Turn One Computer into Four and Turn One Computer into Four and St t hY Bd t ith D kt St t hY Bd t ith D kt Stretch Your Budget with Desktop Stretch Your Budget with Desktop Virtualization Virtualization Steve Young, Chief Technology Officer Beverly Ahr Director of Instructional Technology Beverly Ahr, Director of Instructional Technology Judson ISD 6/1/2009

Judson ISD X-Series Deployment Savingsand Energy Savings

Embed Size (px)

Citation preview

Page 1: Judson ISD X-Series Deployment Savingsand Energy Savings

Turn One Computer into Four and Turn One Computer into Four and St t h Y B d t ith D ktSt t h Y B d t ith D ktStretch Your Budget with Desktop Stretch Your Budget with Desktop

VirtualizationVirtualization

Steve Young, Chief Technology OfficerBeverly Ahr Director of Instructional TechnologyBeverly Ahr, Director of Instructional Technology

Judson ISD6/1/2009

Page 2: Judson ISD X-Series Deployment Savingsand Energy Savings

Presentation Outline

JISD pain points with providing increased computer accessJISD pain points with providing increased computer accessSolutions and PossibilitiesSolutions and PossibilitiesWhat What Judson ISD selectedJudson ISD selectedDeployment detailsDeployment detailsLower acquisition costsLower acquisition costsqqEnergy cost comparison and savingsEnergy cost comparison and savingsEffect on electrical capacityEffect on electrical capacityp yp yEffect on A/C neededEffect on A/C neededEffect on eEffect on e--wastewasteEffect on eEffect on e wastewasteEffect on network ports Effect on network ports HowHow are Judson ISD’s X Series devicesare Judson ISD’s X Series devices beingbeing used?used?How How are Judson ISD s X Series devices are Judson ISD s X Series devices being being used?used?OtherOther

Page 3: Judson ISD X-Series Deployment Savingsand Energy Savings

Judson ISD pain points with providing increased Judson ISD pain points with providing increased computer access to studentscomputer access to students

CostLaptops and desktops have high per seat acquisition costap ops a d d s ops a g p s a a qu s o os

MaintenanceComputers have many common parts that fail or need maintenancemaintenanceIncreasing computer technician staff not an optionExtended warranties can be very costly

Network AccessNetwork AccessMany classrooms have limited network dropsCabling and new switches are very expensive

Electrical CapacityMany older schools have trouble supporting more than a couple of computers per classroomp p pOften no easy way to increase electrical capacityA/C is very expensive for schools and adding more full computers substantially raises A/C demandco pute s substa t a y a ses /C de a d

Page 4: Judson ISD X-Series Deployment Savingsand Energy Savings

Solutions & PossibilitiesSolutions & Possibilities

Thin clientsGood in practice, but we have no spare server room space and eventually p , p p ywould need more network staff (another option we could not choose)

Server rooms are VERY costly, need lots of electricity, and A/COften the cost for thin clients hardware was not significantly less than a l t d ktlow cost desktop

LaptopsTypically a higher acquisition costs when equipped with similar

t d ktcomponents as a desktopHigh total cost of ownership (TCO)

Repairs take longerParts more proprietaryParts more proprietaryMore theft prone

Load Linux variant on old computersCheap/free solution no OS costCheap/free solution – no OS costWe have no Linux management tools and none offer functionality we require at no costStill require expensive network ports and high electricity (higher thanStill require expensive network ports and high electricity (higher than modern CPU)Increase number of service calls and need for repair technicians

Page 5: Judson ISD X-Series Deployment Savingsand Energy Savings

What Judson ISD selected: The What Judson ISD selected: The nComputing nComputing X SeriesX Series

What it is?Modified thin clientIt virtualizes the host OS andIt virtualizes the host OS and shares the host’s resources

How does it work?How does it work?Install a PCI card in host machineConnect up to 3 terminals (multiConnect up to 3 terminals (multi boxes) per PCI card via cat 5 cableConnect monitor keyboard andConnect monitor, keyboard, and mouse to each multi box

Page 6: Judson ISD X-Series Deployment Savingsand Energy Savings

Deployment detailsDeployment details

What Judson ISD did and where we did itDecided to focus X Series deployments in three areas:

Elementary school classroomsMiddle school classrooms

Each classroom end up with 4 student workstations

Library student stationsHow many have we deployed in year 1?

