28
John N. Galayda DESY Workshop [email protected] October 8, 2008 1 LCLS LCLS Commissioning in 2008 Commissioning in 2008 J. Galayda, for J. Galayda, for The The LCLS LCLS Construction/Commissioning Team Construction/Commissioning Team DESY DESY Oct. 8, 2008 Oct. 8, 2008 LCLS LCLS Overview Overview Construction Status Construction Status Commissioning results Commissioning results Stability Stability Day-to-Day Performance Day-to-Day Performance Short pulses Short pulses Plans for 2009 Plans for 2009 LCLS Instruments LCLS Instruments

John N. Galayda DESY [email protected] October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

Embed Size (px)

Citation preview

Page 1: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 20081

LCLSLCLS Commissioning in 2008 Commissioning in 2008J. Galayda, for J. Galayda, for The The LCLSLCLS Construction/Commissioning Team Construction/Commissioning Team

DESYDESY

Oct. 8, 2008Oct. 8, 2008

LCLSLCLS

OverviewOverviewConstruction StatusConstruction StatusCommissioning resultsCommissioning resultsStabilityStabilityDay-to-Day PerformanceDay-to-Day PerformanceShort pulsesShort pulsesPlans for 2009Plans for 2009LCLS InstrumentsLCLS Instruments

Page 2: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 20082

Linac Coherent Light Source at Linac Coherent Light Source at SLACSLAC

Injector (35Injector (35ºº))at 2-km pointat 2-km point

Existing 1/3 Linac (1 km)Existing 1/3 Linac (1 km)(with modifications)(with modifications)

Far ExperimentFar ExperimentHall (underground)Hall (underground)

Near Experiment Hall Near Experiment Hall (underground)(underground)

New New ee Transfer Line (340 m) Transfer Line (340 m)

X-ray X-ray Transport Transport Line (200 m)Line (200 m)

Undulator (130 m)Undulator (130 m)

X-Ray Transport/Optics/Diagnostics

Page 3: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 20083

Linac-to-Undulator (227m)

X-rayTransport(200m)

UndulatorHall (175m)Beam Dump (40M)

Front End (29m)

NearExpt’l.Hall

Near Experimental Hall

1.9 Conventional Facilities >84% complete Turner Construction Co. >90% complete

FarExpt’l.

Hall

64.6 m

14 m

Page 4: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 20084

Far Hall rebar latticeTunnel construction complete 25 April 2008

Page 5: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 20085

Far Experimental Hall south ribInstalling re-bar in the Far Experimental Hall

Far Experimental Hall Structural Shell

Page 6: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 20086

LCLSLCLS Injector Injector

100% Complete100% Complete LCLSLCLS Linac Linac

>96% Complete>96% Complete

Commissioning Complete Commissioning Complete

3/20083/2008

Commissioning Complete 9/2007Commissioning Complete 9/2007

Undulator>80% complete

Page 7: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 20087

dualdualfeedfeed

βr/

mm

-0.008

-0.006

-0.004

-0.002

0.000

0.002

0.004

0.006

0.008

-180 -120 -60 0 60 120 180

rf phase

cylindrical cavity

racetrack cavity withd=0.124"racetrack cavity withd=0.14"racetrack cavity withd=0.134"β

r/m

m

-0.008

-0.006

-0.004

-0.002

0.000

0.002

0.004

0.006

0.008

-180 -120 -60 0 60 120 180

rf phase

cylindrical cavity

racetrack cavity withd=0.124"racetrack cavity withd=0.14"racetrack cavity withd=0.134"

βr/

mm

-0.008

-0.006

-0.004

-0.002

0.000

0.002

0.004

0.006

0.008

-180 -120 -60 0 60 120 180

rf phase

cylindrical cavity

racetrack cavity withd=0.124"racetrack cavity withd=0.14"racetrack cavity withd=0.134"β

r/m

m

-0.008

-0.006

-0.004

-0.002

0.000

0.002

0.004

0.006

0.008

-180 -120 -60 0 60 120 180

rf phase

cylindrical cavity

racetrack cavity withd=0.124"racetrack cavity withd=0.14"racetrack cavity withd=0.134"

