Mysore Mercantile Company Ltd., Mattighatta Holalkere Chitradurga 0.8 Chitradurga 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 69
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
171 Abletech Electro Engineers Pvt.
Ltd., Mattighatta Holalkere Chitradurga 1.6 Chitradurga 220
172 CBM Corporation MMCL Mattighatta Holalkere Chitradurga 0.8 Chitradurga 220
173 Mineral Enterprises Ltd., (MMCL) Mattighatta Holalkere Chitradurga 2.4 Chitradurga 220
174 Avanthi FeedsLtd., Lakkihalli Hiriyur Chitradurga 3.2 Hiryur 220
175 Srinivasa Cystine Ltd., Lakkihalli Hiriyur Chitradurga 0.8 Hiryur 220
176 B V Finanace & Leasing LTd., Lakkihalli Hiriyur Chitradurga 0.8 Hiryur 220
177 Jubilee Textile Mills Lakkihalli Hiriyur Chitradurga 0.8 Hiryur 220
178 RDS Construction Company Lakkihalli Hiriyur Chitradurga 0.8 Hiryur 220
179 Brindavan Agro Industries Ltd., Lakkihalli Hiriyur Chitradurga 0.8 Hiryur 220
180 Neharaj Enegry Lakkihalli Hiriyur Chitradurga 0.8 Hiryur 220
181 Mark Data Power & Energy Ltd., Gujanur Huvinahadagalli Bellary 1.25 Ittagi 220
182 VSL Mining Company Gujanur Huvinahadagalli Bellary 6.25 Ittagi 220
183 Siddhayu Ayurvedic Resarch
Foundation (P) Ltd., Gujanur Huvinahadagalli Bellary 2.5 Ittagi 220
184 VSL Mining Company Gujanur Huvinahadagalli Bellary 2.5 Ittagi 220
185 Srinivasa Cystine Ltd., Lakkihalli Hiriyur Chitradurga 0.8 Hiryur 220
186 Vandana Global Ltd., Lakkihalli Hiriyur Chitradurga 0.8 Hiryur 220
187 Vanadana Rolling Mills Ltd., Lakkihalli Hiriyur Chitradurga 0.8 Hiryur 220
188 Vivek Trading Company Lakkihalli Hiriyur Chitradurga 0.8 Hiryur 220
189 Brindavan Agro Industries Ltd., Lakkihalli Hiriyur Chitradurga 2.4 Hiryur 220
190 Amrit Bottlers Pvt Ltd., Lakkihalli Hiriyur Chitradurga 0.8 Hiryur 220
191 Vivek Pharma Chem India Ltd., Lakkihalli Hiriyur Chitradurga 0.8 Hiryur 220
192 R S Suriya Lakkihalli Hiriyur Chitradurga 0.8 Hiryur 220
193 MSPL-5 Sogi Huvinahadagalli Bellary 1.25 Ittagi 220
194 India Power Corporation Ltd., Lakkihalli Hiriyur Chitradurga 4.8 Hiryur 220
195 India Power Corporation Ltd., Lakkihalli Hiriyur Chitradurga 2.4 Hiryur 220
196 Treveni Enterprises Kappatagudda Mundargi Gadag 1.25 Guttal 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
70 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
197 Research Development and
Manufactuering corporation Kappatagudda Mundargi Gadag 1.25 Guttal 110
198 BSK Trading Inc Kappatagudda Mundargi Gadag 1.25 Guttal 110
199 Shakhambari Enterprises Kappatagudda Mundargi Gadag 1.25 Guttal 110
200 E. Rammurthy Kappatagudda Mundargi Gadag 1.25 Guttal 110
201 Ensemble Infrasturuce India Ltd., Kappatagudda Mundargi Gadag 1.25 Guttal 110
202 Allegro Ventures India (P) Ltd., Gujunur Huvinahadagalli Bellary 1.25 Ittagi 220
203 Visva Vishal Engineering Kappatagudda Mundargi Gadag 1.25 Guttal 110
204 Dempo Industries Pvt LTd., Hosadurga Hosadurga chitradurga 0.8 Hiryur 220
205 Srinivasa Sririgieri Hosadurga Hosadurga chitradurga 0.8 Hiryur 220
206 Ushdev International Ltd., Hosadurga Hosadurga chitradurga 1.6 Hiryur 220
207 Dinesh Prouches Ltd., Hosadurga Hosadurga chitradurga 0.8 Hiryur 220
208 Desai Brotehrs Hosadurga Hosadurga chitradurga 0.8 Hiryur 220
209 R K Marbles Hosadurga Hosadurga chitradurga 0.8 Hiryur 220
210 Ramco Hosadurga Hosadurga chitradurga 0.33 Hiryur 220
211 Ghodawat Industires (P) Ltd., Hosadurga Hosadurga chitradurga 5.6 Hiryur 220
212 India Power Corporation Ltd., Hosadurga Hosadurga chitradurga 3.2 Hiryur 220
213 D R Container Terminal Hosadurga Hosadurga chitradurga 1.6 Hiryur 220
214 Prasad Technology Park Hosadurga Hosadurga chitradurga 1.6 Hiryur 220
215 Unnathi Project Ltd., Hosadurga Hosadurga chitradurga 0.8 Hiryur 220
216 Mumbai Stcok Brokers Pvt LTd., Hosadurga Hosadurga chitradurga 0.8 Hiryur 220
217 Siddganga Oil Extraction Ltd., Hosadurga Hosadurga chitradurga 1.6 Hiryur 220
218 Cavery Coffee Traders Hosadurga Hosadurga chitradurga 0.8 Hiryur 220
219 Gemcraft Hosadurga Hosadurga chitradurga 0.8 Hiryur 220
220 Madras Cements Ltd., Hosadurga Hosadurga chitradurga 4.8 Hiryur 220
221 Lovely Fragrances Hosadurga Hosadurga chitradurga 0.8 Hiryur 220
222 Ramco Industries Ltd., Hosadurga Hosadurga chitradurga 1.6 Hiryur 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 71
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
223 M K Agro tech Pvt LTd., Hosadurga Hosadurga chitradurga 1.6 Hiryur 220
224 Sameer Ladkat Hosadurga Hosadurga chitradurga 0.8 Hiryur 220
225 Gautham Ladkat Hosadurga Hosadurga chitradurga 0.8 Hiryur 220
226 Panama Infrastructer Pvt LTd., Hosadurga Hosadurga chitradurga 1.6 Hiryur 220
227 Balasaheb M. Ladkat Hosadurga Hosadurga chitradurga 1.6 Hiryur 220
228 Panama Business Centre Hosadurga Hosadurga chitradurga 1.6 Hiryur 220
229 Devchand Ramsaran Hosadurga Hosadurga chitradurga 0.8 Hiryur 220
230 Mineral Project Hosadurga Hosadurga chitradurga 4 Hiryur 220
231 Mineral Project Hosadurga Hosadurga chitradurga 5.6 Hiryur 220
232 Elpro Instruments Hosadurga Hosadurga chitradurga 0.8 Hiryur 220
233 Steelfabs Oversees Hosadurga Hosadurga chitradurga 0.8 Hiryur 220
234 Enercon wind farms (Chitradurga)
Pvt Ltd., Hosadurga Hosadurga chitradurga 4 Hiryur 220
235 Bellary Iron Ores Pvt Ltd., Channagiri Chennagiri Davangere 4.2 Bus_WI_Guttur
220
236 Bellary Iron Ores Pvt Ltd., Channagiri Chennagiri Davangere 0.5 Bus_WI_Guttur
220
237 VS Lad & Sons Channagiri Chennagiri Davangere 1.2 Bus_WI_Guttur
220
238 Y.Mahabaleswarappa &Sons Channagiri Chennagiri Davangere 1.2 Bus_WI_Guttur
220
239 R.B.Seth Shreeram Naringdas Channagiri Chennagiri Davangere 2.4 Bus_WI_Guttur
220
240 V.T.Switchgears & Transforms Channagiri Chennagiri Davangere 0.6 Bus_WI_Guttur
220
241 MSPL Ltd., Channagiri Chennagiri Davangere 6 Bus_WI_Guttur
220
242 P.Venganna Setty & Bros. Channagiri Chennagiri Davangere 0.6 Bus_WI_Guttur
220
243 V M Salgocar & Bros (P) Ltd., Kappatagudda Mundargi Gadag 3.75 Guttal 110
244 Indian Wind Energy Association Kappatagudda Mundargi Gadag 1.25 Guttal 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
72 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
245 Vandana Global Ltd., Kappatagudda Mundargi Gadag 1.25 Guttal 110
246 Nav Baharat Intenational Ltd., Kappatagudda Mundargi Gadag 1.25 Guttal 110
247 Ramesh Kumar Hajarimal Rathod Kappatagudda Mundargi Gadag 1.25 Guttal 110
248 Globle Trasnsport Co. Ltd., Kappatagudda Mundargi Gadag 1.25 Guttal 110
249 Unnathi Projects Lakkihalli Hiriyur Chitradurga 0.8 Hiryur 220
250 Enercon Wind Farms (Chitradurga)
Ltd., Bharampura village Chitradurga Chitradurga 4.8 Hiryur 220
251 Indan Energy Pvt. Ltd Kanchiganal Chitradurga Chitradurga 0.95 Chitradurga 220
252 VSL Mining Company (P) Ltd., Kalkeri Mundargi Gadag 3.75 Guttal 110
253 VS Lad & Sons Kalkeri Mundargi Gadag 3.75 Guttal 110
254 VSL Mining Projects (P) Ltd., Mattikoppa Mundargi Gadag 2.5 Guttal 110
255 BSK Trading Inc Mattikoppa Mundargi Gadag 1.25 Guttal 110
256 Enercon Windfarms (Krishna)
Ltd., Hirevadatti Mundargi Gadag 2.4 Dambal 110
257 VSL Mining Company (P) Ltd., Kalkeri Mundargi Gadag 1.25 Guttal 110
258 E Ramamurthy Keluru Mundargi Gadag 1.25 Guttal 110
259 Vijayananda Road Lines Ltd.,
(Phase-2) Hirevadatti Mundargi Gadag 10 Dambal 110
260 VS Lad & Sons Kalkeri Mundargi Gadag 2.5 Guttal 110
261 VSL Mining Company (P) Ltd., Kalkeri Mundargi Gadag 1.25 Guttal 110
262 Shakhambari Enterprises Kappatgudda Mundargi Gadag 1.25 Dambal 110
263 Happy Valley Developers Kappatgudda Mundargi Gadag 1.25 Dambal 110
264 MPR Widn Farms Kappatgudda Mundargi Gadag 1.25 Dambal 110
265 Nuziveedu Seeds Ltd., Kappatgudda Mundargi Gadag 3.75 Dambal 110
266 Revathi Raju Kappatgudda Mundargi Gadag 1.25 Dambal 110
267 Enercon WindFarms (Hindustan)
(P) Ltd.,JNI Chikkabyladakere Chikkanayakanahalli Tumkur 20.8 Hiryur 220
268 Nuziveedu Seeds Ltd., Kappatgudda Mundargi Gadag 1.25 Dambal 110
269 Revathi Raju Kappatgudda Mundargi Gadag 1.25 Dambal 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 73
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
270 Bhagyanagar India Ltd., Kappatgudda Mundargi Gadag 2.5 Dambal 110
271 Bhagyanagar India Ltd., Kappatgudda Mundargi Gadag 2.5 Dambal 110
272 Bharat Electronics Ltd., Chennagiri Chennagiri Davangere 2.5 Bus_WI_Guttur
220
273 Pragathi Aroma Oil Distillers (P)
Ltd., Chennagiri Chennagiri Davangere 1.2
Bus_WI_Guttur
220
274 Sanjay D Ghodawat Chennagiri Chennagiri Davangere 4.2 Bus_WI_Guttur
220
275 Enercon WindFarms (Hindustan)
(P) Ltd.,JNI Dusudi Hosadurga Chitradurga 3.2 Hiryur 220
276 Enercon WindFarms (Hindustan)
(P) Ltd.,JNI Chikkabyladakere Hosadurga Tumkur 4 Hiryur 220
277 Enercon Wiind Farms (Hindustan)
(P) Ltd., - JNI
Dasudi & Chickabaladikere Gollarahatti,
Somanahalli & Thimmapanahalli Hosadurga Tumkur 16.8 Hiryur 220
278 Prasad Global Solutions Majjur Shiratti Gadag 0.8 Shirhatti 110
279 M K Agrotech (P) Ltd., Majjur Shiratti Gadag 0.8 Shirhatti 110
280 VXL Systems Majjur Shiratti Gadag 0.8 Shirhatti 110
281 Cavery Coffee Traders Machinalli Shiratti Gadag 0.8 Bellahatti 110
282 Gangadhar Narsingdas Agarwal Majjur Shiratti Gadag 2.4 Shirhatti 110
283 Gangadhar Narsingdas Agarwal Machenahalli & Ranathur village in
Shirahatti Shiratti Gadag 1.6 Shirhatti 110
284 Abhilash Garments and Estates (P)
Ltd., Machenahalli village in Shirahatti Shiratti Gadag 0.8 Shirhatti 110
285 Siddaganga Oil Extractions Ltd., Machenahalli & Ranathur village in
Shirahatti Shiratti Gadag 1.6 Shirhatti 110
286 Vikram Traders Machenahalli village in Shirahatti Shiratti Gadag 0.8 Shirhatti 110
287 Siddaganga Oil Extraction Ltd., Machinalli Mundargi Gadag 0.8 Bellahatti 110
288 Kaleesuwari Refinery (P) Ltd., Machinalli Mundargi Gadag 0.8 Bellahatti 110
289 Jindal Steels Ltd. Kappatgudda Mundargi Gadag 1.25 Dambal 110
290 Mukund Kamath S Kappatgudda Mundargi Gadag 1.25 Dambal 110
291 Kashyap J Majethia Kappatgudda Mundargi Gadag 1.25 Dambal 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
74 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
292 Bharathi P Holkunde Kappatgudda Mundargi Gadag 1.25 Dambal 110
293 Magnum Intergrafiks (P) Ltd., Kappatgudda Mundargi Gadag 1.25 Dambal 110
294 Sanjay Ghodawat - (SA) Gajendragarh Ron Gadag 5.4 Gajendragad
110
295 MMTC Ltd., Gajendragarh Ron Gadag 4.8 Gajendragad
110
296 MMTC Ltd., Gajendragarh Ron Gadag 4.8 Gajendragad
110
297 MMTC Ltd., Gajendragarh Ron Gadag 2.4 Gajendragad
110
298 Revathi Raju Kappatgudda Mundargi Gadag 1.25 Dambal 110
299 VRL Logistics Ltd., Kappatgudda Mundargi Gadag 1.25 Dambal 110
300 VRL Logistics Ltd., Kappatgudda Mundargi Gadag 1.25 Dambal 110
301 VRL Logistics Ltd., Kappatgudda Mundargi Gadag 1.25 Dambal 110
302 VRL Logistics Ltd., Kappatgudda Mundargi Gadag 1.25 Dambal 110
303 Vikram Traders - LMIL Timmanahalli, Ramanahalli, Annehalli,
Hagalvadi and mattikere Chikkanayakanahalli Tumkur 0.8 Hiryur 220
304 Compucom Software Ltd.,- LMIL Timmanahalli, Ramanahalli, Annehalli,
Hagalvadi and mattikere Chikkanayakanahalli Tumkur 0.8 Hiryur 220
305 Chandulal Surajmal- LMIL Timmanahalli, Ramanahalli, Annehalli,
Hagalvadi and mattikere Chikkanayakanahalli Tumkur 0.8 Hiryur 220
306 G. Shoe Exports- LMIL Timmanahalli, Ramanahalli, Annehalli,
Hagalvadi and mattikere Chikkanayakanahalli Tumkur 0.8 Hiryur 220
307 International conveyors Ltd.,-
LMIL
Timmanahalli, Ramanahalli, Annehalli,
Hagalvadi and mattikere Chikkanayakanahalli Tumkur 0.8 Hiryur 220
308 Arts & Crafts Exports- LMIL Timmanahalli, Ramanahalli, Annehalli,
Hagalvadi and mattikere Chikkanayakanahalli Tumkur 0.8 Hiryur 220
309 I.G.E. India Ltd., - LMIL Timmanahalli, Ramanahalli, Annehalli,
Hagalvadi and mattikere Chikkanayakanahalli Tumkur 0.8 Hiryur 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 75
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
310 Mayura Steels Pvt Ltd., - LMIL Timmanahalli, Ramanahalli, Annehalli,
Hagalvadi and mattikere Chikkanayakanahalli Tumkur 0.8 Hiryur 220
311 Shilpa Medicare Limited - LMIL Timmanahalli, Ramanahalli, Annehalli,
Hagalvadi and mattikere Chikkanayakanahalli Tumkur 1.6 Hiryur 220
312 S. Kumar - LMIL Timmanahalli, Ramanahalli, Annehalli,
Hagalvadi and mattikere Chikkanayakanahalli Tumkur 0.8 Hiryur 220
313 Shreem Capacitors (P) Ltd., -
LMIL
Timmanahalli, Ramanahalli, Annehalli,
Hagalvadi and mattikere Chikkanayakanahalli Tumkur 1.6 Hiryur 220
314 Arathi V Patil Kappatgudda Mundargi Gadag 1.25 Dambal 110
315 Vinay Patil Kappatgudda Mundargi Gadag 1.25 Dambal 110
316 VRL Logistics Ltd., Kappatgudda Mundargi Gadag 2.5 Dambal 110
317 VRL Logistics Ltd., Kappatgudda Mundargi Gadag 3.75 Dambal 110
318 VRL Logistics Ltd., Kappatgudda Mundargi Gadag 13.75 Dambal 110
319 VRL Logistics Ltd., Kappatgudda Mundargi Gadag 5 Dambal 110
320 Magma Leasing Limited Devanakatti village Raybag Belgaum 4.95 Kabbur 110
321 Walden Properties (P) Ltd., Devanakatti village Raybag Belgaum 1.65 Kabbur 110
322 Sanjay Ghodawat - (SA) Gajendragarh Ron Gadag 5.4 Gajendragad
110
323 MMTC Ltd., Gajendragarh Ron Gadag 3 Gajendragad
110
324 Lovely Fragrances - (SA) Gajendragarh Ron Gadag 0.6 Gajendragad
110
325 Pragathi Aroma Distilleries (P)
Ltd., - (SA) Gajendragarh Ron Gadag 0.6
Gajendragad
110
326 Mac Charles (India) Ltd., Kappatgudda Mundargi Gadag 1.5 Dambal 110
327 Bhagyanagar India Ltd., Kappatgudda Mundargi Gadag 2.5 Dambal 110
328 Manoj V Telisara Kappatgudda Mundargi Gadag 1.25 Dambal 110
329 Vikram Traders - SEL Kappatgudda Mundargi Gadag 1.5 Dambal 110
330 Bhagyanagar India Ltd., Kappatgudda Mundargi Gadag 1.5 Dambal 110
331 Surana Telecom Ltd., Kappatgudda Mundargi Gadag 1.25 Dambal 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
76 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
332 V M Salgocar Sales International Kappatgudda Mundargi Gadag 1.25 Dambal 110
333 V M Salgocar & Bros (P) Ltd., Kappatgudda Mundargi Gadag 1.25 Dambal 110
334 Nu-Tech Associates Billenahalli Arasikere Hassan 1.5 Arasikere 110
335 Nu- Tech Prasiddhi Consortium Billenahalli Arasikere Hassan 1.5 Arasikere 110
336 Walden Properties (P) Ltd., - SEL Billenahalli Arasikere Hassan 1.5 Arasikere 110
337 V M Salgocar & Bros (P) Ltd., Kappatgudda Mundargi Gadag 3.75 Dambal 110
338 V M Salgocar Sales International Kappatgudda Mundargi Gadag 1.25 Dambal 110
339 Sapthagiri Distilleries (P) Ltd., Kappatgudda Mundargi Gadag 3 Dambal 110
340 Enercon (India) Ltd., Mundergi Mundargi Gadag 6 Dambal 110
341 Sapthagiri Distilleries (P) Ltd., Rangapurakavalu Arasikere Hassan 3 Arasikere 110
342 V.M.Salgaokar & Bros. (P) Ltd., Kappatgudda Mundargi Gadag 5 Dambal 110
343 Sree Devi Chemicals Chikkanayakanahalli Chikkanayakanahalli Tumkur 0.8 C N Hally 110
344 Triveni Enterprises Chikkanayakanahalli Chikkanayakanahalli Tumkur 0.8 C N Hally 110
345 Texmo Precision Castings Chikkanayakanahalli Chikkanayakanahalli Tumkur 1.6 C N Hally 110
346 V.M.Salgaokar Sales Inetrnational Kappatgudda Mundargi Gadag 1.25 Dambal 110
347 U D Foundation Chikkanayakanahalli Chikkanayakanahalli Tumkur 0.8 C N Hally 110
348 Happy Valley Developers Chikkanayakanahalli Chikkanayakanahalli Tumkur 0.8 C N Hally 110
349 Texonic Instruments Chikkanayakanahalli Chikkanayakanahalli Tumkur 0.8 C N Hally 110
350 Bharath Petroleum Corporation
Ltd., Kappatgudda Mundargi Gadag 5 Dambal 110
351 R.B.Seth Sreeram Narasingdas Chikkanayakanahalli Chikkanayakanahalli Tumkur 0.8 C N Hally 110
352 Protectron Electromech (P) Ltd., Chikkanayakanahalli Chikkanayakanahalli Tumkur 0.8 C N Hally 110
353 VXL Systems Chikkanayakanahalli Chikkanayakanahalli Tumkur 0.8 C N Hally 110
354 Enercon (India) Ltd., Singatalur Mundargi Gadag 5.4 Dambal 110
355 Energy Development CO Ltd., Rangapurakavalu Arasikere Hassan 1.5 Arasikere 110
356 Mac charles India ltd., Kappatagudda Mundargi Gadag 1.5 Dambal 110
357 Indian designs Kappatagudda Mundargi Gadag 1.5 Dambal 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 77
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
358 Vikram Traders Kappatagudda Mundargi Gadag 1.5 Dambal 110
359 B.D.Patel and Company Kappatagudda Mundargi Gadag 1.25 Dambal 110
360 Simran wind project (P) Ltd.,
(Suzlon Towers) Rangapurakavalu Arasikere Hassan 7.5 Arasikere 110
361 Simran wind project (P) Ltd.,
(Rambhaben Ukabhai) Rangapurakavalu Arasikere Hassan 1.5 Arasikere 110
362 Renaissance Holdings and
developers (P) Ltd Rangapurakavalu Arasikere Hassan 1.5 Arasikere 110
363 Renaissance Holdings and
developers (P) Ltd Rangapurakavalu Arasikere Hassan 3 Arasikere 110
364 Ramco Industries Ltd., Rangapurakavalu Arasikere Hassan 1.5 Arasikere 110
365 Keerthi industries Ltd. Rangapurakavalu Arasikere Hassan 1.5 Arasikere 110
366 Bhoruka Power Corporation
Limited Nargund Nargund Gadag 7.2 Nargund 110
367 Hindustan Zinc Limited Kurthkoti, Harti Gadag Gadag 4 Enercon
(Harthi) 220
368 Generacion Eolica India (P) Ltd Harti Gadag Gadag 3.2 Enercon
(Harthi) 220
369 Bharat Earth Movers Limited Kappatagudda Mundargi Gadag 1.25 Dambal 110
370 Bharat Earth Movers Limited Kappatagudda Mundargi Gadag 1.25 Dambal 110
371 Bharat Earth Movers Limited Kappatagudda Mundargi Gadag 1.25 Dambal 110
372 Enercon (India) Ltd., Singatalur, Kolahalli Mundargi Gadag 11.4 Shirhatti 110
373 Ranka N Ranka Jogimatti Chitradurga Chitradurga 5 Chitradurga 220
374 Sridevi Trading Company Beladhadi Gadag Gadag 0.225 Bellahatti 110
375 B.S.C.Textiles Beladhadi Gadag Gadag 0.225 Bellahatti 110
376 B.S.Channabasappa & Sons, Beladhadi Gadag Gadag 0.675 Bellahatti 110
377 Sree Channeshwara Rice
Industries, Beladhadi Gadag Gadag 0.225 Bellahatti 110
378 Daksh Minerals & Marine (P) Ltd., Beladhadi Gadag Gadag 0.45 Bellahatti 110
379 B.C. & Sons, Beladhadi Gadag Gadag 0.225 Bellahatti 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
78 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
380 Sree Channeshwara Drier, Beladhadi Gadag Gadag 0.225 Bellahatti 110
381 Associated Stone Idnustries
(Kotah) Ltd., Beladhadi Gadag Gadag 1.125 Bellahatti 110
382 Ranjeet Bullion, Beladhadi Gadag Gadag 0.225 Bellahatti 110
383 Bedmutha Wire Company Limited, Beladhadi Gadag Gadag 0.225 Bellahatti 110
384 S.K.Sridhar, Beladhadi Gadag Gadag 0.225 Bellahatti 110
385 S. K.Shashidhar, Beladhadi Gadag Gadag 0.225 Bellahatti 110
386 Shri Swami Samarth Engineers, Beladhadi Gadag Gadag 0.225 Bellahatti 110
387 Generacion Eolica India (P) Ltd Harti Gadag Gadag 4.8 Enercon
(Harthi) 220
388 S.C. Shettar & Sons Kappatagudda Mundargi Gadag 1.25 Dambal 110
389 Swarana Construction Kappatagudda Mundargi Gadag 1.25 Dambal 110
390 Kmmi Steel (P) Ltd., Kappatagudda Mundargi Gadag 1.5 Dambal 110
391 Khatau Narbheram & Co (Phase-1) Aidahalli kaval Belur Hassan 1.5 Chikamagalur
220
392 Khatau Narbheram & Co (Phase-2) Aidahalli kaval Belur Hassan 1.5 Chikamagalur
220
393 Khatau Narbheram & Co (Phase-3) Aidahalli kaval Belur Hassan 1.5 Chikamagalur
220
394 Bharat Electronic Limited Aidahalli kaval Belur Hassan 1.5 Chikamagalur
220
395 Bharat Electronic Limited Aidahalli kaval Belur Hassan 1.5 Chikamagalur
220
396 Gangadhar Narasingdas Agarwal Ayyanahalli Bellary Bellary 1.5 Sankalapur 110
397 Gangadhar Narasingdas Agarwal Ayyanahalli Bellary Bellary 1.5 Sankalapur 110
398 Gangadhar Narasingdas Agarwal Ayyanahalli Bellary Bellary 1.5 Sankalapur 110
399 Ramesh Ayyanahalli Bellary Bellary 1.5 Sankalapur 110
400 Indo wind Energy Ltd., Elkurnahalli Chitradurga Chitradurga 1.5 Chitradurga 220
401 Indo wind Energy Ltd., Elkurnahalli Chitradurga Chitradurga 1.5 Chitradurga 220
402 Indo wind Energy Ltd., Elkurnahalli Chitradurga Chitradurga 1.5 Chitradurga 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 79
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
403 Indo wind Energy Ltd., Elkurnahalli Chitradurga Chitradurga 1.5 Chitradurga 220
404 Indo wind Energy Ltd., Elkurnahalli Chitradurga Chitradurga 1.5 Chitradurga 220
405 Allum Veerabhadrappa Elekuranahalli Chitradurga Chitradurga 1.5 Chitradurga 220
406 VS Lad & Sons Elekuranahalli Chitradurga Chitradurga 1.5 Chitradurga 220
407 Swarna Properties Thimmappanagudda Raybag Belgaum 1.65 Donimalali 110
408 The Chennai Silks Aidahalli kaval Belur Hassan 1.25 Chikamagalur
220
409 Mukund Kamath.S Aidahalli kaval Belur Hassan 1.25 Chikamagalur
220
410 Emkay Taps Aidahalli kaval Belur Hassan 1.25 Chikamagalur
220
411 DLF Limited Harti Gadag Gadag 11.2 Enercon
(Harthi) 220
412 Hindustan Zinc Limited Kurthkoti, Harti Gadag Gadag 6.4 Enercon
(Harthi) 220
413 Sai krishna Minera;s (P) Ltd., Kappatagudda Mundargi Gadag 1.5 Dambal 110
414 ILC Industries Ltd., Kappatagudda Mundargi Gadag 1.5 Dambal 110
415 Dr. Madura C. Venkatapura Gadag Gadag 0.25 Mundargi 110
416 Dr.Chandu. G.N Venkatapura Gadag Gadag 0.25 Mundargi 110
417 Ercon Composites Venkatapura Gadag Gadag 0.5 Mundargi 110
418 Mysore Engineers (India) Pvt. Ltd., Venkatapura Gadag Gadag 0.25 Mundargi 110
419 G.N.Chandu (HUF) Venkatapura Gadag Gadag 0.25 Mundargi 110
420 Prasanna K Giriayapur Venkatapura Gadag Gadag 0.25 Mundargi 110
421 Shree Krishna Minerals Venkatapura Gadag Gadag 0.5 Mundargi 110
422 Shriram EPC Limited - PWPL Palavanahalli, Kurumardikere &
Chikkasiddavanahalli Chitradurga Chitradurga 1.35 Chitradurga 220
423 Fairdel Supplies Pvt Ltd-PWPL Palavanahalli, Kurumardikere &
Chikkasiddavanahalli Chitradurga Chitradurga 3.25 Chitradurga 220
424 Savitha Chemicals Siegegudda Kavalu village Hassan Hassan 1.25 Hassan 220
425 Kuminex Minerals (P) Ltd Siegegudda Kavalu village Hassan Hassan 1.25 Hassan 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
80 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
426 Rita Inetrantional Navali Huvinahadagali Bellary 1.5 Ittagi 220
427 Savitha Chemicals Siegegudda Kavalu village Hassan Hassan 1.25 Hassan 220
428 Gangadhar Narasingdas Agarwal Haltithimalapura Navali village hills,
Hoovinahadagali Huvinhagali Bellary 4.5 Ittagi 220
429 The Chennai Silks Shivapura Kaval village Belur Belur Hassan 1.25 Chikamagalur
220
430 The Chennai Silks Shivapura Kaval village Belur Belur Hassan 1.25 Chikamagalur
220
431 Sai krishna Minerals (P) Ltd., Kappatagudda Mundargi Gadag 1.5 Mundargi 110
432 Hindustan Zinc Limited Kurthkoti, Harti Gadag Gadag 4.8 Enercon
(Harthi) 220
433 Accion Wind Energy (P) Ltd-
WZM Arasingundi Jagalur Davangere 13.2 Chitradurga 220
434 Nuziveedu Seeds Ltd-HK-3 Chikkandavadi Chitradurga Chitradurga 1.5 Chitradurga 220
435 Generacion Eolica India (P) Ltd Harti Gadag Gadag 6.4 Enercon
(Harthi) 220
436 ILC Industries Ltd., Kappatagudda Mundargi Gadag 1.5 Mundargi 110
437 Nuziveedu Seeds Ltd-HK-2 Chikkandavadi Chitradurga Chitradurga 1.5 Chitradurga 220
438 Belgaum Wind Farms (P) Ltd Harti Gadag Gadag 0.8 Enercon
(Harthi) 220
439 BP Energy India (P) Limited Bharamasagar Chitradurga Chitradurga 11.55 Chitradurga 220
440 Hindustan Zinc Limited Kurthkoti, Harti Gadag Gadag 3.2 Enercon
(Harthi) 220
441 Skytech Enginbeering Beladhadi Gadag Gadag 0.225 Bellahatti 110
442 Nagashanthi Enterprises (P) Ltd-
GWL Beladhadi Gadag Gadag 0.225 Bellahatti 110
443 J.B.M. Industries Beladhadi Gadag Gadag 0.225 Bellahatti 110
444 Mayura Steels Pvt Ltd., - TDPL Beladhadi Gadag Gadag 0.45 Bellahatti 110
445 B.S.Channabasappa & Sons, Beladhadi Gadag Gadag 0.675 Bellahatti 110
446 Basvaraj N Patil Limited-GWL Beladhadi Gadag Gadag 0.225 Bellahatti 110
447 Kedia Enterprises Beladhadi Gadag Gadag 0.45 Bellahatti 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 81
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
448 Bhanwar Deep Copper Strpis (P)
Ltd Beladhadi Gadag Gadag 0.225 Bellahatti 110
449 B.S.C.Textiles Beladhadi Gadag Gadag 0.225 Bellahatti 110
450 Rachana Consrtuction Co., Beladhadi Gadag Gadag 0.225 Bellahatti 110
451 Belgaum Wind Farms (P) Ltd Kurthkoti, Asundi, Binkadakatte &
Hulkoti Gadag Gadag 4
Enercon
(Harthi) 220
452 Kummnix Minerals (P) Ltd Nitturu Hassan Hassan 2.5 Hassan 220
453 Nuziveedu Seeds Ltd-HK-4 & HK-
5 Chikkandavadi Chitradurga Chitradurga 3 Chitradurga 220
454 Generacion Eolica India (P) Ltd Harti Gadag Gadag 3.2 Enercon
(Harthi) 220
455 BP Energy India (P) Limited Bharamasagar Chitradurga Chitradurga 8.25 Chitradurga 220
456 Accion Wind Energy (P) Ltd-
BWPPL Anabur & Sokke Jagalur Davangere 16.5 Chitradurga 220
457 Generacion Eolica India (P) Ltd Harti Gadag Gadag 3.2 Enercon
(Harthi) 220
458 Nuziveedu Seeds Ltd-HK-1& HK-
6 Chikkandavadi Chitradurga Chitradurga 3 Chitradurga 220
459 Savitha Chemicals Ltd Ph-1 Rangapura Kavalu Arasikere Hassan 1.5 Arasikere 110
460 Savitha Chemicals Ltd Ph-2 Kopalahalli Holenarsipura Hassan 1.5
Hadavahalli
(GOPALPUR)2
20
461 Savitha Chemicals Ltd Ph-3 Nayakanakerekavalu Holenarsipura Hassan 1.5
Hadavahalli
(GOPALPUR)2
20
462 Simran Wind Power Project (P)
Ltd -Ph-2 Aidahalli Kaval Belur Hassan 1.5
Chikamagalur
220
463 Super wind project (P) Ltd Ph-6 Elakuranahalli Chitradurga Chitradurga 1.5 Chitradurga 220
464 Super wind project (P) Ltd Ph-7 Elakuranahalli Chitradurga Chitradurga 1.5 Chitradurga 220
465 Super wind project (P) Ltd Ph-8 Yarehalli Chitradurga Chitradurga 1.5 Chitradurga 220
466 Energy Development Company
Ltd Yarehalli Chitradurga Chitradurga 1.5 Chitradurga 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
82 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
467 Leo Fasterners Banjegondanahalli Chitradurga Chitradurga 1.5 Chitradurga 220
468 BP Energy India (P) Limited Bharamasagar Chitradurga Chitradurga 11.55 Chitradurga 220
469 Generacion Eolica India (P) Ltd Harti Gadag Gadag 2.4 Enercon
(Harthi) 220
470 BP Energy India (P) Limited Bharamasagar Chitradurga Chitradurga 4.95 Chitradurga 220
471 The Tata Power Company Ltd Hosur, Kanavi & Mulgund Gadag Gadag 4 Shirhatti 110
472 The Tata Power Company Ltd Hosur, Kanavi & Mulgund Gadag Gadag 4 Shirhatti 110
473 The Tata Power Company Ltd Hosur, Kanavi & Mulgund Gadag Gadag 4 Shirhatti 110
474 Belgaum Wind Farms (P) Ltd Kurthkoti, Asundi, Binkadakatte &
Hulkoti Gadag Gadag 3.2
Enercon
(Harthi) 220
475 Belgaum Wind Farms (P) Ltd Kurthkoti, Asundi, Binkadakatte &
Hulkoti Gadag Gadag 3.2
Enercon
(Harthi) 220
476 BP Energy India (P) Limited Telagi Harapanahalli Davangere 3.3 Davanagere 220
477 BP Energy India (P) Limited Telagi Harapanahalli Davangere 9.9 Davanagere 220
478 BP Energy India (P) Limited Telagi Harapanahalli Davangere 4.95 Davanagere 220
479 BP Energy India (P) Limited Telagi Harapanahalli Davangere 4.95 Davanagere 220
480 The Tata power company Ltd Hosur, Kanavi & Mulgund Gadag Gadag 3.2 Shirhatti 110
481 Belgaum Wind Farms (P) Ltd Kurthkoti, Asundi, Binkadakatte &
Hulkoti Gadag Gadag 2.4
Enercon
(Harthi) 220
482 Belgaum Wind Farms (P) Ltd Kurthkoti, Asundi, Binkadakatte &
Hulkoti Gadag Gadag 3.2
Enercon
(Harthi) 220
483 P.Venganna Setty & Bros-Ph-1 Sogi Huvinahadagalli Bellary 1.25 Ittagi 220
484 The Campco Ltd Ayyanahalli Bellary Bellary 1.25 Sankalapur 110
485 KMMI Steels (P) Ltd Ph-1 & Ph-2 Ayyanahalli Bellary Bellary 2.5 Sankalapur 110
486 Simran Wind Power Project (P)
Ltd Elkurnahalli Chitradurga Chitradurga 1.25 Chitradurga 220
487 Simran Wind Power Project (P)
Ltd Elkurnahalli Chitradurga Chitradurga 1.25 Chitradurga 220
488 Leo Fasterners Banjegondanahalli Chitradurga Chitradurga 1.5 Chitradurga 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 83