418 sets – which created an additional 1,254 computer seats

h d l d iHow many have we deployed in year 2? 343 sets – which created an additional 1,029 computer seats

Page 7: Judson ISD X-Series Deployment Savingsand Energy Savings

What are the What are the benefits benefits of of X Series X Series solution?solution?Lower Acquisition CostsEnergy cost savings ( Green computing )Less electrical capacity needed in facilitiesLess A/C NeededLess e-waste created75% less network ports/drops needed

Less ports and drops can equate to at least $1200 savings per X Series set.

Page 8: Judson ISD X-Series Deployment Savingsand Energy Savings

Lower Acquisition Lower Acquisition Costs Costs ( 3,044 computing seats )( 3,044 computing seats )( , p g )( , p g )

Acquisition for a PC only deployment $ 2,374,320q y p y $ , ,

Possible additional network growth $ 776,220

f lAcquisition cost for X Series Deployment

Shared PC's $ 593,580

Access Terminals (X Series) $ 152,200

Extra Monitors $ 285,375

Keyboards & Mice $ 45,660

MS OS Licensing $ 108,594

Total X Series Acquisition Cost $ 1,185,409

Savings of 50%

Page 9: Judson ISD X-Series Deployment Savingsand Energy Savings

Energy Cost ComparisonJudson ISD's School Year Energy Cost Comparison

$30.00

Judson ISD s School Year Energy Cost Comparison

$25.00

$20.00

$10.00

$15.00

$5.00

$-Annual Energy Cost

of P3 and CRT Annual Energy Cost of a "green" Dual

Annual Energy Cost of Dual Core w/ 3

JISD's Annual Energy Cost Per Seat using

Monitor Core PC w/LCD terminals nComputing X-Series

Page 10: Judson ISD X-Series Deployment Savingsand Energy Savings

Energy Cost SavingsEnergy Cost Savings (Green Computing)

O Y E C t & S i f J d ISD f 3044One Year Energy Cost & Savings for Judson ISD for 3044 Total Computing Seats

$80,000

$90,000 $84,014

$60,000

$70,000 $61,354

$40,000

$50,000

$35,852

$20,000

$30,000 $22,661

$13,191

$-

$10,000

Y l ti Y l ti Y l ti E i b E iYearly operating cost for 3044 P3

PC's

Yearly operating cost for 3044 green

Core Duo

Yearly operating cost - Using Core Duo's hosting X

Series

Energy savings by using X Series with

Core Duo (instead of P3)

Energy savings using X Series

instead of all an Core Duo fleet

Page 11: Judson ISD X-Series Deployment Savingsand Energy Savings

Auto Shutdown SavingsAuto Shutdown SavingsJudson ISD started automated shutdown of school computers in 2007Numbers based on 25% of 4000 machines left onOver time savings are less as PC base becomes more green

$140,000

$160,000

$80,000

$100,000

$120,000

$40,000

$60,000

$80,000

$54,000

$155,111

$-

$20,000

Year 1 SavingsYear 2 Savings

$ ,$43,649

$33,907 $23,556

Year 2 SavingsYear 3 Savings

Year 4 SavingsTotal Savings

Page 12: Judson ISD X-Series Deployment Savingsand Energy Savings

Less Electrical Capacity NeededLess Electrical Capacity Needed

Many schools lack electrical infrastructure to support large numbers of computersnumbers of computersOften impractical or cost prohibitive to bring in increased electrical serviceelectrical serviceOne X Series set with 1 green dual core and 3 terminals use about the same electricity as a single Pentium 3 system with y g ya CRT monitor.This allows a schools to double number of computer seats in classrooms, while reducing electrical needs by 50%This means a 4 computer classroom can replace outdated

h dsystems with modern ones:And cut acquisition costs 50%Cut energy usage 73%Cut energy usage 73%

