The European Commission’s science and knowledge service Joint Research Centre

Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

The European Commission’s scienceand knowledge service

Joint Research Centre

Page 2: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

JRC’s activities report

JRC-CAPLAND team

23rd MARS Conference; Gormanston, IE; 28-29/11/2017

Page 3: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Presentation Outline - JRC’s activities report

• What we did in 2017 and some guidance for 2018 …

Worldview-4 data, © EUSI / Digital Globe TM, 2017,

distributed by EUSI; Gormanston, IE; image date 28/01/2017

2017 Campaign control zones; G4CAP

Page 4: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Presentation Outline - JRC’s activities report

• Campaign 2017

• Image Acquisition - methods, volumes, success rates, trends 2016-2017-2018

• Sentinel 2

• Greening, LPIS QA, area measurement tools validation, FAS

• Preparing 2018

• Technical guidance including impact on greening, CTS, VHR/HR Specs, image geom. benchmarking, G4CAP, etc.

• Image requests for 2018 - status

• Pilot4CAP

• Web application for gathering Pilot projects for the new CAP2020+

• facts and future

Page 5: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - CwRS Methods

• Comparison 2016 (acquired) – 2017 (acquired) – 2018 (planned)

• average zone area similar through years of the different methods where VHR are smaller, VHR+HR larger, and aerial plus HR largest

• more VHR only zones

• less VHR + HR zones

• use of S2 …

Page 6: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - VHR Zones, Acquisition Windows

• Comparison 2016 (acquired) – 2017 (acquired) – 2018 (planned)

• images/zone 1.1 in 2018 (cf. 1.2 in 2017, and 2016)

• total VHR area reduction from 2016-2017-2018 due to reduction of VHR2

• HHR profile being used instead of VHR profile for period VHR2

Page 7: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - VHR details

• CwRS VHR

• success rate 100% (cf. 2016 99.9%)

• main sensor WV2 40.17% (cf. WV2 67%) – WV4 (17.36%) used from May 2017

• av. cloud cover (CC) 1.59% (cf. 2.09%)

• av. elevation angle (ELA) 63.56 deg. (cf. 62.37 deg.)

• average acquisition time 11.4 c.days (cf. 17 c.days)

• profile use: A.1 82.71% Why so little A.6 (<1%) – the specific 50cm EFA LF profile?

• LPIS QA

• Area 32.370km2 ; 144 images (cf. 2016 27.375km2; 124 images)

• Success rate 100% (cf. 100%)

• Average CC 0.11% (cf. 0.2%)

• Average ELA 84.02 deg. (cf. 83.15 deg.)

Worldview-4

17.36%

ECA audit 2016 recommendation – increase representativeness of QA sample

Page 8: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - HR zones, acquisition windows

• Comparison 2016 (acquired) – 2017 (acquired) – 2018 (planned)

• images/zone 2.08 reduction (cf. 2.21 in 2017, and 2.45 in 2016)

• most VHR+HR zones now have 2 windows, while 3 in 2016, 2017

• no autumn, no winter periods => S2

• Only one period between VHR1 and VHR2 i.e. no HRB2 period

• Reduction HR 30% from 2016 to 2017 – i.e. S2 use

• then a slight increase again in 2018 - why?

Page 9: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - HR details

• CwRS HR

• success rates 95.4% (cf. 2016 95.5%)

• av. acquisition time 12.4 calendar days (16 cd)

• av. CC 0.94% (0.6%)

• av. ELA 67.45 deg.

• Split of profiles (F0 share) 29.4% (29.4%)

• the coarser resolution HR (F0) will not be available in 2018 => S2 …

• Challenges

• Feasibility new (heavy process for HR)

• CC prone areas and short windows (HRB EN, IE, DE)

Average 95.4 %

2017 - HR success rate % by period

Page 10: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - image acquisition conclusions

• 2016-2017-2018 analysis is a bit comparing “apples” (2016, 2017) and “pears” (2018), but:

• Positive to see some changes in control methods where:

• Number of images/control zone is decreasing both for VHR and HR

• VHR2 in 2018 decreases substantially in favour more HHR profile imagery

• The HR decrease in favour of S2 was well noted from 2016 to 2017 (30%), much less from 2017 to 2018 …

• MS should make as much as possible use of Copernicus S2 (S1) imagery, “learning …” also in view of the envisaged future “monitoring” approach

• 2017 in particular saw:

• High image acquisition success rates for both VHR and HR

• MS should use correct profiles for the schemes to control …

• LPIS increase with success after ECA recommendation

• MS should make use of a better feasibility for HR - pls. ask us and image providers for advice for best result

• So what about S2 in 2017?

