15
25 Aug 2009 1 USJFCOM UNCLASSIFIED Joint National Training Capability - Corporate Board FY 10 JNTC Budget Al Lawver JNTC Program Director

Joint National Training Capability - Corporate Board FY 10 JNTC Budget

  • Upload
    arvin

  • View
    66

  • Download
    0

Embed Size (px)

DESCRIPTION

Joint National Training Capability - Corporate Board FY 10 JNTC Budget. Al Lawver JNTC Program Director. Objectives. Consensus brief for the FY 10 JNTC budget. Budget Analysis Assumptions. All known Congressional cuts are included in the FY 10 JNTC President’s Budget (PB). - PowerPoint PPT Presentation

Citation preview

Page 1: Joint National Training Capability - Corporate Board FY 10 JNTC Budget

25 Aug 2009 1

USJFCOM

UNCLASSIFIED

Joint National Training Capability

-Corporate Board

FY 10 JNTC Budget

Al LawverJNTC Program Director

Page 2: Joint National Training Capability - Corporate Board FY 10 JNTC Budget

25 Aug 2009 2

USJFCOM

UNCLASSIFIED

Objectives

• Consensus brief for the FY 10 JNTC budget.

Page 3: Joint National Training Capability - Corporate Board FY 10 JNTC Budget

25 Aug 2009 3

USJFCOM

UNCLASSIFIED

Budget Analysis Assumptions

• All known Congressional cuts are included in the FY 10 JNTC President’s Budget (PB).

– The HAC-D committee has marked all JNTC O&M growth ($4.965M). SAC-D has not reported out.

– Based on previous years’ experience, up to a 4% DoD wide reduction to T2 O&M and RDTE is likely.

• The JTCP Program has received $1.065M in FY 09 end of year funding.

• Service JNTC funding is in accordance with the T2 POM, as modified by cuts.

• The Services will receive quarterly allocations of JTCP funds directly from OSD in accordance with the agreed business rules.

Page 4: Joint National Training Capability - Corporate Board FY 10 JNTC Budget

25 Aug 2009 4

USJFCOM

UNCLASSIFIED

JTCP Reallocation Business Rules• Receiving Service (Army, Navy, USMC, USAF, SOCOM) is responsible for

obligation and expenditure of the reallocated funds.

• Funding not executed must be returned to the Program Director for any reallocation decision. At years end, all unexecuted funds must be returned NLT 30 July to be sure they can be reallocated before the end of the FY. Case by case exceptions will be made for event funds required in the 4th quarter; the PD should be notified as early as possible if any JTCP funds cannot be fully executed.

• As funds are executed, results of Service JTCP efforts will be reported as part of the JNTC quarterly report. Financial reporting will be IAW OSD requirements. These reports do not replace any reporting status required by the TD JTCP coordinator.

• The FAD will contain instructions that the funds will be used for the JTCP event support coordinated at the JTCC except as approved by the PD. Any changes to the JTCP plan that affect the funding allocation must be approved by the Program Director and the TD JTCP coordinator.

• Any changes to the quarterly spend plan must be coordinated with the Program Director, who will request changes to OSD via the JWFC business office.

Page 5: Joint National Training Capability - Corporate Board FY 10 JNTC Budget

25 Aug 2009 5

USJFCOM

UNCLASSIFIED

Terms of Reference for JFCOM Funding

Centrally Managed Capabilities : Support for JNTC national capabilities that are provided by JFCOM JFT.

– JAAR-RL, joint instrumentation development, JTEN expansion, KM/IM capabilities, CDS, JTEN Test Bed, network development efforts (e.g. Alternate JTEN, NexGen JTEN), JTDS, joint architectures and standards development, JATTL support contract, exercise control lab equipment and maintenance, and joint model and federation development.

TD JST Support: JFCOM JST contract support to JNTC.

– JFCOM contract support for Accreditation/Certification, event technical support and model integration, program assessment, and mitigation.

Events/Other Programs: Resources for Service and COCOM accredited programs, events, and other agencies

– TENA, FITE JCTD, BCTP, C-IED, SOF MRX Planners, and joint models technical integration and event support.

Page 6: Joint National Training Capability - Corporate Board FY 10 JNTC Budget

25 Aug 2009 6

USJFCOM

UNCLASSIFIED

Terms of Reference for JFCOM Funding

JNTC Management : JNTC funded labor for 34 military, 58 government, 10 other government civilians, and 31 contract FTEs from JST and non-JFCOM contracts; administrative expenses. (Fixed Cost)

JTEC : JATTL Lab building lease, guard services, utilities, and equipment maintenance contracts. (Fixed Cost)

JTEN Maintenance: NOSC, JTEN operations and maintenance, and network security. (Fixed Cost)

IW PBRs: POM 10 IW funds (O&M, RDTE, and OP) not specifically funding Service PBRs.

OPFOR PBRs: All OPFOR supporting the programs (O&M, RDTE, and OP) including O&M sustainment costs.