RF Gun Installed in March 2007RF Gun Installed in March 2007

Page 8: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 20088

Injector Vault (Oct. ’07)Injector Vault (Oct. ’07)

transverse transverse RF deflectorRF deflector

RF gunRF gun

6-135 MeV 6-135 MeV booster linacbooster linac

OTR screens OTR screens & wire-& wire-scannersscanners

Page 9: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 20089

Beam Transport Hall6/10/08

Page 10: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200810

ANL Work >97% Complete

Quadrupole

Vacuum Chamber

Undulator Segment

RF Cavity BPM

Girder

Page 11: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200811

Undulator Hall

First electrons 12/2008Install Undulators 3/2009

Page 12: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200812

SolidAttenuator

Gas Attenuator

Slit

Start of Experimental

Hutches

5 mm collimator

Muon Shield

Hard X-Ray Offset mirror

system

PulseEnergyThermal Detector

Gas Detector

Gas Detector

e-

Direct Imager

Hard x-ray Monochromator (K Spectrometer)

Soft X-Ray Offset mirror

system

LLNLLLNL

WBS 1.5 is >80% complete

Front end X-ray optics being assembled

All mirrors delivered; mirror figures meet spec

Most diagnostics under assembly at LLNL

X-Ray Transport/Optics/Diagnostics

Page 13: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200813

Measured configuration should give 1012 of photons @ 1.5 Angstrom in 100 fs pulse, the LCLS goal

Will start FEL commissioning in this configuration

Page 14: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200814

Slice Emittance at 135 MeV

Page 15: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200815

LCLS-Quality Beam Demonstrated

Electron beam emittance Electron beam emittance measurementsmeasurements9.2 GeV point in linac0.25 nC, 75 fs 0.25 nC, 75 fs

14 GeV e-beam good14 GeV e-beam goodenough forenough for

~11 GW@ 8 keV

Page 16: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200816

(3.3 days) May 24, 2008 00:01 to May 27 09:00(3.3 days) May 24, 2008 00:01 to May 27 09:00

weekend weekend run at run at

0.25 nC, 0.25 nC, with no with no tuningtuning

Emittance Stability at End of LinacEmittance Stability at End of Linac

((xxyy))1/21/2 = 1.04 = 1.04 mm

Saturation Saturation at 1.5 at 1.5 ÅÅ in in

100 m 100 m (assuming (assuming BBA, etc)BBA, etc)

Page 17: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200817

Normalized phase space centroid jitter Normalized phase space centroid jitter after BC1after BC1 (~4% of rms beam size) (~4% of rms beam size)

D. RatnerD. Ratner

Stability is Stability is not so far not so far from the from the

goal (~10%)goal (~10%)

… … near near end of linacend of linac (10-15% of rms beam size) (10-15% of rms beam size)

RMS RMS AAxNxN = 14% = 14% RMS RMS AAyNyN = 9% = 9%

EE//EE jitter jitter 0.03% 0.03%QQ//QQ jitter jitter 1.5% 1.5%

RMS RMS AAxNxN = 3.9% = 3.9% RMS RMS AAyNyN = 3.4% = 3.4%

QQ = 0.25 nC = 0.25 nC

1-1- beam beam sizesize

Page 18: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200818

Now measure BPM jitter both Now measure BPM jitter both with transverse RF OFF, and with transverse RF OFF, and then ON (at constant phase)then ON (at constant phase)

tt ±0.6 ps±0.6 ps

slope = slope = 2.34 mm/deg2.34 mm/deg

9 9 m rmsm rms 110 110 m rmsm rms

TCAV ONTCAV ONTCAV OFFTCAV OFF

BPM

Y P

ositi

on (

mm

)B

PM Y

Pos

ition

(m

m)