Page 11: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - Sentinel2

• Example: KELL, IE; from 15/12/2016 – 15/10/2017 > 10 good acquisitions …

Sentinel2 QLs over KELL, IE from G4CAP; opaque, cirrus cloud masks; courtesy Copernicus/ESA

Page 12: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - Sentinel2

MS S2 usage trends:

• 2016 => 2017 => 2018

• 11/32 => 17/32 => ?

but more MS are active (outside S2alert …)

Check of S2 success rates in 2017 CwRS:

• As announced in Ghent we ran S2alert on:

• all valid AWs for VHR and HR zones in Campaign 2017; CC < 5%; covering complete zones

• S2A alone until June 2017

• S2A plus S2B from July onwards

• Server making > 320.000 API COPHUB calls for > 1600 Sentinel requests => total time 7-8 days …

• We are now doing same exercise on a “floating window” covering the whole crop year. This will give S2A/S2B availability on all zones through the whole crop season. i.e. more like monitoring approach …

• Could extend to include images covering also partial zones (and indeed covering all cloud free parcels …)

Average

success

rate 89%

Page 13: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - Sentinel2

Average window length (weeks)

10 12 5 7 4 3 7 4 4 5

S2 success rate in VHR1 period

Success

rate 96%

Page 14: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - Sentinel2

Average window length (weeks)

10 12 5 7 4 3 7 4 4 5

S2 success rate in HR+1 period

BE_WA has late HR+1 from 1st Oct 29 Oct

Success

rate 84%

Page 15: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - Technical guidance

‘Greening Review’ amending the Delegated Act n° 639/2014 in July 2016

Voluntary basis not implemented in 2017

(CTS, check Crop diversification, check EFA …)

Page 16: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - LPIS QA

• Updated Technical guidance (07/07/2017)

• TG MTS v.2.1

• TG ETS v.6.2

• Annex I – QC measures

• Annex II – Flow of events

• Annex III – LC concept eligibility

• Annex IV – Four eyes control

• Annex IX – TG population

• Annex X – TG IXIT

• Question and answers after 07/07

https://marswiki.jrc.ec.europa.eu/wikicap/index.php/Question_and_Answers_v.6.2

• Errata

https://marswiki.jrc.ec.europa.eu/wikicap/index.php/ETS_Errata

Page 17: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - LPIS QA

Screening reports

• Belgium Wallonia (for D3)

• Hungary (for D3)

• Croatia (for H3)

• Ireland (for D3)

Technical visits

• Italy (June)

• Belgium Wallonia (August)

• Hungary (September)

• Greece (September)

• Ireland (October)

Page 18: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - LPIS QA

LPIS QA Portal

• New version https://lpis.jrc.ec.europa.eu/lt/

• Enabled a new form to report MTS imagery/vector metadata

• NB: 7 MTS reports still incomplete or absent

• New B-tests development in progress

• Received 38 LPIS population ZeroPointState files

• 6 still pending for the upload

• Generated and distributed 38 sample pre-selection files

• Delivered 38 LPIS QA imagery packages (out of 44)

• Remaining 6 are ready but still pending for the delivery

Page 19: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - LPIS issues to follow-up in 2018

• Reconsidering the role of the RP type (lessons learned from IXIT)

• Was a practical solution for the establishment of the initial graphical identificationof the AP

• But has a different place in a “multi layer” LPIS and GSAA

• In-depth assessment of pro-rata implementation

• Methods applied by EU MS revealed inconsistencies

• Big data and automation call for revised strategy

• Fine-tuning of LPIS/GSAA design to serve CAP monitoring

• Explicit graphical data on land cover within the RP

• Correct assembly of all spatial themes for IACS

• NB: Excel is still the preferred format for MTS exchange

• NB: System data delivery incomplete (issues with INSPIRE implementation?)

Page 20: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - Area measurement tools validation

• Some 13 validation checks + 3 pending

• 1 VHR ortho imagery

• 1 pending Stereo imagery

• GNSS and even dGPS

• All below 50 cm buffer tolerance (some <10 cm)

lighter validation method

• Anyhow set to 50 cm

‘resolving power on field’

Dominique

Page 21: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - FAS database

Collect information about FAS implementation and share it

GAEC database experience

FAS questionnaire

FAS module in the GAEC databaseGAEC users

FAS users

users

36%

Page 22: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - FAS database

A user friendly approach

Functions to complete the questionnaire (125 questions)

Official notification

Easy update (and only when it is needed)

Sharing information: Query/Reports

Page 23: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Campaign 2017 - FAS database

Time frame

Questionnaire presentation in the expert group

28/06 26/9

FAS database presentation in the expert group

FAS database on line for editing

17/10

Deadline (extended 15/11)

24/10

Comments from Member States

Creating the web-application

17 notifications on-line

31/10

First notification

36 users(8 MSs/countries missing!!)

