Page 1: Kanaka Project

Presented by Junha Jeon

Civil 3D Roadway Project

-Kanaka Creek, Maple Ridge

British Columbia, CANADA-

Page 2: Kanaka Project

Apply NAD83 Coordinate system zone numbers

NAD83 : North American Datum 1983 (Easting/Northing)

WGS84 : World Global System of 1984 (Longitude/Latitude)

In CANADA /USA – NAD83 coordinate system is used.

Type-in :Kanaka creek bc

Zone 10 U

How do we find UTM NAD83 datum zone number for the Project

Page 3: Kanaka Project

MTM : Modified Transverse MercatorUTM : Universal Transverse Mercator

1

2 Lf –Rt click 3

How do we apply UTM NAD83 datum zone 10 in Civil3D

Page 4: Kanaka Project

How do we import the survey points in Civil3D

1

2 Lf –Rt click3

Type-in : ZEType-in : Name(Ex.EG-Pts)

Import Points Add files

{Prospector}

[Points] - <Create>

Click[Import Points]

Icon

Click –[Add filels] [PNEZD] Add Points to Point Group type-in Point name Do elevation adjustment if possible

Type-in[ZE]

Page 5: Kanaka Project

Create Existing Surface

1

2 Lf –Rt click 3

Type-in : Name

Select

{Prospector}

[Surfaces] - <Create Surface>

{Prospector} [Surfaces] - <on file name> Definition – Point Groups Select <Kanaka-EG-Pts>

Name : Kanaka-EG-SrfStyle : Contours and TrianglesRen… : Sitework …,Thick

Page 6: Kanaka Project

Existing Ground Surface Object Viewer[3D view]Top Viewer[2D view]

Page 7: Kanaka Project

Create Break LinesEG Surface included with break lines will be more accurate than previous EG surface andwill give more precise cut/fill volume calculations to get more precise estimated amount.

1

2 Lf –Rt click3

Type-in : Name

{Prospector}

[Point Groups] - <New>

[Information]Name : Break - lines

Type-in : Name

[Include] With raw descriptions matching : *DI* OK

Page 8: Kanaka Project

1

2 Lf –Rt click 3

[Close all of the points except break lines]

{Prospector} [Point Groups] [Kanaka-EG-Pts] - <Properties>

[Information] Point Style : <none> Point label style : <none> OK

Page 9: Kanaka Project

[Hide EG surface except border ]

1

2 Lf –Rt click 3

{Prospector} [Surfaces] [Kanaka-EG-Srf] - <Surface Properties>

[Information] Surface Style : Border Only OK

Page 10: Kanaka Project

Only surface border and points with description *DI* (Ditch) will remains.

Create a new layer for break-lines called ‘V-NODE-BRKL’ as per NCS.(NCS stands for National CAD Standards)

Use 2D Object snap (Node), Start to draw 3D Polyline and join DI points.This is the first Break line created in the drawing.

Repeat the procedure to create other break lines for various point groupsone by one.

*di*- ditch, *dw*- drive way, *ep*- edge of pavement, *er*- existing road,*sw*- side walk, *tb*- top of bank, *td*- top of ditch, *to*- slope toes,*walk*- walk way, *wall*- wall

Change scale to 1:200 or 1:250 to see points more clearly.Type REA(REGENALL) in command line after including next break point.

`

Page 11: Kanaka Project

Adding all Break Lines

Page 12: Kanaka Project

Assigning these Break Lines to Surface

Lf –Rt click

Give any name

Page 13: Kanaka Project

Create Feature Lines

EG Surface included with Feature lines will be more accurate than Break lines to EG surface.A Feature line is a special type of line that grading commands recognize and use as footprint.1

2

3

12

2. Select Left line

3

3. Left click anywhere here

4

0.150 is Vertical offset and pressENTER

Right line was offseted

Page 14: Kanaka Project

Final Exsting Ground Surface

Featu

re

Lin

es

Now we allowed to use this surface to design roads or any infrastructure designing projects.