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
489 National Mineral Development
Corporation Ltd Banjegondanahalli Chitradurga Chitradurga 1.5 Chitradurga 220
490 Indo wind Energy Ltd Elkurnahalli Chitradurga Chitradurga 9 Chitradurga 220
491 Sargam Retails (P) Ltd - Ph-1 Kudrekonda Honnali Davangere 5 Honnali 220
492 RMMPL-Ph-2 Bagall Harapanahalli Davangere 2.5 Ittagi 220
493 RMMPL-Ph-3 Jajikalgudda Harapanahalli Davangere 5 Ittagi 220
494 P.Venganna Setty & Bros-Ph-2 Jajikalgudda Harapanahalli Davangere 1.25 Ittagi 220
495 ICSA-Ph-1 & Ph-2 Kudrekonda Honnali Davangere 3 Honnali 220
496 D J Malpani Kudrekonda Honnali Davangere 3 Honnali 220
497 Super wind project (P) Ltd Kappatagudda Mundargi Gadag 4.5 Mundargi 110
498 Avon Cycles Ltd Gopalpura Hassan Hassan 1.5
Hadavahalli
(GOPALPUR)2
20
499 BVSR Energy Systems-Ph-1 & Ph-
2 Gopalpura Hassan Hassan 3
Hadavahalli
(GOPALPUR)2
20
500 Sree Minerals Gopalpura Hassan Hassan 1.5
Hadavahalli
(GOPALPUR)2
20
501 A MA Traders Beladhadi & Navapur Gadag Gadag 0.225 Bellahatti 110
502 K E Kantesh Beladhadi & Navapur Gadag Gadag 0.225 Bellahatti 110
503 G.S.Gayathri Beladhadi & Navapur Gadag Gadag 0.225 Bellahatti 110
504 G.M. Prasanna Kumar Beladhadi & Navapur Gadag Gadag 0.225 Bellahatti 110
505 G.M. Lingaraju Beladhadi & Navapur Gadag Gadag 0.225 Bellahatti 110
506 AAA & Sons Enterprises (P) Lrd Beladhadi & Navapur Gadag Gadag 0.9 Bellahatti 110
507 ESMO Industries Beladhadi & Navapur Gadag Gadag 0.225 Bellahatti 110
508 Doodanavar & Brothers Hanumasagar Kustagi Koppal 1.5 Kustagi 110
509 Shree krishna minerals Hanumasagar Kustagi Koppal 3 Kustagi 110
510 Dr. V V Subba Reddy Shirol & Shirur Gadag Gadag 0.25 Shirol 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
84 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
511 Chandama Farm & Horticulture
Research Centre (P) Ltd Shirol & Shirur Gadag Gadag 0.25 Shirol 110
512 Shah distributors Hanumasagar Kustagi Koppal 0.25 Kustagi 110
513 Orange County Resort & Hotels
Ltd Gowdegere Ron Gadag 0.6
Gajendragad
110
514 The Tata Power Company Ltd Hosur, Kanavi & Mulgund Gadag Gadag 2.4 Enercon
(Harthi) 220
515 The Tata Power Company Ltd Hosur, Kanavi & Mulgund Gadag Gadag 2.4 Enercon
(Harthi) 220
516 The Tata Power Company Ltd Hosur, Kanavi & Mulgund Gadag Gadag 3.2 Enercon
(Harthi) 220
517 Rahul Dravid Harthi Gadag Gadag 0.8 Enercon
(Harthi) 220
518 R B Seth Shreeram Narsingdas Harthi & Beladadi Gadag Gadag 3.2 Enercon
(Harthi) 220
519 G.N.Agrawal Kudrekonda Honnali Davangere 4.5 Honnali 220
520 Ferromar Shipping (P) Ltd., Kudrekonda Honnali Davangere 1.5 Honnali 220
521 Abhishek Developers Phase-3 Gopalpura Hassan Hassan 4.5
Hadavahalli
(GOPALPUR)2
20
522 Sargam Retails Pvt Ltd Kudrekonda Honnali Davangere 1.25 Honnali 220
523 The Tata Power Company Ltd Hosur, Kanavi & Mulgund Gadag Gadag 0.8 Enercon
(Harthi) 220
524 The Tata Power Company Ltd Kanavi Hosur and Harthi Gadag Gadag 3.2 Enercon
(Harthi) 220
525 The Tata Power Company Ltd Hosur, Kanavi & Mulgund Gadag Gadag 1.6 Enercon
(Harthi) 220
526 The Tata Power Company Ltd Kanavi Hosur and Harthi Gadag Gadag 2.4 Enercon
(Harthi) 220
527 The Tata Power Company Ltd Kanavi Hosur and Harthi Gadag Gadag 1.6 Enercon
(Harthi) 220
528 The Tata Power Company Ltd Hosur, Kanavi & Mulgund Gadag Gadag 1.6 Enercon
(Harthi) 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 85
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
529 Ravi Nursing Home Shirund Gadag Gadag 0.25 Enercon
(Harthi) 220
530 The Tata Power Company Ltd Kanavi Hosur and Harthi Gadag Gadag 2.4 Enercon
(Harthi) 220
531 The Tata Power Company Ltd Hosur, Kanavi & Mulgund Gadag Gadag 0.8 Enercon
(Harthi) 220
532 Abhishek Developers Phase-1 Kudrekonda Honnali Davangere 4.5 Honnali 220
533 Abhishek Developers Phase-2 Kudrekonda Honnali Davangere 3 Honnali 220
534 Hotel Leelaventures Kudrekonda Honnali Davangere 2.5 Honnali 220
535 Ramgad Mineral and mining Pvt.
Ltd Sogi Huvinahadagalli Bellary 3.75 Ittagi 220
536 CEPCO Industries Pvt. Ltd. Beladadi Gadag Gadag 2.4 Bellahatti 110
537 Shreeram Narsingdas Harthi Gadag Gadag 1.6 Enercon
(Harthi) 220
538 Eastman International Gopalpura Hassan Hassan 1.5
Hadavahalli
(GOPALPUR)2
20
539 Nuziveedu Seeds Ltd Chikkandavadi Chitradurga Chitradurga 4.5 Chitradurga 220
540 Nuziveedu Seeds Ltd Chikkandavadi Chitradurga Chitradurga 6 Chitradurga 220
541 Nectar Beverages Pvt Ltd Naregal Naregal Gadag 1 Naregal 110
542 Nuziveedu Seeds Ltd Chikkandavadi Chitradurga Chitradurga 6 Chitradurga 220
543 CLP Wind Farms (India) Pvt Ltd Goravinakolla Saundatti Belgaum 18.4 Saundatti 110
544 Technical Associates Ltd Gopalpura Hassan Hassan 1.5
Hadavahalli
(GOPALPUR)2
20
545 Friends Salt Works & Allied
Industries Gopalpura Hassan Hassan 4.5
Hadavahalli
(GOPALPUR)2
20
546 H.G.Rangan Goud (phase-I) Gangavansara Honnali Davangere 1.25 Honnali 220
547 Mac Charles (India)Ltd Sindgiri Siruguppa Bellary 2.1 Kurugodu 110
548 Scotts Garments Ltd Sindgiri Siruguppa Bellary 2.1 Kurugodu 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
86 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
549 Palogix Infrastructure Pvt Ltd Gopalpura Hassan Hassan 1.5
Hadavahalli
(GOPALPUR)2
20
550 PTC India Financial Services Ltd
(Phase-1) Kundur Honnali Davangere 6 Honnali 220
551 Sree Minerals Kallenahalli Jagalur Davangere 10.5 Chitradurga 220
552 Gautham Fright Pvt Ltd Kallenahalli Jagalur Davangere 2.1 Davanagere 220
553 Deepak Cables (I) Pvt Ltd Harthi Gadag Gadag 0.8 Enercon
(Harthi) 220
554 CLP Wind Farms (India) Pvt Ltd Goravinakolla Saundatti Belgaum 2.4 Saundatti 110
555 Bombay Rayon Fashions Ltd Konchigere Siruguppa Bellary 2.1 Kurugodu 110
556 CLP Wind Farms (India) Pvt Ltd Katamalli & Hooli Saundatti Belgaum 16 Saundatti 110
557 ITC Limited Sindgiri Siruguppa Bellary 18.9 Kurugodu 110
558 Pearlite Linears (P) Limited Kundur Honnali Davangere 1.5 Honnali 220
559 Nuziveedu Seeds Limited Bharamasagar Chitradurga Chitradurga 2.1 Chitradurga 220
560 Nuziveedu Seeds Limited Bharamasagar Chitradurga Chitradurga 2.1 Chitradurga 220
561 Nuziveedu Seeds Limited Bharamasagar Chitradurga Chitradurga 2.1 Chitradurga 220
562 Nuziveedu Seeds Limited Bharamasagar Chitradurga Chitradurga 2.1 Chitradurga 220
563 SRB Consultancy (P) Limited Kundur Honnali Davangere 1.5 Honnali 220
564 SRB Consultancy (P) Limited Kundur Honnali Davangere 1.5 Honnali 220
565 ITC Limited Sindgiri Siruguppa Bellary 2.1 Kurugodu 110
566 Vish Wind Infrastrcture LLP Kalasapura Gadag Gadag 6.4 Enercon
(Harthi) 220
567 Nuziveedu Seeds Limited Kallavanagathihalli Chitradurga Chitradurga 4.5 Chitradurga 220
568 Orient Abrasis Ltd (KAL-17) Kalmangi Gangavathi Koppal 1.5 Sindhanur 110
569 CLP Wind Farms (India) Pvt Ltd Sirsangi Saundatti Belgaum 7.2 Saundatti 110
570 CLP Wind Farms (India) Pvt Ltd Harapanahalli Harapanahalli Davangere 13.2 Ittagi 220
571 KRBL Limited (KAL-19) Kalmangi Gangavathi Koppal 1.5 Sindhanur 110
572 Orient Abrasis Ltd (KAL-16) Kalmangi Gangavathi Koppal 1.5 Sindhanur 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 87
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
573 EN Renewables Limited Kakati Belgaum Belgaum 24 Belgaum 220
574 CLP Wind Farms (India) Pvt Ltd Harapanahalli Harapanahalli Davangere 26.4 Ittagi 220
575 EN Renewable Energy Limited Kakati Belgaum Belgaum 12 Belgaum 220
576 Protectron Electro mech (P)
Limited Kalasapura Gadag Gadag 0.8
Enercon
(Harthi) 220
577 EN Renewable Energy Limited Kakati Belgaum Belgaum 14.4 Belgaum 220
578 Golden Hatcheries Adavisomapura Gadag Gadag 4.8 Enercon
(Harthi) 220
579 MBM Engineering Infotech
Limited Adavisomapura Gadag Gadag 1.6
Enercon
(Harthi) 220
580 Swastik Construction Services Adavisomapura Gadag Gadag 0.8 Enercon
(Harthi) 220
581 SVE Castings (P) Limited Kalmangi Sindanur Raichur 1.5 Sindhanur 110
582 Kuminex Minerlas Private Limited Kalmangi Sindanur Raichur 1.5 Sindhanur 110
583 Avon Cycles Ltd Kalmangi Sindanur Raichur 1.5 Sindhanur 110
584 Kuminex Minerlas Private Limited Kalmangi Sindanur Raichur 1.5 Sindhanur 110
585 Vikram Trader Halvagalu Harapanahalli Davangere 2.1 Ittagi 220
586 Maris Hotel and Theatres (P)
Limited Halvagalu Harapanahalli Davangere 2.1 Ittagi 220
587 Malaxmi Wind Power Sindgiri Siruguppa Bellary 2.1 Kurugodu 110
588 Gupta Coalfileds and washeries
Limited Sindgiri Siruguppa Bellary 2.1 Kurugodu 110
589 Hindustan Zinc Limited Gopalpura Hassan Hassan 4.5
Hadavahalli
(GOPALPUR)2
20
590 Hindustan Zinc Limited Gopalpura Hassan Hassan 1.5
Hadavahalli
(GOPALPUR)2
20
591 HGML HGML Chitradurga Chitradurga 2.1 Chitradurga 220
592 Protectron Electro mech (P)
Limited Kalasapura Gadag Gadag 0.8
Enercon
(Harthi) 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
88 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
593 Srinivas Hacheries K-505 Ganganakatti Shikaripura Shimoga 1.5 Davanagere 220
594 Srinivas Hacheries K-521 Tirutharampur Honnali Davangere 1.5 Honnali 220
595 Orient Abrasives Limited KAL-14 Kalmangi Sindanur Raichur 1.5 Sindhanur 110
596 Khanna Industrial Pipes (P) Ltd Erekatte Shikaripura Shimoga 1.5 Shikaripura 110
597 Tuppadahalli Energy India (P)
Limited Tuppadahalli channagiri Shimoga 24.75 Kadur 220
598 KRBL Limited Kalmangi Sindanur Raichur 4.5 Sindhanur 110
599 Bright Packaging Pvt Ltd NEJ Chikkodi Belgaum 1.7 Bhoj 110
600 Tuppadahalli Energy India (P)
Limited Tuppadahalli channagiri Shimoga 16.5 Kadur 220
601 Beta Wind Farm Private Limited Erekatte Shikaripura Shimoga 1.25 Shikaripura 110
602 Sree Minerals SND-100 Konchigere Siruguppa Bellary 2.1 Kurugodu 110
603 Sree Minerals SND-104 Sindigiri Siruguppa Bellary 2.1 Kurugodu 110
604 KRBL Limited SND-103 Sindigiri Siruguppa Bellary 2.1 Kurugodu 110
605 Rajastham Gum (P) Limited Kurugod Siruguppa Bellary 2.1 Kurugodu 110
606 Ruchi Soya Industries Limited Kalmangi Sindanur Raichur 3 Sindhanur 110
607 Rajastham Gum (P) Limited KAL-
10 Kalmangi Gangavathi Koppal 1.5 Sindhanur 110
608 Vish Wind Infrastrcture LLP Kalasapura Gadag Gadag 0.8 Enercon
(Harthi) 220
609 Nuziveedu Seeds Limited Bhimasamudra Chitradurga Chitradurga 12 Chitradurga 220
610 Tuppadahalli Energy India (P)
Limited Tuppadahalli channagiri Shimoga 14.85 Kadur 220
611 M.K.Agrotech Private Limited Kalasapura Gadag Gadag 2.4 Enercon
(Harthi) 220
612 Vish Wind Infrastrcture LLP Kalasapura Gadag Gadag 0.8 Enercon
(Harthi) 220
613 Agrawal Minerals (Goa) Private
Limited (SND-105) Kurugod Siruguppa Bellary 2.1 Kurugodu 110
614 Agrawal Minerals (Goa) Private
Limited (SND-106) Kurugod Siruguppa Bellary 2.1 Kurugodu 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 89
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
615 GAIL India Limited (MG 01 to 06) Chinnapura, Chikkanahalli and
Kyatanahalli Holenarsipura Hassan 9
Hadavahalli
(GOPALPUR)2
20
616 GAIL India Limited (MG 07 to 13) Bettada Satenahalli, Sigaranahalli and
Hariharpura Holenarsipura Hassan 10.5
Hadavahalli
(GOPALPUR)2
20
617 GAIL India Limited (MG 14 to 15) Kallenahalli Holenarsipura Hassan 3
Hadavahalli
(GOPALPUR)2
20
618 GAIL India Limited (MG 16 to 17) Kallenahalli Holenarsipura Hassan 3
Hadavahalli
(GOPALPUR)2
20
619 Pearlite Linears (P) Limited Sigaranahalli Holenarsipura Hassan 1.5
Hadavahalli
(GOPALPUR)2
20
620 GAIL India Limited SD-29 Alagatti Byadagi Haveri 2.1 Bydagi 110
621 GAIL India Limited (SD 32, 34, 35
,36) Byadagi and Kadarmadargi Byadagi Haveri 8.4 Bydagi 110
622 Golden Hatcheries Karoshi Chikkodi Belgaum 3.4 Bhoj 110
623 Manjushree Technopack Limited Karoshi Chikkodi Belgaum 3.4 Bhoj 110
624 Golden Hatcheries Shirgoan Chikkodi Belgaum 0.85 Shirgaon 110
625 Golden Hatcheries Shirgoan Chikkodi Belgaum 1.7 Shirgaon 110
626 Golden Hatcheries Shirgoan Chikkodi Belgaum 2.55 Shirgaon 110
627 Doddanavar Global Wind Private
Limited Chikkodi Chikkodi Belgaum 16 Chikkodi 110
628 Rajasthan Gum (P) Limited Masangi Byadagi Haveri 4.2 Bydagi 110
629 Giriraj Enteprises (Sidenur-2) Byadagi Byadagi Haveri 4.2 Bydagi 110
630 Araind P.Joshi and Company MG-
18 Sigaranahalli - Hassan 1.5 Hassan 220
631 Giriraj Enteprises (Abletech
Electro Engineers Hirebudihal and Aladhgere Byadagi Haveri 6.3 Bydagi 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
90 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
632 Giriraj Enteprises (Abletech
Electro Engineers Aladagere Byadagi Haveri 2.1 Bydagi 110
633 Tadas Wind Energy Limited Tadas Shiggaon Haveri 11.2 Ramanakoppa
110
634 Vish Wind Infrastrcture LLP Tadas Shiggaon Haveri 1.6 Ramanakoppa
110
635 Tadas Wind Energy Limited Tadas Shiggaon Haveri 10.4 Ramanakoppa
110
636 Tadas Wind Energy Limited Tadas Shiggaon Haveri 20.8 Ramanakoppa
110
637 Tadas Wind Energy Limited Tadas Shiggaon Haveri 4 Ramanakoppa
110
638 Tadas Wind Energy Limited Tadas Shiggaon Haveri 2.4 Ramanakoppa
110
639 Tadas Wind Energy Limited Tadas Shiggaon Haveri 4.8 Ramanakoppa
110
640 Tadas Wind Energy Limited Tadas Shiggaon Haveri 4.8 Ramanakoppa
110
641 Tadas Wind Energy Limited Tadas Shiggaon Haveri 1.6 Ramanakoppa
110
642 Tadas Wind Energy Limited Tadas Shiggaon Haveri 6.4 Ramanakoppa
110
643 Tadas Wind Energy Limited Tadas Shiggaon Haveri 2.4 Ramanakoppa
110
644 Tadas Wind Energy Limited Tadas Shiggaon Haveri 12 Ramanakoppa
110
645 Doddanavar Global Wind Private
Limited Chikkodi Chikkodi Belgaum 16 Chikkodi 110
646 Tadas Wind Energy Limited Tadas Shiggaon Haveri 2.4 Ramanakoppa
110
647 AB.Mallikarjuna Tadas Shiggaon Haveri 0.8 Ramanakoppa
110
648 Ablilash Software Development
Centre Tadas Shiggaon Haveri 1.6
Ramanakoppa
110
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 91
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
649 Prasad Technology Park (P)
Limited Tadas Shiggaon Haveri 1.6
Ramanakoppa
110
650 Tadas Wind Energy Limited Tadas Shiggaon Haveri 4.8 Ramanakoppa
110
651 Swastik Constructions Services Tadas Shiggaon Haveri 0.8 Ramanakoppa
110
652 Giriraj Enterprises Aladagere Byadagi Haveri 2.1 Bydagi 110
653 Tadas Wind Energy Limited Tadas Shiggaon Haveri 4 Ramanakoppa
110
654 Tadas Wind Energy Limited Tadas Shiggaon Haveri 4.8 Ramanakoppa
110
655 Tadas Wind Energy Limited Tadas Shiggaon Haveri 3.2 Ramanakoppa
110
656 Renew Wind Power (Karnataka)
Pvt Limited Tadas Kundgola Dharwad 2.4 Bidnal 220
657 Renew Wind Power (Karnataka)
Pvt Limited Tadas Kundgola Dharwad 4 Bidnal 220
658 Renew Wind Power (Karnataka)
Pvt Limited Tadas Kundgola Dharwad 5.6 Bidnal 220
659 Renew Wind Power (Karnataka)
Pvt Limited Tadas Kundgola Dharwad 3.2 Bidnal 220
660 Jayalaxmi Exports and imports (P)
Limited Tadas Shiggaon Haveri 0.8
Ramanakoppa
110
661 Renew Wind Power (Karnataka)
Pvt Limited Tadas Shiggaon Haveri 1.6
Ramanakoppa
110
662 Renew Wind Power (Karnataka)
Pvt Limited Tadas Kundgola Dharwad 4 Bidnal 220
663 Renew Wind Power (Karnataka)
Pvt Limited Tadas Kundgola Dharwad 8.8 Bidnal 220
664 Swastik Constructions Services Tadas Shiggaon Haveri 0.8 Ramanakoppa
110
665 Renew Wind Power (Karnataka)
Pvt Limited Tadas Kundgola Dharwad 13.6 Bidnal 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
92 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
666 Renew Wind Power (Karnataka)
Pvt Limited Tadas Kundgola Dharwad 2.4 Bidnal 220
667 Renew Wind Power (AP) Pvt
Limited Karoshi Chikkodi Belgaum 18 Bhoj 110
668 Polypack Industries tadas Kundgola Dharwad 0.8 Bidnal 220
669 Bidar Rubber and Reclaims Private
Limited Tadas Shiggaon Haveri 0.8
Ramanakoppa
110
670 ITC Limited Bambarge Belgaum Belgaum 8.75 Belgaum 220
671 Rangineni Steel Private Limited Bambarge Belgaum Belgaum 1.25 Belgaum 220
672 Lalpur Wind Energy Limited
(Group A) Tadas Shiggaon Haveri 7.2
Ramanakoppa
110
673 Lalpur Wind Energy Limited
(Group B) Tadas Kundgola Dharwad 19.2 Bidnal 220
674 Lalpur Wind Energy Limited
(Group C) Tadas Kundgola Dharwad 6.4 Bidnal 220
675 Lalpur Wind Energy Limited
(Group D) Tadas Kundgola Dharwad 4.8 Bidnal 220
676 Lalpur Wind Energy Limited Tadas Kundgola Dharwad 6.4 Bidnal 220
677 RNS Power Limited Adavisomapura and Kalasapura Gadag Gadag 5.6 Enercon
(Harthi) 220
678 Maris Power Supply Company
Private Limited Adavisomapura Gadag Gadag 3.2
Enercon
(Harthi) 220
679 Greenergy Wind Corporation
Private Limited Kalasapura and Nagavi Gadag Gadag 2.4
Enercon
(Harthi) 220
680 R.B.Seth Shreeram Narasingdas Adavisomapura and Papanashi Gadag Gadag 1.6 Enercon
(Harthi) 220
681 Mytrah Vayu (Krishna) Private
Limited Savalsang Indi Bijapur 56.95 Indi 220
682 Mangalore Energies Private
Limited Ingeshwara Basavanababewadi Bijapur 15 B Bagewadi 220
683 Greenergy Wind Corporation
Private Limited Kalasapura Gadag Gadag 1.6
Enercon
(Harthi) 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 93
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
684 R.B.Seth Shreeram Narasingdas Kalasapura Gadag Gadag 1.6 Enercon
(Harthi) 220
685 Maris Power Supply Company
Private Limited kalasapura Gadag Gadag 1.6
Enercon
(Harthi) 220
686 Shilpa Medicare Limited Kalasapura Gadag Gadag 3.2 Enercon
(Harthi) 220
687 Prasad Windmiils (P) Limited Kalasapura Gadag Gadag 0.8 Enercon
(Harthi) 220
688 Bhoruka Power Corporation
Limited Savsuddi Raybag Belgaum 17 Itnal 110
689 Greenergy Wind Corporation
Private Limited Kalasapura Gadag Gadag 3.2
Enercon
(Harthi) 220
690 R.B.Seth Shreeram Narasingdas Kalasapura Gadag Gadag 0.8 Enercon
(Harthi) 220
691 Mytrah Vayu (Krishna) Private
Limited Savalsang Indi Bijapur 13.6 Indi 220
692 Bhoruka Power Corporation
Limited savsuddi Raybag Belgaum 13.6 Itnal 110
693 Fortune Five Hydel Projects (P)
Limited Ingeshwara Basavanababewadi Bijapur 50 B Bagewadi 220
694 Greenergy Wind Corporation
Private Limited Kalasapura Gadag Gadag 4
Enercon
(Harthi) 220
695 Polypack Industries Kalasapura Gadag Gadag 0.8 Enercon
(Harthi) 220
696 Jayalaxmi Exports and imports (P)
Limited Kalasapura Gadag Gadag 0.8
Enercon
(Harthi) 220
697 Prasad Windmiils (P) Limited Kalasapura Gadag Gadag 0.8 Enercon
(Harthi) 220
698 Maris Power Supply Kalasapura Gadag Gadag 2.4 Enercon
(Harthi) 220
699 Mytrah Vayu (Krishna) Private
Limited Savalsang Indi Bijapur 16.15 Indi 220
700 Varuna Aurovilee Kalasapura Gadag Gadag 0.8 Enercon
(Harthi) 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
94 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
701 RNS Power Limited Kalasapura Gadag Gadag 0.8 Enercon
(Harthi) 220
702 Canara PCC Poles Kalasapura Gadag Gadag 0.8 Enercon
(Harthi) 220
703 Greenergy Wind Corporation
Private Limited Kalasapura Gadag Gadag 1.6
Enercon
(Harthi) 220
704 Protectron Electro mech (P)
Limited Kalasapura Gadag Gadag 1.6
Enercon
(Harthi) 220
705 R.B.Seth Shreeram Narasingdas Kalasapura Gadag Gadag 0.8 Enercon
(Harthi) 220
706 RNS Power Limited Kalasapura Gadag Gadag 0.8 Enercon
(Harthi) 220
707 M.K.Eco Power Private Limited Kalasapura Gadag Gadag 1.6 Enercon
(Harthi) 220
708 Greenergy Wind Corporation
Private Limited Kalasapura Gadag Gadag 1.6
Enercon
(Harthi) 220
709 Anu Cashews Kalasapura Gadag Gadag 0.8 Enercon
(Harthi) 220
710 Mac Charles (India)Ltd (TDPL) Shirunji, Nabhapura Gadag Gadag 4.2 Mundargi 110
711 Bhoruka Power Corporation
Limited Savsuddi Raybag Belgaum 18.7 Itnal 110
712 Vaayudana Kalasapura Gadag Gadag 0.8 Enercon
(Harthi) 220
713 M.K.Eco Power Private Limited Kalasapura Gadag Gadag 1.6 Enercon
(Harthi) 220
714 Greenergy Wind Corporation
Private Limited Kalasapura Gadag Gadag 1.6
Enercon
(Harthi) 220
715 Mytrah Vayu (Krishna) Private
Limited Savalsang Indi Bijapur 1.7 Indi 220
716 Mytrah Vayu (Krishna) Private
Limited Savalsang Indi Bijapur 3.4 Indi 220
717 Mytrah Vayu (Krishna) Private
Limited Savalsang Indi Bijapur 3.4 Indi 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 95
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
718 Rajasthan Gum Private Limited
(TDPL) Belathadi Gadag Gadag 2.1 Bellahatti 110
719 Shree Ram Industires (TDPL) Belathadi Gadag Gadag 2.1 Bellahatti 110
720 M.Hanumantha Rao (TDPL) Belathadi Gadag Gadag 2.1 Bellahatti 110
721 Green Infra Wind Power
Generation Limited Tadas Shiggaon Haveri 1.6
Ramanakoppa
110
722 Green Infra Wind Power
Generation Limited Tadas Shiggaon Haveri 2.4
Ramanakoppa
110
723 Clean Wind Power (Manvi) Private
Limited Kavithal Manvi Raichur 6 Manvi 110
724 M.Hanumantha Rao (TDPL) Belathadi Gadag Gadag 2.1 Bellahatti 110
725 Power Link System Private
Limited Mallali Kundgola Dharwad 0.8 Bidnal 220
726 Mysore Mercantile Company Ltd., Gojnur Gadag Gadag 6 Bellahatti 110
727 BEML Limited Hanumasagar Kustagi Koppal 9 Kustagi 110
728 Best Corporation Private Limited Hire Hesur Lingasugur Raichur 6 Hatti 110
729 Viking Knitters Nilogal Lingasugur Raichur 2 Hatti 110
730 Rai Bhadhur Seth Shreeram
Narsingdas Private Limited Nilogal Lingasugur Raichur 4 Hatti 110
731 M.Hanumantha Rao (TDPL) Belathadi Gadag Gadag 2.1 Bellahatti 110
732 Pearlite Linears (P) Limited Nilogal Lingasugur Raichur 2 Hatti 110
733 Bhoruka Power Corporation
Limited Yelisurur Gadag Gadag 27.2 Mundargi 110
734 Greenko Bagewadi Wind Energies
Private Limited Basavanabageadi Basavanababewadi Bijapur 30 B Bagewadi 220
735 Vyshali Energy Private Limited Kumatagi Bijapur Bijapur 48 Bijapur 220
736 Rohan Solar Power Private
Limited (Abletech) Kundur Honnali Davangere 10 Honnali 220
737 Sakathi Masala (P) Limited Nilogal Lingasugur Raichur 2 Hatti 110
738 Babu Sares (P) Limited Nilogal Lingasugur Raichur 2 Hatti 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
96 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
739 Prakash Silks and Sares Private
Limited Hirehesurur Lingasugur Raichur 2 Hatti 110
740 Renew Wind Energy Private
Limited Amaravathi, Basapur, Chikkahesarur Lingasugur Raichur 20 Hatti 110
741 Renew Wind Energy Private
Limited Khota, Hireheruru, chikkahesuru Lingasugur Raichur 20 Hatti 110
742 Vivek Agro Foods Bellikatte Kudligi Bellary 2.4 Donimalali 110
743 Nandi Roller Flour Mills Private
Limited Bellikatte Kudligi Bellary 0.8 Donimalali 110
744 Bharat Petroleum Corporation
Limited Harapanahalli Harapanahalli Davangere 4.2 Ittagi 220
745 Bharat Petroleum Corporation
Limited Harapanahalli Harapanahalli Davangere 2.1 Ittagi 220
746 Hindustan Aeronautics Limited Harapanahalli Harapanahalli Davangere 4.2 Ittagi 220
747 Hindustan Aeronautics Limited Harapanahalli Harapanahalli Davangere 2.1 Ittagi 220
748 Bharat Electronics Limited Harapanahalli Harapanahalli Davangere 8.4 Ittagi 220
749 Vyshali Energy Private Limited Kamatagi Bijapur Bijapur 2 Bijapur 220
750 ReNew Wind Energy (Karnataka)
Pvt Limited Abbigeri Ron Gadag 12 Ron 110
751 ReNew Wind Energy (Karnataka)
Pvt Limited Abbigeri Ron Gadag 8 Ron 110
752 ReNew Wind Energy (Karnataka)
Pvt Limited Abbigeri Ron Gadag 8 Ron 110
753 Sakthi Masala Private Limited Abbigeri Ron Gadag 4 Ron 110
754 P.Balasubbasetty Power and Steel Abbigeri Ron Gadag 4 Ron 110
755 P.Balasubbasetty Power and Steel Abbigeri Ron Gadag 2 Ron 110
756 Energon KN Wind Power Private
Limited Mangoli Basavanababewadi Bijapur 46 Mukarthihal 110
757 Vyshali Energy Private Limited Kumatagi, Kaggod, Shivangi and Hadagali Bijapur Bijapur 50 Bijapur 220
758 Bhoruka Power Corporation
Limited Savsuddi Raybag Belgaum 15.3 Itnal 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 97
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
759 Matrix Power (Wind) Private
Limited Hebbal Basavanababewadi Bijapur 24 Mukarthihal 110
760 Athavan Solar Projects Abbigeri Ron Gadag 4 Ron 110
761 Dr K.Ramakrishnan Abbigeri Ron Gadag 2 Ron 110
762 Balaji Malts Private Limited Abbigeri Ron Gadag 2 Ron 110
763 Ferns Builders and Developers Abbigeri Ron Gadag 2 Ron 110
764 Bhoruka Power Corporation
Limited Yelisurur Gadag Gadag 17 Mundargi 110
765 Green Infra Wind Power
Generation Limited Madapur, Uparakeri, Harapanahalli Harapanahalli Davangere 20 Ittagi 220
766 Sandur Power Company Private
Limited Kamatagi Bijapur Bijapur 4 Bijapur 220
767 Renew Wind Energy (Sipla) Pvt
Limited Batkurki Ramdurga Belgaum 26 Lokapur 110
768 Sandur Power Company Private
Limited Kamatagi Bijapur Bijapur 8 Bijapur 220
769 Green Infra Wind Power
Generation Limited Madapur, Uparakeri, Harapanahalli Harapanahalli Davangere 16 Ittagi 220
770 Orange Mamkheda Wind Private
Limited Gurmitkal Gurmitkal Gulburga 16 Gurmatkal 110
771 Renew Wind Energy (Sipla) Pvt
Limited Batkurki Ramdurga Belgaum 34 Lokapur 110
772 Ostro Mahawind Power Private
Limited Sattigeri Saundatti Belgaum 12 Saundatti 110
773 Green Infra Wind Power
Generation Limited Anathanahalli Harapanahalli Davangere 34 Ittagi 220
774 Kalyani Techpark Private Limited Magadi & Gojanur Shirahhti Gadag 10 Bellahatti 110
775 Sun Photo Voltaic Energy India
Private Limited Kanamadi Tikota Bijapur 18 Tikota 110
776 Green Infra Wind Power
Generation Limited Anathanahalli Harapanahalli Davangere 10 Ittagi 220
777 Ostro Mahawind Power Private
Limited Sattigeri Saundatti Belgaum 32 Saundatti 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
98 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
778 Orange Mamkheda Wind Private
Limited Gurmitkal Gurmitkal Gulburga 44 Gurmatkal 110
779 Sun Photo Voltaic Energy India
Private Limited Kanamadi Tikota Bijapur 42 Tikota 110
780 Renew Wind Energy (Sipla) Pvt
Limited Bableshwara Bijapur Bijapur 24
Babaleshwar
110
781 Renew Wind Energy (Sipla) Pvt
Limited Bableshwara Bijapur Bijapur 26
Babaleshwar
110
782 Clean Wind Power (Bableshwar)
Private Limited Bableshwara Bijapur Bijapur 24
Babaleshwar
110
783 Clean Wind Power (Piploda)
Private Limited Bableshwara Bijapur Bijapur 26
Babaleshwar
110
784 PTC Energy Limited Bableshwara Bijapur Bijapur 24 Babaleshwar
110
785 PTC Energy Limited Bableshwara Bijapur Bijapur 26 Babaleshwar
110
786 Dr K.Ramakrishnan Bableshwara Bijapur Bijapur 2 Babaleshwar
110
787 Ostro Mahawind Power Private
Limited Sattigeri Saundatti Belgaum 16 Saundatti 110
788 Aikam Holdings Private Limited Madanayanahalli Chitradurga Chitradurga 8 Chitradurga 220
789 Poonawalla Investments and
industries Private Limited Harapanahalli Harapanahalli Davangere 2.1 Ittagi 220
790 Poonawalla Investments and
industries Private Limited Adavihalli and Harapanahalli Harapanahalli Davangere 8.4 Ittagi 220
791 Seram Institute of India Private
Limited Kambatrahalli Harapanahalli Davangere 8.4 Ittagi 220
792 Sakthi Masala Private Limited Basavanabageadi Basavanababewadi Bijapur 10 B Bagewadi 220
793 Ahill Apparel Exports (P) Limited Basavanabageadi Basavanababewadi Bijapur 2 B Bagewadi 220
794 Laurel Apparels Basavanabageadi Basavanababewadi Bijapur 2 B Bagewadi 220
795 The Impetus Associates LLP Basavanabageadi Basavanababewadi Bijapur 2 B Bagewadi 220
796 Eswari Green Energy LLP Basavanabageadi Basavanababewadi Bijapur 4 B Bagewadi 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 99
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
797 KSSIDC Talakavery Madikere Madikere 0.55 Kushalnagara
220
798 Karnakaka Power Corporation Ltd Kappatagudda Mundargi Gadag 2.025 Mundargi 110
799 Karnakaka Power Corporation Ltd Kappattagudda / Gadag Mundargi Gadag 1.15 Mundargi 110
800 Karnakaka Power Corporation Ltd. Kappattagudda / Gadag Mundargi Gadag 1.38 Mundargi 110
801 Karnataka Renewable Energy
Development Ltd. Mavinahunda Raybag Belgaum 2 Itnal 110
802 Karnataka Renewable Energy
Development Ltd. Sogi Huvinahadagalli Bellary 2.5 Ittagi 220
803 Hutti Gold Mines Company Ltd Ingaldal Chitradurga Chitradurga 4.8 Chitradurga 220
804 Hutti Gold Mines Company Ltd Ingaldalu Chitradurga Chitradurga 4.5 Chitradurga 220
805 Balaji Malts Private Limited Harakhabahvi Kudligi Bellary 1.6 Donimalali 110
806 Jindal Aluminum Limited Bylutumbaraguddi Kudligi Bellary 12 Donimalali 110
807 ReNew Wind Energy (Karnataka)
Pvt Limited Bellikatte Kudligi Bellary 4.8 Donimalali 110
808 Murugendra Rajendra Oil NEJ Chikkodi Belgaum 0.85 Bhoj 110
809 Askok Iron Works (P) Limited NEJ Chikkodi Belgaum 2.55 Bhoj 110
810 Oswal Woollen Mills Limited NEJ Chikkodi Belgaum 0.85 Bhoj 110
811 The Campco Ltd NEJ Chikkodi Belgaum 1.7 Bhoj 110
812 Sarayu Cleangen Private Limited NEJ Chikkodi Belgaum 3.4 Bhoj 110
813 Sandur Power Company Private
Limited Kamatagi Bijapur Bijapur 12 Bijapur 220
814 Devarahipparagi Wind Power
Private Limited Kamatagi Bijapur Bijapur 100 Bijapur 220
815 GAIL India Limited SD -25 Masangi Byadagi Haveri 2.1 Bydagi 110
816 Savitha Chemicals Siegegudda Kavalu village Belur Hassan 1.25 Chikamagalur
220
817 Happy Valley Developers Siegegudda Kavalu village Belur Hassan 1.25 Chikamagalur
220
818 Khatau Narbheram & Co (Phase-1) Aidahalli kaval Belur Hassan 1.5 Chikamagalur
220
Karnataka’s Energy Mix: Computational Model for Energy Planning
100 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
819 Khatau Narbheram & Co (Phase-1) Aidahalli kaval Belur Hassan 1.5 Chikamagalur
220
820 Rathnagiri Impex Aidahalli kaval Belur Hassan 1.25 Chikamagalur
220
821 Doodanavar & Brothers Channenadaddi Chikkodi Belgaum 15 Chikkodi 110
822 Vandana Ispat Ltd., Kurumadikere Chitradurga Chitradurga 2.5 Chitradurga 220
823 Kariganur Iron & steels Jogimatti Chitradurga Chitradurga 2.5 Chitradurga 220
824 Raja Magnetics Ltd, Thalya and Horakerer (Jogimatti in Wind
Zone) Chitradurga Chitradurga 0.6 Chitradurga 220
825 Patel Shanti Steels Pvt. Ltd, Madakaripura Chitradurga Chitradurga 0.23 Chitradurga 220
826 Gangadhar Naringadas Agarwal
(HUF) Kurumardikere Chitradurga Chitradurga 1.25 Chitradurga 220
827 B.S.Chanabasappa & sons Kennedlu, Nandipura Chitradurga Chitradurga 0.6 Chitradurga 220
828 Enercon Windfarms (India) Ltd., Kenndlu,Chitradurga Chitradurga Chitradurga 4.2 Chitradurga 220
829 Indan Energy Pvt. Ltd (FIZA) kanchiganhall Chitradurga Chitradurga 0.75 Chitradurga 220
830 Jindal Aluminium Ltd. (FIZA) kanchiganhall Chitradurga Chitradurga 1.9 Chitradurga 220
831 Savitha Chemicals Ltd. (NEG) Kanchiganhal Chitradurga Chitradurga 3.8 Chitradurga 220
832 Maris Power Supply Co. Limited
(CWEL)
Kanchiganal (1WTGs)
Madakaripura(6WTGs) Chitradurga Chitradurga 5.25 Chitradurga 220
833 Mansukmahal Pvt., Ltd.,(NEG) Kanchiganal Chitradurga Chitradurga 0.95 Chitradurga 220
834 MSPL-6 (NEG) GRHalli Chitradurga Chitradurga 3.8 Chitradurga 220
835 Shanmuga Compacts (FIZA) Gonur Chitradurga Chitradurga 0.75 Chitradurga 220
836 S.Kumar (CWEL) Gonur Chitradurga Chitradurga 0.95 Chitradurga 220
837 Ramgad Mineral and mining Pvt.
Ltd-2 (FIZA) G.R.Halli/ Gonur Chitradurga Chitradurga 0.75 Chitradurga 220
838 Kariganur Iron & Steel Pvt., Ltd.,
(FIZA) G.R.Halli/ Gonur Chitradurga Chitradurga 0.75 Chitradurga 220
839 Victus Associate (FIZA) G.R.Halli/ Gonur Chitradurga Chitradurga 0.75 Chitradurga 220
840 Eswari Garements (FIZA) G.R.Halli Chitradurga Chitradurga 0.75 Chitradurga 220
841 Esawi knittings (FIZA) G.R.Halli Chitradurga Chitradurga 1.5 Chitradurga 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 101