Juan’s presentation tomorrow

Page 24: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Preparing 2018 - Technical guidance

• Impact from ‘Greening review’ and ‘OMNIBUS’

• Amendments among other of 639/2014 and 809/2014

• Substantial changes in DG AGRI guidance

• Ban of pesticides

• EFA types grouped

• Adjacent

• New EFA crops

• New crops for diversification

• …Presentations

DG AGRI D2

DG AGRI D3

Page 25: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Preparing 2018 - Technical guidance

DS-CDP-2015-10Management of layers LPIS

DS-CDP-2015-11LPIS up-date

DS-CDP-2015-09OTS Check EFA

DS-CDP-2015-08OTS Check Crop Diversification

DS-CDP-2016-03On-The-Spot Checks ‘CTS’

Quality check of ortho-imagery

HR Image Acquisition Specifications

VHR Image Acquisition Specifications

Vineyards area measurements

MonitoringDS CDP 2017 03

Not ‘so many’ changes

in technical guidance

Page 26: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Preparing 2018 - Technical guidance

• EFA, Crop diversification, Vineyard area measurements

New elements with no impact on check methods

• Common Technical Specifications (Not so many changes)

• Highlight important messages

Page 27: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Preparing 2018 - Technical guidance (CTS)

• Common Technical Specifications

• 2 major additions

• Geotagged photos

also scanned labels, invoices …

Evidence to replace farm visit, RFV …

• Possible use of ‘Monitoring like methods’

Additional information to support CAPI

Geotagged photos

Monitoring

Page 28: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Preparing 2018 - Technical guidance (VHR/HR)

New VHR/HR Specifications for 2018 Campaign published 20/11/2017

• Comments welcome from MS Administrations and contractors

Reworked:

• More consistency between documents, no repeats, terminology, acronyms etc.

• HR is generic for high resolution and includes all HHR profiles (HR profile does NOT exist)

• VHR is generic for all very high resolution profiles

• Buffer around zones - calculation aid (VHR)

• No autumn, no winter periods => S2

• No HRB2 period => too short

• VHR2 period => HHR profile

• Feasibility chapters updated – pls. study for best results here …

• More mosaic help from image provider – help from IPs to MS in accepting proposed so capacity can shift to next zone …

• Update of profile characteristics

• New LPIS QA chapter

• etc.

https://g4cap.jrc.ec.europa.eu/g4cap/Default.aspx?tabid=172

Max. height

difference

[m]

Recommended

buffer [m]

Max. height

difference

[m]

Recommended

buffer [m]

Max. height

difference [m]

Recommended

buffer [m]

Max. height

difference

[m]

Recommended

buffer [m]

Max. height

difference [m]

Recommended

buffer [m]

100 84 100 67 100 42 100 31 100 18

200 168 200 135 200 85 200 61 200 35

300 252 300 202 300 127 300 92 300 53

400 336 400 270 400 170 400 122 400 71

500 420 500 337 500 212 500 153 500 88

600 503 600 405 600 255 600 183 600 106

700 587 700 472 700 297 700 214 700 123

800 671 800 540 800 340 800 245 800 141

900 755 900 607 900 382 900 275 900 159

1000 839 1000 675 1000 424 1000 306 1000 176

1500 1259 1500 1012 1500 637 1500 459 1500 264

2000 1678 2000 1349 2000 849 2000 611 2000 353

Maximal height difference = Maximal height of the AOI - Average base height of the AOI

General recommendations for a buffer creation around CwRS zones

Minimum elevation angle 50˚

Relevant profiles: A1, A11,

A12, A3, A6, A61, A62

Minimum elevation angle 56˚

Relevant profiles: A2

Minimum elevation angle 67˚

Relevant profiles: A5, A51, A52

Minimum elevation angle 73˚

Relevant profiles: A2 (K3)

Minimum elevation angle 80˚

Relevant profiles: A7, A71, A8,

A81

Page 29: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Preparing 2018 - image benchmarking.

