11
KaoS meeting T.Gogami 20/May/2011

KaoS meeting

  • Upload
    ilya

  • View
    51

  • Download
    0

Embed Size (px)

DESCRIPTION

KaoS meeting. T.Gogami 20/May/2011. Contents. Experimental setup Fiducialization of KaoS Works. Experimental setup. Pre- c hicane. SPECROMETER-C. Target ( 7 Li, 9 Be). KAOS. Experimental setup. Experimental parameters of this beam time. Pre- c hicane. SPECROMETER-C. - PowerPoint PPT Presentation

Citation preview

Page 1: KaoS  meeting

KaoS meetingT.Gogami

20/May/2011

Page 2: KaoS  meeting

Contents

• Experimental setup• Fiducialization of KaoS• Works

Page 3: KaoS  meeting

Experimental setup

Pre-chicane

Target (7Li,9Be)

KAOS

SPECROMETER-C

Page 4: KaoS  meeting

Experimental setup

Pre-chicane

Target (7Li,9Be)

KAOS

SPECROMETER-C

Experimental parameters of this beam time

Electron Beam : 1.5 [GeV]

Page 5: KaoS  meeting

Angle adjustment of KaoS

Laser

Guide line

1. Laser and Guide line in KaOS2. Laser and target and point-A

Point-A

Target

Precision ~ [mm]

Page 6: KaoS  meeting

How to move KaoS

Special oil PUSH

Page 7: KaoS  meeting

Level adjustment of KaoS

1. Two markers on wall of the hall

2. One marker on KaoS

Marker

Page 8: KaoS  meeting

Other works• Fixing bad channels of TOF counters.

– Pedestal broadened– ADC channel shift with time

• Fixing or replacing power and funs which is not working properly.• PMT gain adjustment with radiation source (Nagao-kun)• Labeling for TOF counters

– Around modules– Just after photo multi proportional tubes (Tsukada-san)

• Etc.

Page 9: KaoS  meeting

Several photos

Target

BEAM

Photon dump

Phot

on Photon dump

Aerog

el

Page 10: KaoS  meeting

Summary

The beam time will be started on 24th of May

Page 11: KaoS  meeting

END

On the way to home by bike ( 18/May/2011, ~21:30 ) 明るい!