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
842 MSPL-3(NEG) G.R.Halli Chitradurga Chitradurga 3.8 Chitradurga 220
843 Good luck syndicate. Elladakere Hiriyur Chitradurga 0.6 Chitradurga 220
844 Shreyalakshmi and properties Elladakere Hiriyur Chitradurga 0.6 Chitradurga 220
845 Defree Engineering P. Ltd., Elladakere Hiriyur Chitradurga 0.6 Chitradurga 220
846 B.S.C.Textiles Elladakere Hiriyur Chitradurga 0.6 Chitradurga 220
847 Siddaganga Oil Extractions Ltd., Elladakere Hiriyur Chitradurga 1.2 Chitradurga 220
848 Indo wind Energy Ltd., Elkurnahalli Chitradurga Chitradurga 1.5 Chitradurga 220
849 VSL Mining Company (P) Ltd., Elekuranahalli Chitradurga Chitradurga 1.5 Chitradurga 220
850 VS Lad & Sons Elekuranahalli Chitradurga Chitradurga 1.5 Chitradurga 220
851 Leo Fasterners Elakuranahalli Chitradurga Chitradurga 3 Chitradurga 220
852 Boruka Power Corporation Ltd.,
(Vestas) Betadarangenahalli Chitradurga Chitradurga 2 Chitradurga 220
853 Bellary Iron Ores (P) Ltd., Betadarangenahalli Chitradurga Chitradurga 2.5 Chitradurga 220
854 Atria Wind Power (Bijapur-2) Pvt
Ltd
Bangarakanahalli & Madanayakanahalli
(GE Machine) Chitradurga Chitradurga 23.3 Chitradurga 220
855 National Mineral Development
Corporation Ltd Anehalu Chitradurga Chitradurga 9 Chitradurga 220
856 Bharat Earth Movers Limited Kappatagudda Mundargi Gadag 1.25 Dambal 110
857 Vishwa Vinayaka Minerals Vadegola, Rajur Ron Gadag 0.6 Gajendragad
110
858 Three M Paper manufacturing Ltd Vadegola, Rajur Ron Gadag 0.6 Gajendragad
110
859 RRB Energy Ltd Vadegola Ron Gadag 0.6 Gajendragad
110
860 Orient Steels and Industies Limited Unachageri & Rajur Ron Gadag 0.6 Gajendragad
110
861 Pragathi Aroma oil distillers (P)
Ltd., (SA) Unachagere, Rajur Ron Gadag 1.2
Gajendragad
110
862 Orient Abrasis Ltd Rajur Ron Gadag 0.6 Gajendragad
110
Karnataka’s Energy Mix: Computational Model for Energy Planning
102 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
863 V.Dodappa Rajur Ron Gadag 0.6 Gajendragad
110
864 B V Finanace & Leasing LTd., Lakkihalli Hiriyur Chitradurga 0.8 Hiryur 220
865 Mahalaksmi Construction
Corporation Ltd., Lakkihalli Hiriyur Chitradurga 0.8 Hiryur 220
866 P.Mohan Lal., Elladakere Hiriyur Chitradurga 0.6 Hiryur 220
867 Mineral Enterprises Ltd, Elladakere Hiriyur Chitradurga 1.8 Hiryur 220
868 Laxmi Organic Industries Pvt.,
Ltd., Elladakere Hiriyur Chitradurga 0.6 Hiryur 220
869 Laxmi Organic Industries. Elladakere Hiriyur Chitradurga 0.6 Hiryur 220
870 Hira Ferro Alloys Kundur Honnali Davangere 1.5 Honnali 220
871 Sargam Retails (P) Ltd - Ph-2 Kudrekonda Honnali Davangere 7.5 Honnali 220
872 Hotel Leelaventures Kudrekonda Honnali Davangere 2.5 Honnali 220
873 Rangamma Steels & Malleables -
LMIL
Timmanahalli, Ramanahalli, Annehalli,
Hagalvadi and mattikere Chikkanayakanahalli Tumkur 0.8 Hiryur 220
874 Gemcraft Hosadurga Hosadurga chitradurga 0.8 Hiryur 220
875 Enercon WindFarms (Hindustan)
(P) Ltd.,JNI Dusudi Hosadurga Chitradurga 24 Hiryur 220
876 Ramgad Minerals & Mining Pvt.
Ltd, Jajikalgudda Harpanahalli Davangere 7.5 Ittagi 220
877 Poonawalla Investments and
industries Private Limited Harapanahalli Harapanahalli Davangere 6.3 Ittagi 220
878 Vikram Trader Halvagalu Harapanahalli Davangere 2.1 Ittagi 220
879 Maris Spinners Limited Halvagalu Harapanahalli Davangere 2.1 Ittagi 220
880 Clean Wind Power (Manvi) Private
Limited Kavithal Manvi Raichur 44 Manvi 110
881 Greenko Bagewadi Wind Energies
Private Limited Salawadigi Basavanababewadi Bijapur 4 Mukarthihal 110
882 Green Infra Wind Power
Generation Limited Ramdurga Ramdurga Belgaum 20 Ramdurga 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 103
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
883 ReNew Wind Energy (Karnataka)
Pvt Limited Abbigeri Ron Gadag 12 Ron 110
884 Victory Glass And Industries Ltd. Hargapurgad Hukkeri Gadag 0.45 Sankeshwar 110
885 Kirloskar Electric Company Ltd. Hargapurgad Hukkeri Belgaum 2 Sankeshwar 110
886 Gangadhar Narasingdas Agarwal Ayyanahalli Bellary Bellary 1.5 Sankalapur 110
887 East Man Ayyanahalli Bellary Bellary 1.5 Sankalapur 110
888 CLP Wind Farms (India) Pvt Ltd Katamalli & Hooli Saundatti Belgaum 7.2 Saundatti 110
889 CLP Wind Farms (India) Pvt Ltd Goraballa, Basidoni, Sirasangi Saundatti Belgaum 16 Saundatti 110
890 Giriraj Enterprises Bestur Saundatti Belgaum 10.5 Saundatti 110
891 CLP Wind Farms (India) Pvt Ltd Basidoni, Sirasangi Saundatti Belgaum 4.8 Saundatti 110
892 Sterling Agro Industries Limited Sidaganalu Shikaripura Shimoga 3.75 Shikaripura 110
893 Mantri Homes Shiraganahallu Shikaripura Shimoga 1.5 Shikaripura 110
894 Tirupathi Microtech Hirekatte Shikaripura Shimoga 1.25 Shikaripura 110
895 Bright Packaging Pvt Ltd Gangavansara Shikaripura Shimoga 1.25 Shikaripura 110
896 H.G.Rangan Goud (phase-II) Gangavansara Shikaripura Shimoga 1.25 Shikaripura 110
897 Techno Rings Gangavansara Shikaripura Shimoga 1.25 Shikaripura 110
898 Rajastham Gum (P) Limited Gangavansara Shikaripura Shimoga 1.25 Shikaripura 110
899 Sterling Agro Industries Limited Gangavansara Shikaripura Shimoga 2.5 Shikaripura 110
900 Mantri Homes Gangavansara Shikaripura Shimoga 3 Shikaripura 110
901 Rajastham Gum (P) Limited Gangavansara Shikaripura Shimoga 1.5 Shikaripura 110
902 Kalleshwari Refinary (P) Limited Gangavansara Shikaripura Shimoga 1.5 Shikaripura 110
903 M.R.Pasalkar Gangavansara Shikaripura Shimoga 1.25 Shikaripura 110
904 Rajastham Gum (P) Limited Gangavansara Shikaripura Shimoga 1.25 Shikaripura 110
905 Rajastham Gum (P) Limited Gangavansara Shikaripura Shimoga 1.5 Shikaripura 110
906 Mantri Homes Gangavansara Shikaripura Shimoga 1.5 Shikaripura 110
907 Rameshkumar Hanjarimal Rathod Gangavansara Shikaripura Shimoga 1.25 Shikaripura 110
908 Indus Trust Gangarkatte Shikaripura Shimoga 1.5 Shikaripura 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
104 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
909 Gemscab Industries Solutions Ranathur village in Shirahatti Shiratti Gadag 0.8 Shirhatti 110
910 Prasad Global Solutions Ranathur village in Shirahatti Shiratti Gadag 0.8 Shirhatti 110
911 Protectron Electromech (P) Ltd., Ranathur village in Shirahatti Shiratti Gadag 0.8 Shirhatti 110
912 Fatehpurai Transformer &
Switchgears (P) Ltd., Majjur Shiratti Gadag 0.8 Shirhatti 110
913 Super wind project (P) Ltd Ph-2 Jalavadgi Mundargi Gadag 1.5 Shirhatti 110
914 The Tata Power Company Ltd Hosur, Kanavi & Mulgund Gadag Gadag 4 Shirhatti 110
915 Super wind project (P) Ltd Ph-4 Chaginakere Mundargi Gadag 1.5 Shirhatti 110
916 Bhoruka Power Corporation
Limited Yelisurur Gadag Gadag 15 Shirhatti 110
917 Bhoruka Power Corporation
Limited Yelisurur Gadag Gadag 3 Shirhatti 110
918 Bhoruka Power Corporation
Limited Yelisurur Gadag Gadag 7.5 Shirhatti 110
919 Mysore Engineers (India) Ltd., Sirund village, Gadag taluk, Gadag
district. Gadag Gadag 0.25 Shirhatti 110
920 Fasteners and Allied Products (P)
Ltd.,
Sirund village, Gadag taluk, Gadag
district. Gadag Gadag 0.25 Shirhatti 110
921 Suresh C Angadi Sirund village, Gadag taluk, Gadag
district. Gadag Gadag 0.25 Shirhatti 110
922 Mangal S Angadi Sirund village, Gadag taluk, Gadag
district. Gadag Gadag 0.25 Shirhatti 110
923 C.R.Rajesh Nair Sirund village, Gadag taluk, Gadag
district. Gadag Gadag 0.75 Shirhatti 110
924 Swani Corporation Sirund village, Gadag taluk, Gadag
district. Gadag Gadag 0.25 Shirhatti 110
925 Oswal Woollen Mills Limited Shorgaon Chikkodi Belgaum 0.85 Shirgaon 110
926 Canara PCC Poles Shirogoan Chikkodi Belgaum 0.85 Shirgaon 110
927 NSB Infrastrcture and Projects
Private Limited Shirogoan Chikkodi Belgaum 0.85 Shirgaon 110
928 Chamundeshwari Build Tech (P)
Limited Shirogoan Chikkodi Belgaum 0.85 Shirgaon 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 105
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
929 KRBL Limited Kalmangi Sindanur Raichur 1.5 Sindhanur 110
930 Fortune Five Hydel Projects (P)
Limited Ingeshwara Basavanababewadi Bijapur 51.2 B Bagewadi 220
931 Matrix Power (Wind) Private
Limited Ingeshwara Basavanababewadi Bijapur 15 B Bagewadi 220
932 Rahul Dravid Machinalli Mundargi Gadag 0.8 Bellahatti 110
933 Goetze (India) Financial Services
Ltd., Gopalpura Hiriyur Chitradurga 9.6
Hadavahalli
(GOPALPUR)2
20
934 Eastman International Gopalpura Hassan Hassan 3
Hadavahalli
(GOPALPUR)2
20
935 Avon Cycles Ltd Gopalpura Hassan Hassan 1.5
Hadavahalli
(GOPALPUR)2
20
936 Hindustan Zinc Limited Gopalpura Hassan Hassan 3
Hadavahalli
(GOPALPUR)2
20
937 Hindustan Zinc Limited Gopalpura Hassan Hassan 3
Hadavahalli
(GOPALPUR)2
20
938 Simran Wind Power Project (P)
Ltd -Ph-1 Kopalahalli Holenarsipura Hassan 1.5
Hadavahalli
(GOPALPUR)2
20
939 Suresh Kumar Sharma (HUF) Horigeri Mundargi Gadag 1.25 Guttal 110
940 M.K.Agrotech Private Limited Sambapur, Papanashini and Adavisomapur Gadag Gadag 8 Enercon
(Harthi) 220
941 Hindustan Zinc Limited Kurthkoti, Harti Gadag Gadag 8 Enercon
(Harthi) 220
942 Hindustan Zinc Limited Kurthkoti, Harti Gadag Gadag 8 Enercon
(Harthi) 220
943 Generacion Eolica India (P) Ltd Kurthkoti, Harti Gadag Gadag 8 Enercon
(Harthi) 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
106 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
944 Belgaum Wind Farms (P) Ltd Kurthkoti, Asundi, Binkadakatte &
Hulkoti Gadag Gadag 1.6
Enercon
(Harthi) 220
945 Belgaum Wind Farms (P) Ltd Kurthkoti, Asundi, Binkadakatte &
Hulkoti Gadag Gadag 2.4
Enercon
(Harthi) 220
946 Belgaum Wind Farms (P) Ltd Kurthkoti, Asundi, Binkadakatte &
Hulkoti Gadag Gadag 4
Enercon
(Harthi) 220
947 The Tata Power Company Ltd Kanavi, Harthi & Mulgund villages Gadag Gadag 8 Enercon
(Harthi) 220
948 Maris Power Supply Company
Private Limited Adavisomapura and Kalasapura Gadag Gadag 0.8
Enercon
(Harthi) 220
949 Hindustan Zinc Limited Chudanhalli Hassan Hassan 3 Hassan 220
950 MSPL Sogi Huvinahadagalli Bellary 18.75 Ittagi 220
951 VS Lad & Sons Gujanur Huvinahadagalli Bellary 3.75 Ittagi 220
952 Mahalaksmi Commercial Services Gujanur Huvinahadagalli Bellary 1.25 Ittagi 220
953 Abhishek Exports India Pvt Ltd Gangavansara Honnali Davangere 2.5 Honnali 220
954 KRBL Limited (KAL-20) Kalmangi Gangavathi Koppal 1.5 Sindhanur 110
955 Renew Wind Power (Karnataka)
Pvt Limited Tadas Kundgola Dharwad 4.8 Bidnal 220
956 Sameera Trading Company Ayyanahalli Bellary Bellary 1.5 Sankalapur 110
957 The Tata power company Ltd Hosur, Kanavi & Mulgund Gadag Gadag 0.8 Shirhatti 110
958 Vijayananda Road Lines Ltd.,
(Phase-1) Hirevadatti Mundargi Gadag 2.5 Dambal 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 107
Details of Existing KPTCL Substations
Table 19: Details of KPTCL substation as on March 31, 2017
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
1 Hosur SHIKARPUR SHIVAMOGGA Hassan 110 / 11 10 1 10
2 Jade SORBA SHIVAMOGGA Hassan 110 / 11 10 1 10
3 Sarjapura ANEKAL BENGALURU
URBAN
Bengaluru
Urban 220 / 66 100 2 200
4 APMC Yard Raichur RAICHUR RAICHUR Gulbarga 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
5 Chikkasugur RAICHUR RAICHUR Gulbarga 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
6 Maliyabad RAICHUR RAICHUR Gulbarga 110 / 11 10 1 10
7 Vadavatti RAICHUR RAICHUR Gulbarga 110 / 11 10 2 20
8 Matamari MANVI RAICHUR Gulbarga 110 / 11 10 2 20
9 K R pet KRISHNARUJPET Mandya Mysore 220 / 66 100 2 200
10 Deodurga DEVADURGA RAICHUR Gulbarga 110 / 11 10 2 20
110 / 33 20 2 40
11 Gabbur DEVADURGA RAICHUR Gulbarga 110 / 11 10 1 10
12 Shahapur SHAHPUR YADGIR Gulbarga 110 / 11 10 2 20
220 / 110 100 2 200
13 Gowribidanur GOWRIBIDANUR CHIKBALLAPUR Bengaluru
Rural 220 / 66 100 2 200
14 Kembhavi SHORAPUR YADGIR Gulbarga 110 / 11 10 2 20
110 / 33 20 1 20
15 Shahapur SHAHPUR YADGIR Gulbarga 110 / 11 10 2 20
110 / 33 10 1 10
Karnataka’s Energy Mix: Computational Model for Energy Planning
108 www.cstep.in © CSTEP
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
16 Shorapur SHORAPUR YADGIR Gulbarga
110 / 11 10 2 20
110 / 33 10 1 10
20 1 20
17 Yadgiri YADGIR YADGIR Gulbarga 110 / 11 10 2 20
110 / 33 20 2 40
18 Konkal YADGIR YADGIR Gulbarga 110 / 11 10 1 10
110 / 33 20 1 20
19 Gurmatkal YADGIR YADGIR Gulbarga 110 / 11 10 1 10
20 Sedam SEDAM KALABURAGI Gulbarga
110 / 11 10 2 20
110 / 33 20 1 20
220 / 110 100 2 200
21 Channarayapatna CHANNARAYAPATNA HASSAN Hassan 220 / 66 100 2 200
22 Vadagera JEVARGI KALABURAGI Gulbarga 110 / 11 10 1 10
110 / 33 20 1 20
23 Saidapur K YADGIR YADGIR Gulbarga 110 / 11 10 2 20
24 Khanapur SH SHAHPUR YADGIR Gulbarga 110 / 11
5 1 5
10 1 10
110 / 33 20 1 20
25 Shahabad CHITAPUR KALABURAGI Gulbarga 110 / 11 20 2 40
220 / 110 100 2 200
26 Anchepalya KUNIGAL TUMAKURU Tumkur 220 / 66 100 2 200
27 Chitapur CHITAPUR KALABURAGI Gulbarga 110 / 11 10 2 20
110 / 33 20 1 20
28 Korwar temple CHITAPUR KALABURAGI Gulbarga 110 / 11 10 1 10
110 / 33 10 1 10
29 Jevargi JEVARGI KALABURAGI Gulbarga 110 / 11 10 2 20
110 / 33 10 1 10
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 109
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
30 Bidadi RAMANAGARAM RAMNAGAR Bengaluru
Rural 220 / 66 100 2 200
31 Nalwar CHITAPUR KALABURAGI Gulbarga 110 / 11 10 1 10
110 / 33 10 1 10
32 Wadi CHITAPUR KALABURAGI Gulbarga 110 / 11 10 1 10
33 Farhatabad KALABURAGI KALABURAGI Gulbarga 110 / 11 10 2 20
34 Gulbarga South KALABURAGI KALABURAGI Gulbarga 110 / 11 10 2 20
20 1 20
35 Gulbarga West KALABURAGI KALABURAGI Gulbarga 110 / 11 10 2 20
110 / 33 20 1 20
36 Kapnoor KALABURAGI KALABURAGI Gulbarga 220 / 110 100 2 200
37 Gulbarga North KALABURAGI KALABURAGI Gulbarga
110 / 11 20 2 40
110 / 33 10 1 10
20 1 20
38 Gulbarga (U) KALABURAGI KALABURAGI Gulbarga 110 / 11 10 2 20
39 Nittur GUBBI TUMAKURU Tumkur 110 / 11 20 2 40
220 / 110 100 2 200
40 Kapnoor KALABURAGI KALABURAGI Gulbarga 110 / 11 10 2 20
41 Mandewali JEVARGI KALABURAGI Gulbarga 110 / 11 10 1 10
110 / 33 20 1 20
42 Madiyal ALAND KALABURAGI Gulbarga 110 / 11 10 2 20
110 / 33 20 1 20
43 Chowdapur AFZALPUR KALABURAGI Gulbarga 110 / 11 10 1 10
110 / 33 20 1 20
44 Afzalpur AFZALPUR KALABURAGI Gulbarga 110 / 11 10 3 30
110 / 33 20 1 20
45 Karajgi AFZALPUR KALABURAGI Gulbarga 110 / 11 10 2 20
110 / 33 20 1 20
Karnataka’s Energy Mix: Computational Model for Energy Planning
110 www.cstep.in © CSTEP
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
46 Devangaon SINDGI VIJAYAPURA Bagalkot 110 / 11 10 1 10
47 Betagera GADAG GADAG Bagalkot 110 / 11 10 2 20
110 / 33 10 1 10
48 HSR layout BENGALURU SOUTH BENGALURU
URBAN
Bengaluru
Urban 220 / 66
100 1 100
150 2 300
49 Kurkunta SEDAM KALABURAGI Gulbarga 110 / 11 10 1 10
50 Chincholi CHINCHOLI KALABURAGI Gulbarga 110 / 11 10 1 10
110 / 33 20 1 20
51 Yedrami JEVARGI KALABURAGI Gulbarga 110 / 11 10 1 10
110 / 33 10 1 10
52 Kadaganchi ALAND KALABURAGI Gulbarga 110 / 11 10 1 10
53 Aland ALAND KALABURAGI Gulbarga
110 / 11 10 2 20
110 / 33 10 1 10
20 1 20
54 Kanakapura KANAKAPURA RAMNAGAR Bengaluru
Rural 220 / 66 100 1 100
55 Mahagaon KALABURAGI KALABURAGI Gulbarga 110 / 11 10 1 10
110 / 33 10 1 10
56 Margutti cross KALABURAGI KALABURAGI Gulbarga 110 / 11 10 1 10
57 Humnabad HUMNABAD BIDAR Gulbarga 110 / 11 10 1 10
220 / 110 100 2 200
58 Chittaguppa HUMNABAD BIDAR Gulbarga 110 / 11 10 2 20
59 Humnabad HUMNABAD BIDAR Gulbarga 110 / 11 10 2 20
110 / 33 10 4 40
60 Antharasanahalli TUMAKURU TUMAKURU Tumkur 220 / 66 100 2 200
61 Manna-ek-halli HUMNABAD BIDAR Gulbarga
110 / 11 10 2 20
110 / 33 10 1 10
20 1 20
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 111
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
62 Hallikheda HUMNABAD BIDAR Gulbarga 110 / 11 10 2 20
110 / 33 20 1 20
63 Kamathana BIDAR BIDAR Gulbarga 110 / 11 10 1 10
110 / 33 20 1 20
64 Habsikote BIDAR BIDAR Gulbarga 110 / 11 10 2 20
65 Chidri BIDAR BIDAR Gulbarga 110 / 11 10 3 30
66 Kolhar BIDAR BIDAR Gulbarga 110 / 11
10 1 10
20 1 20
110 / 33 20 2 40
67 Janawad BIDAR BIDAR Gulbarga 110 / 11 10 1 10
110 / 33 20 1 20
68 Halabarga BHALKI BIDAR Gulbarga 110 / 11 10 1 10
220 / 110 100 2 200
69 Rajeshwar BASAVAKALYAN BIDAR Gulbarga 110 / 11 10 2 20
70 Mantala BASAVAKALYAN BIDAR Gulbarga 110 / 11 10 2 20
110 / 33 20 1 20
71 Torekadanahalli MALAVALLI Mandya Mysore 220 / 66 100 2 200
72 Sasthapur BASAVAKALYAN BIDAR Gulbarga 110 / 11 10 2 20
110 / 33 10 2 20
73 Bhalki BHALKI BIDAR Gulbarga 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
74 Ladha BHALKI BIDAR Gulbarga 110 / 11 10 1 10
110 / 33 20 1 20
75 Kibbanahalli TIPTUR TUMAKURU Tumkur 110 / 11 10 2 20
220 / 110 100 2 200
76 Santhapur AURAD BIDAR Gulbarga 110 / 11 10 2 20
Karnataka’s Energy Mix: Computational Model for Energy Planning
112 www.cstep.in © CSTEP
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
110 / 33 20 1 20
77 Dongergaon AURAD BIDAR Gulbarga 110 / 11 10 1 10
110 / 33 20 1 20
78 Kamalnagar AURAD BIDAR Gulbarga 110 / 11 10 1 10
110 / 33 20 1 20
79 Turvihal SINDHNUR RAICHUR Gulbarga 110 / 11 10 1 10
110 / 33 10 1 10
80 Hanamanal HUNGUND BAGALKOT Bagalkot 110 / 11 10 2 20
81 Metri HOSAPETE BALLARI Gulbarga 110 / 11 10 1 10
82 Halkundi BALLARI BALLARI Gulbarga 110 / 11 10 1 10
83 Shaktinagar RAICHUR RAICHUR Gulbarga 110 / 11 10 2 20
84 Kerehalli KOPPAL KOPPAL Gulbarga 110 / 11 10 2 20
110 / 33 20 1 20
85 Shiggaon SHIGGAON HAVERI Bagalkot 110 / 11 10 2 20
110 / 33 10 1 10
86 Tumminakatte RANIBENNURU HAVERI Bagalkot 110 / 11 10 2 20
87 Bidi KHANAPUR BELAGAVI Bagalkot 110 / 11 10 2 20
88 Suvarnasoudha BELAGAVI BELAGAVI Bagalkot 110 / 11 10 2 20
89 Jambagi K D ATHNI BELAGAVI Bagalkot 110 / 11 10 1 10
90 Bisnal SINDGI VIJAYAPURA Bagalkot 110 / 11 10 1 10
91 Madhuvanahally KOLLEGALA CHAMARAJANAG
AR Mysore 220 / 66 100 2 200
92 Itanal RAYBAG BELAGAVI Bagalkot 110 / 11 10 2 20
93 Chandakavate SINDGI VIJAYAPURA Bagalkot 110 / 11 10 2 20
94 Kulageri cross BADAMI BAGALKOT Bagalkot 110 / 11 10 2 20
95 Aski SINDGI VIJAYAPURA Bagalkot 110 / 11 10 1 10
96 UAS Dharwad DHARWAD DHARWAD Bagalkot 110 / 11 10 2 20
97 Daddi HUKERI BELAGAVI Bagalkot 110 / 11 10 2 20
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 113
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
98 Guttur HARIHAR DAVANGERE Tumkur 400 / 220 315 2 630
99 Sultanpur RAYBAG BELAGAVI Bagalkot 110 / 11 10 2 20
100 Kagwada ATHNI BELAGAVI Bagalkot 110 / 11 10 2 20
101 Alabal JAMKHANDI BAGALKOT Bagalkot 110 / 11 10 2 20
102 Yalparatti BASAVANA
BAGEVADI VIJAYAPURA Bagalkot 110 / 11 10 2 20
103 Mantur MUDHOL BAGALKOT Bagalkot 110 / 11 10 2 20
104 Hassan HASSAN HASSAN Hassan 220 / 66 100 2 200
105 Kuditini BALLARI BALLARI Gulbarga 110 / 11 10 1 10
106 Basthipura (Mysore) SHRIRANGAPATTANA Mandya Mysore 400 / 220 315 2 630
500 1 500
107 Bidadi PGCIL RAMANAGARAM RAMNAGAR Bengaluru
Rural 400 / 220 500 2 1000
108 Tumkur (New
Madhugiri) TUMAKURU TUMAKURU Tumkur 400 / 220 500 2 1000
109 Khodays BENGALURU SOUTH BENGALURU
URBAN
Bengaluru
Urban 220 / 66 100 2 200
110 Magadi MAGADI RAMNAGAR Bengaluru
Rural 220 / 66 100 2 200
111 Nelamangla NELAMANGALA BENGALURU
RURAL
Bengaluru
Rural 400 / 220 500 3 1500
112 Kolar PGCIL KOLAR KOLAR Bengaluru
Rural 400 / 220 500 2 1000
113 Kuduchi RAYBAG BELAGAVI Bagalkot 110 / 11 10 2 20
220 / 110 100 2 200
114 Somanahalli PGCIL BENGALURU SOUTH BENGALURU
URBAN
Bengaluru
Urban 400 / 220 500 3 1500
115 RTPS RAICHUR RAICHUR Gulbarga 400 / 220 315 2 630
500 1 500
116 Raichur New RAICHUR RAICHUR Gulbarga 765 / 400 1500 2 3000
117 Kadavinakote HOLE NARASIPURA HASSAN Hassan 220 / 66 100 2 200
Karnataka’s Energy Mix: Computational Model for Energy Planning
114 www.cstep.in © CSTEP
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
118 Kudgi BASAVANA
BAGEVADI VIJAYAPURA Bagalkot
400 / 21 941 3 2823
400 / 220 500 2 1000
119 Kudgi New BASAVANA
BAGEVADI VIJAYAPURA Bagalkot 765 / 400 1500 2 3000
120 Hoody BENGALURU EAST BENGALURU
URBAN
Bengaluru
Urban
220 / 66 100 4 400
400 / 220 500 3 1500
121 Keregodi TIPTUR TUMAKURU Tumkur 110 / 11 10 1 10
122 Talakere MADHUGIRI TUMAKURU Tumkur 110 / 11 10 1 10
123 Bidare GUBBI TUMAKURU Tumkur 110 / 11 10 1 10
124 Arsikere ARASIKERE HASSAN Hassan 110 / 11 10 2 20
220 / 110 100 2 200
125 BTPS 400 BALLARI BALLARI Gulbarga 400 / 220 315 1 315
126 Ghattaprabha HUKERI BELAGAVI Bagalkot 110 / 11 10 1 10
20 1 20
127 Kaiga KARWAR UTTAR KANNADA Bagalkot 400 / 220 315 2 630
128 Chikkamagalur CHIKKAMAGALURU CHIKKAMAGALU
RU Hassan 220 / 66 100 2 200
129 Mallapura ARASIKERE HASSAN Hassan 110 / 11 5.2 2 10.4
10 1 10
130 Munirabad KOPPAL KOPPAL Gulbarga
110 / 33 10 2 20
110 / 66 20 2 40
220 / 110 100 2 200
131 Naganathapura BENGALURU SOUTH BENGALURU
URBAN
Bengaluru
Urban 220 / 66 100 2 200
132 Kadur KADUR CHIKKAMAGALU
RU Hassan
110 / 11 10 2 20
220 / 110 100 2 200
133 Yelahanka BENGALURU NORTH BENGALURU
URBAN
Bengaluru
Urban 220 / 66 150 2 300
134 Gajanur SHIVAMOGGA SHIVAMOGGA Hassan 110 / 11 10 1 10
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 115
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
135 UPCL UDUPI UDUPI Hassan 400 / 220 315 2 630
136 Malghan (near Indi) SINDGI VIJAYAPURA Bagalkot 110 / 11 10 2 20
137 Kavoor MANGALURU DAKSHIN
KANNADA Hassan
110 / 11 20 2 40
110 / 33 20 2 40
220 / 110 100 3 300
138 Belgaum BELAGAVI BELAGAVI Bagalkot 110 / 11 10 2 20
110 / 33 20 2 40
139 Kothipura KUNIGAL TUMAKURU Tumkur 220 / 66 100 2 200
140 Mittemari BAGEPALLI CHIKBALLAPUR Bengaluru
Rural 220 / 66 100 2 200
141 Mallat MANVI RAICHUR Gulbarga 220 / 110 100 2 200
142 Devaragennur VIJAYAPURA VIJAYAPURA Bagalkot 110 / 11 10 2 20
143 Dhoni MUNDARGI GADAG Bagalkot 400 / 220 500 2 1000
144 Halaki MUDHOL BAGALKOT Bagalkot 110 / 11 10 1 10
145 Hiremasali INDI VIJAYAPURA Bagalkot 110 / 11 10 1 10
146 Khadakalat CHIKODI BELAGAVI Bagalkot 110 / 11 10 2 20
147 Morab NAVALGUND DHARWAD Bagalkot 110 / 11 10 2 20
148 Tolamatti BILGI BAGALKOT Bagalkot 110 / 11 10 1 10
149 Jigani ANEKAL BENGALURU
URBAN
Bengaluru
Urban 220 / 66 150 2 300
150 Belagumba ARASIKERE HASSAN Hassan 110 / 11 10 2 20
151 Karkala KARKAL UDUPI Hassan 110 / 11 10 2 20
152 Hosanagara HOSANAGARA SHIVAMOGGA Hassan 110 / 11 10 2 20
153 Ghattarga AFZALPUR KALABURAGI Gulbarga 110 / 11 10 2 20
154 Muddapura HOLALKERE CHITRADURGA Tumkur 110 / 11 10 1 10
155 Yeragera RAICHUR RAICHUR Gulbarga 110 / 11 10 2 20
156 Chintamani CHINTAMANI CHIKBALLAPUR Bengaluru
Rural 220 / 66 100 3 300
157 Pavagada PAVAGADA TUMAKURU Tumkur 220 / 66 100 2 200
Karnataka’s Energy Mix: Computational Model for Energy Planning
116 www.cstep.in © CSTEP
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
158 Pavagada Pooling station PAVAGADA TUMAKURU Tumkur 400 / 220 500 3 1500
159 Puttur 220 PUTTUR DAKSHIN
KANNADA Hassan
110 / 11 10 1 10
110 / 33 20 1 20
220 / 110 100 2 200
160 MSEZ MANGALURU DAKSHIN
KANNADA Hassan
110 / 11 20 2 40
220 / 110 100 2 200
161 Shivamogga SHIVAMOGGA SHIVAMOGGA Hassan
110 / 11 10 2 20
110 / 66 20 4 80
220 / 110 100 3 300
162 NIMHANS BENGALURU NORTH BENGALURU
URBAN
Bengaluru
Urban 220 / 66 150 2 300
163 Talaguppa SAGAR SHIVAMOGGA Hassan
110 / 11 10 2 20
220 / 110 100 2 200
400 / 220 315 3 945
164 Balligavi SHIKARPUR SHIVAMOGGA Hassan 110 / 11 10 1 10
220 / 110 100 2 200
165 Kemar KARKAL UDUPI Hassan 110 / 11
10 1 10
20 1 20
220 / 110 100 3 300
166 Kulshekara MANGALURU DAKSHIN
KANNADA Hassan
110 / 11 20 1 20
110 / 33 20 2 40
167 Somanahalli BENGALURU SOUTH BENGALURU
URBAN
Bengaluru
Urban 220 / 66
100 2 200
150 1 150
168 Konaje MANGALURU DAKSHIN
KANNADA Hassan
110 / 11 10 1 10
20 1 20
110 / 33 20 1 20
169 Bantawal BUNTWAL DAKSHIN
KANNADA Hassan
110 / 11 20 2 40
110 / 33 10 1 10
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 117
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
170 Salethur BUNTWAL DAKSHIN
KANNADA Hassan 110 / 11 10 1 10
171 Vittla BUNTWAL DAKSHIN
KANNADA Hassan 110 / 11 10 2 20
172 Puttur 110 PUTTUR DAKSHIN
KANNADA Hassan
110 / 11 20 2 40
110 / 33 20 2 40
173 Karaya 110 BELTHANGADI DAKSHIN
KANNADA Hassan 110 / 11 10 2 20
174 Baikampady MANGALURU DAKSHIN
KANNADA Hassan
110 / 11 10 1 10
20 1 20
110 / 33 20 2 40
175 Gurupur MANGALURU DAKSHIN
KANNADA Hassan 110 / 11 10 2 20
176 Moodabidre MANGALURU DAKSHIN
KANNADA Hassan 110 / 11
10 1 10
20 1 20
177 Guruvankere BELTHANGADI DAKSHIN
KANNADA Hassan
110 / 11 20 2 40
110 / 33 20 2 40
178 Nandikur UDUPI UDUPI Hassan 110 / 11 10 2 20
179 Davangere DAVANGERE DAVANGERE Tumkur 220 / 66 60 1 60
100 2 200
180 Manipal UDUPI UDUPI Hassan
110 / 11 20 2 40
110 / 33 10 1 10
20 1 20
181 Nittur HOSANAGARA SHIVAMOGGA Hassan 110 / 11 10 1 10
20 1 20
182 Brahmavara UDUPI UDUPI Hassan 110 / 11 10 2 20
183 Hiriyadaka UDUPI UDUPI Hassan 110 / 11 10 1 10
110 / 33 10 2 20
184 Madhuvana UDUPI UDUPI Hassan 110 / 11 20 1 20
Karnataka’s Energy Mix: Computational Model for Energy Planning
118 www.cstep.in © CSTEP
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
185 Kundapura KUNDAPURA UDUPI Hassan 110 / 11 20 1 20
110 / 33 20 1 20
186 Navuda KUNDAPURA UDUPI Hassan 110 / 11 10 1 10
110 / 33 10 1 10
187 Halady KUNDAPURA UDUPI Hassan 110 / 11 10 2 20
188 Hosangadi KUNDAPURA UDUPI Hassan 110 / 11 10 1 10
110 / 33 20 1 20
189 Hulikal HOSANAGARA SHIVAMOGGA Hassan 110 / 11 5 1 5
110 / 33 10 1 10
190 Kammaradi KOPPA CHIKKAMAGALU
RU Hassan 110 / 11 10 1 10
191 Thirthahalli THIRTHAHALLI SHIVAMOGGA Hassan 110 / 11 10 3 30
192 Muthinakoppa NARASIMHARAJAPUR
A
CHIKKAMAGALU
RU Hassan
110 / 11 10 2 20
110 / 33 20 1 20
193 Subramanyapura BENGALURU SOUTH BENGALURU
URBAN
Bengaluru
Urban 220 / 66
100 1 100
150 2 300
194 Mandali SHIVAMOGGA SHIVAMOGGA Hassan 110 / 11 10 1 10
20 1 20
195 Alkola SHIVAMOGGA SHIVAMOGGA Hassan 110 / 11 10 3 30
196 Kumshi SHIVAMOGGA SHIVAMOGGA Hassan 110 / 11 10 2 20
197 Anandapur SAGAR SHIVAMOGGA Hassan 110 / 11 10 2 20
198 Sagar SAGAR SHIVAMOGGA Hassan 110 / 11 10 2 20
110 / 33 10 1 10
199 Soraba SORBA SHIVAMOGGA Hassan 110 / 11 10 1 10
20 1 20
200 Shiralkoppa SHIKARPUR SHIVAMOGGA Hassan 110 / 11 10 1 10
20 1 20
201 Issuru CHITRADURGA CHITRADURGA Tumkur 110 / 11 10 2 20
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 119
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
202 Shikaripura SHIKARPUR SHIVAMOGGA Hassan 110 / 11 10 2 20
203 Kittadahalli SHIKARPUR SHIVAMOGGA Hassan 110 / 11 10 1 10
204 Togarsi SHIKARPUR SHIVAMOGGA Hassan 110 / 11 10 1 10
205 Barangi SORBA SHIVAMOGGA Hassan 110 / 11 10 2 20
206 Anavatti SORBA SHIVAMOGGA Hassan 110 / 11 10 1 10
20 1 20
207 Jog SAGAR SHIVAMOGGA Hassan 110 / 11 5 2 10
110 / 33 10 1 10
208 Chandragutti SORBA SHIVAMOGGA Hassan 110 / 11 10 1 10
209 Manchenahalli BHADRAVATHI SHIVAMOGGA Hassan 110 / 11 20 2 40
210 Bhadravathi BHADRAVATHI SHIVAMOGGA Hassan 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
211 Birur KADUR CHIKKAMAGALU
RU Hassan 110 / 11 10 2 20
212 EPIP BENGALURU EAST BENGALURU
URBAN
Bengaluru
Urban 220 / 66 150 2 300
213 Neralakere TARIKERE CHIKKAMAGALU
RU Hassan 110 / 11 10 2 20
214 Shivapura TARIKERE CHIKKAMAGALU
RU Hassan 110 / 11 10 1 10
215 Tarikere TARIKERE CHIKKAMAGALU
RU Hassan 110 / 11
10 1 10
20 1 20
216 Tangli KADUR CHIKKAMAGALU
RU Hassan 110 / 11 10 2 20
217 Yagatipura KADUR CHIKKAMAGALU
RU Hassan 110 / 11 10 2 20
218 Sinagatgere KADUR CHIKKAMAGALU
RU Hassan 110 / 11 10 1 10
219 Hirenallur THIRTHAHALLI SHIVAMOGGA Hassan 110 / 11 10 1 10
Karnataka’s Energy Mix: Computational Model for Energy Planning
120 www.cstep.in © CSTEP
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
220 Ajjampura TARIKERE CHIKKAMAGALU
RU Hassan 110 / 11
10 1 10
20 1 20
221 Shivani TARIKERE CHIKKAMAGALU
RU Hassan 110 / 11 10 2 20
222 Nagenahalli KADUR CHIKKAMAGALU
RU Hassan 110 / 11 10 2 20
223 Nidaghatta MALAVALLI Mandya Mysore 110 / 11 10 1 10
224 Javagal ARASIKERE HASSAN Hassan 110 / 11 10 2 20
225 Shantigrama HASSAN HASSAN Hassan 400 / 220 315 2 630
226 Banavara ARASIKERE HASSAN Hassan 110 / 11 10 2 20
227 Kallusadarahalli ARASIKERE HASSAN Hassan 110 / 11 10 1 10
228 Gerumara ARASIKERE HASSAN Hassan 110 / 11 10 2 20
229 Gandsi ARASIKERE HASSAN Hassan 110 / 11 10 2 20
230 Somalapur SINDHNUR RAICHUR Gulbarga 110 / 11 10 1 10
231 Kondenalu ARASIKERE HASSAN Hassan 110 / 11 10 2 20
232 Dodda Metikurke ARASIKERE HASSAN Hassan 110 / 11 10 2 20
234 Bejai MANGALURU DAKSHIN
KANNADA Hassan
110 / 11 20 1 20
110 / 33 20 2 40
235 Gubbi GUBBI TUMAKURU Tumkur 110 / 11 10 3 30
