3
Attachment 48 SAUDI PETROCHEMICAL COMPANY (SADAF) PROCEDURE NO: SHEM 08.10 REVISION:00 DATE May 9, 2014 SUBJECT : JOB SAFETY ANALYSIS PAGE See bottom JOB SAFETY ANALYSIS(TANK) Area: EDC ( ALL) Job Description: Internal Inspection New Job Location: 33TK27 / 33TK13 Tanks Applicable SHEM 08 Revised Maintenance Manager: Department: SAP: Use additionalsheetsif necessary JSA 06A Attachments Yes No. of Pages 2 No Job Steps PotentialHazard s Risk Rating Steps toreduceHazard (Control/Mitigation) Action Completion Remainin g Remarks 1 Pre-entry 1) Entry without valid permit. 2) Improper ventilation. 3) Existence of Process Gas. 4) Slips & Trips, Unsafe manual handling. 1 1)Obtain valid work permit as [per SHEM 08.10. 2) Assure proper ventilation is done (0 LEL) 3) Gas test to be conducted. Concern MTC supervis or. Concern AXIS Permit Reciever . OP Issuer. 4 2 Entry for inspection 1)Trips and Slips, Unsafe access. 2) Falling / Hitting object. 3) Flash Hazard. 1 1) Wear All required PPE and full body harness if needed as per SHEM 08.08 2) Use safe flash light inside the confind space. 3) Use Camera without flash. 4) LEL=0, Toxic=0, O2=20.8%. Concern MTC supervis or. Concern K-kem AXIS Permit Reciever . OP 4 1

JSA Sample

Embed Size (px)

DESCRIPTION

higd

Citation preview

1

SAUDI PETROCHEMICAL COMPANY (SADAF)PROCEDURE NO:SHEM 08.10Attachment 48

REVISION:00 DATEMay 9, 2014

SUBJECT : JOB SAFETY ANALYSIS PAGESee bottom

JOB SAFETY ANALYSIS(TANK)

Area: EDC ( ALL)Job Description: Internal Inspection tesyinhtttTTesttestinghhhhhhHydrotestingHydrotesting testing)New JSA

Job Location: 33TK27 / 33TK13 TanksApplicable SHEM 08Revised JSA

Maintenance Manager: Department: SAP: Date: Use additionalsheetsif necessaryJSA No.06A

AttachmentsYesNo. of Pages2

NoJob StepsPotentialHazardsRisk Rating1/2/3/4*Steps toreduceHazard(Control/Mitigation)Action Completion byRemainingRisk 1/2/3/4*Remarks

1Pre-entry 1) Entry without valid permit.2) Improper ventilation.3) Existence of Process Gas.4) Slips & Trips, Unsafe manual handling.

11)Obtain valid work permit as [per SHEM 08.10.2) Assure proper ventilation is done (0 LEL)3) Gas test to be conducted.Concern MTC supervisor.Concern AXIS Permit Reciever.OP Issuer.

4

2Entry for inspection1)Trips and Slips, Unsafe access.2) Falling / Hitting object.3) Flash Hazard.

11) Wear All required PPE and full body harness if needed as per SHEM 08.08 2) Use safe flash light inside the confind space.3) Use Camera without flash.4) LEL=0, Toxic=0, O2=20.8%.Concern MTC supervisor.Concern K-kem AXIS Permit Reciever.OP Issuer.

4

Risk Rating: 1 Major; 2- Significant; 3 Minor; 4 Insignificant.

Review Team: Name

ID#:Dept.Sign:Date:Other Team Members :NameID#:Dept.Sign:Date:

Maintenance Manager/ Supervisor

Other Team Members: Names

Operations Manager / Supervisor:safety

EHS Representative

Maint.

Approval by Dept. Senior Manager Unplanned lifting activity Remaining Risk at Significant (2) level activity

Permit Issuer:I have reviewed and agreed with all steps of this JSA.

Approval by M-RAC Chairman Major Risk (1) activity

Permit Acceptor:I have agreed with all steps of this JSA and briefed all my team menmbers on the precaution requirements.

Risk Rating: 1 Major; 2- Significant; 3 Minor; 4 Insignificant.

1