Page 7: Joint National Training Capability - Corporate Board FY 10 JNTC Budget

25 Aug 2009 7

USJFCOM

UNCLASSIFIED

FY10 JNTC Congressional Appropriation

OP $21,727,000

14%

RDTE $30,279,500

20%

O&M $100,971,800

62%

Total Program: $154,605,811 JFCOM Total: $97,748,551

Services Total: $56,857,260

Page 8: Joint National Training Capability - Corporate Board FY 10 JNTC Budget

25 Aug 2009 8

USJFCOM

UNCLASSIFIED

FY10 PEP Stakeholder Distribution

JFCOM$92,348,551

60%

Service Direct

$50,940,870 31%

USAF JNTC OPFOR OP $4,177,000

3%

JFCOM OPFOR OP $5,400,000,

4%

Total Program: $154,605,811 JFCOM Total: $97,748,551

Services Total: $56,857,260

Page 9: Joint National Training Capability - Corporate Board FY 10 JNTC Budget

25 Aug 2009 9

USJFCOM

UNCLASSIFIED

FY10 JNTC Program Distribution

Total Program: $154,605,811 JFCOM Total: $97,748,551

Services Total: $56,857,260

Navy $11,923,500

8%

USAF $18,497,000

12%

Army $14,067,929

9%

JFCOM OM $60,118,551

38%

JFCOM RDTE $22,850,000

15%

JFCOM OP $14,780,000, 10%

JFCOM Total $97,748,551

62%

USAF AP/OP $6,947,000

4%USMC

$5,421,831 4%

Page 10: Joint National Training Capability - Corporate Board FY 10 JNTC Budget

25 Aug 2009 10

USJFCOM

UNCLASSIFIED

Total Program: $154,605,811 JFCOM Total: $97,748,551

Services Total: $56,857,260

Centrally Managed Capability

$14,442,069 15%

Events/Other Programs

$5,164,340 5%

Support Elements

$4,842,000 5%

TD JST Support $7,542,000

8%JTEC

$1,835,000 2% JNTC Management

& Overhead $16,984,500, 18%

Service PBRs

$20,745,216 21%

Army $4,104,508, 4%

Navy $3,821,000, 4%

USAF $3,219,354, 3%

USMC $3,219,354, 3%

SOCOM $6,381,000, 7%

IW $5,086,666

5%

OPFOR $14,709,875

15%

JTEN Maintenance $5,800,250

6%

Internal Core JFCOM

Funding

$46,603,819 (48%)

Service/ COCOM

Training Programs

$50,548,097 (52%)

FY10 JFCOM JNTC Distribution

Page 11: Joint National Training Capability - Corporate Board FY 10 JNTC Budget

25 Aug 2009 11

USJFCOM

UNCLASSIFIED

FY10 Program ManagementProgram Management: $16,984,500Administrative Costs1: $4,310,819JFCOM Total: $97,748,551

GS Labor $6,100,000

36%

ISSA $2,565,819

15%

Other GS Labor $1,620,000

10%

JNTC Travel $500,000

3%

Lease, Shipping, Communications

$1,245,000 7%

PM Contract Labor

$4,953,681 29%

Note: 1. Administrative costs are used in operating an organization including rent, management salaries, utilities, security, travel, etc.

Page 12: Joint National Training Capability - Corporate Board FY 10 JNTC Budget

25 Aug 2009 12

USJFCOM

UNCLASSIFIED

FY 10 Budget Cuts ($K)

FY 10 Baseline

POM 10 INC

FY 10 Pres Bud

PBD 707 $5.7M

REDUCFY 10 ADJ

PBD 610 & 800

REDUCPBD 802 REDUC

Revised FY 10

JNTC 58,580.0 2,340.0 60,920.0 (1,874.6) 59,045.4 (1,053.2) (355.3) 57,636.9

IW 0.0 2,625.0 2,625.0 (80.8) 2,544.2 (47.1) (15.4) 2,481.7

Total 58,580.0 4,965.0 63,545.0 (1,955.5) 61,589.5 (1,100.3) (370.7) 60,118.5

The HAC-D has cut all growth for FY 10 which means the POM 10 O&M increase of $4,965K is at risk. The SAC-D had no reductions. Conference committee will make the final decision, which will be part of the FY 10 Appropriations Bill.

The JTCP Program has received $1.065M in FY 09 end of year funding.

Page 13: Joint National Training Capability - Corporate Board FY 10 JNTC Budget

25 Aug 2009 13

USJFCOM

UNCLASSIFIED

FY 10 Budget Issues

• FY 10 draft budget of 11 August accepted by SOCOM, Navy, USAF, JCS J7.

• Three remaining issues –

– USMC: JFCOM funds directly supporting pre-deployment training (PBR 2732 -USMC MRX JTF-FC Host Nation Role Players and PBR 3411- USMC SOF Role Players at MAGTFTC) received no allocation of funds.

– Army: JISR training at the CTCs was not funded.

– JWFC TD: No funding for procurement of NexGen JTEN equipment. This pushes the problem to the right and creates an insurmountable problem in the FY 12 - 13 timeframe. High risk that some persistent sites will become non-functional without ATM equipment replacement.

Page 14: Joint National Training Capability - Corporate Board FY 10 JNTC Budget

25 Aug 2009 14

USJFCOM

UNCLASSIFIED

FY 10 Budget Issues Resolutions

• USMC: Two PBRs for JFCOM funds directly supporting pre-deployment training were not allocated funding. (PBR 2732 -USMC MRX JTF-FC Host Nation Role Players and PBR 3411- USMC SOF Role Players at MAGTFTC). – Action: The PD has fully funded PBR 2732.

• Army: JISR training at the CTCs was not funded. – Action: The PD has funded PBR 3415 at $1.085M with FY 09 EOY

funds and FY 10 IW funds. Army will fund an additional $915K.

• JWFC TD: No funding for procurement of NexGen JTEN equipment. This pushes the problem to the right and creates an insurmountable problem in the FY 12 - 13 timeframe. High risk that some persistent sites will become non-functional without ATM equipment replacement.– Action: The PD recommends redistribution of JFCOM OP to allocate

$4M on PBR 2690 NexGen Equipment procurement. Details are in a separate brief. This will impact FY 10 JTEN expansion and USMC and Army procurement plans as allocated in the 11 August draft budget.

Page 15: Joint National Training Capability - Corporate Board FY 10 JNTC Budget

25 Aug 2009 15

USJFCOM

UNCLASSIFIED

Questions