236 HAL BENGALURU SOUTH BENGALURU
URBAN
Bengaluru
Urban 220 / 66 150 2 300
237 Kadaba SIDLAGHATTA CHIKBALLAPUR Bengaluru
Rural 110 / 11 10 2 20
238 K G Temple GUBBI TUMAKURU Tumkur 110 / 11 10 2 20
239 Ungra GUBBI TUMAKURU Tumkur 110 / 11 10 2 20
240 Kallur GUBBI TUMAKURU Tumkur 110 / 11 10 2 20
241 Doddaguni GUBBI TUMAKURU Tumkur 110 / 11 10 2 20
242 Sampige TURUVEKERE TUMAKURU Tumkur 110 / 11 10 2 20
243 Ammasandra TURUVEKERE TUMAKURU Tumkur 110 / 11 10 3 30
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 121
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
244 Novinakere TIPTUR TUMAKURU Tumkur 110 / 11 10 2 20
245 Turuvekere TURUVEKERE TUMAKURU Tumkur 110 / 11 10 1 10
20 1 20
246 Mayasandra TURUVEKERE TUMAKURU Tumkur 110 / 11 10 1 10
20 1 20
247 Kadehally (Dabbeghatta) CHIKNAYAKANHALLI TUMAKURU Tumkur 110 / 11 10 2 20
248 Chikkanayakanahalli CHIKNAYAKANHALLI TUMAKURU Tumkur 110 / 11 10 2 20
249 Thimmanahalli CHIKNAYAKANHALLI TUMAKURU Tumkur 110 / 11 10 2 20
250 Neelagunda HARPANAHALLI DAVANGERE Tumkur 220 / 66 100 2 200
251 Shettigere CHIKNAYAKANHALLI TUMAKURU Tumkur 110 / 11 10 2 20
252 Huliyar CHIKNAYAKANHALLI TUMAKURU Tumkur 110 / 11 10 2 20
253 Hadanakere CHIKNAYAKANHALLI TUMAKURU Tumkur 110 / 11 10 2 20
254 Bandihalli TIPTUR TUMAKURU Tumkur 110 / 11 10 2 20
255 Tiptur TIPTUR TUMAKURU Tumkur 110 / 11 10 3 30
256 Halukurke TIPTUR TUMAKURU Tumkur 110 / 11 10 1 10
257 Murdeshwar BHATKAL UTTAR KANNADA Bagalkot 110 / 11 10 1 10
110 / 33 10 2 20
258 Honnavalli TIPTUR TUMAKURU Tumkur 110 / 11 10 2 20
259 Hunaseghatta TIPTUR TUMAKURU Tumkur 110 / 11 10 2 20
260 Honnavara HONAVAR UTTAR KANNADA Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
261 Kumta KUMTA UTTAR KANNADA Bagalkot 110 / 11 10 2 20
110 / 33 10 1 10
262 Siddapura DAVANGERE DAVANGERE Tumkur 110 / 11 5 1 5
10 1 10
263 Sirsi SIRSI UTTAR KANNADA Bagalkot 110 / 11 10 3 30
220 / 110 50 1 50
Karnataka’s Energy Mix: Computational Model for Energy Planning
122 www.cstep.in © CSTEP
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
264 Ankola ANKOLA UTTAR KANNADA Bagalkot 110 / 11 10 1 10
110 / 33 10 2 20
265 Arga KARWAR UTTAR KANNADA Bagalkot 110 / 11 10 1 10
266 Karwar KARWAR UTTAR KANNADA Bagalkot
110 / 11 10 1 10
110 / 33 20 1 20
220 / 110 100 2 200
267 Ambewadi HALIYAL UTTAR KANNADA Bagalkot 110 / 11 20 2 40
220 / 110 100 2 200
268 Bidnal HUBBALLI DHARWAD Bagalkot 110 / 11 10 2 20
220 / 110 100 2 200
269 Hootagalli MYSURU MYSURU Mysore 220 / 66 100 3 300
270 SRS Hubli DHARWAD DHARWAD Bagalkot
110 / 11 10 2 20
110 / 33 20 2 40
220 / 110 100 3 300
271 Ganesh gudi JOIDA(SUPA) UTTAR KANNADA Bagalkot 110 / 11 10 1 10
110 / 33 10 1 10
272 Anmod JOIDA(SUPA) UTTAR KANNADA Bagalkot 110 / 11 5 1 5
273 Sanda SHIKARPUR SHIVAMOGGA Hassan 110 / 11 10 2 20
274 Tandaga TURUVEKERE TUMAKURU Tumkur 110 / 11 10 1 10
275 Gungurumale TIPTUR TUMAKURU Tumkur 110 / 11 10 1 10
276 Haliyal HALIYAL UTTAR KANNADA Bagalkot 110 / 11 10 2 20
110 / 33 10 1 10
277 Kavalwad HALIYAL UTTAR KANNADA Bagalkot 110 / 11 10 1 10
278 Kadanakoppa KALGHATGI DHARWAD Bagalkot 110 / 11 10 1 10
110 / 33 20 1 20
279 Kalghatgi KALGHATGI DHARWAD Bagalkot 110 / 11 10 3 30
280 Kiravatti SIRSI UTTAR KANNADA Bagalkot 110 / 11 10 1 10
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 123
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
110 / 33 20 1 20
281 Umachagi YELLAPUR UTTAR KANNADA Bagalkot 110 / 11 5 1 5
282 Tarihal HUBBALLI DHARWAD Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
283 Tadasinakoppa DHARWAD DHARWAD Bagalkot 110 / 11 10 2 20
284 Navanagar (Dharwad) HUBBALLI DHARWAD Bagalkot 110 / 11 10 2 20
285 Lakamanahalli DHARWAD DHARWAD Bagalkot
110 / 11 10 2 20
110 / 33 10 1 10
20 1 20
286 Narendra DHARWAD DHARWAD Bagalkot 220 / 110 100 2 200
287 KUD Dharwad DHARWAD DHARWAD Bagalkot 110 / 11 10 2 20
288 Mruthyanjayanagar DHARWAD DHARWAD Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
289 Goppanakoppa HUBBALLI DHARWAD Bagalkot 110 / 11 10 2 20
110 / 33 10 2 20
290 Gadag road GADAG GADAG Bagalkot 110 / 11 10 1 10
291 Navalgund NAVALGUND DHARWAD Bagalkot 110 / 11 10 2 20
292 Anandanagar HUBBALLI DHARWAD Bagalkot 110 / 11 10 2 20
293 Chitradurga CHITRADURGA CHITRADURGA Tumkur 220 / 66 100 3 300
294 Aakshay colony HUBBALLI DHARWAD Bagalkot 110 / 11 10 1 10
110 / 33 10 1 10
295 PH Compound HUBBALLI DHARWAD Bagalkot 110 / 11 10 2 20
296 Saundatti SAVADATTI BELAGAVI Bagalkot 110 / 11 10 1 10
220 / 110 100 2 200
297 Saundatti SAVADATTI BELAGAVI Bagalkot 110 / 11
5 1 5
10 1 10
110 / 33 10 1 10
Karnataka’s Energy Mix: Computational Model for Energy Planning
124 www.cstep.in © CSTEP
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
20 1 20
298 A-Station BENGALURU NORTH BENGALURU
URBAN
Bengaluru
Urban 220 / 66 150 2 300
299 Annigeri NAVALGUND DHARWAD Bagalkot 110 / 11 10 1 10
300 Gadag GADAG GADAG Bagalkot
110 / 11 10 2 20
110 / 33 20 2 40
220 / 110 100 3 300
301 Gadag bettigere GADAG GADAG Bagalkot 110 / 11 10 1 10
302 Naregal RON GADAG Bagalkot 110 / 11 10 1 10
304 Ron RON GADAG Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
305 Hirehal RON GADAG Bagalkot 110 / 11 10 1 10
110 / 33 10 1 10
306 Badami BADAMI BAGALKOT Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
307 Gajendragad RON GADAG Bagalkot 110 / 11 10 2 20
110 / 33 20 2 40
308 Sambapur GADAG GADAG Bagalkot 110 / 11 10 1 10
309 Dambala MUNDARGI GADAG Bagalkot 110 / 11 10 1 10
110 / 33 10 1 10
310 Mundargi MUNDARGI GADAG Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
311 Hebbal BENGALURU NORTH BENGALURU
URBAN
Bengaluru
Urban 220 / 66 100 2 200
312 Shirahatti SHIRHATTI GADAG Bagalkot 110 / 11 10 1 10
313 Lakshmeshwar SHIRHATTI GADAG Bagalkot 110 / 11 10 2 20
110 / 33 10 1 10
314 Bellatti SHIRHATTI GADAG Bagalkot 110 / 11 10 2 20
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 125
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
110 / 33 20 1 20
315 Ramankoppa KUNDGOL DHARWAD Bagalkot 110 / 11 10 1 10
316 Mundgod MUNDGOD UTTAR KANNADA Bagalkot 110 / 11 10 2 20
317 Savanur SAVANUR HAVERI Bagalkot 110 / 11 10 2 20
110 / 33 20 2 40
318 Haveri 110 HAVERI HAVERI Bagalkot 110 / 11
10 1 10
20 1 20
110 / 33 10 2 20
319 Haveri 220 HAVERI HAVERI Bagalkot 220 / 110 100 2 200
320 Hangal HANGAL HAVERI Bagalkot
110 / 11 10 1 10
110 / 33 10 1 10
20 2 40
321 Tiluvali HANGAL HAVERI Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
322 Byadgi BYADGI HAVERI Bagalkot 110 / 11 10 2 20
110 / 33 20 2 40
323 Honnali HONNALI DAVANGERE Tumkur 220 / 66 100 2 200
324 Ranebennur RANIBENNURU HAVERI Bagalkot
110 / 11 10 3 30
110 / 33 20 2 40
220 / 110 100 2 200
325 Hirekerur HIREKERUR HAVERI Bagalkot 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
326 NRS (New Receiving
Station) BENGALURU NORTH
BENGALURU
URBAN
Bengaluru
Urban 220 / 66 100 2 200
327 Rattihalli HIREKERUR HAVERI Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
328 Aremallapur RANIBENNURU HAVERI Bagalkot 110 / 11 10 2 20
Karnataka’s Energy Mix: Computational Model for Energy Planning
126 www.cstep.in © CSTEP
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
110 / 33 20 1 20
329 Guttal HAVERI HAVERI Bagalkot 110 / 11 10 2 20
110 / 33 20 2 40
330 Narendra PGCIL DHARWAD DHARWAD Bagalkot 400 / 220 500 2 1000
331 Beluria BADAMI BAGALKOT Bagalkot 110 / 11 10 3 30
110 / 33 20 2 40
332 Kittur BAILHONGAL BELAGAVI Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
333 M K Hubli 220 BAILHONGAL BELAGAVI Bagalkot 110 / 11 10 1 10
220 / 110 100 2 200
334 Bailhongal BAILHONGAL BELAGAVI Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
335 Hiriyur PGCIL HIRIYUR CHITRADURGA Tumkur 400 / 220 315 2 630
336 Khanapur MK KHANAPUR BELAGAVI Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
337 Hirebagewadi BELAGAVI BELAGAVI Bagalkot 110 / 11 10 2 20
338 Udayambagh BELAGAVI BELAGAVI Bagalkot 110 / 11 10 3 30
339 Uchagaon BELAGAVI BELAGAVI Bagalkot 110 / 11 10 2 20
340 East division company BENGALURU NORTH BENGALURU
URBAN
Bengaluru
Urban 220 / 66 150 2 300
341 Mache KHANAPUR BELAGAVI Bagalkot 110 / 11 10 2 20
110 / 33 20 2 40
342 Belgaum BELAGAVI BELAGAVI Bagalkot
110 / 11 10 2 20
110 / 33 20 2 40
220 / 110 100 2 200
343 Ankalagi GOKAK BELAGAVI Bagalkot 110 / 11 20 1 20
110 / 33 20 1 20
344 Vadagaon BELAGAVI BELAGAVI Bagalkot 110 / 11 10 3 30
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 127
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
345 Kanabargi BELAGAVI BELAGAVI Bagalkot 110 / 11 10 2 20
110 / 33 20 2 40
346 Hattargi HUKERI BELAGAVI Bagalkot 110 / 11 10 2 20
347 Kadakola MYSURU MYSURU Mysore 220 / 66 100 2 200
348 Hukkeri HUKERI BELAGAVI Bagalkot 110 / 11
10 1 10
20 1 20
110 / 33 10 1 10
349 Hidkal Dam HUKERI BELAGAVI Bagalkot 110 / 11 10 2 20
110 / 33 10 1 10
350 Ghattaprabha GOKAK BELAGAVI Bagalkot 110 / 33 10 2 20
20 1 20
351 Shirgaon HUKERI BELAGAVI Bagalkot 110 / 11 10 2 20
352 Kushtagi KUSHTAGI KOPPAL Gulbarga
110 / 11 10 1 10
20 1 20
110 / 33 20 2 40
220 / 110 100 2 200
353 Kabbur CHIKODI BELAGAVI Bagalkot 110 / 11 10 2 20
354 Hunsihal BELAGAVI BELAGAVI Bagalkot 110 / 11 10 2 20
356 Peenya BENGALURU NORTH BENGALURU
URBAN
Bengaluru
Urban 220 / 66
67.5 1 67.5
150 3 450
357 Mudalagi GOKAK BELAGAVI Bagalkot 110 / 11 10 3 30
358 Kuligod RAYBAG BELAGAVI Bagalkot 110 / 11 10 3 30
110 / 33 20 1 20
359 Saidapur M DAVANGERE DAVANGERE Tumkur 110 / 11 10 2 20
360 Dhavaleshwara GOKAK BELAGAVI Bagalkot 110 / 11 10 2 20
361 Mahalingapura MUDHOL BAGALKOT Bagalkot 110 / 11 10 2 20
110 / 33 20 2 40
Karnataka’s Energy Mix: Computational Model for Energy Planning
128 www.cstep.in © CSTEP
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
220 / 110 100 3 300
362 Thallak CHALLAKERE CHITRADURGA Tumkur 220 / 66 100 2 200
363 Sankeshwar HUKERI BELAGAVI Bagalkot 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
364 Chikkodi 110 CHIKODI BELAGAVI Bagalkot 110 / 11 10 2 20
110 / 33 20 2 40
365 Chikkodi 220 CHIKODI BELAGAVI Bagalkot 220 / 110 100 2 200
366 Nippani CHIKODI BELAGAVI Bagalkot 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
367 Nanadi CHIKODI BELAGAVI Bagalkot 110 / 11 10 2 20
368 Bhoj CHIKODI BELAGAVI Bagalkot 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
369 Sadalga CHIKODI BELAGAVI Bagalkot 110 / 11 10 2 20
110 / 33 20 2 40
370 Borgaon CHIKODI BELAGAVI Bagalkot 110 / 11 10 2 20
371 Ankali CHIKODI BELAGAVI Bagalkot
110 / 11 10 1 10
20 1 20
110 / 33 10 1 10
20 1 20
372 Raibag RAYBAG BELAGAVI Bagalkot 110 / 11 10 2 20
20 1 20
373 Hidkal HUKERI BELAGAVI Bagalkot
110 / 11 20 2 40
110 / 33 10 1 10
20 1 20
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 129
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
374 Ranna Belagali MUDHOL BAGALKOT Bagalkot 110 / 11 10 2 20
375 Uttur MUDHOL BAGALKOT Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
376 Vrushabhavathi BENGALURU SOUTH BENGALURU
URBAN
Bengaluru
Urban 220 / 66 150 2 300
377 Mudhol MUDHOL BAGALKOT Bagalkot 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
378 Manthur MUDHOL BAGALKOT Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
379 Vajramatti MUDHOL BAGALKOT Bagalkot 110 / 11 10 2 20
380 Vajramatti MUDHOL BAGALKOT Bagalkot 220 / 110 100 2 200
381 Melligere MUDHOL BAGALKOT Bagalkot 110 / 11 10 2 20
382 Lokapur MUDHOL BAGALKOT Bagalkot 110 / 11 10 3 30
110 / 33 20 1 20
383 Salahalli RAMDURG BELAGAVI Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
384 Katharki HUKERI BELAGAVI Bagalkot 110 / 11 10 1 10
20 1 20
385 Chamarajanagara CHAMARAJANAGAR CHAMARAJANAG
AR Mysore 220 / 66 100 2 200
386 Neerbudihal BADAMI BAGALKOT Bagalkot 110 / 11 10 1 10
387 Bagalkot BADAMI BAGALKOT Bagalkot
110 / 11 10 1 10
110 / 33 20 1 20
220 / 110 100 2 200
388 Kaladgi BAGALKOT BAGALKOT Bagalkot 110 / 11 10 3 30
389 Kerur BADAMI BAGALKOT Bagalkot 110 / 11 20 1 20
110 / 33 10 2 20
Karnataka’s Energy Mix: Computational Model for Energy Planning
130 www.cstep.in © CSTEP
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
390 Konnur GOKAK BELAGAVI Bagalkot 110 / 11 10 2 20
391 Nargund NARGUND GADAG Bagalkot 110 / 11 10 1 10
392 Ramdurga RAMDURG BELAGAVI Bagalkot
110 / 11 20 1 20
110 / 33 10 1 10
20 1 20
393 Guledgudda BADAMI BAGALKOT Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
394 Navanagar BAGALKOT BAGALKOT Bagalkot 110 / 11 10 2 20
395 Vajamangala MYSURU MYSURU Mysore 220 / 66 75 1 75
100 1 100
396 Bagalkot BAGALKOT BAGALKOT Bagalkot 110 / 11 10 2 20
397 Udakeri BAILHONGAL BELAGAVI Bagalkot 110 / 11 10 2 20
398 Munavalli SAVADATTI BELAGAVI Bagalkot 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
399 Hiriyur HIRIYUR CHITRADURGA Tumkur 220 / 66 100 3 300
400 Yaragatti SAVADATTI BELAGAVI Bagalkot 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
401 Katakol RAMDURG BELAGAVI Bagalkot 110 / 11 10 2 20
402 Terdal JAMKHANDI BAGALKOT Bagalkot 110 / 11 10 1 10
20 1 20
403 Kudachi RAYBAG BELAGAVI Bagalkot 110 / 11 10 3 30
110 / 33 20 2 40
404 Yerandenahally ANEKAL BENGALURU
URBAN
Bengaluru
Urban 220 / 66 100 3 300
405 Ugar Khurd ATHNI BELAGAVI Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 131
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
406 Ainapur ATHNI BELAGAVI Bagalkot 110 / 11 10 1 10
20 1 20
407 Shiraguppi BAGALKOT BAGALKOT Bagalkot 110 / 11 10 2 20
408 Athani ATHNI BELAGAVI Bagalkot 110 / 11 10 1 10
220 / 110 100 2 200
409 Athani ATHNI BELAGAVI Bagalkot 110 / 11 20 1 20
110 / 33 20 3 60
410 Tanvashi ATHNI BELAGAVI Bagalkot 110 / 11 10 1 10
411 Aigali ATHNI BELAGAVI Bagalkot 110 / 11 10 1 10
20 1 20
412 Yallammanawadi ATHNI BELAGAVI Bagalkot 110 / 11 10 2 20
413 Savalgi JAMKHANDI BAGALKOT Bagalkot 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
414 Todalbagi JAMKHANDI BAGALKOT Bagalkot 110 / 11 10 3 30
110 / 33 20 1 20
415 Mamadapura CHIKODI BELAGAVI Bagalkot 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
416 Bableshwara VIJAYAPURA VIJAYAPURA Bagalkot 110 / 11 10 1 10
20 1 20
417 Shirbur VIJAYAPURA VIJAYAPURA Bagalkot 110 / 11 10 2 20
418 Basavana Bagewadi BASAVANA
BAGEVADI VIJAYAPURA Bagalkot
110 / 11 10 2 20
110 / 33 20 2 40
220 / 110 100 2 200
419 Malghan (near
B.Bagewadi)
BASAVANA
BAGEVADI VIJAYAPURA Bagalkot 110 / 11 10 2 20
420 Mattihal VIJAYAPURA Bagalkot 110 / 11 10 2 20
Karnataka’s Energy Mix: Computational Model for Energy Planning
132 www.cstep.in © CSTEP
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
BASAVANA
BAGEVADI 110 / 33 20 1 20
421 Giri Sagar BILGI BAGALKOT Bagalkot 110 / 11 10 2 20
422 Bilagi BILGI BAGALKOT Bagalkot 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
423 Rabkavi JAMKHANDI BAGALKOT Bagalkot 110 / 11 10 1 10
20 1 20
424 Satti ATHNI BELAGAVI Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
425 Banahatti JAMKHANDI BAGALKOT Bagalkot 110 / 11 10 2 20
426 Hoskote HOSKOTE BENGALURU
RURAL
Bengaluru
Rural 220 / 66 100 2 200
427 Jamakhandi JAMKHANDI BAGALKOT Bagalkot 110 / 11 10 3 30
110 / 33 10 2 20
428 Shirol NARGUND GADAG Bagalkot 110 / 11 10 1 10
20 1 20
429 Mundaganur BILGI BAGALKOT Bagalkot 110 / 11 10 2 20
430 Mareguddi JAMKHANDI BAGALKOT Bagalkot 110 / 11 10 2 20
431 Rampur CHIKODI BELAGAVI Bagalkot 110 / 11 10 2 20
110 / 33 10 1 10
432 Sigikere BAGALKOT BAGALKOT Bagalkot 110 / 11 10 2 20
433 Nidagundi RON GADAG Bagalkot 110 / 11 10 2 20
434 Mukarthihal BASAVANA
BAGEVADI VIJAYAPURA Bagalkot 110 / 11 10 2 20
435 Madhugiri MADHUGIRI TUMAKURU Tumkur 220 / 66 100 2 200
436 Achanur BAGALKOT BAGALKOT Bagalkot 110 / 11 10 2 20
437 Muddebihal MUDDEBIHAL VIJAYAPURA Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 133
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
438 Kudala sangama MUDDEBIHAL VIJAYAPURA Bagalkot 110 / 11 10 1 10
439 Hunagunda HUNGUND BAGALKOT Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
440 Ilkal HUNGUND BAGALKOT Bagalkot 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
441 Bijapur 220 VIJAYAPURA VIJAYAPURA Bagalkot 110 / 11 10 1 10
220 / 110 100 2 200
442 Bijapur (KIADB) VIJAYAPURA VIJAYAPURA Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
443 Bijapur City VIJAYAPURA VIJAYAPURA Bagalkot 110 / 11 10 2 20
20 1 20
444 Dabaspet NELAMANGALA BENGALURU
RURAL
Bengaluru
Rural 220 / 66 100 2 200
445 Bhutnal VIJAYAPURA VIJAYAPURA Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
446 Toravi VIJAYAPURA VIJAYAPURA Bagalkot 110 / 11 10 2 20
447 Tekkalaki VIJAYAPURA VIJAYAPURA Bagalkot 110 / 11 10 2 20
448 Tikota VIJAYAPURA VIJAYAPURA Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
449 Indi 220 INDI VIJAYAPURA Bagalkot 110 / 11 10 1 10
220 / 110 100 2 200
450 Atharga INDI VIJAYAPURA Bagalkot 110 / 11 10 2 20
451 Indi 110 INDI VIJAYAPURA Bagalkot
110 / 11 10 3 30
110 / 33 10 1 10
20 1 20
452 Kushalnagara SOMVARPET KODAGU Mysore 220 / 66 100 2 200
453 Hirebevanur INDI VIJAYAPURA Bagalkot 110 / 11 10 1 10
Karnataka’s Energy Mix: Computational Model for Energy Planning
134 www.cstep.in © CSTEP
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
454 Lachayan INDI VIJAYAPURA Bagalkot 110 / 11 10 2 20
455 Zhalki INDI VIJAYAPURA Bagalkot
110 / 11 10 2 20
110 / 33 10 1 10
20 1 20
456 Chadachan INDI VIJAYAPURA Bagalkot 110 / 11 10 2 20
457 Ghataprabha GOKAK BELAGAVI Bagalkot 110 / 11 10 1 10
220 / 110 100 2 200
458 Devarahipparagi SINDGI VIJAYAPURA Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
459 Sindagi SINDGI VIJAYAPURA Bagalkot
110 / 11 10 2 20
110 / 33 10 1 10
20 1 20
460 Doddaballapura DODDABALLAPUR BENGALURU
RURAL
Bengaluru
Rural 220 / 66 100 2 200
461 Almel SINDGI VIJAYAPURA Bagalkot 110 / 11 10 2 20
462 Mortagi SINDGI VIJAYAPURA Bagalkot 110 / 11 10 1 10
463 Gokak GOKAK BELAGAVI Bagalkot 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
464 Mamadapur GOKAK BELAGAVI Bagalkot 110 / 11 10 2 20
465 Ittagi HUVVINAHADAGALI BALLARI Gulbarga 220 / 66 100 2 200
466 Koppal KOPPAL KOPPAL Gulbarga 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
467 Ginigera KOPPAL KOPPAL Gulbarga 110 / 11 10 2 20
110 / 33 10 1 10
468 Guddadahalli KOPPAL KOPPAL Gulbarga 400 / 220 315 2 630
469 Bevoor YALBURGA KOPPAL Gulbarga 110 / 11 10 1 10
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 135
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
110 / 33 20 1 20
470 Ganadhal YALBURGA KOPPAL Gulbarga 110 / 11 10 1 10
471 Kanakagiri GANGAVATI KOPPAL Gulbarga 110 / 11 10 2 20
110 / 33 20 1 20
472 KIADB Doddaballapura BENGALURU NORTH BENGALURU
URBAN
Bengaluru
Urban 220 / 66 50 1 50
473 Yelburga YALBURGA KOPPAL Gulbarga 110 / 11 10 2 20
110 / 33 20 2 40
474 Hanumasagar KUSHTAGI KOPPAL Gulbarga 110 / 11 10 2 20
110 / 33 10 1 10
475 Hiregonnagar KUSHTAGI KOPPAL Gulbarga 110 / 11 10 1 10
110 / 33 10 1 10
476 Lingasugur LINGA SUGUR
(MUDGAL) RAICHUR Gulbarga
110 / 11 10 2 20
110 / 33 10 2 20
20 1 20
220 / 110 100 1 100
477 Gurugunta LINGA SUGUR
(MUDGAL) RAICHUR Gulbarga 110 / 11 10 1 10
478 Mudgal LINGA SUGUR
(MUDGAL) RAICHUR Gulbarga
110 / 11 10 2 20
110 / 33 20 1 20
479 Tubinakere MANDYA Mandya Mysore 220 / 66 100 2 200
480 Hatti LINGA SUGUR
(MUDGAL) RAICHUR Gulbarga 110 / 11
10 2 20
20 1 20
481 Donimalai SANDUR BALLARI Gulbarga 110 / 11 10 1 10
110 / 33 20 1 20
482 Sanklapur HOSAPETE BALLARI Gulbarga 110 / 11 10 1 10
20 1 20
483 Kamalapura HOSAPETE BALLARI Gulbarga 110 / 11 10 1 10
Karnataka’s Energy Mix: Computational Model for Energy Planning
136 www.cstep.in © CSTEP
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
484 BIAL Begur BENGALURU NORTH BENGALURU
URBAN
Bengaluru
Urban 220 / 66 100 2 200
485 Katrikehal CHIKNAYAKANHALLI TUMAKURU Tumkur 110 / 11 10 1 10
486 Alipura BALLARI BALLARI Gulbarga 110 / 11 20 2 40
220 / 110 100 2 200
487 Toranagallu SANDUR BALLARI Gulbarga 110 / 11 10 2 20
110 / 33 20 1 20
488 Kurugodu BALLARI BALLARI Gulbarga 110 / 11
10 1 10
20 1 20
110 / 33 10 1 10
489 Somasamudra BALLARI BALLARI Gulbarga 110 / 11 10 1 10
110 / 33 10 1 10
490 Bellary (N) BALLARI BALLARI Gulbarga 110 / 11 10 2 20
20 1 20
491 Ananthpur Road
(Bisilahalli) BALLARI BALLARI Gulbarga 110 / 11 10 2 20
492 Kolar KP KOLAR KOLAR Bengaluru
Rural 220 / 66 100 2 200
493 Bellary (S) BALLARI BALLARI Gulbarga 110 / 11 10 2 20
494 Moka BALLARI BALLARI Gulbarga 110 / 11 10 2 20
110 / 11 20 1 20
495 Paramadevana halli BALLARI BALLARI Gulbarga 110 / 11 10 1 10
496 Venkatagiri GANGAVATI KOPPAL Gulbarga 110 / 11 10 2 20
497 Gangavathi DEVADURGA RAICHUR Gulbarga 110 / 11 20 2 40
110 / 33 20 1 20
498 Sriramnagar GANGAVATI KOPPAL Gulbarga 110 / 11 10 2 20
499 Karatagi GANGAVATI KOPPAL Gulbarga 110 / 11 10 2 20
500 Sindhanoor SINDHNUR RAICHUR Gulbarga 110 / 11 10 1 10
220 / 110 100 2 200
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 137
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
501 Kampli HOSAPETE BALLARI Gulbarga 110 / 11 10 2 20
110 / 33 20 1 20
502 Mukund SINDHNUR RAICHUR Gulbarga 110 / 11 10 2 20
503 Sirwar MANVI RAICHUR Gulbarga 110 / 11 10 1 10
504 Sindhanur SINDHNUR RAICHUR Gulbarga 110 / 11 10 2 20
110 / 33 20 2 40
505 Dadesugur SINDHNUR RAICHUR Gulbarga 110 / 11 10 2 20
506 Siruguppa SIRUGUPPA BALLARI Gulbarga 110 / 11
10 1 10
20 1 20
110 / 33 20 1 20
507 Tekkalkote SIRUGUPPA BALLARI Gulbarga 110 / 11 10 2 20
110 / 33 20 1 20
508 Maski LINGA SUGUR
(MUDGAL) RAICHUR Gulbarga 110 / 11 10 1 10
509 Kavital MANVI RAICHUR Gulbarga 110 / 11 10 2 20
110 / 33 20 1 20
510 Malur MALUR KOLAR Bengaluru
Rural 220 / 66 100 2 200
511 Walkamdinni SINDHNUR RAICHUR Gulbarga 110 / 11 10 3 30
512 Byagwat MANVI RAICHUR Gulbarga 110 / 11 10 1 10
513 Alkod DEVADURGA RAICHUR Gulbarga 110 / 11 10 1 10
514 Galaga DEVADURGA RAICHUR Gulbarga 110 / 11 10 1 10
515 Manvi MANVI RAICHUR Gulbarga 110 / 11 10 2 20
516 Madalapur MANVI RAICHUR Gulbarga 110 / 11 10 2 20
517 Kurdi cross MANVI RAICHUR Gulbarga 110 / 11 10 1 10
110 / 33 20 1 20
518 Raichur RAICHUR RAICHUR Gulbarga 110 / 11 10 1 10
20 1 20
Karnataka’s Energy Mix: Computational Model for Energy Planning
138 www.cstep.in © CSTEP
# Substation Name Taluk District Zone Voltage
(kV)
Unit
capacity
(MVA)
No. of units
Total
Capacity
(MVA)
110 / 33 20 2 40
220 / 110 100 2 200
519 M K Hubli 110 BAILHONGAL BELAGAVI Bagalkot 110 / 11 10 2 20
110 / 33 20 1 20
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 139
Details of Existing Transmission Lines
Table 20: Details of transmission lines in Karnataka as on March 31, 2017
# From substation To substation Line length (km) Conductor type Ampacity (amps)
400kV
1 KOLAR PGCIL 400 KOLAR HVDC 0.1 Quad moose 2524
2 SMHLY PGCIL 400 KOLAR PGCIL 400 108.0 Twin Moose 1262
3 KOLAR PGCIL 400 HOODY 400 65.0 Quad moose 2524
4 KOLAR PGCIL 400 HOODY 400 65.0 Quad moose 2524
5 TUMKUR (New Madhugiri)400 BIDADI PGCIL 400 160.0 Quad moose 2524
6 TUMKUR (New Madhugiri)400 BIDADI PGCIL 400 160.0 Quad moose 2524
7 Hiryur PGCIL 400 NELAMANGALA 400 138.0 Twin Moose 1262
8 Hiryur PGCIL 400 NELAMANGALA 400 138.0 Twin Moose 1262
9 GUTTUR 400 Hiryur PGCIL 400 110.0 Twin Moose 1262
10 BTPS 400 Hiryur PGCIL 400 135.0 Twin Moose 1262
11 Dhoni 400 GUTTUR 400 118.0 Twin Moose 1262
12 Kaiga 400 GUTTUR 400 168.9 Twin Moose 1262
13 Kaiga 400 GUTTUR 400 168.9 Twin Moose 1262
14 Narendra PGCIL 400 GUTTUR 400 155.8 Twin Moose 1262
15 Narendra PGCIL 400 GUTTUR 400 155.8 Twin Moose 1262
16 UPCL 400 Shanthigrama (Hasan) 400 182.0 Quad moose 2524
17 UPCL 400 Shanthigrama (Hasan) 400 182.0 Quad moose 2524
18 Pavagada PS 400 TUMKUR (New Madhugiri)400 80.0 Quad moose 2524
19 Basthipura (Mysure) 400 NELAMANGALA 400 132.9 Twin Moose 1262
20 Shanthigrama (Hasan) 400 NELAMANGALA 400 213.0 Twin Moose 1262
21 Basthipura (Mysure) 400 Shanthigrama (Hasan) 400 95.9 Twin Moose 1262
22 Basthipura (Mysure) 400 Shanthigrama (Hasan) 400 95.9 Twin Moose 1262
23 Kudgi New 400 TUMKUR (New Madhugiri)400 265.0 Quad moose 2524
24 Kudgi New 400 TUMKUR (New Madhugiri)400 265.0 Quad moose 2524
25 GUTTUR 400 Hiryur PGCIL 400 110.0 Twin Moose 1262
26 Raichur New 400 RTPS 400 51.0 Quad moose 2524
27 NELAMANGALA 400 HOODY 400 80.0 Twin Moose 1262
Karnataka’s Energy Mix: Computational Model for Energy Planning
140 www.cstep.in © CSTEP
# From substation To substation Line length (km) Conductor type Ampacity (amps)
28 NELAMANGALA 400 HOODY 400 80.0 Twin Moose 1262
29 BIDADI PGCIL 400 SMHLY PGCIL 400 17.0 Twin Moose 1262
30 BIDADI PGCIL 400 SMHLY PGCIL 400 17.0 Twin Moose 1262
31 NELAMANGALA 400 BIDADI PGCIL 400 20.0 Twin Moose 1262
32 NELAMANGALA 400 BIDADI PGCIL 400 20.0 Twin Moose 1262
33 Basthipura (Mysure) 400 NELAMANGALA 400 132.9 Twin Moose 1262
34 Raichur New 400 RTPS 400 51.0 Quad moose 2524
35 Narendra PGCIL 400 Kaiga 400 100.0 Twin Moose 1262
36 Narendra PGCIL 400 Kaiga 400 100.0 Twin Moose 1262
37 Pavagada PS 400 TUMKUR (New Madhugiri)400 80.0 Quad moose 2524
38 Yermarus TPS 400 BTPS Pool 400 142.5 Quad moose 2524
39 Yermarus TPS 400 BTPS Pool 400 142.5 Quad moose 2524
40 BTPS 400 JSW 400 12.0 Twin Moose 1262
41 JSW 400 GUTTUR 400 141.0 Twin Moose 1262
42 BTPS 400 Hiryur PGCIL 400 135.0 Twin Moose 1262
43 Guddadahalli 400 RTPS 400 172.5 Twin Moose 1262
44 RTPS 400 BTPS 400 220.0 Twin Moose 1262
45 KOLAR PGCIL 400 KOLAR HVDC 0.1 Quad moose 2524
46 Kudgi New 400 Narendra PGCIL 400 110.0 Quad moose 2524
47 Kudgi New 400 Narendra PGCIL 400 110.0 Quad moose 2524
48 Kudgi New 400 Kudgi 400 7.0 Quad moose 2524
49 Kudgi New 400 Kudgi 400 7.0 Quad moose 2524
50 Kudgi New 400 Kudgi 400 7.0 Quad moose 2524
51 Kudgi New 400 Kudgi 400 7.0 Quad moose 2524
52 Guddadahalli 400 Dhoni 400 56.0 Twin Moose 1262
53 Shanthigrama (Hasan) 400 TALAGUPPA 400 284.0 Twin Moose 1262
54 TALAGUPPA 400 NELAMANGALA 400 350.0 Twin Moose 1262
55 BTPS Pool 400 BTPS 400 4.0 Twin Moose 1262
56 BTPS Pool 400 BTPS 400 4.0 Twin Moose 1262
57 BTPS Pool 400 JSW 400 10.0 Twin Moose 1262
58 BTPS Pool 400 JSW 400 10.0 Twin Moose 1262
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 141
# From substation To substation Line length (km) Conductor type Ampacity (amps)
59 Pavagada PS 400 TUMKUR (New Madhugiri)400 80.0 Quad moose 2524
60 Pavagada PS 400 TUMKUR (New Madhugiri)400 80.0 Quad moose 2524
61 Hiryur PGCIL 400 Pavagada PS 400 85.0 Quad moose 2524
62 Hiryur PGCIL 400 Pavagada PS 400 85.0 Quad moose 2524
63 BTPS Pool 400 Pavagada PS 400 150.0 Quad moose 2524
64 BTPS Pool 400 Pavagada PS 400 150.0 Quad moose 2524
220kV
65 Alamatti 220 B Bagewadi 220 32 Drake 710
66 Alamatti 220 BAGALKOT 220 46.03 Drake 710
67 Alamatti 220 B Bagewadi 220 32 Drake 710
68 Alamatti 220 BAGALKOT 220 46.03 Drake 710
69 GM NAVARA 220 B Bagewadi 220 20.97 Drake 710
70 LINGASUGUR 220 B Bagewadi 220 95 Drake 710
71 Bijapur 220 GM NAVARA 220 17.97 Drake 710
72 GM NAVARA 220 B Bagewadi 220 20.97 Drake 710
73 LINGASUGUR 220 B Bagewadi 220 95 Drake 710
74 Hebbal Tap-1 Yelahanka 220 8 Drake 710
75 Bijapur 220 INDI 220 53 Drake 710
76 Chintamani 220 KOLAR PGCIL 220 30.9 Drake 710
77 Chintamani 220 KOLAR PGCIL 220 30.9 Drake 710
78 KOLAR KP 220 KOLAR PGCIL 220 11 Drake 710
79 KOLAR KP 220 KOLAR PGCIL 220 11 Drake 710
80 MALUR 220 KOLAR KP 220 30 Drake 710
81 MALUR 220 KOLAR KP 220 30 Drake 710
82 Sarjapura 220 MALUR 220 36 Drake 710
83 SMHLY 220 NGN PURA 220 23 Drake 710
84 SMHLY 220 HSR LT 220 23.5 Drake 710
85 SMHLY PGCIL 220 SMHLY 220 0.5 Quad moose 2524
86 SMHLY PGCIL 220 SMHLY 220 0.5 Quad moose 2524
87 HSR LT 220 NGN PURA 220 5 Drake 710
88 ITPL 220 HOODY 220 6.9 Drake 710
Karnataka’s Energy Mix: Computational Model for Energy Planning
142 www.cstep.in © CSTEP
# From substation To substation Line length (km) Conductor type Ampacity (amps)
89 SMHLY 220 HAROHALLI 220 17 Drake 710
90 HAROHALLI 220 Kanakapura 220 16 Drake 710
91 PEENYA 220 Hebbal Tap-1 7 Drake 710
92 HSR LT 220 HOODY 220 21.5 Drake 710
93 SMHLY 220 TATAGUNI 220 8 Drake 710
94 Khodyas 220 SBMPURA 220 23 Drake 710
95 RTPS 220 Raichur 220 20 Drake 710
96 SMHLY 220 YRND HALLI 220 50 Drake 710
97 Bus_WI_B Bagewadi 220 B Bagewadi 220 10 Drake 710
98 Bus_WI_Belgaum 220 Belgaum 220 5.3 Drake 710
99 Bidnal 220 Bus_WI_Bidnal 220 26 Drake 710
100 Bidnal 220 Bus_WI_Bidnal 220 26 Drake 710
101 Bus_WI_Guttur 220 GUTTUR 220 60 Drake 710
102 DB PURA Tap-1 KIADB DB Pura 220 0.5 Drake 710
103 DB PURA Tap-1 GOWRIBIDANUR 220 35 Drake 710
104 Vajramatti 220 BAGALKOT 220 30 Drake 710
105 Vajramatti 220 BAGALKOT 220 30 Drake 710