Measuring Bunch Arrival Time JitterMeasuring Bunch Arrival Time Jitter

ee

VV((tt))

SS-band (2856 MHz)-band (2856 MHz) BPMBPM

Timing Jitter (w.r.t. RF) = (110 Timing Jitter (w.r.t. RF) = (110 m)/(2.34 mm/deg) = 0.047 deg m)/(2.34 mm/deg) = 0.047 deg 46 fsec rms46 fsec rms

QQ = 0.25 nC = 0.25 nC

Page 19: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200819

Time-sliced Time-sliced xx-Emittance at Very Low Charge-Emittance at Very Low Charge

20 pC20 pC135 MeV135 MeV0.6-mm spot diameter0.6-mm spot diameter400 400 µµm rms bunch length (5 A)m rms bunch length (5 A)

TAILTAIL

(not same data)(not same data)

0.14 0.14 µµmm

Page 20: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200820

zz 1 1 m ?m ?

8 kA?8 kA?

LiTrackLiTrack(no CSR)(no CSR)

xx 0.4 0.4 m at m at zz 1 1 mm

Measurements and SimulationsMeasurements and Simulationsfor 20-pC Bunch at 14 GeVfor 20-pC Bunch at 14 GeV

Photo-diode signalPhoto-diode signal on OTR screen after BC2 shows on OTR screen after BC2 shows minimum compression at L2-linac phase of -34.5 deg.minimum compression at L2-linac phase of -34.5 deg.

Horizontal projected emittanceHorizontal projected emittancemeasuredmeasured at 10 GeV, after BC2, at 10 GeV, after BC2,using 4 wire-scanners.using 4 wire-scanners.

Y. DingY. Ding

LCLS FEL LCLS FEL simulationsimulation at 1.5 at 1.5 ÅÅ based on measured based on measured injector beam and injector beam and ElegantElegant tracking, tracking, with CSR, at 20 pC.with CSR, at 20 pC.

1.5 Å1.5 Å,,3.63.610101111 photons photonsIIpkpk = 4.8 kA = 4.8 kA 0.4 µm0.4 µm

PRELIMINARYPRELIMINARY

Page 21: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200821

20-pC Bunch at 4.3 GeV, 15 Angstrom 20-pC Bunch at 4.3 GeV, 15 Angstrom Approaches a LongitudinallyApproaches a LongitudinallyCoherent Single SpikeCoherent Single Spike

Y. DingY. Ding

15 Å15 Å,zz = 25 m, = 25 m,2.42.410101111 photons, photons,IIpkpk = 2.6 kA, = 2.6 kA, 0.4 µm0.4 µm

(power profile at (power profile at zz = 25 m varies from = 25 m varies from shot to shot due to noisy startup)shot to shot due to noisy startup)

1.2 fs1.2 fs

zz = 25 m = 25 m

LCLS FEL LCLS FEL simulationsimulation at 15 at 15 ÅÅ based on measured injector beam based on measured injector beam and and ElegantElegant tracking, tracking, with CSR, at with CSR, at 20 pC.20 pC.

Page 22: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200822

LCLSLCLS Installation and Commissioning Time-Line Installation and Commissioning Time-Line

LTU

/Und

/Dum

p

LTU

/Und

/Dum

p

Inst

all

Inst

all

Re-Re-commission commission

Inj/BC2 to SL2Inj/BC2 to SL2

LTU/LTU/UndUndComm. Comm.