• Geometric benchmarking

• WV4 performed and introduced in VHR Campaign in May 2017 - successfully

• S2B performed with July/August 2017 S2B data - successfully

• PlanetScope ongoing (of interest also for future monitoring)

• Reference to presentation in Technical developments session by Planet, DE

• Imagery products (time series) delivered for the benchmarking over Maussane (PlanetScope)

• Basic scene product – 3,9 m GSD

• Ortho scene product - 3,0 m GSD

• Orto Tile product - 3,125m GSD (resampled)

• 4-band multispectral image (blue, green, red, near-infrared)

• The external quality control has been performed by measuring the planimetric error of a set of GCPs

• The geometric requirements for the CAP checks (HHR F2. ORTHO profile MSP):

• RMSE in Easting and Northing directions should not exceed ≈1.5xGSD i.e ≤ 5,85m

Worldview-4 - publication

http://publications.jrc.ec.europa.eu/rep

ository/handle/JRC107673

Sentinel2B - publication

http://publications.jrc.ec.europa.eu/rep

ository/handle/JRC107674

Product being

tested

Page 30: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Preparing 2018 – image benchmarking.

• Absolute positional accuracy test

• 81 GCPs identified over Maussane AOI (10x10km)

• 28 GCPs suitable for control

• preliminary results: absolute positional accuracy over Maussane

• RMSE(E) = 4,868 m

• RMSE(N) = 3,712 m

• CE(90) = 9,294 m

• Next step

• Check other geographic areas. Measure relative positional accuracy over two LPIS QA zones (VHR)

Existing GCP data sets over AOI

Page 31: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

• Introduced in 2015 for the Campaign 2016 - now on its 3rd year in production environment - constantly enhanced - driven by stakeholders input

• 290 registered users; ≈ 600 user interactions /day (edit, create, delete); 31 logins / day; 49 operative emails sent / day; 73,174 lines of code

• In 2017 - CIAS (Campaign Image Acquisition Statistics), pre-IRs and budget management, new acquisition upload, Pilot4CAP module, EPSG codes and new IDQA, new Feasibility management, S2alert upgrades, etc.

• For 2018 – new image return module (source and ortho), further CIAS, Campaign Results stats. update

• Training ongoing here in Dublin – advance registration, but contact Giovanni Di Matteo to get a slot

Preparing 2018 -

G4CAP

Page 32: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Preparing 2018 – pre-IRs request

2018 (what are we checking in 2018)

1. Total no. of applications > 7.000.000

2. Total no. of OTS checks ≈ 475.000

3. Total OTS checks for greening ≈ 180.000

4. CwRS 83% Total

474,139

Page 33: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Preparing 2018 – pre-IRs request

2018 (cf. volumes discussed earlier in presentation)

1. image use optimization, and effective controls

2. some negotiation with some MS but iterations are now complete

3. Any questions can be taken up here in Dublin

Page 34: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Pilot4CAP - Some basic facts

• Platform calls for sharing/reporting of publicly known new or ongoing pilot projects performed in preparation for

the new CAP 2020+.

• Agreed on at Amsterdam workshop (30-31/03/2017)

• The Platform was created by the JRC upon the request of the MS Administrations and DG AGRI

• JRC integrated the platform into G4CAP web application i.e. no additional account needed

• The aim is to build an information basis for the EC Services, and the MS Administrations.

• https://g4cap.jrc.ec.europa.eu/G4CAP/pilot4cap

Page 35: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Pilot4CAP - Screenshot

Reporting options

Filtering options

Page 36: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Pilot4CAP - Content

• 16 projects inserted

7 pilot project ongoing

9 projects concluded ( 3 directly relate to CAP 2020+, 6 old projects that could be relevant)

Ongoing:

SEN4CAP (EC)

RECAP (GR)

Grass mowing detection system (EE)

Detection and control of Catch crops (DK)

Main crop detection/crop diversification (DE)

Automated Detection of alpine fodder areas (AT)

COPERCAP (ES)

Concluded:

CzechAgri project (CZ)

Crop map of England (UK)

Automated detection of grassland mowing, arable and abandoned land (LT)

Page 37: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Pilot4CAP - Future

• Number of inserted projects is disappointing

• JRC encourages all coordinators/responsible persons to insert their pilot projects into G4CAP

Awareness of what is going on

To share experiences between MS/stakeholders

To support collaboration

• Options for its future should be discussed.

Page 38: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

2018 rather uncertain … however in 2019 …

Basis of future CAP ?

Mid-year

Multiannual Financial Framework ?

Mid-year

CAP2020+ or CAP2023+ ?

Pilot studies on Monitoring ?

Is present CAP image requests effective ?

Pilot4CAP database continues ?

Is present use of S2 optimal?

Page 39: Joint Research Centre - European Commission · 2017-12-05 · Presentation Outline - JRC’s activities report • Campaign 2017 • Image Acquisition - methods, volumes, success

Any questions?

You can find us all at:JRC [email protected]

Specific imagery at:[email protected] Worldview-4 data, © EUSI / Digital Globe TM, 2017,

distributed by EUSI; Gormanston, IE; image date 17/10/2017