106 BMM ISPAT 220 Ittagi 220 40.3 Drake 710
107 Lingapur 220 BMM ISPAT 220 18.97 Drake 710
108 GUTTUR 220 Davanagere 220 40 Drake 710
109 GUTTUR 220 Davanagere 220 20 Drake 710
110 GUTTUR 220 Davanagere 220 22 Drake 710
111 Lingapur 220 Lingapur Tap-1 18 Drake 710
112 Shimoga 220 Davanagere 220 105 Drake 710
113 GUTTUR 220 Neelagunda 220 43 Drake 710
114 Ittagi 220 Neelagunda 220 37 Drake 710
115 Ranebennur 220 GUTTUR 220 40 Drake 710
116 Haveri 220 GUTTUR 220 70 Drake 710
117 Haveri 220 GUTTUR 220 70 Drake 710
118 GUTTUR 220 Chitradurga 220 85 Drake 710
119 Davanagere 220 Honnali 220 45 Drake 710
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 143
# From substation To substation Line length (km) Conductor type Ampacity (amps)
120 Shimoga 220 Honnali 220 50 Drake 710
121 BIDADI PGCIL 220 Bidadi 220 3.4 1000 Sq.mm XLPE
UG cable 820
122 BIDADI PGCIL 220 Bidadi 220 3.4 1000 Sq.mm XLPE
UG cable 820
123 DB PURA 220 DB PURA Tap-1 7.3 Drake 710
124 Bidadi 220 SMHLY 220 40 Drake 710
125 Bidadi 220 SMHLY 220 40 Drake 710
126 ITPL 220 EPIP 220 10 Drake 710
127 Hiryur 220 Hiryur PGCIL 220 14.2 Drake 710
128 Bus_WI_Guttur 220 GUTTUR 220 60 Drake 710
129 Lingapur 220 MUNIRABAD PH 220 1.5 Drake 710
130 BIAL Begur 220 HOSKOTE 220 19.1 Drake 710
131 Hiryur PGCIL 220 GOWRIBIDANUR 220 121 Drake 710
132 HSR LT 220 NIMHANS 220 10 Lynx 385
133 NELAMANGALA 220 Magadi 220 40 Drake 710
134 Hiryur PGCIL 220 GOWRIBIDANUR 220 121 Drake 710
135 Hiryur PGCIL 220 Thallak 220 77 Drake 710
136 Yelahanka 220 HOODY 220 42 Drake 710
137 Hiryur 220 Madhugiri 220 78 Drake 710
138 NELAMANGALA 220 PEENYA 220 15 Drake 710
139 NELAMANGALA 220 PEENYA 220 15 Drake 710
140 NELAMANGALA 220 PEENYA 220 15 Drake 710
141 Hebbal Tap-1 CPRI 220 0.8 Drake 710
142 NELAMANGALA 220 DB PURA 220 35.9 Drake 710
143 NELAMANGALA 220 DB PURA 220 35.9 Drake 710
144 Shimoga 220 ANSN HALLY 220 200 Drake 710
145 DB PURA 220 BIAL Begur 220 24 Drake 710
146 HEBBAL 220 HOODY 220 24.4 Drake 710
147 Madhugiri 220 GOWRIBIDANUR 220 33 Drake 710
148 NRS 220 A STN 220 3.5 1000 Sq.mm XLPE
UG cable 820
Karnataka’s Energy Mix: Computational Model for Energy Planning
144 www.cstep.in © CSTEP
# From substation To substation Line length (km) Conductor type Ampacity (amps)
149 VRB VATHI 220 TATAGUNI 220 18.25 Drake 710
150 A STN 220 EDC 220 12 1000 Sq.mm XLPE
UG cable 820
151 PEENYA 220 NRS 220 7 Drake 710
152 EDC 220 HAL 220 20 Drake 710
153 HAL 220 HOODY 220 10 1000 Sq.mm XLPE
UG cable 820
154 HAL 220 HOODY 220 10 1000 Sq.mm XLPE
UG cable 820
155 HOODY 220 W FIELD 220 4 Drake 710
156 NELAMANGALA 220 DOBSPET 220 27 Drake 710
157 DOBSPET 220 KADUR 220 155 Drake 710
158 VARAHI 220 KEMAR 220 79 Drake 710
159 VARAHI 220 KEMAR 220 79 Drake 710
160 VARAHI 220 KEMAR 220 76.8 Moose 631
161 UPCL 220 KEMAR 220 23.1 Moose 631
162 UPCL 220 KEMAR 220 23.1 Moose 631
163 MSEZ 220 KEMAR 220 39 Drake 710
164 MSEZ 220 KEMAR 220 39 Drake 710
165 KEMAR 220 NETLAMADNUR 220 73 Drake 710
166 KEMAR 220 NETLAMADNUR 220 73 Drake 710
167 Kudgi 220 GM NAVARA 220 18.25 Drake 710
168 HASAN 220 NITTUR 220 115 Drake 710
169 Hadavahalli (GOPALPUR)220 Basthipura 220 85 Drake 710
170 Hootagalli 220 Basthipura 220 7.26 Drake 710
171 Hootagalli 220 Basthipura 220 7.26 Drake 710
172 SMHLY 220 Khodyas 220 10 Twin Moose 1262
173 Ancheplaya 220 Magadi 220 45 Drake 710
174 Shantigrama 220 Shimoga 220 143.4 Drake 710
175 CHIKAMAGALUR 220 Shimoga 220 109 Drake 710
176 CHIKAMAGALUR 220 Shantigrama 220 81 Drake 710
177 C R NAGARA 220 Kadakola 220 44.8 Drake 710
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 145
# From substation To substation Line length (km) Conductor type Ampacity (amps)
178 C R NAGARA 220 Kadakola 220 44.8 Drake 710
179 C R NAGARA 220 MADHUVANAHALLY 220 41.5 Drake 710
180 C R NAGARA 220 MADHUVANAHALLY 220 41.5 Drake 710
181 Guddadahalli 220 Lingapur 220 9 Drake 710
182 Guddadahalli 220 Lingapur 220 9 Drake 710
183 MADHUVANAHALLY 220 T K Halli 220 25 Drake 710
184 Hadavahalli (GOPALPUR)220 Shantigrama 220 34.1 Drake 710
185 Basthipura 220 Kadakola 220 27.21 Drake 710
186 Basthipura 220 Kadakola 220 27.21 Drake 710
187 Kadakola 220 Hootagalli 220 28 Drake 710
188 VAJAMANGALA 220 Hootagalli 220 19.3 Drake 710
189 Guddadahalli 220 GUDDADAHALLI Tap-1 2.5 Drake 710
190 VAJAMANGALA 220 T K Halli 220 57.1 Drake 710
191 C R PATNA 220 K R PET 220 46.8 Drake 710
192 K R PET 220 TUBINAKERE 220 58.2 Drake 710
193 TUBINAKERE 220 Basthipura 220 39.6 Drake 710
194 KUSHALNAGARA 220 Basthipura 220 75.3 Drake 710
195 KUSHALNAGARA 220 Basthipura 220 75.3 Drake 710
196 Athani 220 Kudachi 220 39.15 Drake 710
197 GUDDADAHALLI Tap-1 GUDDADAHALLI Tap-2 3.5 Drake 710
198 Athani 220 Mahalingapura 220 60 Drake 710
199 ULTRA TECH 220 GUDDADAHALLI Tap-1 1.5 Drake 710
200 Kudachi 220 Mahalingapura 220 35 Drake 710
201 GUDDADAHALLI Tap-2 PRAXIER 220 0.5 Drake 710
202 Narendra2 220 Kanabargi Swt Stn 220 63 Drake 710
203 GUDDADAHALLI Tap-2 KALYAN STEELS 220 0.1 Drake 710
204 Narendra2 220 Kanabargi Swt Stn 220 63 Drake 710
205 MUKUNDA STEELS 220 KALYAN STEELS 220 0.5 Drake 710
206 Mahalingapura 220 Narendra PGCIL 220 123.41 Drake 710
207 Lingapur 220 Kustagi 220 77.5 Drake 710
208 Ghataprabha 220 Narendra PGCIL 220 96.5 Drake 710
Karnataka’s Energy Mix: Computational Model for Energy Planning
146 www.cstep.in © CSTEP
# From substation To substation Line length (km) Conductor type Ampacity (amps)
209 Ghataprabha 220 Narendra PGCIL 220 96.5 Drake 710
210 MK Hubli 220 Narendra PGCIL 220 34.53 Drake 710
211 MK Hubli 220 Narendra PGCIL 220 34.53 Drake 710
212 Mahalingapura 220 Narendra PGCIL 220 123.41 Drake 710
213 Chikkodi 220 Belgaum 220 75 Drake 710
214 Chikkodi 220 Belgaum 220 75 Drake 710
215 NELAMANGALA 220 ANSN HALLY 220 50 Drake 710
216 NELAMANGALA 220 Ancheplaya 220 36.7 Drake 710
217 SHARAVATHI 220 Shimoga 220 112 Drake 710
218 SHARAVATHI 220 Shimoga 220 112 Drake 710
219 SHARAVATHI 220 BALLIGAVI 220 65 Drake 710
220 SIRSI 220 SHARAVATHI 220 54 Drake 710
221 LINGASUGUR 220 Kustagi 220 73 Drake 710
222 SIRSI 220 SHARAVATHI 220 54 Drake 710
223 TALAGUPPA 220 SHARAVATHI 220 33 Drake 710
224 TALAGUPPA 220 SHARAVATHI 220 33 Drake 710
225 Shimoga 220 ARASIKERE 220 110 Drake 710
226 NELAMANGALA 220 NITTUR 220 75 Drake 710
227 Shimoga 220 KADUR 220 68 Drake 710
228 Shimoga 220 KIBBANAHALLI 220 140 Drake 710
229 NELAMANGALA 220 KIBBANAHALLI 220 110 Drake 710
230 Shimoga 220 VARAHI 220 86 Drake 710
231 Shimoga 220 VARAHI 220 86 Drake 710
232 Shimoga 220 VARAHI 220 86 1000 Sq.mm XLPE
UG cable 820
233 STRP 220 (Gerusoppa) TALAGUPPA 220 30 Drake 710
234 NELAMANGALA 220 Hebbal Tap-1 17 Drake 710
235 Kodasalli 220 Kadra 220 28.2 Drake 710
236 Mughalkhod 220 Ghataprabha 220 23 Drake 710
237 Kadra 220 Karwar 220 27.5 Drake 710
238 Kadra 220 Karwar 220 27.5 Drake 710
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 147
# From substation To substation Line length (km) Conductor type Ampacity (amps)
239 Bidnal 220 Enercon (Harthi) 220 55 Drake 710
240 Bidnal 220 Enercon (Harthi) 220 55 Drake 710
241 Enercon (Harthi) 220 Gadag 220 7.3 Drake 710
242 Lingapur 220 MUNIRABAD PH 220 1.5 Drake 710
243 Bidnal 220 Saundatti 220 54.13 Drake 710
244 Bidnal 220 Nagajari 220 67.6 Drake 710
245 Kudgi 220 GM NAVARA 220 18.25 Drake 710
246 Nagajari 220 Ambewadi 220 30 Drake 710
247 Nagajari 220 Ambewadi 220 30 Drake 710
248 Narendra2 220 Ambewadi 220 54.5 Moose 631
249 Narendra2 220 Ambewadi 220 54.5 Moose 631
250 Kothipura 220 TUBINAKERE 220 18.17 Drake 710
251 Kothipura 220 TUBINAKERE 220 18.17 Drake 710
252 Kaiga 220 Kodasalli 220 15.24 Drake 710
253 TUMKUR (New Madhugiri)220 ANSN HALLY 220 18.5 Drake 710
254 Kothipura 220 Bidadi 220 68.82 Drake 710
255 SRS Hubli 220 Nagajari 220 65 Drake 710
256 SRS Hubli 220 Nagajari 220 65 Drake 710
257 SRS Hubli 220 Bidnal 220 5.3 Drake 710
258 SRS Hubli 220 Narendra2 220 38 Drake 710
259 SRS Hubli 220 Narendra2 220 38 Drake 710
260 SRS Hubli 220 SIRSI 220 137 Drake 710
261 SRS Hubli 220 SIRSI 220 137 Drake 710
262 TUMKUR (New Madhugiri)220 ANSN HALLY 220 18.5 Drake 710
263 Kothipura 220 Bidadi 220 68.82 Drake 710
264 TUMKUR (New Madhugiri)220 Madhugiri 220 44.5 Drake 710
265 MITTERMARI 220 GOWRIBIDANUR 220 45 Drake 710
266 MITTERMARI 220 GOWRIBIDANUR 220 45 Drake 710
267 Dhoni 220 Gadag 220 20.22 Drake 710
268 Narendra2 220 Haveri 220 90 Lynx 385
269 Narendra2 220 Haveri 220 90 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
148 www.cstep.in © CSTEP
# From substation To substation Line length (km) Conductor type Ampacity (amps)
270 Narendra PGCIL 220 Narendra2 220 0.1 Drake 710
271 Narendra PGCIL 220 Narendra2 220 0.1 Drake 710
272 Vajramatti 220 Mahalingapura 220 40 Drake 710
273 Vajramatti 220 Mahalingapura 220 40 Drake 710
274 JSW 220 Lingapur 220 35 Drake 710
275 JSW 220 Lingapur 220 35 Drake 710
276 BTPS 220 Lingapur 220 61 Drake 710
277 ALIPURA 220 BTPS 220 22 Drake 710
278 SINDHANUR 220 Lingapur 220 103 Drake 710
279 SINDHANUR 220 LINGASUGUR 220 91 Drake 710
280 LINGASUGUR 220 Mallat Tap_1 220 39.6 Drake 710
281 RTPS 220 Raichur 220 20 Drake 710
282 LINGASUGUR 220 RTPS 220 96 Drake 710
283 LINGASUGUR 220 RTPS 220 96 Drake 710
284 Mallat Tap_1 220 RTPS 220 46 Drake 710
285 Shahapur 220 RTPS 220 68.04 Drake 710
286 Shahapur 220 RTPS 220 68.04 Drake 710
287 Shahapur 220 LINGASUGUR 220 73.71 Drake 710
288 Mallat Tap_1 220 Mallat 220 2.14 Drake 710
289 Sedam 220 RTPS 220 105 Drake 710
290 Sedam 220 Shahapur 220 114.85 Drake 710
291 Sedam 220 RTPS 220 105 Drake 710
292 SHAHABAD 220 Shahapur 220 67.56 Drake 710
293 Humnabad 220 Sedam 220 85 Drake 710
294 Humnabad 220 Sedam 220 85 Drake 710
295 Bidadi 220 Toyota 220 0.3 Drake 710
296 HALABARGA 220 Humnabad 220 30 Drake 710
297 HALABARGA 220 Humnabad 220 30 Drake 710
298 Ittagi 220 Harkanal (Vestas) 220 34 Drake 710
299 Pavagada 220 Madhugiri 220 60 Drake 710
300 Shantigrama 220 C R PATNA 220 43.2 Drake 710
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 149
# From substation To substation Line length (km) Conductor type Ampacity (amps)
301 TUMKUR (New Madhugiri)220 Madhugiri 220 44.5 Drake 710
302 Lingapur 220 Dhoni 220 79.77 Drake 710
303 KADAVINAKOTE (HNPURA) 220 Hadavahalli (GOPALPUR)220 8.9 Drake 710
304 KADAVINAKOTE (HNPURA) 220 Hadavahalli (GOPALPUR)220 8.9 Drake 710
305 Lingapur Tap-1 Dhoni 220 77.77 Drake 710
306 MSEZ 220 KAVOOR 220 9 Drake 710
307 MSEZ 220 KAVOOR 220 9 Drake 710
308 Thallak 220 Chitradurga 220 62 Drake 710
309 Honnali 220 Honnali Suzlon 19.81 Drake 710
310 Honnali 220 Honnali Suzlon 19.81 Drake 710
311 Guttur Vishwind 220 GUTTUR 220 5 Drake 710
312 Guttur Vishwind 220 GUTTUR 220 5 Drake 710
313 TALAGUPPA 220 SHARAVATHI 220 33 Drake 710
314 SRS Hubli 220 Nagajari 220 65 Drake 710
315 SRS Hubli 220 Bidnal 220 5.3 Drake 710
316 SMHLY 220 Jigani 220 45 Drake 710
317 Jigani 220 YRND HALLI 220 10 Drake 710
318 HASAN 220 ARASIKERE 220 50 Drake 710
319 B Bagewadi 220 IPP FF Greenko 220 2 Drake 710
320 Mughalkhod 220 Chikkodi 220 20 Drake 710
321 BAGALKOT 220 Gadag 220 110 Drake 710
322 Enercon (Harthi) 220 Gadag 220 7.3 Drake 710
323 Dhoni 220 Gadag 220 22.77 Drake 710
324 Kudachi 220 Ghataprabha 220 110 Drake 710
325 Humnabad 220 Kapanoor 220 65 Drake 710
326 BAGALKOT 220 Gadag 220 110 Drake 710
327 Humnabad 220 Kapanoor 220 65 Drake 710
328 GOWRIBIDANUR 220 RVM 220 5 Drake 710
329 Bijapur 220 GM NAVARA 220 17.97 Drake 710
330 GM NAVARA 220 Kudgi 220 18.25 Drake 710
331 GM NAVARA 220 Kudgi 220 18.25 Drake 710
Karnataka’s Energy Mix: Computational Model for Energy Planning
150 www.cstep.in © CSTEP
# From substation To substation Line length (km) Conductor type Ampacity (amps)
332 Pavagada 220 Madhugiri 220 60 Drake 710
333 Magadi 220 Bidadi 220 32 1000 Sq.mm XLPE
UG cable 820
334 Magadi 220 Bidadi 220 32 1000 Sq.mm XLPE
UG cable 820
110kV
335 Athani_2 110 Athani 110 3.7 Lynx 385
336 Yallammanawadi 110 Aigali 110 12 Lynx 385
337 Savalgi 110 Yallammanawadi 110 12 Lynx 385
338 Todalbagi 110 Savalgi 110 12.1 Lynx 385
339 Mamadapura 110 Todalbagi 110 20.1 Lynx 385
340 Mamadapura 110 Babaleshwar 110 13.46 Lynx 385
341 Shirabur Tap-1 Mamadapura 110 5 Lynx 385
342 Shirbur 110 Nandi Sugars 110 2.17 Lynx 385
343 B Bagewadi 110 Mamadapura 110 50 Lynx 385
344 Mamadapura Tap-1 Mamadapura 110 20 Lynx 385
345 Bhutnal 110 Bijapuri E 110 8 Lynx 385
346 B Bagewadi 110 Mamadapura Tap-1 30 Lynx 385
347 Malaghan 110 Mamadapura Tap-1 5 Lynx 385
348 Mathihal 110 Malaghan 110 8 Lynx 385
349 Tolmatti Tap-1 Shiraguppi V 110 8.5 Lynx 385
350 Bisnal Tap-1 Bilagi 110 5 Lynx 385
351 Rabkavi 110 Mahalingapura 110 20.7 Lynx 385
352 Athani 110 Satti 110 14.5 Lynx 385
353 Banahatti 110 Mahalingapura 110 9.5 Lynx 385
354 Banahatti 110 Jamakhandi 110 22.5 Lynx 385
355 Jamakhandi Tap-1 Jamakhandi 110 8 Lynx 385
356 Prabhulingeshwar Sugr 110 Jamakhandi Tap-1 1.2 Lynx 385
357 Shirol 110 Jamakhandi Tap-1 7.27 Lynx 385
358 Mareguddi 110 Manthur 110 15.9 Lynx 385
359 Mundaganur 110 Mareguddi 110 16.41 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 151
# From substation To substation Line length (km) Conductor type Ampacity (amps)
360 Sigikere 110 Bagalkot2 110 9.64 Lynx 385
361 Rampur 110 Sadashiv Sugars 110 4.21 Lynx 385
362 Nidagundi 110 Rampur 110 11.33 Lynx 385
363 Mukarthihal 110 Nidagundi 110 14.88 Lynx 385
364 B Bagewadi 110 Mukarthihal 110 14.04 Lynx 385
365 Toravi 110 Bhutnal 110 10 Lynx 385
366 Achanur 110 Bagalkot Tap-3 11.79 Lynx 385
367 Bagalkot Tap-4 Bagalkot Tap-3 7.92 Lynx 385
368 Bagalkot Tap-4 Muddebihal 110 21.9 Lynx 385
369 Tekkalaki 110 Toravi 110 10 Lynx 385
370 B Bagewadi 110 Bagalkot Tap-4 27.1 Lynx 385
371 Kudal Sangam 110 Bagalkot Tap-3 21.19 Lynx 385
372 Hungund 110 Kudal Sangam 110 23.63 Lynx 385
373 Kustagi 110 Ilkal 110 35 Lynx 385
374 Kustagi 110 Ilkal 110 35 Lynx 385
375 DEODURGA Tap-1 GABBUR 110 28 Coyote 323
376 Bijapuri E 110 Bijapur 110 2.04 Lynx 385
377 Bijapuri E 110 Bijapur 110 2.04 Lynx 385
378 Bijapur 110 Bijapur City 110 10 Lynx 385
379 Tikota 110 Tekkalaki 110 10 Lynx 385
380 Gajanur 110 Muthinakoppa 110 20 Dog 311
381 INDI 110 INDI_2 110 3 Lynx 385
382 B Bagewadi 110 Indi Tap-2 24 Wolf 405
383 Atharga 110 Indi Tap-1 10.75 Lynx 385
384 INDI_2 110 Indi Tap-1 15 Lynx 385
385 INDI 110 INDI_2 110 3 Lynx 385
386 INDI 110 Hirebevanur 110 16.24 Lynx 385
387 INDI 110 Lachayan 110 13.15 Lynx 385
388 INDI 110 Zhalki 110 21 Lynx 385
389 Zhalki 110 Chadchan 110 16 Lynx 385
390 Chadchan 110 Indian Sugars 110 4.3 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
152 www.cstep.in © CSTEP
# From substation To substation Line length (km) Conductor type Ampacity (amps)
391 D Hippargi 110 Indi Tap-3 21 Wolf 405
392 Indi Tap-3 Sindagi 110 1.4 Lynx 385
393 Indi Tap-2 D Hippargi 110 2 Lynx 385
394 Sindagi 110 Chandakavate 110 21.3 Lynx 385
395 Malghana (Sindagi Tq) 110 Indi Tap-3 8 Wolf 405
396 Indi Tap-4 Mortagi 110 0.5 Lynx 385
397 HALABARGA 110 BIDAR (KOLHAR) 110 7.64 Lynx 385
398 HALABARGA 110 KAMATHANA 110 22 Lynx 385
399 Indi Tap-4 Mandewali 110 16 Lynx 385
400 Hosur 110 Kittadahalli Tap-1 10 Lynx 385
401 Kittadahalli Tap-1 Kittadahalli 110 3 Lynx 385
402 Malghana (Sindagi Tq) 110 Manali Sugars 110 1 Wolf 405
403 Sanda 110 Balligavi Tap1 15 Lynx 385
404 GURMATKAL 110 Bus_WI_Gurmitkal 110 3 Lynx 385
405 Vajramatti 110 Vajramatti2 110 1.8 Lynx 385
406 Vajramatti 110 Vajramatti2 110 1.8 Lynx 385
407 Lokapur 110 Salahalli 110 16.77 Lynx 385
408 Uttur 110 ICPL 110 4.32 Lynx 385
409 Badami 110 Kerur 110 23.5 Lynx 385
410 GMR Sugars 110 Ramdurga 110 1 Lynx 385
411 Bagalkot Tap-1 Ramdurga 110 34 Lynx 385
412 Shimoga 110 MYSORE PAPER MILL 110 8 Wolf 405
413 MOKA Tap-1 BELLARY Tap-1 5.1 Lynx 385
414 MOKA 110 MOKA Tap-1 8.5 Lynx 385
415 MOKA Tap-1 PD Halli Tap-1 2.4 Lynx 385
416 GABBUR 110 Raichur 110 23 Coyote 323
417 KIRLOSKAR- Tap 1 MUNIRABAD PH 110 8 Lynx 385
418 KIRLOSKAR- Tap 1 KIRLOSKAR 110 4 Lynx 385
419 HAREKRISHNA 110 KIRLOSKAR- Tap 1 3.92 Lynx 385
420 Somalapur 110 NITTUR 110 6.53 Lynx 385
421 NONAVINAKERE 110 Tandaga 110 8 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 153
# From substation To substation Line length (km) Conductor type Ampacity (amps)
422 Tandaga 110 Gungurmele 110 8 Lynx 385
423 C N Hally Tap1 Katrikehal 110 10 Lynx 385
424 Tiptur Tap-2 Keregodi 110 9 Lynx 385
425 MAYASANDRA 110 Talakere 110 4.43 Lynx 385
426 KOPPAL Tap-1 HAREKRISHNA 110 1.06 Lynx 385
427 Narendra2 110 Kud Dharwad 110 9.6 Drake 710
428 C N Hally Tap2 Huliyar 110 8 Lynx 385
429 C N Hally Tap2 Hadanakere 110 12.22 Lynx 385
430 Thimmanahalli 110 C N Hally Tap2 11.73 Lynx 385
431 C N Hally Tap1 Thimmanahalli 110 17.73 Lynx 385
432 C N Hally 110 C N Hally Tap1 4 Lynx 385
433 C N Hally Tap1 Settikere 110 6.52 Lynx 385
434 KIBBANAHALLI Tap3 KADEHALLI 110 11.7 Lynx 385
435 KIBBANAHALLI Tap3 MAYASANDRA 110 11.09 Lynx 385
436 KIBBANAHALLI Tap2 KIBBANAHALLI Tap3 2 Lynx 385
437 KIBBANAHALLI Tap2 TURUVEKERE 110 2 Lynx 385
438 KIBBANAHALLI Tap1 KIBBANAHALLI Tap2 4 Lynx 385
439 KIBBANAHALLI 110 KIBBANAHALLI Tap1 16 Lynx 385
440 KIBBANAHALLI 110 C N Hally 110 15 Lynx 385
441 KIBBANAHALLI Tap1 NONAVINAKERE 110 2 Lynx 385
442 Tiptur Tap1 Halukurke 110 12.5 Lynx 385
443 Tiptur 110 Tiptur Tap1 2 Lynx 385
444 Bandihalli 110 Tiptur 110 4.5 Lynx 385
445 Doddaguni Tap1 Doddaguni Tap2 2.5 Lynx 385
446 Doddaguni Tap1 Sampige 110 11.56 Lynx 385
447 Doddaguni Tap2 Ammasandra 110 6 Lynx 385
448 Tiptur Tap-2 Tiptur Tap1 5 Lynx 385
449 Bandihalli 110 KIBBANAHALLI 110 19 Lynx 385
450 Kammaradi 110 Hulikam Tap1(1) 4 Dog 311
451 Hulikam Tap1(1) Hulikal Tap1 8 Dog 311
452 Hulikal Tap1 Manidam 110 4.4 Dog 311
Karnataka’s Energy Mix: Computational Model for Energy Planning
154 www.cstep.in © CSTEP
# From substation To substation Line length (km) Conductor type Ampacity (amps)
453 Hulikal Tap1 Hulikal 110 0.07 Dog 311
454 Hosangadi 110 Hulikal 110 9 Dog 311
455 Halady 110 Hosangadi 110 17 Moose 415
456 Hiriyadaka 110 Madhuvana 110 15 Lynx 385
457 Madhuvana 110 Kundapura 110 13 Lynx 385
458 Kundapura 110 Navuda 110 32 Lynx 385
459 Hosangadi 110 Sandur Power 110 2.6 Lynx 385
460 Hosangadi 110 Sandur Power 110 2.6 Lynx 385
461 Muthinakoppa 110 Hulikam Tap2 34.8 Dog 311
462 Hulikam Tap2 Thirthalli 110 1 Moose 415
463 Hulikam Tap2 Hulikam Tap1(1) 8 Dog 311
464 Shimoga 110 Gajanur 110 12.8 Dog 311
465 KAVOOR 110 Bejai 110 5.85 Lynx 385
466 KAVOOR 110 AMR RITWK 110 23.1 Lynx 385
467 B C Road 110 Kanoje Tap1 26.52 Lynx 385
468 KAVOOR 110 Kulshekara 110 12.5 Dog 311
469 KAVOOR 110 Kulshekara 110 12.5 Dog 311
470 konaje 110 Kanoje Tap1 12 Lynx 385
471 SALETHUR 110 Kanoje Tap2 20 Lynx 385
472 Kanoje Tap1 SALETHUR 110 20 Lynx 385
473 Kanoje Tap2 Vitla 110 1.5 Lynx 385
474 NETLAMADNUR 110 Kanoje Tap2 10 Lynx 385
475 NETLAMADNUR 110 Puttur 110 4 Lynx 385
476 Puttur 110 Karaya 110 4 Lynx 385
477 Kavoor Tap1 KAVOOR 110 4.5 Lynx 385
478 Kavoor Tap2 Kavoor Tap1 1.3 Lynx 385
479 Kavoor Tap2 Baikampady 110 5.32 Lynx 385
480 MRPL 110 Kavoor Tap1 8.1 Lynx 385
481 Moodabidre 110 Gurupura 110 26.2 Lynx 385
482 KEMAR 110 Manipal 110 31 Lynx 385
483 Moodabidre 110 KEMAR 110 15 Moose 415
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 155
# From substation To substation Line length (km) Conductor type Ampacity (amps)
484 KEMAR 110 Manipal 110 31 Lynx 385
485 Manipal 110 Manipal Nittur 110 8.4 Lynx 385
486 Manipal 110 Hiriyadaka 110 11.5 Lynx 385
487 KEMAR 110 Karkala 110 1.1 Moose 415
488 Manipal 110 Brahmavara 110 13.7 Lynx 385
489 Kadur Tap4 Kallusadarahalli 110 14.3 Lynx 385
490 Nandikur 110 KEMAR 110 22.6 Lynx 385
491 Guruvanakere 110 KEMAR 110 47.5 Lynx 385
492 Guruvanakere 110 KEMAR 110 47.5 Lynx 385
493 Kadur Tap3 Banavara 110 0.5 Lynx 385
494 Kadur Tap3 Jawagal 110 22 Lynx 385
495 Kadur Tap3 Kadur Tap4 2.4 Lynx 385
496 Kadur Tap5 Kadur Tap4 11 Lynx 385
497 Kadur Tap 6 Kadur Tap5 0.9 Lynx 385
498 Kadur Tap5 Gerumara 110 16 Lynx 385
499 Kadur Tap 6 Kandur Tap7 9 Lynx 385
500 Kadur Tap 6 ARASIKERE 110 0.1 Lynx 385
501 Honnavalli 110 D M Kurke 110 19.6 Lynx 385
502 Kandur Tap7 Honnavalli 110 11.6 Lynx 385
503 Kandur Tap7 Kadur Tap 8 19.8 Lynx 385
504 Kadur Tap 8 Gandasi 110 1.2 Lynx 385
505 Kadur Tap 8 Kondenalu 110 5.5 Lynx 385
506 Koppal 110 KOPPAL Tap-1 10 Lynx 385
507 KOPPAL Tap-1 GINIGERA 110 3 Lynx 385
508 Bus_CO_Girisagar 110 Giri sagar 110 5.65 Lynx 385
509 UAS Dharwad 110 Mruthyanjayanagar 110 6 Lynx 385
510 Athani_2 110 Renuka Sugars A 110 10.14 Lynx 385
511 UGAR Sugars 110 UGAR 110 1 Lynx 385
512 Athani 110 Tanvashi 110 20.35 Lynx 385
513 Nirani Sugars 110 Mahabalipura Tap-2 0.3 Lynx 385
514 Mahabalipura Tap-3 Mudhol 110 1 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
156 www.cstep.in © CSTEP
# From substation To substation Line length (km) Conductor type Ampacity (amps)
515 Mahabalipura Tap-1 Uttur 110 6.8 Lynx 385
516 Mahabalipura Tap-1 Rannabelagali 110 7 Wolf 405
517 Manthur 110 Mahabalipura Tap-3 5 Lynx 385
518 Vajramatti 110 Jambagi K D 110 8 Lynx 385
519 Manthur 110 Vajramatti 110 9.9 Lynx 385
520 Ainapur 110 Kudachi 110 9 Lynx 385
521 UGAR 110 Kudachi 110 10 Lynx 385
522 Kudachi_2 110 Kudachi 110 1.5 Lynx 385
523 Terdal 110 Mahalingapura 110 15 Lynx 385
524 Ainapur LIS 110 Ainapur 110 12 Lynx 385
525 Kud Dharwad 110 Lakammanahalli 110 5.42 Drake 710
526 Narendra2 110 Tadasan Koppa 110 14.8 Drake 710
527 Lakammanahalli 110 Navanagar_D 110 9.16 Drake 710
528 MK Hubli_2 110 Kittur 110 26.5 Lynx 385
529 Beluria 110 Narendra_2 Tap-1 3.25 Lynx 385
530 Beluria 110 Narendra2 110 6.15 Lynx 385
531 Narendra2 110 Mruthyanjayanagar 110 9.62 Lynx 385
532 Bevoor 110 Kustagi 110 24.6 Lynx 385
533 MK Hubli 110 MK Hubli_2 110 1.42 Lynx 385
534 MK Hubli 110 MK Hubli_2 110 1.42 Lynx 385
535 Khanapur MK 110 MK Hubli 110 24 Lynx 385
536 Hirebaagewadi 110 MK Hubli 110 13.2 Wolf 405
537 Bailhongal 110 MK Hubli 110 21.23 Lynx 385
538 Belgaum Tap-1 Uchagaon 110 15.12 Lynx 385
539 Belgaum Tap-1 Belgaum 110 0.3 Lynx 385
540 Uchagaon 110 Udayambagh 110 6.5 Lynx 385
541 Bus_WI_Saundatti 110 Saundatti 110 10.6 Lynx 385
542 Kanabargi Layout 110 Vadagaon 110 21 Lynx 385
543 Belgaum 110 Kanabargi Layout 110 5.5 Lynx 385
544 KUSHTAGI Tap-1 Kustagi 110 20.05 Lynx 385
545 GANADHAL 110 KUSHTAGI Tap-1 1.62 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 157
# From substation To substation Line length (km) Conductor type Ampacity (amps)
546 GDPH Hittargi Tap-1 4 Lynx 385
547 Ghataprabha_2 110 Hittargi Tap-1 17 Lynx 385
548 Hidakaldam 110 GDPH 2 Lynx 385
549 Ghataprabha 110 Ghataprabha_2 110 5.76 Lynx 385
550 Ghataprabha 110 Ghataprabha_2 110 5.76 Lynx 385
551 Chikkodi 110 Sankeshwar 110 32.78 Lynx 385
552 Sankeshwar 110 Heera Sugars 110 1 Lynx 385
553 Sankeshwar 110 Heera Sugars_1 110 0.3 Lynx 385
554 Hukkeri 110 Kotabagi LIS 110 9 Lynx 385
555 KANAKAGIRI 110 KUSHTAGI Tap-1 17.16 Lynx 385
556 Daddi 110 Belgaum Tap-1 20 Lynx 385
557 Ankalgi 110 Belgaum 110 30 Lynx 385
558 Hukkeri 110 Vishwanatha Sugars 110 15 Lynx 385
559 Sankeshwar 110 Hukkeri 110 14.73 Lynx 385
560 Ghataprabha 110 Shirgaon 110 14.11 Lynx 385
561 Ghataprabha 110 Kabbur 110 24.16 Lynx 385
562 Gokak 110 Ghataprabha 110 14.5 Lynx 385
563 Gokak 110 Mamdapura 110 12.38 Lynx 385
564 Mudalgi 110 Hunsihal 110 14.58 Lynx 385
565 Mudalgi Tap-1 Mudalgi 110 6 Lynx 385
566 Hunsihal 110 Satish Sugar 110 1.8 Lynx 385
567 Hunsihal 110 Ghataprabha 110 16.6 Lynx 385
568 Bus_WI_shiratti 110 Shirhatti 110 1 Lynx 385
569 Bus_CO_HALYAL 110 Halyal 110 0.9 Lynx 385
570 Mahalingapura 110 Davaleshwar 110 12 Lynx 385
571 Mudalgi Tap-1 Kuligod 110 13 Lynx 385
572 Kustagi 110 YELBURGA 110 28 Lynx 385
573 NITTUR 110 Bidre 110 6.53 Lynx 385
574 HANAMSAGAR 110 Kustagi 110 29.27 Lynx 385
575 HANAMSAGAR 110 HIREGONNAGAR 110 13.4 Lynx 385
576 Shikaripura 110 BALLIGAVI 110 23 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
158 www.cstep.in © CSTEP
# From substation To substation Line length (km) Conductor type Ampacity (amps)
577 Balligavi Tap1 Shrilkoppa 110 20.45 Lynx 385
578 Balligavi Tap1 Essur 110 7.5 Lynx 385
579 Shrilkoppa 110 BALLIGAVI 110 6 Lynx 385
580 Shikaripura 110 Balligavi Tap2 1.5 Lynx 385
581 Balligavi Tap2 Balligavi Tap1 2.5 Lynx 385
582 BPCL (CHAYADEVI PH) 110 Lingasugur 110 18 Lynx 385
583 Gubbi 110 NITTUR 110 15 Lynx 385
584 Hirekerur 110 Ranebennur 110 42 Lynx 385
585 Ranebennur 110 Tumminakatte 110 26 Lynx 385
586 Ranebennur Tap 1 Ranebennur 110 20 Lynx 385
587 Aremallapur 110 Ranebennur Tap 1 24 Lynx 385
588 Guttal Switching 110 Ranebennur Tap 1 11 Lynx 385
589 Guttal Switching 110 Ranebennur 110 31 Lynx 385
590 Guttal Switching 110 Guttal 110 3.8 Lynx 385
591 Guttal Switching 110 Guttal 110 3.8 Lynx 385
592 Hangal 110 Haveri 110 35 Lynx 385
593 Haveri 110 Haveri2 110 0.1 Lynx 385
594 Haveri 110 Tiluvalli 110 33 Lynx 385
595 Haveri 110 Bydagi 110 18 Lynx 385
596 Suzlon (Shindenur) 110 Bydagi 110 8.1 Lynx 385
597 Araga 110 Ankola 110 19.5 Lynx 385
598 Ankola 110 Kumta 110 31.87 Lynx 385
599 Kumta 110 Honnavara 110 25 Lynx 385
600 Honnavara 110 Murdeshwar 110 28 Lynx 385
601 Chandragutti 110 Sirsi Tap-1 4.5 Coyote 286
602 Sirsi Tap-1 Siddapura 110 6 Coyote 286
603 Bharanagi 110 Balligavi Tap3 8 Lynx 385
604 Anavatti 110 Bharanagi 110 12 Lynx 385
605 Yagati 110 Singatagere 110 17.5 Lynx 385
606 KADUR 110 Yagati 110 18.4 Lynx 385
607 KADUR 110 Tangali 110 7 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 159
# From substation To substation Line length (km) Conductor type Ampacity (amps)
608 Machenahalli 110 Bhadravathi 110 9 Lynx 385
609 Shimoga 110 VISL 110 15.3 Lynx 385
610 Shimoga 110 VISL 110 15.3 Lynx 385
611 VISL 110 Bhadravathi 110 1.5 Lynx 385
612 BPCL (CHAYADEVI PH) 110 Lingasugur 110 18 Lynx 385
613 Nagenahalli 110 Kadur Tap2 4 Lynx 385
614 Nidaghatta 110 Kadur Tap2 6 Lynx 385
615 Kadur Tap2 KADUR 110 21 Lynx 385
616 Shivani 110 Ajjamapura 110 14 Lynx 385
617 Kadur Tap1 Ajjamapura 110 4 Lynx 385
618 KADUR 110 Kadur Tap1 13.6 Lynx 385
619 Kadur Tap1 Hirenallur 110 5 Lynx 385
620 Birur 110 KADUR 110 5 Lynx 385
621 Birur 110 Shivapura 110 10 Lynx 385
622 Shivapura 110 Nerlakere 110 10 Lynx 385
623 Tarikere Tap1 Nerlakere 110 6.5 Lynx 385
624 Tarikere Tap1 Tarikere 110 0.5 Lynx 385
625 Soham Power Moodabidre 110 13.2 Lynx 385
626 Kavoor Tap3 Baikampady 110 5.2 Lynx 385
627 Kavoor Tap3 KISCO 110 0.05 Lynx 385
628 Shimoga Tap2 Shimoga 110 30 Drake 710
629 Kumshi 110 Shimoga Tap2 0.6 Drake 710
630 Anandapur 110 Ripponpet 110 10 Drake 710
631 Sorba 110 Sagar 110 28 Lynx 385
632 GURGUNTA 110 Lingasugur 110 17.5 Lynx 385
633 Talaguppa 110 Sagar 110 15 Lynx 385
634 Sagar 110 MGHE 110 26 Lynx 385
635 Sagar 110 MGHE 110 26 Lynx 385
636 Sagar 110 LDPH 110 28.5 Lynx 385
637 MUDUGAL 110 Lingasugur 110 19.8 Lynx 385
638 Talaguppa 110 LDPH 110 13 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
160 www.cstep.in © CSTEP
# From substation To substation Line length (km) Conductor type Ampacity (amps)
639 MGHE 110 LDPH 110 12 Lynx 385
640 LDPH 110 Jog 110 12 Lynx 385
641 MGHE 110 Jog 110 2 Lynx 385
642 Alkola 110 Shimoga Tap1 3.5 Drake 710
643 Shimoga Tap1 Mandli 110 0.5 Drake 710
644 Shimoga Tap1 Shimoga 110 3.5 Drake 710
645 Sagar 110 Anandapur 110 28 Drake 710
646 Sagar 110 Alkola 110 65 Drake 710
647 Togarsi 110 Balligavi Tap3 6 Lynx 385
648 Balligavi Tap3 BALLIGAVI 110 10 Lynx 385
649 Jog 110 Ambuthirtha 110 4 Lynx 385
650 Jog 110 Ambuthirtha 110 4 Lynx 385
651 Kavoor Tap2 MCF 110 0.4 Lynx 385
652 Kittadahalli Tap-1 BALLIGAVI 110 20 Lynx 385
653 Solaris 110 Karwar 110 7 Lynx 385
654 Karwar 110 Araga 110 8.3 Lynx 385
655 NITTUR 110 Doddaguni 110 36.2 Lynx 385
656 Doddaguni 110 Doddaguni Tap1 2 Lynx 385
657 NITTUR 110 Kadaba 110 11.14 Lynx 385
658 NITTUR 110 Nittur Tap1 10 Lynx 385
659 NITTUR 110 Kallur 110 34 Lynx 385
660 K G Temple 110 UNGRA 110 7.4 Lynx 385
661 Nittur Tap1 K G Temple 110 16.32 Lynx 385
662 Keregodi 110 Hunaseghatta 110 9 Lynx 385
663 SUZLON KALMANGI 110 SINDHANUR 110 28.6 Lynx 385
664 HATTI 110 Lingasugur 110 16 Lynx 385
665 MUNIRABAD PH 110 KEREHALLI Tap-1 5 Coyote 323
666 MUNIRABAD PH 110 JPH Tap-1 1 Lynx 385
667 Gajanur 110 Bus_MH_Gajanur 110 1.5 Lynx 385
668 Hiriyadaka 110 Bus_MH_Hiriyadka 33 3.6 Lynx 385
669 JPH Tap-1 JPH 110 0.5 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 161