Page 15: Kanaka Project

Create Existing Utilities

1

2 Lf –Rt click

3 Make sure only surface border should be visible in drawing.

Connect all *gas* points using 2D PL command & Osnap (Node). Use scale 1:500 to see points clearly on drawing.

Repeat to create 2D Polylines for rest of utilities.

Type-in : Name

Page 16: Kanaka Project

Exsting Utilities

Page 17: Kanaka Project

Description key sets

12 Lf –Rt click

3

Type-in : Name

{Setteings} [Description Key Sets] [Civil 3D] - <Copy>

<Copy of Civil 3D> Properties Name : Type-in name (ex. Metro)

OK

Automatically control some drawing point properties, such as the appearance of a point when we create or import points.

Page 18: Kanaka Project

[Apply Description keys][Edit keys]

{Setteings} [Metro]

<Edit Keyes>

{Prospector} [Point Groups] [Kanaka-EG-Pts]

<Apply Description Keys>

Page 19: Kanaka Project

Description Key Sets Automatically control some drawing point properties, such as the appearance of a point when we create or import points.

Page 20: Kanaka Project

Horizontal AlignmentThe Horizontal Alignment is the first DESIGN ELEMENT.

• Horizontal Alignment is the centerline of a roadway passing through certain points in a specific direction and having a certain length

• Transitional Curves (Spirals)- they help in smooth transitioning between a tangent and a curve ( or between a curve and a tangent)

• The elevation of a horizontal alignment is zero (0)

[Components]

• Tangent : fixed length, specific direction, start and end points

• Curve : fixed radius, specific curve length, start and end points

• Spiral : variable radius, fixed length, start and end points

Page 21: Kanaka Project

[Horizontal Alignment]

Page 22: Kanaka Project

Create Existing Ground Profile

• Existing Ground Profile is a longitudinal cross section along a horizontal alignment passing through a surface (existing ground)

• REQUIREMENTS:• EG Surface• Horizontal alignment passing through the surface

Page 23: Kanaka Project

Create Finished Ground Profile• It is the proposed ground profile.• It is the designed vertical alignment created in a vertical plane so as to provide a comfortable ride

along the centerline of a roadway.”• Two Parabolic Curves (no radius - constant rate of change of slope) are in a FG Ground Profile:

• Crest Curve and Sag Curve

Page 24: Kanaka Project

Create Kanaka-Assembly-1 : Curb & Gutter, Side walks & Slopes on both sides.

Create Assembly

Page 25: Kanaka Project

Right side – Curb & Gutter, Side walk and Slopes Left side- Shoulder and Slopes.

[Kanaka-Assembly-Half-way]

Page 26: Kanaka Project

Create Kanaka-Corridor-1 Standard style and Kanaka-Corridor-2(Split Region) for Assembly Half-way.

Create Corridor

• It is a graphical representation of all design elements used in road/highway design

• The previously created assemblies are applied to the corridor in order to obtain accurate cut an fill volumes

• Finally intersections are created also to obtain cut and fill volumes

Page 27: Kanaka Project

Create IntersectionIntersections are created in order to provide a smooth transition for all vehicles. We used a minimum of 15 m to allow for trucks.

Page 28: Kanaka Project

To get Enough Survey Data – Extend Surface for this Project.

Extend Surface coverage area

Page 29: Kanaka Project

Cross Section

Cross sections are the sections created perpendicular to the direction of a roadway. They have to be created at regular intervals on tangents, curves and spirals.

Page 30: Kanaka Project

Create Pond

Paste Pond Surface to Datum Surface

Page 31: Kanaka Project

Quantities

Page 32: Kanaka Project

Quantities

Page 33: Kanaka Project

Earth Work Volume Table

TOTAL CUT VOLUME = 23,921.11 Cu.M.

TOTAL FILL VOLUME = 22,859.82 Cu. M.

NET EARTHWORK VOLUME = 1,061.28 Cu.M.