First LightFirst Lightin FEEin FEE

PEP-I

I ru

n

PEP-I

I ru

n

ends

ends

FEE/N

EH

In

stall

FEE/N

EH

In

stall

PPS C

ert

. LT

U/D

um

pPPS C

ert

. LT

U/D

um

p

FEH

In

stall

FEH

In

stall

CD

-4C

D-4

(7

/31

/201

0)

(7/3

1/2

01

0)

X-R

ays

in N

EH

X-R

ays

in N

EH

First LightFirst Lightin FEHin FEH

NEH NEH Operations/ Operations/ CommissioningCommissioning

JJJJ FFFF MMMM AAAA MMMM JJJJ JJJJ AAAA SSSS DDDD JJJJ FFFF MMMM AAAA MMMM JJJJ JJJJ AAAA SSSS OOOO NNNN DDDD JJJJ FFFF MMMM AAAA MMMM JJJJ JJJJOONNA

2008 2009 20102008 2009 2010 2008 2009 20102008 2009 2010DownDown

PP

SP

PS

AM

no

wn

ow

Linac/BC2 Linac/BC2 CommissioninCommissionin

g g FEEFEE

Comm. Comm. May 2, 2008May 2, 2008

FEH

Hutc

h B

OFE

H H

utc

h B

O

Un

d.

Seg

. In

sta

llU

nd

. S

eg

. In

sta

ll

Page 23: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John [email protected]

DESY WorkshopOctober 8, 2008 23

Atomic Physics (LCLS) Atomic Molecular and Optical Physics 8/2009

Plasma and Warm Dense Matter Materials/matter under Extreme Conditions

Nanoscale Dynamics Coherent scattering at thein Condensed matter (LUSI) nanoscale (XCS) 3/2012

Structural Studies on Single Nano-particle and singleParticles and Biomolecules molecule (non-periodic)(LUSI) imaging (CXI) 4/2011

Femtochemistry Pump/probe diffraction (LUSI) dynamics (XPP) 12/2010

Soft X-Ray Imaging & Spectroscopy (SXR) 12/2009

FEL Science/Technology

Program developed by international team of scientists working with accelerator and laser physics communities

SLAC Report 611

“First Experiments” Realized within Concepts LCLS and LUSI

Science with LCLS

Page 24: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200824

Envisioned Placement of ExperimentsEnvisioned Placement of Experiments

Electron Dump

FEE

Hutch 1 Hutch 2 Hutch 3

X-Ray TunnelHutch 4

Hutch 5

Hutch 6S0

S1

S2

SH 1

M 1S M2S

M 3/4S

X3 X4

M6

S 3

SH2

S4

S5

S 6

Horizontal Offset Mirrors

PPS Stopper Set

X- Ray Mirror

X-Ray Crystal

Primary Movable Elements

Experiment

Near Experimental Hall

Far Experimental Hall

Moveable Dump

XPCS Pos2

XPCS

Pos1CXI

HED

XPP Pos1

XPP

Pos2

AM O

SXP

SXP

LUSI LUSILUSI

LCLS

BESSYDESY LBNL

SLAC

Page 25: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200825

Find out what will be

Schematic of AMO Instrument•Build/buy and assemble – Jul-Dec 2008•Assembly & Testing – Feb-Jun 2009•Ready for first light – Jul 2009

July 2010

Page 26: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200826

AMO Experiment Proposals for August 2009 Run

28 Proposals

206 Individual Signatories (82 from US)

15 Countries13 US States

13 US Universities

4 DOE Labs

>200% of beam time

Page 27: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200827

For More LCLS Information

LCLS Web Page

http://lcls.slac.stanford.edu/

Instrument Descriptions and Specifications

http://lcls.slac.stanford.edu/Instruments.aspx

LCLS User Meeting 15-18 October

http://www-conf.slac.stanford.edu/ssrl-lcls/2008/Proposal Submission

https://oraweb.slac.stanford.edu/apex/slacprod/f?p=188:1

Page 28: John N. Galayda DESY Workshopgalayda@slac.stanford.edu October 8, 2008 1 LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning

John N. Galayda

DESY Workshop [email protected]

October 8, 200828

Presentation MaterialsThanks to:SLAC ANL LLNLJess Albino Geoffrey Pile Richard BiontaJohn Arthur Bill Berg Donn McMahon Paul Emma Marion WhiteTom FornekDavid SaenzDavid Schultz