# From substation To substation Line length (km) Conductor type Ampacity (amps)
670 JPH Tap-1 STAR Metalics Ltd 110 12 Lynx 385
671 Ambewadi Tap 2 Supa power house 110 40 Lynx 385
672 Supa power house 110 Ambewadi Tap 1 1.72 Lynx 385
673 Ambewadi Tap 1 Ambewadi 110 12 Lynx 385
674 Ambewadi Tap 1 GANESHGUDI 110 0.9 Lynx 385
675 Supa power house 110 Ambewadi 110 13.72 Lynx 385
676 Ambewadi 110 Halyal 110 27 Coyote 286
677 Ambewadi 110 Kavalwad 110 33.6 Coyote 286
678 Halyal 110 Kavalwad 110 22 Coyote 286
679 SRS Hubli 110 Kadanakoppa 110 17.07 Lynx 385
680 SRS Hubli 110 Kavalwad Tap 1 28.7 Lynx 385
681 Kavalwad 110 Kiravatti 110 17 Coyote 286
682 Kavalwad Tap 1 Kalaghatagi 110 4.65 Lynx 385
683 Kiravatti 110 Umachagi 110 29 Coyote 286
684 Umachagi 110 Sirsi Tap-1 26 Lynx 385
685 SRS Hubli 110 Anandnagar 110 3 Lynx 385
686 SRS Hubli 110 RAMANKOPPA 110 24.3 Lynx 385
687 Anandnagar 110 Aakshaya Colony 110 3.8 Lynx 385
688 SHATHAVAHANA IPP Kuditini 110 10 Lynx 385
689 SAVANUR 110 Haveri 110 30 Lynx 385
690 STAR Metalics Ltd 110 DONIMALALI 110 45 Lynx 385
691 MUNIRABAD PH 110 DONIMALALI 110 44 Lynx 385
692 MUNIRABAD PH 110 SANKALAPUR 110 17.5 Lynx 385
693 SRS Hubli 110 SRS Hubli Tap 1 3 Lynx 385
694 SRS Hubli 110 SRS Hubli Tap 1 3 Lynx 385
695 KAMALAPURA Tap-1 KAMALAPURA 110 5.8 Lynx 385
696 SRS Hubli Tap 1 Tarihal 110 15.8 Drake 710
697 Ambewadi Tap 2 Anmod 110 0.1 Lynx 385
698 Gadag Road 110 Bidnal 110 5.59 Lynx 385
699 PH Comp 110 SRS Hubli 110 5.19 Lynx 385
700 Navalgund 110 Bidnal 110 35.05 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
162 www.cstep.in © CSTEP
# From substation To substation Line length (km) Conductor type Ampacity (amps)
701 Nargund Tap-1 Navalgund 110 23 Lynx 385
702 BPCL (Nargund) 110 Nargund 110 1 Lynx 385
703 Nargund Tap-1 Nargund 110 2 Lynx 385
704 KEREHALLI Tap-1 BPCL M 110 7 Coyote 323
705 Konnur 110 Nargund Tap-1 26.1 Lynx 385
706 Laxmeshwar 110 Gadag 110 37 Lynx 385
707 Laxmeshwar 110 Shirhatti 110 21.96 Lynx 385
708 Laxmeshwar 110 Bellahatti 110 22.6 Lynx 385
709 Enercon (Bannikoppa) 110 Bellahatti 110 12.39 Lynx 385
710 Mundargi 110 VSPL 110 16.5 Lynx 385
711 Mundargi 110 Dambal Tap1 2 Lynx 385
712 Uppin Betagere 110 Dambal Tap1 17 Lynx 385
713 Enercon (Hirewaditti) 110 Dambal 110 9.34 Lynx 385
714 Dambal Tap1 Dambal 110 18.17 Lynx 385
715 Suzlon (Herogere) 110 Dambal 110 17 Lynx 385
716 SUZLON KALMANGI 110 SINDHANUR 110 28.6 Lynx 385
717 Dambal 110 Gadag 110 21.5 Lynx 385
718 Hirehal 110 Ron 110 9.38 Lynx 385
719 Ron 110 Naregal 110 18.5 Lynx 385
720 Naregal 110 Gadagbettigere 110 24.8 Lynx 385
721 Gadag2 110 Gadagbettigere 110 11.8 Lynx 385
722 BPCL M 110 MALLPURA 110 16.5 Coyote 323
723 Annigeri 110 Bidnal 110 39.14 Lynx 385
724 Gadag 110 Gadag2 110 0.5 Lynx 385
725 KEREHALLI Tap-1 KEREHALLI 110 3 Coyote 323
726 Gajendragad 110 Ron 110 24.9 Lynx 385
727 Dambal 110 Sambapur 110 18.95 Lynx 385
728 Shirhatti 110 Gadag 110 32 Lynx 385
729 Sambapur 110 Gadag 110 8.73 Lynx 385
730 Suzlon (Bagewadi) 110 Guttal Switching 110 37.62 Lynx 385
731 Suzlon (Bagewadi) 110 Guttal Switching 110 37.62 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 163
# From substation To substation Line length (km) Conductor type Ampacity (amps)
732 Belgaum 110 Nehru nagar 110 14.3 Lynx 385
733 RAIBAGH 110 Chikkodi 110 18 Lynx 385
734 RAIBAGH 110 Chikkodi 110 18 Lynx 385
735 Kabbur 110 Gamesha 2.5 Lynx 385
736 Saidapur M 110 Davaleshwar 110 3.3 Lynx 385
737 Nippani 110 Khadakalat 110 15 Lynx 385
738 Ankali 110 Chikkodi 110 18 Lynx 385
739 Chikkodi 110 CHIKKODI_2 110 7 Lynx 385
740 RSR 110 Bhoj 110 0.1 Lynx 385
741 Chikkodi 110 Nanadi 110 10 Lynx 385
742 Chikkodi 110 Sadalga Tap-1 7 Lynx 385
743 Chikkodi 110 Doodaganga krishna 110 7 Lynx 385
744 CHIKKODI_2 110 Doddannavar 110 1.5 Lynx 385
745 Sadalga 110 Boragaon 110 8.5 Lynx 385
746 Ankali 110 Shivashakti Sugars 110 6.5 Lynx 385
747 Sadalga Tap-1 Sadalga 110 7 Lynx 385
748 Chikkodi 110 Bhoj 110 16.72 Lynx 385
749 Sadalga 110 Venkateshwara Sugar 110 8.5 Lynx 385
750 Mahalingapura 110 GSML 110 8.3 Lynx 385
751 Mahalingapura 110 GSML 110 8.3 Lynx 385
752 Rannabelagali 110 Mahalingapura 110 8.5 Wolf 405
753 Manthur 110 Nirani Sugars 110 7.3 Lynx 385
754 Melligere 110 Vajramatti 110 8.32 Lynx 385
755 Vajramatti 110 Katharki 110 14.35 Lynx 385
756 Katharki 110 GEM Sugars 110 3.91 Lynx 385
757 Bagalkot2 110 BAGALKOT 110 10.75 Lynx 385
758 Bagalkot2 110 BAGALKOT 110 10.75 Lynx 385
759 Neerbudihal 110 K Sugars 110 4.2 Lynx 385
760 K Sugars 110 BAGALKOT 110 8.08 Lynx 385
761 BAGALKOT 110 Guledagudda 110 29.2 Lynx 385
762 BAGALKOT 110 Navanagar_B 110 6.18 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
164 www.cstep.in © CSTEP
# From substation To substation Line length (km) Conductor type Ampacity (amps)
763 BAGALKOT 110 Bagalkot Tap-1 17.5 Lynx 385
764 Saundatti 110 Saundatti2 110 1 Lynx 385
765 Saundatti 110 Saundatti2 110 1 Lynx 385
766 Saundatti 110 Udakeri 110 23.9 Lynx 385
767 Saundatti 110 Munavalli 110 20.12 Lynx 385
768 Saundatti 110 Saundatti Tap-1 16.12 Lynx 385
769 Saundatti Tap-1 Renuka Sugars 110 7.3 Lynx 385
770 Renuka Sugars 110 Yaragatti 110 14.6 Lynx 385
771 Yaragatti 110 Katkol 110 13.52 Lynx 385
772 Lokapur 110 BAGALKOT 110 28.4 Lynx 385
773 Kaladigi 110 BAGALKOT 110 19.53 Lynx 385
774 Kerur 110 Konnur 110 18.1 Lynx 385
775 Shiraguppi V 110 Vajramatti 110 20.15 Lynx 385
776 Mundagod Tap-1 Mundagod 110 10 Lynx 385
777 Kuditini 110 THORANAGAL 110 25 Lynx 385
778 ALIPURA Tap-1 SHATHAVAHANA IPP 2.1 Lynx 385
779 Allipura 110 Agarwal Tap-1 5 Lynx 385
780 ALIPURA Tap-1 KURUGODU 110 16 Lynx 385
781 KURUGODU 110 SUZLON KURGODU 110 11.9 Lynx 385
782 AC CEMENT Tap-1 Allipura 110 10 Lynx 385
783 AC CEMENT Tap-1 AC CEMENT 110 1.2 Lynx 385
784 AC CEMENT Tap-1 SOMASAMUDRA Tap-1 15 Lynx 385
785 SOMASAMUDRA 110 SOMASAMUDRA Tap-1 4.1 Lynx 385
786 BELLARY(N) 110 SOMASAMUDRA Tap-1 5 Lynx 385
787 BELLARY Tap-1 BELLARY(N) 110 3.6 Lynx 385
788 NKS Tap-1 BELLARY Tap-1 0.1 Lynx 385
789 NKS Tap-1 BSAL Tap-1 0.1 Lynx 385
790 BSAL Tap-1 ANANTHPUR ROAD Tap-1 0.1 Lynx 385
791 ANANTHPUR ROAD Tap-1 ANANTHPUR ROAD 110 3 Lynx 385
792 Mundagod Tap-1 Shiggaon 110 15 Lynx 385
793 BELLARY(S) 110 BELLARY(S) Tap-1 2 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 165
# From substation To substation Line length (km) Conductor type Ampacity (amps)
794 BELLARY(S) Tap-1 HOTHUR STEELS 110 6.5 Lynx 385
795 PD Halli Tap-1 PD Halli 110 3.35 Lynx 385
796 PD Halli 110 Janaki 110 7.01 Lynx 385
797 ROYAL SEEMA 110 PD Halli Tap-1 3.65 Lynx 385
798 VENKATAGIRI 110 MALLPURA 110 10.5 Lynx 385
799 VENKATAGIRI 110 GANGAVATHI 110 3 Coyote 323
800 KARATAGI Tap-1 SRIRAMNAGAR 110 18.2 Coyote 323
801 KARATAGI 110 KARATAGI Tap-1 0.5 Coyote 323
802 KARATAGI Tap-1 SINDHANUR 110 14 Coyote 323
803 KAMPLI 110 KAMPLI Tap-1 9 Coyote 323
804 KAMPLI Tap-1 KPH 110 9 Coyote 323
805 KPH 110 MUKUND Tap-1 36 Coyote 323
806 MUKUND Tap-1 MUKUND 110 12.62 Lynx 385
807 SINDHANUR 110 MUKUND Tap-1 4.3 Coyote 323
808 SINDHANUR 110 SINDHANUR2 110 8 Lynx 385
809 SINDHANUR 110 SINDHANUR2 110 10.7 Lynx 385
810 SINDHANUR 110 SINDHANUR2 110 12.56 Lynx 385
811 SINDHANUR 110 DADESUGUR 110 24.57 Lynx 385
812 DADESUGUR 110 SIRAGUPPA 110 11.9 Lynx 385
813 SIRAGUPPA 110 TEKKALKOTE 110 15.38 Lynx 385
814 SIRAGUPPA 110 NSL SUGARS S 110 8 Lynx 385
815 Kavital Tap-1 MASKI 110 15.01 Lynx 385
816 Kavital 110 Kavital Tap-1 3.6 Lynx 385
817 NPC 110 HATTI 110 19.6 Lynx 385
818 Kavital Tap-1 HATTI 110 12.6 Lynx 385
819 Krishna Hydro 110 GURGUNTA 110 5 Lynx 385
820 SINDHANUR 110 SINDHANUR2 110 8 Lynx 385
821 SINDHANUR2 110 WALKAMDINNI 110 10 Lynx 385
822 KOGANTI 110 WALKAMDINNI 110 0.43 Lynx 385
823 BYAGWAT 110 BYAGWAT tap-1 7.32 Lynx 385
824 SIRWAR-TAP-1 BYAGWAT tap-1 10 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
166 www.cstep.in © CSTEP
# From substation To substation Line length (km) Conductor type Ampacity (amps)
825 Mallat 110 SIRWAR 110 15 Coyote 323
826 SIRWAR 110 ALKODU 110 17 Coyote 323
827 ALKODU 110 Galaga 110 10 Lynx 385
828 SINDHANUR 110 MANVI-TAP-1 51.16 Lynx 385
829 MANVI-TAP-1 Manvi 110 10 Lynx 385
830 MANVI-TAP-1 MADALAPUR 110 12 Lynx 385
831 Raichur 110 KURDI CROSS 110 19.8 Coyote 323
832 SIRWAR-TAP-1 Raichur 110 33 Lynx 385
833 Raichur 110 APMC 110 6 Lynx 385
834 Raichur 110 APMC 110 6 Lynx 385
835 APMC 110 CHIKASUGUR 110 9.31 Lynx 385
836 Raichur 110 MALIYABAD 110 17.2 Lynx 385
837 MALIYABAD 110 VADAVATTI 110 11.14 Lynx 385
838 Raichur 110 Matmari 110 23.15 Lynx 385
839 CHIKASUGUR 110 VADAVATTI 110 15 Lynx 385
840 DEODURGA 110 DEODURGA Tap-1 5 Lynx 385
841 KBJNL LIS 110 SHAHAPUR 110 38.92 Lynx 385
842 KEMBHAVI 110 SHAHAPUR 110 36.1 Lynx 385
843 UGAR SUGARS K KEMBHAVI 110 12 Lynx 385
844 SHAHAPUR 110 SHAHAPUR2 110 12 Coyote 323
845 SHAHAPUR 110 SHAHAPUR2 110 12 Wolf 405
846 SHAHAPUR 110 SHORAPUR 110 26 Lynx 385
847 SHAHAPUR 110 YADGIR 110 37.25 Lynx 385
848 KONKAL 110 YADGIR 110 33 Lynx 385
849 SEDAM 110 GURMATKAL 110 40 Lynx 385
850 SHAHAPUR 110 KHANAPUR SH 110 24.3 Lynx 385
851 KHANAPUR SH 110 WADAGERA 110 20.1 Lynx 385
852 CORE GREEN Sugar 110 WADAGERA 110 2.02 Lynx 385
853 KHANAPUR SH 110 SAIDAPUR K 110 36 Lynx 385
854 KHANAPUR SH 110 SUGNANESHWARA 110 17 Lynx 385
855 Sedam Tap-1 CHITAPUR 110 13.3 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 167
# From substation To substation Line length (km) Conductor type Ampacity (amps)
856 Sedam Tap-1 SEDAM 110 23 Lynx 385
857 Sedam Tap-1 RAJASHREE CEMENTS 110 8.33 Lynx 385
858 Korwar Temple 110 CHITAPUR 110 36.4 Lynx 385
859 Shahabad 110 JEWARGI Tap-1 25 Wolf 405
860 JEWARGI 110 JEWARGI Tap-1 1.5 Wolf 405
861 SHAHAPUR2 110 Nalwar 110 55 Coyote 323
862 Shahabad 110 Wadi Tap-1 12 Wolf 405
863 Wadi Tap-1 Wadi 110 0.6 Lynx 385
864 GULBURGA(S) 110 FARHATABAD 110 12 Lynx 385
865 GULBURGA(W) 110 GULBURGA(S) 110 25 Lynx 385
866 KAPNOOR 110 GULBURGA(W) 110 14 Lynx 385
867 KAPNOOR 110 GULBURGA(N) 110 8 Coyote 323
868 KAPNOOR 110 GULBURGA(N) 110 8 Wolf 405
869 GULBURGA(U) 110 GULBURGA(S) 110 11 Lynx 385
870 KAPNOOR1 110 KAPNOOR 110 0.6 Lynx 385
871 MADYAL 110 KAPNOOR 110 40 Lynx 385
872 Shahabad 110 Mandewali 110 47 Lynx 385
873 NSL SUGARS M 110 MADYAL 110 13.7 Lynx 385
874 CHOWDAPUR 110 MADYAL 110 26 Lynx 385
875 AFZALPUR 110 KARAJGI 110 23.7 Lynx 385
876 AFZALPUR 110 DEVANGAON 110 12 Lynx 385
877 RENUKA SUGARS D 110 DEVANGAON 110 12 Lynx 385
878 Mortagi 110 RENUKA SUGARS D 110 12 Lynx 385
879 Kurkunta Tap-1 SEDAM 110 4 Lynx 385
880 Kurkunta 110 Kurkunta Tap-1 11.03 Lynx 385
881 CHINCHOLI 110 SEDAM 110 44 Lynx 385
882 YEDRAMI Tap-1 Shahabad 110 45 Lynx 385
883 YEDRAMI 110 YEDRAMI Tap-1 16.87 Lynx 385
884 YEDRAMI Tap-1 Indi Tap-4 83 Lynx 385
885 ALLAND Tap-1 MAHAGAON-TAP-2 35 Lynx 385
886 ALLAND 110 ALLAND Tap-1 8 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
168 www.cstep.in © CSTEP
# From substation To substation Line length (km) Conductor type Ampacity (amps)
887 ALLAND Tap-1 Kadaganchi 110 17.63 Lynx 385
888 MAHAGAON-TAP-1 MAHAGAON 110 0.6 Wolf 405
889 MARGUTTI Cross 110 MAHAGAON-TAP-1 20 Wolf 405
890 Humnabad 110 MARGUTTI Cross 110 20 Wolf 405
891 Humnabad 110 MAHAGAON-TAP-2 38 Coyote 323
892 Humnabad 110 CHITTAGUPPA 110 16.4 Lynx 385
893 Humnabad 110 HUMNABAD Tap-1 1.4 Lynx 385
894 HUMNABAD Tap-1 HUMNABAD SWT STN 110 0.6 Lynx 385
895 MANNA-E-KHELLI 110 HUMNABAD Tap-1 29.87 Lynx 385
896 HABSIKOTE 110 BIDAR (CHIDRI) 110 2.2 Lynx 385
897 HALLIKHED 110 Humnabad 110 22 Lynx 385
898 HABSIKOTE 110 KAMATHANA 110 12.66 Lynx 385
899 BIDAR (KOLHAR) 110 Bidar Tap-1 3.16 Lynx 385
900 JANAWAD 110 BIDAR (KOLHAR) 110 2.5 Lynx 385
901 NSSK 110 JANAWAD 110 4 Lynx 385
902 BIDAR (CHIDRI) 110 HALABARGA 110 35 Lynx 385
903 RAJESHWAR 110 Humnabad 110 12 Lynx 385
904 SASTHAPUR 110 RAJESHWAR 110 7 Lynx 385
905 SASTHAPUR 110 MANTALA 110 10 Lynx 385
906 LADHA 110 BHALKI 110 14.2 Lynx 385
907 MGSSK 110 BHALKI 110 12.3 Lynx 385
908 BHALKI 110 HALABARGA 110 38.77 Lynx 385
909 SANTPUR 110 HALABARGA 110 51 Lynx 385
910 DONGARGAON 110 SANTPUR 110 18.67 Lynx 385
911 Kamalnagar 110 DONGARGAON 110 13.59 Lynx 385
912 SINDHANUR 110 Turvihal 110 17.46 Lynx 385
913 Hanumanhal 110 HIREGONNAGAR 110 10.58 Lynx 385
914 Metri Tap-1 KAMALAPURA Tap-1 24.5 Lynx 385
915 THORANAGAL 110 Metri Tap-1 5 Lynx 385
916 Metri 110 Metri Tap-1 6.2 Lynx 385
917 Agarwal Tap-1 ALIPURA Tap-1 11.2 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 169
# From substation To substation Line length (km) Conductor type Ampacity (amps)
918 Halkundi Tap-1 ANANTHPUR ROAD Tap-1 2.5 Lynx 385
919 Halkundi Tap-1 Halkundi 110 3.25 Lynx 385
920 Halkundi Tap-1 BELLARY(S) 110 2.5 Lynx 385
921 CHIKASUGUR 110 Shaktinagar 110 15 Lynx 385
922 Shiggaon 110 SAVANUR 110 15 Lynx 385
923 Tumminakatte 110 Rattihalli 110 18.5 Lynx 385
924 Bidi 110 MK Hubli 110 16.15 Lynx 385
925 Mache 110 Suvarna soudha 110 18.6 Lynx 385
926 Suvarna soudha 110 Hirebaagewadi 110 24 Lynx 385
927 Giri sagar 110 Bisnal Tap-1 5.65 Lynx 385
928 Mahabalipura Tap-3 Jambagi K D 110 8 Lynx 385
929 Bisnal 110 Bisnal Tap-1 15.6 Lynx 385
930 Mahalingapura 110 Itnal 110 25.6 Lynx 385
931 Chandakavate 110 Almel 110 23.8 Lynx 385
932 Kerur 110 Kulageri cross 110 12 Lynx 385
933 KEMBHAVI 110 Aski 110 18 Lynx 385
934 UAS Dharwad 110 Narendra2 110 6 Lynx 385
935 Mruthyanjayanagar 110 Gopankoppa 110 17.65 Lynx 385
936 Hattargi 110 Daddi 110 20 Lynx 385
937 Sultanpur 110 H Hidakal 110 11 Lynx 385
938 Mahalingapura 110 Sultanpur 110 11 Lynx 385
939 Kagwad 110 UGAR 110 13.14 Lynx 385
940 Yallammanawadi 110 Alabal 110 10 Lynx 385
941 Kudachi 110 Yalparatti 110 9.2 Lynx 385
942 Ghataprabha 110 Mantur 110 13.43 Lynx 385
943 Shirabur Tap-1 Shirbur 110 11.9 Lynx 385
944 Shirabur Tap-1 Devaragennur 110 3 Lynx 385
945 Morab 110 Kudachi 110 8.5 Lynx 385
946 Shimoga 110 MPM 110 18 Lynx 385
947 Bilagi 110 Tolmatti Tap-1 7.5 Lynx 385
948 Halaki 110 Jambagi K D 110 13.5 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
170 www.cstep.in © CSTEP
# From substation To substation Line length (km) Conductor type Ampacity (amps)
949 Jade 110 Anavatti 110 30 Lynx 385
950 Gajendragad 110 Ron 110 24.9 Lynx 385
951 Suzlon (Herogere) 110 Dambal 110 17 Lynx 385
952 Indi Tap-1 Hiremasali 110 15 Lynx 385
953 Shirguppi Sugar UGAR 110 5 Lynx 385
954 LJVL 110 GURGUNTA 110 5 Drake 710
955 Hatti Gamesa HATTI 110 10 Drake 710
956 Khadakalat 110 Chikkodi 110 13 Lynx 385
957 Tolamatti 110 Tolmatti Tap-1 8.5 Lynx 385
958 Belagumba 110 Kadur Tap 6 0.15 Lynx 385
959 Ripponpet 110 Hosanagara 110 30 Moose 415
960 Dubalgundi Tap-1 Dubalgundi 110 10 Moose 415
961 BHALKI 110 Dubalgundi Tap-1 20 Moose 415
962 RENUKA SUGARS D 110 Ghattarga 110 2 Moose 415
963 MASKI 110 Muddapura 110 10 Moose 415
964 Yeragera 110 MALIYABAD 110 20 Moose 415
965 Bus_CO_Mundargi 110 Mundargi 110 16.5 Lynx 385
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 171
Details of Existing Installed Reactors in the KPTCL Grid
Table 21: Details of installed reactors in KPTCL grid as on March 31, 2017
# Connected substation/line Voltage
level (kV)
Rating
in Mvar
Switchable/Non
Switchable
Bus reactor
1 Somanahally 400 1×63 Switchable
2 Bidadi 400 1×63 Switchable
3 BTPS 400kV 400 1×80 Not available
4 Dhoni 400 1×63 Not available
5 Guddadahalli 400 1×50 Not available
6 Guttur 400 1×63 Not available
7 Hassan 400 1×80 Switchable
8 Hassan 400 1×125 Switchable
9 Hiriyur 400 1×63 Switchable
10 Hoody 400 1×63 Not available
11 Kaiga 400 1×63 Not available
12 Kaiga 400 1×63 Not available
13 Kolar 400 1×50 Switchable
14 Kudgi 400 1×125 Switchable
15 Kudgi 400 1×125 Switchable
16 Kudgi 400 1×125 Not available
17 Mysore 400 1×50 Switchable
18 Narendra 400 1×125 Switchable
19 Narendra 400 1×50 Switchable
20 Nelmangala 400 1×63 Not available
21 Raichur 765 1×240 Switchable
22 RTPS 400 1×63 Not available
23 Shantigaram 400 1×80 Not available
24 Talaguppa 400 1×63 Not available
25 Tumkur 400 1×63 Switchable
26 Pavagada PS 400 1×125 Not available
Line reactor
1 Somanahally to Kolar line at Somanahally
end 400 1×50 Switchable
2 Somanahally to Gooty line at Somanahally
end 400 1×63 Non Switchable
3 Guddadahalli to RTPS line at Guddadahalli
end 400 1×50 Not available
4 Guttur to Toranagallu line at Guttur end 400 1×50 Not available
5 Guttur to Hiriyur line 1 at Guttur end 400 1×50 Not available
6 Guttur to Hiriyur line 2 at Guttur end 400 1×50 Not available
7 Nelamangla to Gooty line at Nelamangala
end 400 1×50 Switchable
8 Nelamangla to Hiriyur line at Nelamangala
end 400 1×50 Not available
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 172
# Connected substation/line Voltage
level (kV)
Rating
in Mvar
Switchable/Non
Switchable
9 Nelamangla to Hassan line at Nelamangala
end 400 1×50 Not available
10 Nelamangla to Talaguppa line at
Nelamangala end 400 1×50 Not available
11 Nelamangla to Gooty line at Nelamangala
end 400 1×50 Not available
12 Sholapur to Raichur line 1 at Raichur end 765 1×240 Switchable
13 Sholapur to Raichur line 2 at Raichur end 765 1×240 Switchable
14 Talaguppa to Hassan line at Talaguppa end 400 1×50 Not available
15 Talaguppa to Nelamangala line at Talaguppa
end 400 1×50 Not available
Details of Transmission Line Parameters Considered in this Study
Table 22: Transmission line parameters considered in this study
# Line parameters Quad Moose
(400kV)
Twin
Moose
(400kV)
Drake
(220kV)
Lynx
(132kV)
1000Sqmm
XLPE cable
(220kV)
1 Positive Sequence
Resistance (ohm/km/ckt) 0.0147 0.0298 0.08712 0.17 0.0321
2 Positive Sequence
Reactance (ohm/km/ckt) 0.2528 0.332 0.397848 0.378 0.126
3
Positive Sequence
Suseptance, B/2
(mho/km/ckt)
2.29E-
06
1.73E-
06 1.46E-06 1.5E-06 3.23E-05
4 Zero Sequence
Resistance (ohm/km/ckt) 0.248 0.1619 0.29524 0.411 0.13
5 Zero Sequence
Reactance (ohm/km/ckt) 1.000 1.24 1.23904 1.34 0.068
6
Zero Sequence
Suseptance, B/2
(mho/km/ckt)
1.32E-
06
1.12E-
06 8.32E-07 8.17E-07 3.00E-05
7 Ampacity (amps) 2524 1262 710 385 820
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 173
Annexure II – Base Case Network Validation with SCADA Flows
(Data considered in this Study the Instant May 05, 2017, 10:09AM)
Transmission Line Power Flow Comparison
Table 23: ETAP Transmission line power flow comparison with SCADA snapshot
# From Bus To Bus
ETAP
flows
in
MW
SCADA
flows in
MW
Difference
(MW)
Difference
(%)
400 kV
1 NELAMANGALA 400 Basthipura (Mysure) 400 405.6 406 0.4 0.1
2 NELAMANGALA 400 Basthipura (Mysure) 400 405.6 406 0.4 0.1
3 BTPS 400 Hiryur PGCIL 400 355.8 355 0.8 0.2
4 KOLAR PGCIL 400 HOODY 400 685.8 683 2.8 0.4
5 KOLAR PGCIL 400 HOODY 400 685.8 683 2.8 0.4
6 BTPS 400 Hiryur PGCIL 400 355.8 354 1.8 0.5
7 RTPS 400 Guddadahalli 400 307.3 309 1.7 0.5
8 Kaiga 400 Narendra PGCIL 400 275.9 274 1.9 0.7
9 Shanthigrama (Hasan) 400 Basthipura (Mysure) 400 212.3 214 1.7 0.8
10 UPCL 400 Shanthigrama (Hasan) 400 143.6 142 1.6 1.1
11 TALAGUPPA 400 Shanthigrama (Hasan) 400 197.7 200 2.3 1.1
12 Kaiga 400 Narendra PGCIL 400 275.9 272 3.9 1.4
13 Shanthigrama (Hasan) 400 Basthipura (Mysure) 400 212.3 216 3.7 1.7
14 Hiryur PGCIL 400 NELAMANGALA 400 386.3 393 6.7 1.7
15 UPCL 400 Shanthigrama (Hasan) 400 143.6 141 2.6 1.8
16 Narendra PGCIL 400 Kudgi New 400 160.7 164 3.3 2
17 BIDADI PGCIL 400 SMHLY PGCIL 400 18.4 18 0.4 2.4
18 Hiryur PGCIL 400 NELAMANGALA 400 386.3 401 14.7 3.7
19 Narendra PGCIL 400 Kudgi New 400 160.7 167 6.3 3.8
20 JSW 400 GUTTUR 400 270.5 282 11.5 4.1
21 Kaiga 400 GUTTUR 400 146.5 153 6.5 4.2
22 Kaiga 400 GUTTUR 400 146.5 153 6.5 4.2
23 JSW 400 BTPS 400 235.5 225 10.5 4.6
24 TUMKUR 400 BIDADI PGCIL 400 365.1 383 17.9 4.7
25 TUMKUR 400 BIDADI PGCIL 400 365.1 383 17.9 4.7
26 RTPS 400 Raichur New 400 166.8 158 8.8 5.6
27 HOODY 400 NELAMANGALA 400 108.1 102 6.1 6
28 TALAGUPPA 400 NELAMANGALA 400 52.5 56 3.5 6.2
29 NELAMANGALA 400 Shanthigrama (Hasan) 400 166.2 178 11.8 6.6
30 HOODY 400 NELAMANGALA 400 108.1 101 7.1 7
31 Guddadahalli 400 GUTTUR 400 141.6 132 9.6 7.2
32 GUTTUR 400 Hiryur PGCIL 400 122 132 10 7.6
33 BIDADI PGCIL 400 SMHLY PGCIL 400 18.4 20 1.6 7.8
34 BIDADI PGCIL 400 NELAMANGALA 400 186.5 203 16.5 8.1
35 GUTTUR 400 Hiryur PGCIL 400 122 133 11 8.3
36 BIDADI PGCIL 400 NELAMANGALA 400 186.5 205 18.5 9
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 174
# From Bus To Bus
ETAP
flows
in
MW
SCADA
flows in
MW
Difference
(MW)
Difference
(%)
37 RTPS 400 Raichur New 400 166.8 152 14.8 9.7
38 GUTTUR 400 Narendra PGCIL 400 17 15 2 13.6
39 RTPS 400 BTPS 400 158.9 186 27.1 14.6
41 Kudgi New 400 Kudgi 400 4.8 4 0.8 18.8
42 Kudgi New 400 Kudgi 400 4.8 4 0.8 18.8
43 Kudgi New 400 Kudgi 400 4.8 4 0.8 18.8
44 Kudgi New 400 Kudgi 400 4.8 4 0.8 18.8
45 GUTTUR 400 Narendra PGCIL 400 17 14 3 21.8
46 KOLAR PGCIL 400 SMHLY PGCIL 400 381.3 265 116.3 43.9
47 Kudgi New 400 TUMKUR 400 15.6 31 15.4 49.8
48 Kudgi New 400 TUMKUR 400 15.6 31 15.4 49.8
220 kV
1 Alamatti 220 B Bagewadi 220 54.3 82.2 27.9 33.9
2 Alamatti 220 BAGALKOT 220 54.2 82.7 28.6 34.5
3 Alamatti 220 B Bagewadi 220 -
SCADA
flow not
available
- -
4 Alamatti 220 BAGALKOT 220 -
SCADA
flow not
available
- -
5 Bijapur 220 B Bagewadi 220 110.3 106.3 -4 -3.7
6 LINGASUGUR 220 B Bagewadi 220 275.2 294.5 19.3 6.6
7 Bijapur 220 B Bagewadi 220 -
SCADA
flow not
available
- -
8 LINGASUGUR 220 B Bagewadi 220 -
SCADA
flow not
available
- -
9 Bijapur 220 INDI 220 59 61.6 2.6 4.3
10 Chintamani 220 KOLAR PGCIL 220 110.5 134.5 23.9 17.8
11 Chintamani 220 KOLAR PGCIL 220
12 KOLAR KP 220 KOLAR PGCIL 220 345.7 351.1 5.5 1.6
13 KOLAR KP 220 KOLAR PGCIL 220
14 MALUR 220 KOLAR KP 220 186.7 193.7 7 3.6
15 MALUR 220 KOLAR KP 220
16 Sarjapura 220 MALUR 220 85.7 85.6 -0.2 -0.2
17 SMHLY 220 NGN PURA 220 184.3 191.2 6.9 3.6
18 SMHLY 220 HSR LT 220 188.2 194.5 6.4 3.3
19 SMHLY PGCIL 220 SMHLY 220 949.7 806 -143.7 -17.8
20 SMHLY PGCIL 220 SMHLY 220
21 HSR LT 220 NGN PURA 220 38.3 47.4 9.1 19.2
22 ITPL 220 HOODY 220 134.6 133 -1.6 -1.2
23 SMHLY 220 HAROHALLI 220 79.8 80.1 0.3 0.4
24 HAROHALLI 220 Kanakapura 220 48 48.3 0.3 0.7
25 PEENYA 220 Hebbal Tap-1 20.4 26.7 6.2 23.4
26 HSR LT 220 HOODY 220 124.3 110.1 -14.2 -12.9
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 175
# From Bus To Bus
ETAP
flows
in
MW
SCADA
flows in
MW
Difference
(MW)
Difference
(%)
27 SMHLY 220 TATAGUNI 220 191 189.7 -1.3 -0.7
28 Khodyas 220 SBMPURA 220 112.1 112 -0.1 -0.1
29 RTPS 220 Raichur 220 55.3 55.2 -0.2 -0.3
30 SMHLY 220 YRND HALLI 220 147.9 144 -3.9 -2.7
31 Vajramatti 220 BAGALKOT 220 106.3 142 35.7 25.2
32 Vajramatti 220 BAGALKOT 220
33 BMM ISPAT 220 Ittagi 220 97.4 101 3.7 3.6
34 Lingapur 220 BMM ISPAT 220 97.7 96.9 -0.8 -0.9
35 GUTTUR 220 Davanagere 220
379.9 390.9 11 2.8 36 GUTTUR 220 Davanagere 220
37 GUTTUR 220 Davanagere 220
38 Lingapur 220 Lingapur Tap-1 52.4 65.7 13.3 20.2
39 Shimoga 220 Davanagere 220 111.6 126.5 14.8 11.7
40 GUTTUR 220 Neelagunda 220 22.4 25.8 3.5 13.4
41 Ittagi 220 Neelagunda 220 71.6 69.8 -1.8 -2.5
42 Ranebennur 220 GUTTUR 220 64.5 65.4 0.9 1.4
43 Haveri 220 GUTTUR 220 24.7 11.2 -13.5 -120.8
44 Haveri 220 GUTTUR 220
45 GUTTUR 220 Chitradurga 220 22.9 20 -2.9 -14.5
46 Davanagere 220 Honnali 220 147.2 151.5 4.2 2.8
47 Shimoga 220 Honnali 220 98.4 101 2.6 2.6
48 BIDADI PGCIL 220 Bidadi 220 317.8 308 -9.8 -3.2
49 BIDADI PGCIL 220 Bidadi 220
50 DB PURA 220 DB PURA Tap-1 137.4 129 -8.5 -6.6
51 Bidadi 220 SMHLY 220 231.6 216.5 -15.2 -7
52 Bidadi 220 SMHLY 220
53 ITPL 220 EPIP 220 129.2 129 -0.2 -0.1
54 Hiryur 220 Hiryur PGCIL 220 20.9 19.8 -1.2 -5.9
55 Lingapur 220 MUNIRABAD PH 220 111.6 108.5 -3.2 -2.9
56 BIAL Begur 220 HOSKOTE 220 96.4 96.9 0.5 0.5
57 Hiryur PGCIL 220 GOWRIBIDANUR 220 192 197.9 5.9 3
58 HSR LT 220 NIMHANS 220 80.2 80.7 0.5 0.7
59 NELAMANGALA 220 Magadi 220 34.9 33.4 -1.5 -4.4
60 Hiryur PGCIL 220 GOWRIBIDANUR 220 -
SCADA
flow not
available
- -
61 Hiryur PGCIL 220 Thallak 220 49.6 45 -4.6 -10.2
62 Yelahanka 220 HOODY 220 100.9 101.1 0.2 0.2
63 Hiryur 220 Madhugiri 220 124.8 126.1 1.3 1.1
64 NELAMANGALA 220 PEENYA 220
453.5 460.5 6.9 1.5 65 NELAMANGALA 220 PEENYA 220
66 NELAMANGALA 220 PEENYA 220
67 NELAMANGALA 220 DB PURA 220 101.7 108 6.3 5.9
68 NELAMANGALA 220 DB PURA 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 176
# From Bus To Bus
ETAP
flows
in
MW
SCADA
flows in
MW
Difference
(MW)
Difference
(%)
69 Shimoga 220 ANSN HALLY 220 43.5 48.5 5 10.4
70 DB PURA 220 BIAL Begur 220 124.8 125 0.2 0.1
71 HEBBAL 220 HOODY 220 161.5 160.6 -0.8 -0.5
72 Madhugiri 220 GOWRIBIDANUR 220 51 51.4 0.5 0.9
73 NRS 220 A STN 220 48.8 51.5 2.7 5.2
74 VRB VATHI 220 TATAGUNI 220 156.3 155 -1.3 -0.8
75 A STN 220 EDC 220 33.9 31.8 -2.1 -6.6
76 PEENYA 220 NRS 220 140.1 141 1 0.7
77 EDC 220 HAL 220 134.2 132.2 -2 -1.5
78 HAL 220 HOODY 220 329.4 327.6 -1.8 -0.6
79 HAL 220 HOODY 220
80 HOODY 220 W FIELD 220 2 1.6 -0.4 -25
81 NELAMANGALA 220 DOBSPET 220 91.2 87.5 -3.7 -4.2
82 DOBSPET 220 KADUR 220 10.1 15.2 5.1 33.7
83 VARAHI 220 KEMAR 220
245 259 14 5.4 84 VARAHI 220 KEMAR 220
85 VARAHI 220 KEMAR 220
86 UPCL 220 KEMAR 220 235.8 226.9 -8.9 -3.9
87 UPCL 220 KEMAR 220
88 MSEZ 220 KEMAR 220 182.2 182.1 -0.1 0
89 MSEZ 220 KEMAR 220
90 KEMAR 220 NETLAMADNUR 220 124 124.9 0.9 0.7
91 KEMAR 220 NETLAMADNUR 220
92 HASAN 220 NITTUR 220 23.6 20.9 -2.8 -13.2
93 Hadavahalli (GOPALPUR)220 Basthipura 220 73.2 73.1 -0.1 -0.2
94 Hootagalli 220 Basthipura 220 357.6 353 -4.7 -1.3
95 Hootagalli 220 Basthipura 220
96 SMHLY 220 Khodyas 220 160 159.9 -0.1 -0.1
97 Ancheplaya 220 Magadi 220 33.5 33.1 -0.4 -1.2
98 Shantigrama 220 Shimoga 220 38.5 46 7.5 16.2
99 CHIKAMAGALUR 220 Shimoga 220 47 46.7 -0.3 -0.6
100 CHIKAMAGALUR 220 Shantigrama 220 4.1 4 -0.1 -3.5
101 C R NAGARA 220 Kadakola 220 146.2 144.8 -1.4 -1
102 C R NAGARA 220 Kadakola 220
103 C R NAGARA 220 MADHUVANAHALLY 220 73.4 72.5 -0.9 -1.2
104 C R NAGARA 220 MADHUVANAHALLY 220
105 Guddadahalli 220 Lingapur 220 119 91.7 -27.3 -29.7
106 Guddadahalli 220 Lingapur 220
107 MADHUVANAHALLY 220 T K Halli 220 17.6 16.6 -1 -6.2
108 Hadavahalli (GOPALPUR)220 Shantigrama 220 96.7 97.3 0.6 0.6
109 Basthipura 220 Kadakola 220 236.3 235.6 -0.8 -0.3
110 Basthipura 220 Kadakola 220
111 Kadakola 220 Hootagalli 220 67.3 63.5 -3.7 -5.9
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 177
# From Bus To Bus
ETAP
flows
in
MW
SCADA
flows in
MW
Difference
(MW)
Difference
(%)
112 VAJAMANGALA 220 Hootagalli 220 157.2 158.2 1 0.6
113 Guddadahalli 220 GUDDADAHALLI Tap-1 -
SCADA
flow not
available
- -
114 VAJAMANGALA 220 T K Halli 220 67.9 68.5 0.6 0.9
115 C R PATNA 220 K R PET 220 103.1 115 11.9 10.3
116 K R PET 220 TUBINAKERE 220 22.2 28.5 6.3 22.1
117 TUBINAKERE 220 Basthipura 220 105 98.1 -6.9 -7.1
118 KUSHALNAGARA 220 Basthipura 220 96.3 90.9 -5.3 -5.9
119 KUSHALNAGARA 220 Basthipura 220
120 Athani 220 Kudachi 220 27.5 35.5 8 22.5
121 Athani 220 Mahalingapura 220 39.1 30.6 -8.5 -27.8
122 ULTRA TECH 220 GUDDADAHALLI Tap-1 -
SCADA
flow not
available
- -
123 Kudachi 220 Mahalingapura 220 36.8 50 13.2 26.5
124 Narendra2 220 Kanabargi Swt Stn 220 -
SCADA
flow not
available
- -
125 Narendra2 220 Kanabargi Swt Stn 220 - -
126 MUKUNDA STEELS 220 KALYAN STEELS 220 -
SCADA
flow not
available
- -
127 Mahalingapura 220 Narendra PGCIL 220 184.8 186.7 1.9 1
128 Lingapur 220 Kustagi 220 25.2 22.4 -2.8 -12.7
129 Ghataprabha 220 Narendra PGCIL 220 178.3 165 -13.3 -8
130 Ghataprabha 220 Narendra PGCIL 220
131 MK Hubli 220 Narendra PGCIL 220 70.4 69.1 -1.3 -1.9
132 MK Hubli 220 Narendra PGCIL 220
133 Mahalingapura 220 Narendra PGCIL 220 -
SCADA
flow not
available
- -
134 Chikkodi 220 Belgaum 220 100.7 100.9 0.2 0.2
135 Chikkodi 220 Belgaum 220
136 NELAMANGALA 220 ANSN HALLY 220 89.9 88.2 -1.7 -2
137 NELAMANGALA 220 Ancheplaya 220 78.9 80 1.1 1.4
138 SHARAVATHI 220 Shimoga 220 165.4 173.3 7.8 4.5
139 SHARAVATHI 220 BALLIGAVI 220 64.4 64.3 0 0
140 SIRSI 220 SHARAVATHI 220 43.3 45.9 2.6 5.7
141 LINGASUGUR 220 Kustagi 220 62 58.3 -3.7 -6.3
142 SIRSI 220 SHARAVATHI 220 -
SCADA
flow not
available
- -
143 TALAGUPPA 220 SHARAVATHI 220 203.2 205.8 2.5 1.2
144 TALAGUPPA 220 SHARAVATHI 220
145 Shimoga 220 ARASIKERE 220 89.1 85.5 -3.6 -4.2
146 NELAMANGALA 220 NITTUR 220 69.1 69.9 0.8 1.1
147 Shimoga 220 KADUR 220 76.3 84 7.6 9.1
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 178
# From Bus To Bus
ETAP