Page 13: Judson ISD X-Series Deployment Savingsand Energy Savings

Less A/C NeededLess A/C Needed

Less power consumption equates to less heat generatedLess power consumption equates to less heat generated per computing seatHeat output is cut the same percentage as energy usageHeat output is cut the same percentage as energy usageThis means heat output compared to traditional PC’s can reduce heat output by 73% or higher.p y gThis translates into large savings on A/C bills or on retrofit of A/C systems to service hot roomsLess $$ is spent on building A/C per computing seat

Page 14: Judson ISD X-Series Deployment Savingsand Energy Savings

Less eLess e--waste Createdwaste Created

Long term, there is much less e-waste for disposal, i.e. there are 3 less CPU’sLess to dispose of means:

Less pollutionLower disposal costs

Page 15: Judson ISD X-Series Deployment Savingsand Energy Savings

Less Network Ports NeededLess Network Ports NeededLess ports and drops can equate to at least $1200 savings per X Series set, if drops needed for increased computer access.How is this money saved?

Network switches can be very costly at more than $150 per portCopper prices have been rapidly rising (a key component of network cables)network cables)Labor to install cabling is expensive (from $75 to $200 per drop)

Switches are not always very “green” – and canSwitches are not always very green and can consume a lot of electricity, as well as generate a lot of heat, so reducing numbers of switch ports canof heat, so reducing numbers of switch ports can help schools become greener

Page 16: Judson ISD X-Series Deployment Savingsand Energy Savings

Judson ISD Configuration Options

Side to SideSide to Side

Back to Back

Page 17: Judson ISD X-Series Deployment Savingsand Energy Savings

How Are The X300’s Being Used?How Are The X300’s Being Used?

ResearchUsed as learning center using Judson ISD developed activitiesUsed to augment TechKnowledge (computer literacy curriculum)U d t f i t ti j tUsed as center for integration projectsUse to reinforce keyboarding skillsX300 S t d i ti f t hX300 Systems used as incentive for teacher proficiency (computer literacy)s

Page 18: Judson ISD X-Series Deployment Savingsand Energy Savings

X Series Learning in Action

Page 19: Judson ISD X-Series Deployment Savingsand Energy Savings

OtherOther

Technical IssuesWe learned we needed an audio solution per seatPut in inexpensive amplified speakers and headphonesThere is not enough output on multi box audio portStudents should be logged in under different user ggaccounts when using web applicationsTest all software you want to use prior to deployment to avoid unexpected surprises

Licensing IssuesCheck with operating system vendor and software vendors for their requirementsUsing Linux can save substantial licensing costs

Page 20: Judson ISD X-Series Deployment Savingsand Energy Savings

Summary

Funding adequate technology is difficult in good years, but finding lower cost computing solutions is even more i t timportant now.Deploying X Series sets can cut your deployment costs for computing seats by 50% or morecomputing seats by 50% or moreX Series are not as green as trees, but they are much more efficient in energy usage e-waste and air conditioning thanefficient in energy usage, e-waste, and air conditioning than traditional computers.By replacing older PC’s with X Series you can cut energyBy replacing older PC s with X Series, you can cut energy usage by 70% or more.You or someone in your organization will increasingly need ou o o o you o ga a o a g y dto demonstrate how you are savings $$ and being greener in IT. X Series fit into this strategy.Make sure X Series fit your needs and test, test, test prior to deployment.

Page 21: Judson ISD X-Series Deployment Savingsand Energy Savings

Information

More Information on Judson ISD Technology Services available at:

http://www.judsonisd.org/district/technology/

nComputing green computing and savings calculator at:http://tinyurl com/btrupahttp://tinyurl.com/btrupa

Steve YoungSteve [email protected]

Beverly [email protected]