flows
in
MW
SCADA
flows in
MW
Difference
(MW)
Difference
(%)
148 Shimoga 220 KIBBANAHALLI 220 55.3 52.9 -2.4 -4.6
149 NELAMANGALA 220 KIBBANAHALLI 220 32.1 35.1 3.1 8.7
150 Shimoga 220 VARAHI 220
90.8 82.3 -8.5 -10.3 151 Shimoga 220 VARAHI 220
152 Shimoga 220 VARAHI 220
153 STRP 220 (Gerusoppa) TALAGUPPA 220 50.9 50.7 -0.2 -0.4
154 NELAMANGALA 220 Hebbal Tap-1 125 129.1 4.1 3.1
155 Kodasalli 220 Kadra 220 7.8 8.8 1 11
156 Mughalkhod 220 Ghataprabha 220 51.5 49.4 -2.1 -4.2
157 Kadra 220 Karwar 220 66.9 65.9 -1.1 -1.6
158 Kadra 220 Karwar 220
159 Bidnal 220 Enercon (Harthi) 220 105.4 101.7 -3.7 -3.6
160 Bidnal 220 Enercon (Harthi) 220
161 Enercon (Harthi) 220 Gadag 220 105.3 98.8 -6.4 -6.5
162 Lingapur 220 MUNIRABAD PH 220 -
SCADA
flow not
available
- -
163 Bidnal 220 Saundatti 220 76.3 73.6 -2.7 -3.7
164 Bidnal 220 Nagajari 220 112 110 -2 -1.9
165 Nagajari 220 Ambewadi 220 270.3 281.6 11.3 4
166 Nagajari 220 Ambewadi 220
167 Narendra2 220 Ambewadi 220 211.7 222.1 10.4 4.7
168 Narendra2 220 Ambewadi 220
169 Kaiga 220 Kodasalli 220 82.6 77 -5.6 -7.3
170 SRS Hubli 220 Nagajari 220 337.3 332.4 -4.9 -1.5
171 SRS Hubli 220 Nagajari 220
172 SRS Hubli 220 Bidnal 220 102.4 95.5 -6.9 -7.2
173 SRS Hubli 220 Narendra2 220 132.5 134.9 2.3 1.7
174 SRS Hubli 220 Narendra2 220
175 SRS Hubli 220 SIRSI 220 44.2 47.5 3.3 6.9
176 SRS Hubli 220 SIRSI 220
177 Narendra2 220 Haveri 220 97.7 83.8 -13.9 -16.5
178 Narendra2 220 Haveri 220
179 Narendra PGCIL 220 Narendra2 220 -
SCADA
flow not
available
- -
180 Narendra PGCIL 220 Narendra2 220 - -
181 Vajramatti 220 Mahalingapura 220 15.7 50.5 34.8 68.9
182 Vajramatti 220 Mahalingapura 220
183 JSW 220 Lingapur 220 164.8 159 -5.8 -3.6
184 JSW 220 Lingapur 220
185 BTPS 220 Lingapur 220 58.8 61.5 2.7 4.4
186 ALIPURA 220 BTPS 220 52.2 54.1 1.9 3.5
187 SINDHANUR 220 Lingapur 220 1.6 1.7 0.1 5.4
188 SINDHANUR 220 LINGASUGUR 220 30.7 30.5 -0.2 -0.8
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 179
# From Bus To Bus
ETAP
flows
in
MW
SCADA
flows in
MW
Difference
(MW)
Difference
(%)
189 RTPS 220 Raichur 220 -
SCADA
flow not
available
- -
190 LINGASUGUR 220 RTPS 220
343.1 351.5 8.4 2.4 191 LINGASUGUR 220 RTPS 220
192 LINGASUGUR 220 RTPS 220
193 Shahapur 220 RTPS 220 206.4 201.5 -4.9 -2.4
194 Shahapur 220 RTPS 220
195 Shahapur 220 LINGASUGUR 220 56 61.6 5.6 9.1
196 Sedam 220 RTPS 220 194.4 173.7 -20.7 -11.9
197 Sedam 220 Shahapur 220 26.2 19 -7.2 -37.8
198 Sedam 220 RTPS 220 -
SCADA
flow not
available
- -
199 SHAHABAD 220 Shahapur 220 76.8 76.4 -0.3 -0.4
200 Humnabad 220 Sedam 220 207.5 181.6 -25.9 -14.3
201 Humnabad 220 Sedam 220
202 Bidadi 220 Toyota 220 15.9 15.9 0 -0.3
203 HALABARGA 220 Humnabad 220 80.2 80.4 0.2 0.2
204 HALABARGA 220 Humnabad 220
205 Shantigrama 220 C R PATNA 220 165 178 13 7.3
206 KADAVINAKOTE (HNPURA) 220 Hadavahalli (GOPALPUR)220 22.9 23.6 0.7 2.8
207 KADAVINAKOTE (HNPURA) 220 Hadavahalli (GOPALPUR)220
208 MSEZ 220 KAVOOR 220 172.4 170.9 -1.5 -0.9
209 MSEZ 220 KAVOOR 220
210 Thallak 220 Chitradurga 220 74.3 89.3 15 16.8
211 TALAGUPPA 220 SHARAVATHI 220 -
SCADA
flow not
available
- -
212 SRS Hubli 220 Nagajari 220 -
SCADA
flow not
available
- -
213 SRS Hubli 220 Bidnal 220 -
SCADA
flow not
available
- -
214 HASAN 220 ARASIKERE 220 50 52.4 2.4 4.6
215 B Bagewadi 220 IPP FF Greenko 220 0.8 0.8 0 0
216 Mughalkhod 220 Chikkodi 220 29.8 28.5 -1.3 -4.4
217 BAGALKOT 220 Gadag 220 149.6 157.4 7.8 5
218 Enercon (Harthi) 220 Gadag 220 -
SCADA
flow not
available
- -
219 Lingapur 220 Gadag 220 52.4 60 7.6 12.7
220 Kudachi 220 Ghataprabha 220 40.7 0 -40.7 100
221 Humnabad 220 Kapanoor 220 64.9 64 -0.9 -1.4
222 BAGALKOT 220 Gadag 220 -
SCADA
flow not
available
- -
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 180
# From Bus To Bus
ETAP
flows
in
MW
SCADA
flows in
MW
Difference
(MW)
Difference
(%)
223 Humnabad 220 Kapanoor 220 -
SCADA
flow not
available
- -
224 GOWRIBIDANUR 220 RVM 220 0.9 1 0.1 6
Comparison of Bus Voltages
Table 24: ETAP bus voltage comparison with SCADA snapshot
# Bus ID ETAP
voltage (kV)
SCADA voltage
(kV)
Difference
(kV)
Difference
(%)
1 Basthipura (Mysure) 400 385.8 385.8 0.0 0.0
2 BIDADI PGCIL 400 394.4 387.0 -7.4 -1.9
3 BTPS 400 401.8 397.3 -4.5 -1.1
4 Guddadahalli 400 403.4 390.0 -13.4 -3.4
5 GUTTUR 400 406.4 415.5 9.1 2.2
6 Hiryur PGCIL 400 400.7 413.7 13.0 3.1
7 HOODY 400 387.7 SCADA voltage not
available - -
8 JSW 400 402.4 416.3 13.9 3.3
9 Kaiga 400 409.1 418.3 9.2 2.2
10 KOLAR HVDC 400.0 403.0 3.0 0.7
11 KOLAR PGCIL 400 400.0 403.0 3.0 0.7
12 Kudgi New 400 405.0 SCADA voltage not
available - -
13 Kudgi New 765 400.0 SCADA voltage not
available - -
14 Narendra PGCIL 400 407.3 421.0 13.7 3.3
15 NELAMANGALA 400 386.6 384.6 -2.0 -0.5
16 Raichur New 400 403.8 405.5 1.7 0.4
17 RTPS 400 401.0 396.6 -4.4 -1.1
18 Shanthigrama (Hasan) 400 400.3 414.0 13.7 3.3
19 SMHLY PGCIL 400 400.0 403.3 3.3 0.8
20 TALAGUPPA 400 410.0 397.0 -13.0 -3.3
21 TUMKUR 400 400.0 401.8 1.8 0.4
22 UPCL 400 411.5 SCADA voltage not
available - -
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 181
Annexure III – Proposed Network
(Data considered in this study post March 31, 2017)
Details of Proposed Generation
Conventional generations
Table 25: Details of proposed conventional generations for FY 18 and FY 19
# Generation
name
Generation
type
No of
units
Unit
capacity
(MW)
Total capacity
(MW) Connected substation
FY 2017-18
1 Munirabad Mini hydro 1 10 10 Munirabad PH 110
FY 2018-19
1 Yelahanka CCGP Gas 1 370 370 Yelahanka 220kV
Karnataka’s Energy Mix: Computational Model for Energy Planning
182 www.cstep.in © CSTEP
Non conventional generations
Solar generation
Table 26: Details of proposed solar generations for FY 18 and FY 19
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
FY 2017-18
1 Ishwar Shivalingappa Matagar Hukkeri Hukkeri Belgaum 2 Hukkeri 110
2 Sharda Doddi Hamilapur Bidar Bidar 1 Habsikote 110
3 Iravva R Patil Kurugunda Bailhongal Belgaum 3 Kurkunta 110
4 Ramu G Kuderu Chamarajanag
ara
Chamarajan
agara 3 C r nagara 220
5 Pandu Ramappa Dasar Kulagod Gokak Belgaum 1 Davaleshwar 110
6 Bhaskar Rao Jonnikeri Aurad Bidar 3 Dongargaon 110
7 Kamala Bai Jonnikeri Aurad Bidar 3 Dongargaon 111
8 Babu G Kallur Madamgeri Savadatti Belgaum 3 Saundatti 220
9 H Kamalakshi Tambralli Bellary Bellary 1 Aakshaya
Colony 110
10 Pallavi S Hunasankodihalli Kanakapura Ramanagara 3 Kanakapura 220
11 Tulasiram Kampli Hospet Bellary 2 KAMPLI 110
12 Ramesh C Jigajinagi Bhoothanala Bijapur Bijapur 3 Bhutnal 110
13 Photon suryakiran Pvt Ltd (M/s. Today Green Power Pvt. Ltd.) Varavu Challakere Chitradurga 10 Thallak 220
14 Cheluvaraju Channamanagathihalli
kaval Challkere Chitradurga 1 Thallak 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 183
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
15 Mallikarjuna Gundappa jigada Alanda Kalburgi 1 ALLAND 110
16 S.Shashidar Gadhikere Hagaribomma
nahalli Bellary 2 Ittagi 220
17 Malati B Raddy Bannur Ramdurg Belgaum 1 Vajamangala 220
18 Marakka Channamanagathihalli
kaval Challkere Chitradurga 1 Thallak 220
19 G Mahseh Channamanagathihalli
kaval Challkere Chitradurga 3 Thallak 220
20 Rajamma Channammanagattana
halli kavalu Challkere Chitradurga 2 Thallak 220
21 Sreenidhi V Thalavatti Hiriyur Chitradurga 1 Hiryur 220
22 Devubai Anumanahalli Ramanagara Ramanagara 1 Bidadi 220
23 Bommappa Kenchikoppa Bin Marigowdappa (Amarthya
Rajshekarappa) Thuglalahalli Honnalli Davanagere 2 Honnali 220
24 AR Rekha Guttahalli Chintamani Chikkaballa
pura 1 Chintamani 220
25 HP Rajesh Gopalagondanahalli Jagaluru Davanagere 3 Thallak 220
26 Manjunath KT JG halli Hiriyur Chitradurga 2 Hiryur 220
27 Jayalakshmi JG halli Hiriyur Chitradurga 1 Hiryur 220
28 Ramachandra K Raju sulthanapura koppala Koppal 2 Koppal 110
29 D Ramlingaiha Mragronahalli KR pet Mandya 3 Chikamagalur
220
30 K Sharada Guttahalli Chintamani Chikkaballa
pura 1 Chintamani 220
31 Manjunath R Kabadi Kalasapura Gadag Gadag 1 Gadag 220
32 T Vijaykumar Kiragandhuru Mandya Mandya 1 Nagenahalli 110
33 KH Lakshmamma Hunasankodihalli Kanakapura Ramanagara 3 Kanakapura 220
34 Mohan Gowda H Adaappa Goudar Kurthakoti Gadag Gadag 2 Gadag 220
35 Ananda.R.Jigajinagi Arkere Bijapur Bijapur 3 Bhutnal 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
184 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
36 R Anantha kumar Doddasomanahalli KR pete Mandya 2 Chikamagalur
220
37 R Gayathri Haralalu Kanakapura Ramanagara 2 Kanakapura 220
38 Lakshmamma Ganganala tumkur Tumkur 1 ANSN HALLY
220
39 Kamali Bai Gaddethimanahalli Madhugiri Tumkur 3 Madhugiri 220
40 Gangaraju Gadhikere Hagaribomma
na halli Bellary 3 Ittagi 220
41 Krishna Naik Thumulu Madhugiri Tumkur 2 Madhugiri 220
42 Hanumant Fakirappa Waddar @ Pathrot Chikkanandi Belagavi Belgaum 1 Gokak 110
43 Smt. Shobha Shidramappa Waddar @ Pathrot Chikkanandi Gokak Belgaum 1 Gokak 110
44 R M Lakshmana kyathagiri pavagada Tumkur 3 Pavagada 220
45 RM Rama Kyathagiri Pavagada Tumkur 3 Pavagada 220
46 H.V.Chowdary chikkahalli pavagada
taluk Tumkur 3 Pavagada 220
47 Tapam Renewable Energy Pvt Ltd Sugatur Kolar Kolar 1 Kolar KP 220
48 Balasimha Rao Ramanadurga pavagada Tumkur 3 Pavagada 220
49 Renew Solar Power Pvt Ltd (Renew Wind Energy (MP four)
Pvt Ltd) Chincholi Chincholli Kalburgi 20 Kapnoor 110
50 Aditya Birla Solar Ltd Bellati Shrirahatti Gadag 20 Bellahatti 110
51 Aditya Birla Solar Ltd Katkol Ramdurg Belgaum 20 Katkol 110
52 Sukhbir Solar energy pvt ltd Haradanahalli Nagamangala Mandya 5 K R pet 220
53 Asian Fab Tech Ltd Alakapura &
Bommasandra
Gowribidanur
u
Chikkaballa
pura 20
Gowribidanur
220 kV
54 Wardha Solar (Maharashtra)Pvt Ltd SPV of Paramapujya Solar
Energy Pvt Ltd Nalwar Chittapur Kalburgi 40 Nalwar 110 kV
55 Wardha Solar (Maharashtra)Pvt Ltd SPV of Paramapujya Solar
Energy Pvt Ltd Kallur Yelburga Koppal 10 Yelburga 110 kV
56 Wardha Solar (Maharashtra)Pvt Ltd SPV of Paramapujya Solar
Energy Pvt Ltd Yatnal Vijayapura Vijayapura 10 Bhutnal 110 kV
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 185
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
57 Wardha Solar (Maharashtra)Pvt Ltd SPV of Paramapujya Solar
Energy Pvt Ltd Rajeshwar
Basavakalyan
a Bidar 50
Rajeshwar 110
kV
58 Solitaire Powertech Pvt Ltd SPV of Hindustan Cleanenergy
Limited Kanajanahalli Hiriyur Chitradurga 30 Pavagada 220 kV
59 SolarArise India Projects Pvt. Ltd SPV of Talettutayi Solar One
Projects Pvt. Ltd. Yelburga Yelburga Koppal 30 Yelburga 110 kV
60 Energon Soleq Ravi India Power Resources Pvt. Ltd. Guttigoli Ramadurga Belagavi 100 Ramadurga 110
kV
61 MBP Solar Pvt Ltd SPV of Patil Constructions &
Infrastructure Ltd Lingi Aurad Bidar 40
Santhapur 110
kV
62 Bosch Limited Industrial area, Bidadi
Hobli, Ramanagara Ramanagar 3.5 Bidadi 220 kV
63 Asian Fab Tech Ltd Near Yediyuru Nagamangala Mandya 15 Mayasandra 110
kV
64 BVH Hydel Pvt Ltd Shivaganga , thalya hobli, Holalkere Chitradurga 1 Chitradurga 220
kV
65 Esskay Power Kamadahalli, Koratagere Tumkur 1 Madhugiri 220
kV
66 Hero Solar Energy Pvt Ltd (Clean solar power (Tumkur) pvt
ltd) Marenadu
Chikkanayaka
nahalli Tumkur 20
Chikkanayakana
halli 110 kV
67 Clean Solar Power Pvt Ltd Thimmalapura &
Vitalapura Molakalmuru Chitradurga 20 Thallak 220 kV
68 Shivam solar pvt ltd KASABA HOBLI,
JAGALUR Jagalur Davanagere 5
Davanagere 220
kV
69 Sri Swarna Green Power Mavinahonda Raibagh Belagavi 4 Raibagh 110 kV
70 Embassy Energy Pvt Ltd Gudegudda Hangal Haveri 100 Guledagudda
110 kV
71 Renew Solar Power Pvt Ltd (Renew Wind Energy (Rajasthan
Four) Pvt Ltd) - Turuvekere Tumkur 20
Turuvekere 110
kV
72 Rishabh Buildwell Pvt Ltd Bennihalli Harapanahalli Davanagere 14 Kabbur 110 kV
73 Rays Power Expert Pvt Ltd (Mighty Avengers Solar Pvt Ltd) - Chikkabalapur
a
Chikkaballa
pura 10
Chintamani 220
kV
Karnataka’s Energy Mix: Computational Model for Energy Planning
186 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
74 Hero Solar Energy Pvt Ltd [Clean Solar power(tumkur) Pvt
Ltd] - Koratagere Tumkur 20
Madhugiri 220
kV
75 Hero Solar Energy Pvt Ltd [Clean Solar power(tumkur) Pvt
Ltd] Shettihalli
Chamrajanaga
ra
Chamarajan
agar 20
Chamarajanagar
220 kV
76 Clean MaxHarsh Solar LLP(SP) Tondihatti Madhugiri Tumkur 4.5 Madhugiri 220
kV
77 Alpha Devanahalli Propoerties Thavandi Hiriyur Chitradurga 20 Hiriyur 220 kV
78 Clean Max SonnaSolar LLP(SP Sonna Grama Hagari
Bommanahalli Bellary 48 Ittagi 220 kV
79 Hero Solar Energy Pvt Ltd [Clean Solar power(tumkur) Pvt
Ltd] -
Kollegala+Ha
nnur
Chamarajan
agar 20
Madhuvanahalli
220 kV
80 Hero Solar Energy Pvt Ltd [Clean Solar power(tumkur) Pvt
Ltd] - Gundlupet
Chamarajan
agar 20
Chamarajanagar
220 kV
81 Hero Solar Energy Pvt Ltd (Clean solar power (Tumkur) pvt
ltd) - Madhugiri Tumkur 20
Madhugiri 220
kV
82 Renew Solar Power Pvt Ltd (Renew Wind Energy
(Maharashtra) Pvt Ltd Saidapur Yadgiri Yadgir 20
Saidapur K 110
kV
83 Parampujya Solar Energy Pvt Ltd Satyampet Shorapur Yadgir 10 Shorapur 110 kV
84 Karvy Consultants Ltd [Shorapur solar power system ltd] Shorapur/kembhavi Shorapur Yadgir 10 Shorapur 110 kV
85 Hero Solar Energy Pvt Ltd [Clean Solar Energy Pvt Ltd] Wadgere Shahpur Yadgir 20 Wadgere 110 kV
86 Hero Solar Energy Pvt Ltd [Clean Solar Energy Pvt Ltd] Kolkera Chittapur Kalburgi 20 Chittapur 110 kV
87 Renew Solar Power Pvt Ltd [Bhumi prakash pvt ltd] - Devadurga Raichur 20 -
88 Hero Solar Energy Pvt Ltd [Clean Solar Energy Pvt Ltd] - Gangavati Koppal 20 Devadurga 110
kV
89 Essel Green Energy Pvt Ltd (KN Indi Vijaypura Solar Energy
Pvt Ltd) Rajanal/Kotnal Indi Vijayapura 20 Indi 220 kV
90 Marikal Solar Parks Pvt Ltd (Kodangal Solar Park Pvt Ltd) Nagavada Basavana
bagevadi Vijayapura 20
B Bagewadi 220
kV
91 Mytrah Energy Ltd Yenkanchi Sindagi Vijayapura 15 Mandewali 110
kV
92 Aditya Birla Nuvo Ltd Byrakur GSS Mulbagal Kolar 20 Kolar 220 kV
93 Essel Green Energy Pvt Ltd (KN Bijapura Solar Energy Pvt
Ltd) Kalkavatagi
Bijapura+Nag
atana Vijayapura 20
Takkalakki 110
kV
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 187
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
94 Marikal Solar Parks Pvt Ltd (Anantapur Solar Parks Pvt Ltd) Reddy Nagnur Naragund Gadag 20 Naragund 110
kV
95 Marikal Solar Parks Pvt Ltd [Tungabhadra Solar Parks Pvt Ltd] Umrani Chikkodi Belagavi 20 Chadchan 110
kV
96 Essel Green Energy Pvt Ltd [ KN Sindagi Solar Energy Pvt
Ltd] Kokatanoor Sindagi Vijayapura 5
Takkalakki 110
kV
97 OPG Power Generation Pvt Ltd [Aavanti Solar Energy Pvt Ltd] Kamanahalli Shiggaon Haveri 20 Shiggoa 110 kV
98 Essel Green Energy Pvt Ltd [KN Muddebihal solar energy pvt
ltd] Chelumi Muddebihal Vijayapura 20
Muddebihal 110
kV
99 OPG Power Generation Pvt Ltd [Mayfair renewable energy pvt
ltd] Nargel Ron Gadag 20 Nargel 110 kV
100 Mytrah Energy Ltd (Mytrah Advaith Power Pvt Ltd) Chittawadagi hunagund Bagalkot 15 Hunagunda 110
kV
101 Mytrah Energy Ltd (Mytrah Akshaya Energy Pvt Ltd) Mantur Raibagh Belagavi 15 Mantur 110 kV
102 Tata power solar system ltd (Chitrasthayee saurya Ltd) Ragunathpura Srinivasapura Kolar 20 Chintamani 220
kV
103 AMPL Cleantech Pvt Ltd (NVR renew pvt ltd) - Holalkere Chitradurga 20 Chitradurga 220
kV
104 Tata power solar system ltd (Chitrasthayee saurya Ltd) Manahalli bidar rural Bidar 10 Manekalli 110
kV
105 Tata power solar system ltd (Chitrasthayee saurya Ltd) Kanakagiri Gangavati Koppal 17 Kanakagiri 110
kV
106 Emmvee photovoltaic power pvt ltd (ES Solar Pvt ltd) - Bidar Bidar 10 Hasbikote 110
kV
107 Emmvee photovoltaic power pvt ltd [ES energy] - kunigal Tumkur 10 Anchepalya 220
kV
108 Emmvee photovoltaic power pvt ltd (ES Sun Power Pvt Ltd) - Bagepalli Chikkaballa
pura 20
Chintamani 220
kV
109 Swelect energy systems ltd Jiddigere kunigal Tumkur 10 Anchepalya 220
kV
110 Microsun solar tech pvt ltd [Megasun Solar Tech Pvt Ltd] - kanakagiri Koppal 3 Kanakagiri 110
kV
Karnataka’s Energy Mix: Computational Model for Energy Planning
188 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
111 Adani Green Energy Kadaramandalagi Byadagi Haveri 20 Bydagi 110 kV
112 Adani Green Energy Madapooradadodi Channapatann
a Ramanagar 20 T K Halli 220 kV
113 Krishi Technologies Pvt Ltd - Chikkabalapur
a
Chikkaballa
pura 10
Chintamani 220
kV
114 Growthstreet Consultants Pvt Ltd Benihalli Harapanahalli Davanagere 4 Neelagunda 220
kV
115 Asian Fab Tech Ltd Kavalahalli Doddaballapur
a
Bengaluru
rural 10
Chintamani 220
kV
116 Adani Green Energy Gopipura Gubbi Tumkur 20 Gubbi 110 kV
117 Adani Green Energy Alladahalli Holenarasipur
a Hassan 20 T K Halli 220 kV
118 Adani Green Energy Hipperga Jevargi Kalburgi 20 Jevargi 110 kV
119 Adani Green Energy Malguru K R Pet Mandya 20 KR pet 220 kV
120 Adani Green Energy Thirta Bandahatti Maaluru Kolar 20 Malur 220 kV
121 Adani Green Energy Gajjarguppe Magadi Ramanagar 20 Magadi 220 kV
122 Adani Green Energy Kallakere Periyapattana Mysore 20 Hasan 220 kV
123 Adani Green Energy Hosadodi Ramanagara Ramanagar 20 Kanakapura 220
kV
124 Adani Green Energy Vijayapura T Narasipura Mysore 20 Hasan 220 kV
125 OPG Power Generation Pvt Ltd (Aavanti Renewable energy pvt
ltd) Mathode Hosadurga Chitradurga 20 Yagati 110 kV
126 Adani Green Energy Thimmalapura Tipatturu Tumkur 20 Anthrasanahalli
220 kV
127 Mandi Durgappa Channammanagathihalli Challakere Chitradurga 1 Thallak 220 kV
128 Thimmannna Channammanagathihalli Challakere Chitradurga 1 Thallak 220 kV
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 189
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
129 M R C Chouhan Mussenalu Honnalli Davanagere 2 Honnali 110 kV
130 Jyothi Chouhan Mussenalu Honnalli Davanagere 2 Honnali 110 kV
131 C S Nanjundaiah shyasamaru Sira Tumkur 2 Hiriyur 220 kV
132 B.S. Anoop Kumar Channammanagathihalli Challakere Chitradurga 3 Thallak 220 kV
133 H.V Thimmaiah Vetakalluguda Hiriyur Chitradurga 3 Hiriyur 220 kV
134 A.S.Vyramudi Hireehalli Challkere Chitradurga 3 Thallak 220 kV
135 GRT Jewellers Pvt Ltd - Kanakapura Ramanagar 20 Kanakapura 220
kV
136 H.Ramanjaneya chikkahalli Pavagada Tumkur 3 Pavagada 220 kV
137 Murali M Baldev Venkatapura Pavagada Tumkur 3 Pavagada 220 kV
138 Siddalingamma kadapalagere Pavagada Tumkur 3 Pavagada 220 kV
139 Muniraj M kyathagiri Pavagada Tumkur 3 Pavagada 220 kV
140 Sri Gurugunda Bramheshwara Swamy Mutt Naduru Sira Tumkur 3 Hiriyur 220 kV
141 Y.Satyanarayanappa bheemanakunte Pavagada Tumkur 3 Pavagada 220 kV
142 Irappa Roopsing Naik Honaganahalli Babaleshwara Vijayapura 1 Bableshwar 110
kV
143 Ashok Bhima Dhotre Adiasanga Indi Vijayapura 1 Indi 220 kV
144 Renew Solar Power Pvt Ltd (Renew Wind Energy (Rajasthan
four) Pvt Ltd) - Honnalli Davanagere 20 Honnali 110 kV
145 Sunil Roopsingh Rathod Thidagundi Bijapur Vijayapura 1 Atharga 110 kV
146 Ravi Shivappa Padasalagi Kannur village Bijapur Vijayapura 1 Bijapur city 110
kV
147 Shakuntala Naik Araladinni Basavana
bagevadi Vijayapura 1
B Bagewadi 220
kV
148 ACME Kaithal Solar Power Private Limited SPV of ACME
Solar Holdings Pvt Ltd Chittaguppa Homnabad Bidar 40
Chittaguppa 110
kV
149 ACME Koppal Solar Energy Private Limited SPV of ACME
Solar Holdings Pvt Ltd Sagare Khanapur Belagavi 40 Bidi 110 kV
150 ACME Vijayapura Solar Energy Pvt Ltd SPV of ACME Solar
Holdings Pvt Ltd Neelamhalli Bhalki Bidar 40 Bhalki 110 kV
Karnataka’s Energy Mix: Computational Model for Energy Planning
190 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
151 ACME Babadham Solar Power Private Limited SPV of ACME
Solar Holdings Pvt Ltd Amravati Manvi Raichur 40 Manvi 110 kV
152 Clean Solar Power (Gulbarga) Pvt Limited SPV of Hero Solar
Energy Private Limited Kurdi Manvi Raichur 50 Manvi 110 kV
153 Clean Solar Power (Gulbarga) Pvt Limited SPV of Hero Solar
Energy Private Limited - Sindanooru Raichur 40
Sindhanur 110
kV
154 Clean Solar Power (Gulbarga) Pvt Limited SPV of Hero Solar
Energy Private Limited Santapura Aurad Bidar 40
Dangargoan 110
kV
155 OPG Power Generation Pvt Ltd (Brics Renewable Energy Pvt
ltd) Uchangidurga/Mellekatte Harapanahalli Davanagere 2
Neelagunda 220
kV
156 Clean Solar Power (Gulbarga) Pvt Limited SPV of Hero Solar
Energy Private Limited Margutti Kalaburgi Kalburgi 40 Margutti 110 kV
157 Clean Solar Power (Gulbarga) Pvt Limited SPV of Hero Solar
Energy Private Limited Bejjihalli Sira Tumkur 30 Hiriyur 220 kV
158 JKPetroenergy pvt Ltd SPV of JKPetroeenergy Betagera Koppal Koppal 10 Gokak 110 kV
159 Karanataka Power Corporation Limited, Bangalore Chandapur Shiggaon Haveri 10 Savanur 110 kV
160 Wardha Solar (Maharashtra)Pvt Ltd SPV of Paramapujya Solar
Energy Pvt Ltd Kallur Yelburga Koppal 40 Yelburga 110 kV
161 Wardha Solar (Maharashtra)Pvt Ltd SPV of Paramapujya Solar
Energy Pvt Ltd Hattiguduru Shahpur Yadgir 50 Shapur 220 kV
162 Wardha Solar (Maharashtra)Pvt Ltd SPV of Paramapujya Solar
Energy Pvt Ltd Madhuvanahalli Kollegala
Chamarajan
agar 50
Madhuvanahalli
220 kV
163 Wardha Solar (Maharashtra)Pvt Ltd SPV of Paramapujya Solar
Energy Pvt Ltd Maskal Aurad Bidar 50
Santhapur 110
kV
164 Wardha Solar (Maharashtra)Pvt Ltd SPV of Paramapujya Solar
Energy Pvt Ltd Madhuvanahalli Kollegala
Chamarajan
agar 50
Madhuvanahalli
220 kV
165 Wardha Solar (Maharashtra)Pvt Ltd SPV of Paramapujya Solar
Energy Pvt Ltd Yatnal Vijayapura Vijayapura 40 Bhutnal 110 kV
166 KSPDCL Tirumani, Pavagada Tumkur 1000 Pavagada PS 220
FY 2018-19
1 KSPDCL Tirumani, Pavagada Tumkur 1000 Pavagada PS 220
2 Amplus KN Solar Pvt Ltd Kurthakothi Gadag Gadag 170 Enercon (Harthi)
220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 191
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
3 Sagitaur Venture India Pvt Ltd Nayakanahatti Challkere Chitradurga 70 Thallak 220
4 Avaada Power Projects Pvt Ltd Karadihalli Molakalmuru Chitradurga 60 Jagalur 220
5 Avaada Power Projects Pvt Ltd Janakal Hosadurga Chitradurga 60 Hiryur PGCIL
220
6 Avaada Power Projects Pvt Ltd Ilkal Ilkal Bagalkot 60 Ilkal 110
7 Atria Solar Power (Chamrajnagar) Pvt Ltd Kyatanakere Indi Vijayapura 50 Atharga 110
8 Gamesa Renewable Pvt Ltd Kerkalamatti Badami Bagalkot 50 BAGALKOT
110
9 M/s Gamesa Renewable Pvt. Ltd Kirala Shahpur Yadgir 50 SHAHAPUR
110
10 Infosys Ltd Dyagerahalli Sira Tumkur 40 Hiryur PGCIL
220
11 Cleanmax Power Projects Pvt Ltd Minahalli Bellary Bellary 40 PD Halli 110
12 Atria Solar Power (Chamrajnagar)Pvt Ltd Kogalli & Kodalli Hagari
Bommanahalli Bellary 30 Ittagi 220
13 Atria Solar Power (Chamrajnagar)Pvt Ltd Halladpura Gundlupet Chamarajan
agar 30
C R NAGARA
66
14 Gamesa Renewable Pvt Ltd Bandalli Kollegala Chamarajan
agar 30
MADHUVANA
HALLY 220
15 Gamesa Renewable Pvt Ltd Holavanahalli Koratagere Tumkur 30 Madhugiri 220
16 Abhimaani Publications Ltd Upparahosahalli village,
Tekkalakote Siraguppa Bellary 24 Tekkalaki 110
17 Mysore Mercantile Co Ltd Vittalapura Molakalmuru Chitradurga 22 Halkundi 110
18 Renew Wind Energy (Budh 3) Pvt Ltd Nirna Homnabad Bidar 20 MANNA-E-
KHELLI 110
19 Renew Wind Energy (Budh 3) Pvt Ltd hikur Shahpur Yadgir 20 SHAHAPUR
110
20 Clean Solar power (Bellary) Pvt Ltd Karekallu Bellary Bellary 20 Janaki 110
21 Shri Keshav Cement & Infra Ltd Bisarahalli Yelburga Koppal 20 Koppal 110
22 M/s Gamesa Renewable Pvt. Ltd Thagaduru Nanjanagudu Mysore 20 Kadakola 66
23 M/s Gamesa Renewable Pvt. Ltd Thagaduru Nanjanagudu Mysore 20 Kadakola 66
Karnataka’s Energy Mix: Computational Model for Energy Planning
192 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
24 Gokak Power & Energy Ltd Gokak falls Gokak Belagavi 20 Gokak 110
25 Gamesa Wind turbines Pvt Ltd-Ittigi Near Sonna Hagari
Bommanahalli Bellary 15 Ittagi 220
26 KARLE Homes Pvt Ltd Gandihalli Sira Tumkur 15 Hiryur PGCIL
220
27 M/s Gamesa Renewable Pvt. Ltd Kadamgeri Shahpur Yadgir 15 WADAGERA
110
28 KCL Re Energy Pvt Ltd Kurubarahalli Mulbagal Kolar 10 KOLAR 66
29 Gamesa Wind turbines Pvt Ltd P D Kote (Parasurama
Devara Kote) Hiriyur Chitradurga 10
Hiryur PGCIL
220
30 Gamesa Wind turbines Pvt Ltd Near Venkatapura Pavagada Tumkur 10 Pavagada 220
31 Global Tech Park Pvt Ltd Hosakote Sira Tumkur 10 Pavagada 66
32 Velstand Solar Pvt Ltd Bankapur Gangavati Koppal 10 KANAKAGIRI
110
33 Helios Fusion Energy Pvt Ltd Mudatanur Siraguppa Bellary 10 KURUGODU
110
34 Genial Energy House Pvt Ltd Dadesgur Sindanooru Raichur 10 DADESUGUR
110
35 Prabhuraj Solar Energy Pvt Ltd Gandal Yelburga Koppal 10 GANADHAL
110
36 East Man International - Yelburga Koppal 10 YELBURGA
110
37 Sri Adithya Green Power Pvt Ltd Kukanpalli Koppal Koppal 10 Guddadahalli
220
38 VIP Infrabuild Projects Pvt lTd Allavandi Koppal Koppal 10 Koppal 110
39 Basava Renewable Energy Pvt Ltd Talakal Yelburga Koppal 10 Uppin Betagere
110
40 Matrix Green Energy Private Limited Konkala Wadegere Yadgir 8.5 CORE GREEN
Sugar 110
41 Refex energy Thimmala Naikana Betta Pavagada Tumkur 7 Pavagada 66
42 Matrix Green Energy Private Limited Valkamdinni, Sindanooru Raichur 6.5 WALKAMDIN
NI 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 193
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
43 Bharti Airtel Limited Kammaravaripalli Bagepalli Chikkaballa
pura 6
MITTERMARI
66
44 Banashankari Energy Pvt Ltd - Yelburga Koppal 6 YELBURGA
110
45 Memisis Solar Energy Private Ltd Pallavalli, nagalmadike
hobli, Pavagada Tumkur 5 Pavagada 66
46 Pragathi Group Hiremallanahole Jagalur Davanagere 5 Thallak 220
47 ReNew Saur Vidut Pvt Ltd Bidadi Ramanagara Ramanagar 3.2 Bidadi 66
48 Supakhalanas Sour Vidyuth Pvt Ltd., Sugutur kolar Kolar 3 KOLAR 66
49 Pristine Solar Park Pvt Ltd Oolvadi , kasaba hobli Chintamani Chikkaballa
pura 3 Chintamani 66
50 Fortune Cotton & Agro Industries Devasamudra Molakalmuru Chitradurga 2 Halkundi 110
51 TVS Motor Company Ltd Byatha Nanjanagudu Mysore 1.5 Kadakola 66
52 B. Lingaraju * Muganakoppalu Malavalli Mandya 1 SIVASAMUDR
AM 66
53 Vahini Irrigation Pvt Ltd Honnudike Tumkur Tumkur 1 DOBSPET 66
54 Kalaskar Infrastructures Dongeragaon Kalaburgi Kalburgi 1 MARGUTTI
Cross 110
55 Dasappa Y Huchbasavanahalli Tumkur Tumkur 1 ANSN HALLY
66
56 Subash Maruti Patankar Kokatanoor Athani Belagavi 1 Yallammanawadi
110
57 Reitz India Pvt Ltd - Sira Tumkur 15 Madhugiri 220
58 Sun Veda - Koratagere Tumkur 2 Madhugiri 220
59 Embassy Services Pvt Ltd - Madhugiri Tumkur 100 TUMKUR (New
Madhugiri)220
60 Golden Hatcheries Huyildore Sira Tumkur 20 Thimmanahalli
110
61 Shree Jai Santhoshimatha Solar Plant Mudlamachikere ,Kasaba
Hobli, Jagalur Davanagere 1.5 Jagalur 220
62 Sathya Deeptha Pharmaceuticals ltd Chittaguppa Homnabad Bidar 5 Humnabad 110
63 Hutti Gold Mines ltd M.Kota Lingasugur Raichur 14 Lingasugur 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
194 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected
substation
64 VSAA Energy Pvt Ltd Davanadahosa Halli Chikkanayaka
nahalli Tumkur 50 Halukurke 110
Wind generation
Table 27: Details of proposed wind generations for FY 18 and FY 19
# Developer Village Taluk District
Installed
capacity
in MW
Connected substation
FY 2017-18
1 Fortune Five Hydel Projects (P) Limited Ingeshwara Basavanababewadi Bijapur 80 B Bagewadi 220
2 GM Navara Wind Energy Private Limited Babaleshwara Bijapur Bijapur 100 GM NAVARA 220
3 GM Navara Wind Energy Private Limited Babaleshwara Bijapur Bijapur 100 GM NAVARA 220
4 Vish Wind Infrastructure LLP Jogihalli Davangere/Bellary Davangere/Bellary 150 Guttur Vishwind 220
5 Vish Wind Infrastructure LLP Jogihalli Davangere/Bellary Davangere/Bellary 150 Guttur Vishwind 220
6 Bhoruka Power Corporation Limited Yelisurur Gadag Gadag 58.2 Mundargi 110
7 Green Infra Wind Energy Solutions Limited Harpanahalli Davangere Davangere 36 Davanagere 220
8 Green Infra Wind Energy Solutions Limited Harpanahalli Davangere Davangere 48 Davanagere 220
9 Bharat Earth Movers Limited Mattikod Koppal/bagalkot Koppal/bagalkot 18 Kustagi 110
10 Tejashri developers Private Limited Belthadi Gadag gadag 40 Bellahatti 110
FY 2018-19
1 Vyshali Energy Private Limited Kumatagi - Bijapur 100 Bus_WI_Kumatagi 220
2 Devarahipparagi Wind Power Private Limited Devarahipparagi - Bijapur 100 Bus_WI_Kumatagi 220
3 Four EF wind power private limited Jogimatti - Chitradurga 19.95 Chitradurga 220
4 Fortune five minral exports private limited Rajur and Vadegol - Gadag 99 Kustagi 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 195
Mini hydro generation
Table 28: Details of proposed mini hydro generations for FY 18 and FY 19
# Developer Village Taluk District
Installed
capacity
in MW
Connected substation
FY 2017-18
1 MALLAPURA - - - 9 MALLPURA 110
2
1. International Power Corporation Private Limited, (Formerly 2. M/s.
Prasanna Power Private Limited (Formerly 1 M/s. Prasanna Power Ltd)
2. Dishaa Power Corporation Ltd
3. Mount Kailash Power Projects Pvt. Ltd. - - - 21.3 AMR RITWK 110
3
1. Moodabagil Power company
2. Vasgi power - - - 1.15 Honnali 220
4
1. Sandur Manganese & Iron Ores Ltd.
2. Flax Hydro Energy Pvt. Ltd.
3. Sai Nireeha Power Pvt. Ltd. - - Udupi 22.5 HASAN 220
5 AMBUTHIRTHA - - Shimoga 22 Jog 110
6 AMR + RITHWIK+Perla - - - 58 AMR RITWK 110
7 ATRIA - - - 24 T K Halli 220
8 ATRIA - - - 16 TUBINAKERE 220
9 ATRIA HYDEL - - Mandya 6.6 T K Halli 220
10 Bhavana Hydro Electric Private Limited - - Yadgir 2 Shahapur 220
11 BHORUKA - - Koppal 18 BPCL M 110
12 BHORUKA POWER
- - Yadgir 24
BPCL (CHAYADEVI PH)
110
13 Bonal Hydro Electric company - - Gulbarga 1.25 SHORAPUR 110
14 BPCL - - - 7.6
15 BPCL
- -
Dakshina
Kannada 9 Guruvanakere 110
16 BPCL - - - 12 MADHUVANAHALLY 220
17 BPCL - - Mysore 3 VAJAMANGALA 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
196 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected substation
18 BPCL(Amoga Power) - - Hassan 1.5 KADAVINAKOTE 66
19 BPCL(Mandagere) - - Mandya 3.5 K R PET 66
20 Brindavan - - Shimoga 24 Gajanur 110
21
Brindavan Hydro Power Pvt. Ltd (Formerly Dandeli Steel & Ferro Alloys
Ltd.) - - - 1.5 Shimoga 110
22 CAVERY HYDRO - - Mandya 3 T K Halli 220
23 Energy Development Co. Ltd. - - Kodagu 6 C R PATNA 220
24
Gokak Power and Energy Limited (Formerly Gokak Textiles Ltd. (Gokak
Mills Division) - - Belgaum 0 Konnur 110
25
Gokak Power and Energy Limited (Formerly Gokak Textiles Ltd. (Gokak
Mills Division) - - Belgaum 0 Konnur 110
26
Gokak Power and Energy Limited (Formerly Gokak Textiles Ltd. (Gokak
Mills Division) - - Belgaum 4.5 Konnur 110
27 GRAPHITE - - Mandya 1.5 TUBINAKERE 220
28 GRAPHITE INDIA - - Mysore 18 KUSHALNAGARA 220
29 GVP Infra Projects Private Limited - - Udupi 15 Hiriyadaka 110
30 KALMALA
- - Raichur 0.4 Raichur 110
31 KARE POWER - - Raichur 24.7 Lingasugur 110
32 KEMPHOLE - - Hassan 18 HASAN 220
33 Khandaleru Power Pvt Ltd, (NCL Energy Ltd) - - Bellary 1.4 SANKALAPUR 110
34 KIRALA POWER - - Mandya 2 T K Halli 220
35 Kodagu Hydel - - Kodagu 3 KUSHALNAGARA 220
36 KPCL - - Mandya 17.2 T K Halli 220
37 KRISHNA HYDRO - - Yadgir 24.75 GURGUNTA 110
38 KRISHNA RIGHT BANK(SOMANAMARDI) - - Raichur 12 HATTI 110
39 LAXMI JALA VIDYUT - - Yadgir 24.75 GURGUNTA 110
40 LIMBAVALI - - Mandya 12 T K Halli 220
41 Lk power - - Mandya 2 TUBINAKERE 220
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 197
# Developer Village Taluk District
Installed
capacity
in MW
Connected substation
42 M/S CHEL Cauvery Hydro Energy Ltd(KAVERI) - - Mandya 4.5 K R PET 66
43 M/s Devar Power Ltd - - Udupi 3.8 Hiriyadaka 110
44 M/s Jasfer - - Bijapur 10.5 AFZALPUR 110
45 MARUTHI POWER - - Hassan 3 HASAN 220
46 MARUTHI POWER(Kabini) - - Mysore 5 Katkol 110
47 MASTER POWER(KALSON) - - Mysore 3 Katkol 110
48 MRUJJA MINI HYDEL - - Shimoga 0.75 Honnali 220
49 Murudeshwara Power Corporation Ltd., MPCL - - Bijapur 11.6 Muddebihal 110
50 Mysore Merchantile - - Hassan 3 HASAN 220
51 Nagarjuna Hydro - - Hassan 25.5 HASAN 220
52 Paschim Hydro Energy Pvt. Ltd. - - Hassan 9 HASAN 220
53 PIONEER GENCO
- - Mandya 24.75 T K Halli 220
54 PIONEER POWER
- -
Chamaraj
anagar 24.75 T K Halli 220
55 Pusala Power Projects Pvt. Ltd. - - Bellary 6 SIRAGUPPA 110
56 Rising Sun Power (P) Ltd.
- -
Ramanag
ar 2 Bidadi 220
57 SAGAR Dondole
- -
Dakshina
Kannada 13 Guruvanakere 110
58 SAGAR Neerukatte
- -
Dakshina
Kannada 15 Guruvanakere 110
59 Sai Spurthi Power Pvt. Ltd.,
- -
Ramanag
ar 10.25 Kanakapura 220
60 SANDUR - - - 37.5 Hosangadi 110
61 Sandur Manganese & Iron Ores Ltd. - - Hassan 8 HASAN 220
62 Saroj Energy Company Pvt. Ltd.
- -
Ramanag
ar 1.5 T K Halli 66
63 Sarovar Energy Pvt. Ltd. - - Raichur 1 DEODURGA 110
64 SHAMILLI - - Udupi 12 Hosangadi 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
198 www.cstep.in © CSTEP
# Developer Village Taluk District
Installed
capacity
in MW
Connected substation
65 SLS Power Industries Ltd - - Bellary 10 MUNIRABAD PH 110
66 SLS Power Industries Ltd.
- -
Chamaraj
anagar 6.25 MADHUVANAHALLY 220
67 Soham Renewable Energy India Pvt. Ltd.
- - Mandya 6 TUBINAKERE 220
68 SOHAM-MANNAPITLU
- -
Dakshina
Kannada 15 Soham Power
69 SRM (KALASA)
- -
Chikkam
agalore 6 CHIKAMAGALUR 220
70 SRS Energy Pvt. Ltd. - - Yadgir 10 SHAHAPUR 110
71 SUBHAS KABINI PCL - - Mysore 20 Katkol 110
72 Sugnaneshwara Hydel Power Pvt. Ltd., - - Yadgir 13.5 Khanapur MK 110
73
Trinetra
- -
Dakshina
Kannada 4.5 Guruvanakere 110
74 TRISHUL POWER - - Mandya 4 K R PET 66
75 Tungabhadra Power Co. Pvt. Ltd. - - Bellary 18 MUNIRABAD PH 110
76 TUNGABHADRA STEEL - - Belgaum 2.4 Saundatti 110
77 VENIKA GREEN POWER - - Mandya 0.75 TUBINAKERE 220
78 VIJAYALAKSHMI - - Mandya 1.75 T K Halli 220
79 YUKEN INDIA - - Mandya 0.35 TUBINAKERE 220
FY 2018-19
NIL
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 199
Co-generation
Table 29: Details of proposed Co-generations for FY 18 and FY 19
# Developer Installed capacity in MW Connected substation
FY 2017-18
1 Athani farmers 24 Ainapur 110
2 KPR 30 Almel 110
3 SHIVASHAKTHI SUGARS 30.00 Ankali 110
4 RENUKA SUGARS 30 Athani_2 110
5 RENUKA SUGARS 37.20 Athani_2 110
6 KRISHNA SUGARS KSSKN 12 Athani_2 110
7 M/s Shri Sai Priya Sugars Ltd 50 Athani_2 110
8 M/s Belgaum Sugars 13 Belgaum 110
9 MAHATMA GANDHI SSK 13.00 BHALKI 110
10 Indian Sugars 19.5 Chadchan 110
11 DOODGANGA SUGARS 24.00 Chikkodi 110
12 SHAMNUR SUGARS 22 Davanagere 220
13 Davangere Sugars 24 Davanagere 220
14 BILAGI SUGARS 8.00 Giri sagar 110
15 KOLVI SUGARS (Gokak SC & ST Sahakari Sakkare Karkhane
Niyamita) 14.00 Gokak 110
16 GODAVARI SUGARS 44.00 Mahalingapura 110
17 PARRYS SUGAR(GMR) 24 Halyal 110
18 VISHWANATH SUGARS 14.00 Hukkeri 110
19 SATISH SUGARS 31.00 Hunsihal 110
20 NSSK 14.00 JANAWAD 110
21 South India Paper Mills Ltd. 7.8 Kadakola 220
22 BANNARI AMMAN SUGARS 36.00 Kadakola 220
23 GEM SUGARS 16.50 Katharki 110
24 UGAR SUGARS 15.00 KEMBHAVI 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
200 www.cstep.in © CSTEP
# Developer Installed capacity in MW Connected substation
25 CORAMANDEL SUGARS 12 K R PET 220
26 RYTARA SAHAKARI SAKKERE 12.50 Lokapur 110
27 BANNARI AMMAN SUGARS 20.00 MADHUVANAHALLY 220
28 NSL SUGARS 34.00 MADYAL 110
29 Sowbhagyalakshmi Sugars 18 Mamadapura 110
30 Shri Balaji Sugars & Chemicals Pvt.Ltd 17.00 Muddebihal 110
31 VIJAYANAGAR SUGAR 35.50 Mundargi 110
32 K Sugars 18 Neerbudihal 110
33 NIRANI 40.00 Manthur 110
34 Prabhulingeshwara 38.45 Jamakhandi 110
35 GMR SUGARS 1.00 Ramdurga 110
36 SADASHIVA SUGARS 16.00 Rampur 110
37 Basaveshwara Sugars 10 Saundatti 110
38 RENUKA SUGARS 38 Saundatti 110
39 RENUKA SUGARS(HAVALGA) 25.00 Ghattarga 110
40 VENKATESHWARA 15.00 Sadalga 110
41 HIRA SUGARS(KIRLOSKAR) 46.25 Sankeshwar 110
42 NANDI SAHAKARI 21.00 Shirbur 110
43 Manali Sugar Ltd. 15.00 Malghana (Sindagi Tq) 110
44 NSL SUGARS 28.00 SIRAGUPPA 110
45 CHAMUNDESHWARI SUGARS 26.00 T K Halli 220
46 JAMAKANDI SUGARS 29.80 Todalbagi 110
47 SCM SUGARS(NSL) 26.00 TUBINAKERE 220
48 Shiraguppi Sugars Works Pvt. Ltd. 6.00 UGAR 110
49 Shiraguppi Sugar Works Ltd. 14.00 UGAR 110
50 UGAR SUGARS(Chikkodi) 44.00 UGAR 110
51 INDIAN CANE POWER 28.00 Uttur 110
52 CORE Green sugars 24.00 WADAGERA 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 201
# Developer Installed capacity in MW Connected substation
53 Shivasagar Sugar & Agro Products Ltd 18 Rampur 110
FY 2018-19
1 Athani farmers 24 Ainapur 110
2 BANNARI AMMAN SUGARS 36 Kadakola 220
3 BANNARI AMMAN SUGARS 20 MADHUVANAHALLY 220
4 Basaveshwara Sugars 20 Saundatti 110
5 BILAGI SUGARS 14 Giri sagar 110
6 CHAMUNDESHWARI SUGARS 26 T K Halli 220
7 CORAMANDEL SUGARS 30 K R PET 220
8 CORE Green sugars 24 WADAGERA 110
9 Davangere Sugars 24 Davanagere 220
10 DOODGANGA SUGARS 24 Chikkodi 110
11 GEM SUGARS 22.5 Katharki 110
12 GMR SUGARS 1 Ramdurga 110
13 GODAVARI SUGARS 62 Mahalingapura 110
14 HIRA SUGARS(KIRLOSKAR) 46 Sankeshwar 110
15 INDIAN CANE POWER 28 Uttur 110
16 Indian Sugars 19.5 Chadchan 110
17 JAMAKANDI SUGARS 57.3 Todalbagi 110
18 K Sugars 15 Neerbudihal 110
19 KOLVI SUGARS (Gokak SC & ST Sahakari Sakkare Karkhane
Niyamita) 14 Gokak 110
20 KPR 30 Almel 110
21 KRISHNA SUGARS KSSKN 12 Athani_2 110
22 M/s Belgaum Sugars 14 Belgaum 110
23 M/s Shri Sai Priya Sugars Ltd 50 Athani_2 110
24 MAHATMA GANDHI SSK 13 BHALKI 110
25 Manali Sugar Ltd. 15 Malghana (Sindagi Tq) 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
202 www.cstep.in © CSTEP
# Developer Installed capacity in MW Connected substation
26 NANDI SAHAKARI 21 Shirbur 110
27 NIRANI 72 Manthur 110
28 NSL SUGARS 34 MADYAL 110
29 NSL SUGARS 28 SIRAGUPPA 110
30 NSSK 14 JANAWAD 110
31 PARRYS SUGAR(GMR) 22 Halyal 110
32 Prabhulingeshwara 55.5 Jamakhandi 110
33 RENUKA SUGARS 30 Athani_2 110
34 RENUKA SUGARS 37.5 Athani_2 110
35 RENUKA SUGARS 38 Saundatti 110
36 RENUKA SUGARS(HAVALGA) 25 Ghattarga 110
37 RYTARA SAHAKARI SAKKERE 12.5 Lokapur 110
38 SADASHIVA SUGARS 16 Rampur 110
39 SATISH SUGARS 34 Hunsihal 110
40 SCM SUGARS(NSL) 40 TUBINAKERE 220
41 SHAMNUR SUGARS 22 Davanagere 220
42 Shiraguppi Sugar Works Ltd. 20.4 UGAR 110
43 Shiraguppi Sugars Works Pvt. Ltd. 6 UGAR 110
44 Shivasagar Sugar & Agro Products Ltd 18 Rampur 110
45 SHIVASHAKTHI SUGARS 35 Ankali 110
46 Shri Balaji Sugars & Chemicals Pvt.Ltd 18 Muddebihal 110
47 South India Paper Mills Ltd. 7.8 Kadakola 220
48 Sowbhagyalakshmi Sugars 18 Mamadapura 110
49 UGAR SUGARS 15 KEMBHAVI 110
50 UGAR SUGARS(Chikkodi) 44 UGAR 110
51 VENKATESHWARA 30 Sadalga 110
52 VIJAYANAGAR SUGAR 35.5 Mundargi 110
53 VISHWANATH SUGARS 14 Hukkeri 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 203
# Developer Installed capacity in MW Connected substation
54 Parrys Sugar Industries Ltd. 31.5 Halyal 110
55 Shivashakthi Sugars Ltd. 15 Saundatti 220
56 Bhalakeshwar Sugars Ltd 14 BHALKI 110
57 Bidar Kissan Shakkar Karkhane Ltd 15 MANNA-E-KHELLI 110
58 Bilagi Sugar Mill Ltd. 16 Giri sagar 110
59 GM Sugars & Energy Limited 18 Haveri 110
60 Indian Cane Power Ltd. 55 Uttur 110
61 Shree Halasidhnath Sahakari Sakhar Kharkhana Ltd 15 Nippani 110
62 Shri Bhimashankar Shakari Sakkare Karkhane Niyamita 14 Zhalki 110
63 Soveregin Industries Limited 20 Terdal 110
64 Chamundeshwari Sugars Ltd. 18 C R PATNA 220
65 Chincholi Sugars & Bio
Industries Ltd. 26 CHINCHOLI 110
66 Koujalagi Sugars Ltd. 25 Gokak 110
67 Markandeya Co-Operative
Sugar Mill Pvt. Ltd. 14 Belgaum 110
68 Sangam Sahakari Sakkare
Karkhane Niyamita 14 H Hidakal 110
69 Sharada Sugars Pvt. Ltd. 12 Aski 110
70 Shree Renuka Sugars Ltd. 30 Ankali 110
Biomass generation
Table 30: Details of proposed biomass generations for FY 18 and FY 19
# Developer Installed capacity in MW Connected substation
FY 2017-18
1 Bhagyanagar Solvents & Extractions Pvt. Ltd. 6 Shaktinagar 110
2 Dharwad Bio Energy Pvt. Ltd. 10 PH Comp 110
Karnataka’s Energy Mix: Computational Model for Energy Planning
204 www.cstep.in © CSTEP
# Developer Installed capacity in MW Connected substation
3 FALCON TYRES 6 Hootagalli 220
4 Gujarat Ambuja Exports Ltd 2.85 Mundagod 110
5 Gujarat Ambuja Exports Ltd (Biomass based Cogen) 2.44 SAVANUR 110
6 Hassan Biomass Power Co. Pvt. Ltd. 8 HASAN 220
7 Haveri Bio Energy Pvt. Ltd. 10 Tiluvalli 110
8 INDRA POWER 6 GANGAVATHI 110
9 KOGANTI 7.5 KOGANTI 110
10 KONARK 6 ANSN HALLY 220
11 KOPPAL GREEN POWER 6 KARATAGI 110
12 MALAVALLI 4.5 VAJAMANGALA 220
13 Manchukonda Bio energy Pvt. Ltd 6 Raichur 220
14 Matrix Agro Pvt Ltd 6 CHINCHOLI 110
15 POWER ONICS 6 SIRAGUPPA 110
16 Raichur Bio Energies Pvt. Ltd. 9 Raichur 220
17 RAVI KIRAN 7.5 GANGAVATHI 110
18 RK POWER 20 Hiryur 220
19 SAMSON DISTILLERIES 2 Davanagere 220
2108-19
NIL
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 205
Details of Proposed KPTCL Network Augmentations
Details of proposed KPTCL substation for FY 2017-18
Table 31: Details of proposed KPTCL substations for FY 18
Sl.No Substation name Zone District Taluk N/U
Voltage
level
(kV)
no of untis
Transformer
capacity
(MVA)
Total capacity (MVA)
Bagalkote Zone
1 Doni Bagalkote Gadag Mundaragi N 400/220 2 500 1000
2 Devaragennur Bagalkote Vijayapura Vijayapura N 110/11 2 10 20
3 Halaki Bagalkote Bagalkote Mudhol N 110/11 1 10 10
4 Hiremasali Bagalkote Bijapur Indi N 110/11 1 10 10
5 Khadakalat Bagalkote Belgaum Chikkodi N 110/11 2 10 20
6 Morab Bagalkote Belgaum Raibag N 110/11 2 10 20
7 Tolamatti (Anagawadi) Bagalkote Bagalkote Bilagi N 110/11 1 10 10
Karnataka’s Energy Mix: Computational Model for Energy Planning
206 www.cstep.in © CSTEP
Sl.No Substation name Zone District Taluk N/U
Voltage
level
(kV)
no of untis
Transformer
capacity
(MVA)
Total capacity (MVA)
Bengaluru Zone
1 Jigani Bengaluru Bengaluru urban Anekal N 220/66/11 2 150 300
2 Kothipura (Ramanagara) Bengaluru Ramanagara Ramanagara N 220/66 2 100 200
3 Mittemari Bengaluru Chikkaballapura Bagepalli N 220/66/11 2 100 200
4 Magadi Bengaluru Ramanagara Magadi N 220/66 2 100 200
Hassan Zone
1 Belagumba Hassan Hassan Arasikere N 110/11 2 10 20
2 Karkala Hassan Udupi Karkala N 110/11 2 10 20
3 Hosanagara Hassan Shivamogga Hosanagara U 110/11 2 10 20
Gulbarga Zone
1 Ghattarga Gulbarga Gulbarga Afzalpur N 110/11 2 10 20
2 Mallat (Manvi) Gulbarga Raichur Manvi N 220/110 2 100 200
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 207
Sl.No Substation name Zone District Taluk N/U
Voltage
level
(kV)
no of untis
Transformer
capacity
(MVA)
Total capacity (MVA)
3 Muddapura Gulbarga Raichur Sindhanur N 110/11 1 10 10
4 Yeragera Gulbarga Raichur Raichur N 110/11 2 10 20
Mysore Zone
NIL
Tumkur Zone
1 Pavagada Tumkur Tumkur Pavagada N 220/66 2 100 200
Details of proposed KPTCL substation for FY 2018-19
Table 32: Details of proposed KPTCL substations for FY 19
Sl.No Substation name Zone District Taluk N/U
Voltage
level
(kV)
no of untis
Transformer
capacity
(MVA)
Total capacity (MVA)
Bagalkote Zone
1 Hebballi Bagalkote Bagalkote Badami N 110/11 1 10 10
2 Talikote Bagalkote Bijapur Muddebihal U 110/11 2 10 20
3 Khedagi cross
(Rodagi) Bagalkote Bijapur Indi N 110/11 1 10 10
4 Garag (Shedabal) Bagalkote Dharwad Dharwad N 110/11 2 10 20
5 Belavanaki Bagalkote Gadag Ron N 110/11 1 10 10
Karnataka’s Energy Mix: Computational Model for Energy Planning
208 www.cstep.in © CSTEP
Sl.No Substation name Zone District Taluk N/U
Voltage
level
(kV)
no of untis
Transformer
capacity
(MVA)
Total capacity (MVA)
Bengaluru Zone
1 T.Gollahalli
(Thimmasandra) Bengaluru Kolar Bangarpet U 220/66/11 2 100 200
2 Koramangala Bengaluru Bengaluru urban Bengaluru south N 220/66/11 2 150 300
3 ITI Bengaluru Bengaluru urban Bengaluru east N 220/66 2 150 300
Gulbarga Zone
1 Ramasamudra Gulbarga Yadgir Yadgir N 220/110 2 100 200
2 Yaapaldinni Gulbarga Raichur Raichur U 110/11 2 10 20
3 Yeradona Gulbarga Koppal Gangavathi N 110/11 1 10 10
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 209
Sl.No Substation name Zone District Taluk N/U
Voltage
level
(kV)
no of untis
Transformer
capacity
(MVA)
Total capacity (MVA)
4 Thavaragera Gulbarga Koppal Kustagi U
110/33 1 20 20
110/11 1 10 10
5 Bennur Gulbarga Koppal Gangavathi N 110/11 1 10 10
Hassan Zone
1 Mulki Hassan Dakshina
kannada Mangalore U 110/11 1 10 10
2 Madavu Hassan Dakshina
kannada Puttur N
110/33 2 20 40
110/11 1 10 10
Mysore Zone
NIL
TumkurZone
1 Benkikere (Channagiri) Tumkur Davanagere Channagiri N 220/66 2 100 200
Details of proposed KPTCL transmission lines for FY 2017-18
Table 33: Details of proposed KPTCL transmission lines for FY 18
Voltage level
(kV) From SS To SS No of circuits
Line route
length (km)
LILO route
length (km) Conductor type
Bagalkote Zone
400 Doni Guddadahalli 1 56 26.798
Twin Moose ACSR
400 Doni Guttur 1 118 Twin Moose ACSR
220 Doni Gadag 2 22.77, 20.22
2.775
Drake
220 Doni Lingapur 1 79.77 Drake
220 Doni Lingapur Tap-1 1 77.77 Drake
110 Devaragennur Shirabur Tap-1 1 3 - Lynx
Karnataka’s Energy Mix: Computational Model for Energy Planning
210 www.cstep.in © CSTEP
Voltage level
(kV) From SS To SS No of circuits
Line route
length (km)
LILO route
length (km) Conductor type
110 Shirabur Shirabur Tap-1 1 11.9 Lynx
110 Mamadapura Shirabur Tap-1 1 5 Lynx
110 Halaki Jambagi K.D 1 13.5 - Lynx
110 Hiremasali Indi Tap-1 1 8
-
Lynx
110 Indi Indi Tap-1 1 15 Lynx
110 Devarahipparagi Indi Tap-1 1 28 Lynx
110 Khadakalat Chikkodi 1 13 5
Lynx
110 Khadakalat Nippani 1 15 Lynx
110 Morab 220kV Kudachi 1 8.5 - Lynx
110 Tolamatti (Anagawadi) Tolamatti Tap-1 1 8.5
-
Lynx
110 Shiraguppi Tolamatti Tap-1 1 8.5 Lynx
110 Bilagi Tolamatti Tap-1 1 7.5 Lynx
Bengaluru Zone
220 Jigani Somanahalli 1 45 -
Drake
220 Jigani Yerandanahalli 1 10 Drake
220 Kothipura (Ramanagara) Bidadi 2 18.12 - Drake
220 Mittemari Gowribidnur 2 45.5 - Drake
220 Magadi Bidadi 2 32
-
Drake
220 Magadi Anchepalya 1 45 Drake
220 Magadi Nelamangla 1 40 Drake
Hassan Zone
110 Belagumba Kadur Tap 6 1 0.15
-
Lynx
110 Arasikere Kadur Tap 6 1 0.1 Lynx
110 Kadur Tap 7 Kadur Tap 6 1 9 Lynx
110 Kadur Tap 5 Kadur Tap 6 1 0.9 Lynx
110 Karkala Kemar 1 1.1 1.1
Moose
110 Karkala Hiriyadka 1 20 Moose
110 Hosanagara Ripponpet 1 30 - Lynx
Gulbarga Zone
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 211
Voltage level
(kV) From SS To SS No of circuits
Line route
length (km)
LILO route
length (km) Conductor type
400 Yermarus TPS Bellary PS 2 142.5 - Quad moose
400 JSW TPS Bellary PS 2 10 - Quad moose
220 Mallat Mallat Tap_1 1 2.14 - Drake
220 Lingasugur Mallat Tap_1 1 39.6 - Drake
220 RTPS Mallat Tap_1 1 46 - Drake
110 Ghattarga Renuka sugars D 1 2 - Lynx
110 Mallat Sirwar 1 15 Lynx
110 Muddapura Sindhanur 1 19.64 -
Lynx
110 Muddapura Maski 1 10 Lynx
110 Yeragera Muliyabad 1 20 - Lynx
Mysore Zone
NIL
Tumkur Zone
220 Pavagada Madhugiri 2 60 - Drake
220 Vasanthanarasapura Antharasanahally 2 18.5 - Drake
220 Vasanthanarasapura Madhugiri 2 44.5 - Drake
Details of proposed KPTCL transmission lines for FY 2018-19
Table 34: Details of proposed KPTCL transmission lines for FY 19
Voltage level
(kV) From SS To SS No of circuits
Line route
length (km)
LILO route
length (km) Conductor type
Bagalkote Zone
220 Kudgi STPP Vajramatti 2 79.42 - Drake
220 Bijapur 220 kV Kumatagi 2 23.897 - Drake
110 Mahalingapur 220 kV SS Jamakhandi 2 17 - Lynx
Karnataka’s Energy Mix: Computational Model for Energy Planning
212 www.cstep.in © CSTEP
Voltage level
(kV) From SS To SS No of circuits
Line route
length (km)
LILO route
length (km) Conductor type
110
Hebballi Hebballi Tap-1 1 14.188 - Lynx
Bidnal Hebballi Tap-1 1 19 - Lynx
Navalgunda Hebballi Tap-1 1 16 - Lynx
110 Talikote Aski 1 17.557 - Lynx
110 Khedagi cross Hirebevanur 1 10.969 - Lynx
110
Garag Kittur 1 23.37
4.598 Lynx Garag Narendra 1 16.21
110 Belavanki Ron 1 22.27 - Lynx
Bengaluru Zone
220 T.Gollahalli (Thimmasandra) Kolar HVDC 2 27.269 - Drake
220 Koramangala NIMHANS 1 5.5
- 1000 sq.mm single core XLPE
copper UG cable Koramangala HSR layout 1 8.5
220
ITI Hoody 1 4.5
- 1000 sq.mm single core XLPE
UG cable Hebbal ITI 1 23
Gulbarga Zone
220 Ramasamudra RTPS 2 53.18
1.82 Drake Ramasamudra Sedam 2 53.15
110
Ramasamudra Yadgir 1 17.45 6.835 Lynx
Ramasamudra Konkal 1 29.18
Ramasamudra Saidapur k 1 24.207 - Lynx
110
Yaapaldinni Yaapaldinni Tap-1 1 11.15
- - Chiksugur Yaapaldinni Tap-1 1 9.14
Vadavatti Yaapaldinni Tap-1 1 5.86
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 213
Voltage level
(kV) From SS To SS No of circuits
Line route
length (km)
LILO route
length (km) Conductor type
110
Yeradona Yaradona Tap-1 1 4.96
- Patridge Karatagi Tap-1 Yaradona Tap-1 1 9
Sriramnagar Yaradona Tap-1 1 12
110 Thavaragera Kushtagi 1 26.495 - -
110 Bennur Yeradona 1 8.647 - -
Hassan Zone
110 Mulki Nandikur 1 11 - -
110 Madavu Puttur 1 27 - -
Mysore Zone
NIL
Tumkur Zone
220 Benkikere Honnali 2 47.439 - -
Details of proposed KPTCL transformer augmentations
Table 35: Details of proposed KPTCL transformer augmentations for FY 18 and FY 19
# Substation name Zone District Voltage
level (kV)
Existing
transformation
capacity (MVA)
Proposed
augmentation
capacity (MVA)
Final
transformation
capacity
(MVA)
Final total transformation
capacity (MVA)
FY 2017-18
Bagalkote zone
NIL
Karnataka’s Energy Mix: Computational Model for Energy Planning
214 www.cstep.in © CSTEP
# Substation name Zone District Voltage
level (kV)
Existing
transformation
capacity (MVA)
Proposed
augmentation
capacity (MVA)
Final
transformation
capacity
(MVA)
Final total transformation
capacity (MVA)
Bengaluru zone
1 Chintamani Bengaluru Chikkaballapur 220/66 2×100 100 3x100 300
Gulbarga zone
NIL
Hassan zone
NIL
Mysore
NIL
Tumkur zone
NIL
FY 2018-19
Bagalkote zone
1 Kudachi 220/110/11 Bagalkote Belgaum 110/11 2×10 10 3×10 30
2 Nehru nagar Bagalkote Belgaum 110/33 2×20 - 2×20 40
110/11 2×10 20 2×20 40
3 Indi 220/110/11 Bagalkote Bijapur 110/11 1×10 10 2×10 20
4 Hangal Bagalkote Haveri 110/33 2×20+1×10 - 2×20+1×10 50
110/11 1×10 10 2×10 20
5 Banahatti Bagalkote Bagalkote 110/11 2×10 10 1×20+1×10 30
6 Shirabur Bagalkote Bijapur 110/11 2×10 10 1×20+1×10 30
7 Zhalki Bagalkote Bijapur 110/33 1×20+1×10 - 1×20+1×10 30
110/11 2×10 10 1×20+1×10 30
Bengaluru zone
NIL
Gulbarga zone
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 215
# Substation name Zone District Voltage
level (kV)
Existing
transformation
capacity (MVA)
Proposed
augmentation
capacity (MVA)
Final
transformation
capacity
(MVA)
Final total transformation
capacity (MVA)
1 Lingasugur Gulbarga Raichur 220/110 1×100 1×100 2×100 200
2 Ananthpur road
(Bisilahalli) Gulbarga Bellary
110/11 2×10 - 2×10 20
110/33 - 20 1×20 20
3 Konkal Gulbarga Yadgiri 110/33 1×20 - 1×20 20
110/11 1×10 10 2×10 20
4 Chincholi Gulbarga Gulbarga 110/33 1×20 10 1×20+1×10 30
110/11 1×10 - 1×10 10
Hassan zone
1 Netlamadnur Hassan Dakshina kannada 110/33 1×20 20 2×20 40
110/11 1×10 - 1×10 10
2 Salethur Hassan Dakshina kannada 110/11 1×10 10 2×10 20
3 Bantwala Hassan Dakshina kannada 110/33 1×10 30 2×20 40
110/11 2×20 - 2×20 40
4 Madhuvana Hassan Udupi 110/11 1×20 10 1×20+1×10 30
5 Kallusadarahally Hassan Hassan 110/11 1×10 10 2×10 20
6 Gurupura Hassan Dakshina kannada 110/11 2×10 10 1×20+1×10 30
Mysore
NIL
Tumkur zone
1 Halukurke Tumkur Tumkur 110/11 1×10 10 2×10 20
2 K B cross Tumkur Tumkur 220/110 2×100 100 3×100 300
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 216
Details of Proposed PGCIL Network Augmentations
Details of proposed PGCIL substations for FY 2017-18
Table 36: Details of proposed PGCIL substation for FY 18
# Substation name Voltage
level (kV)
Number of
units
Transformer capacity
(MVA) Total capacity (MVA)
1 Kothipura
(Ramanagara) 220/66 2 100 200
2 Magadi 220/66 2 100 200
3 Chintamani
Augmnt. 220/66 1 100 100
4 Pooling station at
Tumkur(Pavagada) 400/220 1 500 500
5
Pooling station at
Tumkur(Pavagada)
Augmentation
400/220 2 500 1000
6 Mallat (Manvi) 220/66 2 100 200
7 Mittemari 220/66 2 100 200
Details of proposed PGCIL transmission lines for FY 2017-18
Table 37: Details of proposed PGCIL transmission lines for FY 18
Sl
No From Substation To Substation
Voltage
level
(kV)
No of circuits Line route
length (km)
Conductor
type
1 Gooty Pavagada PS 400 2 130 Twin Moose
2 Tumkur
(Vasantnarsapur) Pavagada PS 400 2 80.5 Twin Moose
3 Hiriyur Bastipur
(Mysore) 400 1 206 Quad Moose
4 Pavagada PS Bastipur
(Mysore) 400 1 315 Quad Moose
5 Bellary PS Pavagada PS 400 2 260 Quad Moose
6 Pavagada PS Tumkur
(Vasantnarsapur) 400 2 185 Quad Moose
7 JSW TPS Bellary (PS) 400 2 10 Quad Moose
8 Bellary (PS) New Madhugiri
(near tumkur) 400 2 225 Quad Moose
9 Yermarus TPS Bellary Pooling
Station 400 2 142.5 Quad Moose
10 Bidadi Magadi 220 2 32 Drake
11 Tumkur
(Vasantnarsapur) Antharasanahally 220 2 18.5 Drake
12 Vasanthanarasapura Madhugiri 220 2 44.5 Drake
13 RTPS Mallat (Manvi) 220 1 46 Drake
14 Lingasugur Mallat (Manvi) 220 1 39.6 Drake
15 Madhugiri Pavagada 220 2 60 Drake
16 B Bagewadi Kudgi 220 2 39.22 Drake
17 Bijapur Kudgi 220 2 36.22 Drake
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 217
Details of proposed PGCIL substations for FY 2018-19
Table 38: Details of proposed PGCIL substation for FY 19
Details of proposed PGCIL transmission lines for FY 2018-19
Table 39: Details of proposed PGCIL transmission lines for FY 19
# From Substation To Substation
Voltage
level
(kV)
No of circuits
Line
route
length
(km)
Conductor type
1 Vasantanarasapura Salem 765 1 219 Quad Bersimis
2 Vasantanarasapura Salem PS 765 1 245 Quad Bersimis
3 Yelahanka Hoodi 400 1 86.2 Twin Moose
4 Yelahanka Nelamangala 400 1 27.54 Twin Moose
5 Jagalur BTPS Pool 400 400 2 90 Quad Moose
6 Pavagada PS Hiriyur 400 1 109 Quad Moose
7 Yelahanka Madhugiri 400 2 66 Quad Moose
8 Somanahalli Dharmapuri (Salem new) 400 2 122 Quad Moose
9 Jagalur Kudligi 220 2 48 Drake
10 Kudligi Ittagi 220 2 33 Drake
11 BIAL Begur Devanahalli HP 220 1 5 Drake
12 Devanahalli HP Hoskote 220 1 15 Drake
13 Kudgi UMPP NTPC Vajramati 220 2 79.5 Drake
14 Yelahanka PGCIL Yelahanka KPTCL 220 2 5 1000 Sq.mm XLPE
15 Yelahanka PGCIL BIAL 220 2 15 Drake
16 Jagalur Chitradurga 220 2 35.5 Drake
17 Jagalur Thallak 220 2 90 Drake
# Substation name Voltage
level (kV) No of units
Transformer
capacity (MVA)
Total
capacity
(MVA)
1 Yelahanka 400/220 2 500 1000
2 Pavagada PS 400/220 2 500 1000
3 500 1500
3 Vasantanarasapura 400/220 1 500 500
4 Jagalur 400/220 2 500 1000
4 Kudligi 220/66 2 100 200
6 Devanahalli HP 220/66 2 100 200
Karnataka’s Energy Mix: Computational Model for Energy Planning
www.cstep.in © CSTEP 218
Details of proposed reactors
Table 40: Details of proposed reactors in KPTCL grid for FY 18 and FY 19
Sl No Connected substation/line Voltage level
(kV)
Rating in
Mvar
Switchable/Non
Switchable
FY 2017-18
Bus reactor
NIL
Line reactor
1 Kudgi to Tumkur line 1 at both
Kudgi and Tumkur end 400 2×80 Switchable
2 Kudgi to Tumkur line 2 at both
Kudgi and Tumkur end 400 2×80 Switchable
FY 2018-19
Bus reactor
1 Pavagada PS 400 2×125 -
2 Davanagere 400 1×125 -
3 Talaguppa 400 1×125 -
Line reactor
1 Hiriyur to Mysore line 1 at
Hiriyur end 400 1×80 -
2 Hiriyur to Mysore line 2 at
Hiriyur end 400 1×80 -
Annexure IV – CGS Share Allocation and Transmission System
Asset Cost Data
Details of CGS Share Allocation for Karnataka
Table 41: Details of CGS share allocation for Karnataka
Sl. No CGS Stations
Installed
Capacity
(MW)
Karnataka State
ESCOMs firm Share
(MW)
Share from CGS plants located within Karnataka for FY 2017-18
1 Kaiga APS U#1 & 2 440 108
2 Kaiga APS U#3 & 4 440 119
3 Kudgi Unit-1 800 400
4 Kudgi Unit-2 800 400
5 Kudgi Unit-3 800 400
Share from CGS plants located outside Karnataka for FY 2017-18
1 Ramagundam St. I &II 2100 345
2 Ramagundam St.III 500 87
3 Talcher St.II 2000 350
4 Simhadri STPS ST.II U#1,2 1000 176
5 NLC TPS II St.I 630 84
Karnataka’s Energy Mix: Computational Model for Energy Planning
© CSTEP www.cstep.in 219
Sl. No CGS Stations
Installed
Capacity
(MW)
Karnataka State
ESCOMs firm Share
(MW)
6 NLC TPS-II St.II 840 115
7 NLC TPS-I Exp. 420 92
8 NLC TPS-II Exp. U#1,2 500 110
9 Vallur STPS U#1,2 & 3 1500 112
10 NTPL Tuticorin U#1,2 1000 158
11 Madras APS 440 29
12 Kudnakulam NPP U#1&2 2000 442
13 Kalpakam PFBR - 500 MW 17% 84.4
14 NVVN Coal power for bundling
with Solar power (under JNNSM) 70
15 Power Procurement under long term
(CGS from DVC) 450 450
16 T B dam 14
17 Jurala 117
Total state share by 2017-18 4262.4
Additional Share from CGS plants located outside Karnataka for FY 2018-19
1 NLC New TPP-U#1 and U#2
(2X500) 7% 71
Total state share by 2018-19 4333.4
Transmission System Asset Cost Data
Table 42: Transmission system asset cost data considered in this study
# Particulars Cost (INR crore)
1 110 kV S/C Lynx 0.31
2 110 kV D/C Lynx 0.45
3 220 kV D/C Drake 0.65
4 220 kV S/C Drake 0.71
5 220 kV XLPE 1000 sq,mm D/C UG Cable 23
6 220/66 kV, 100 MVA Transformer along with terminal bays 9
7 220/110 kV, 100 MVA Transformer along with terminal bays 8.5
8 220/66 kV, 2×100 MVA Substation 41
9 220/110 kV, 2×100 MVA Substation 41
10 110 kV transmission line Bay 0.4
11 220 kV transmission line Bay 1.5