GRAVE SITES OF CANADIAN PRIME MINISTERSMONITORING REPORT
[Grave Sites of Canadian Prime Ministers Monitoring Report: The Right Hon. John George Diefenbaker] Page 1 of 17
SUBJECT: The Right Hon. John George Diefenbakers Grave SiteGrave Sites of Canadian Prime Ministers Monitoring Report
Diefenbaker Canada CentreUniversity of Saskatchewan Campus, Saskatoon, SK
TO: Madame Julie Dompierre, DirectorHistoric Sites and Monuments Board of Canada (HSMBC)Les Terrasses de la Chaudire25, Eddy Street, Gatineau, 5th floorQuebec K1A 0M5
FOR: National Program for the Grave Sites of Canadian PrimeMinisters
THE RIGHT HONOURABLE
OHN GEORGE DIEFENBAKER
7/31/2019 John Diefenbaker Grave Site Monitoring Report 2011
2/17
GRAVE SITES OF CANADIAN PRIME MINISTERSMONITORING REPORT
[Grave Sites of Canadian Prime Ministers Monitoring Report: The Right Hon. John George Diefenbaker] Page 2 of 17
PREPARED BY: Jim Wagner, Conservation ArchitectW&N Asset Management, Parks Canada Agency145 McDermot Avenue, Winnipeg, MB R3B 0R9
DATE: January 31, 2012
1.0 GENERAL INFORMATIONDATE OF INSPECTION: August 26, 2011PC FIELD UNIT CONTACT: Audra Norek, A/CRM Advisor,
Saskatchewan South Field Unit, Parks Canada,P.O. Box 13, Gerald, Saskatchewan S0A 1B0306-745-6234
CLIMATIC CONDITIONS: Clear sky, 20 degrees CelsiusGENERAL DESCRIPTION OF THE GRAVE SITE ENVIRONMENT:The grave of The Right Honourable John George Diefenbaker is located on a grassyslope at the side of a paved path on the University of Saskatchewan campus. Itoverlooks a shallow ravine that leads to the South Saskatchewan River valley.Downtown Saskatoon is visible in the distance. The single grave marker for the PrimeMinister and his second wife Olive Evangeline is composed of light grey granite slabsset flush with the ground.
2.0 COMPONENTS OBSERVATION AND RECOMMENDED INTERVENTIONS
1. Awareness Panel
Description: Cast aluminum plaque with grey-greenenamel, approx 610mm x 1015mm, mounted to a steelback plate, supported by a 100mm diameter steel post witha black spun-aluminum base cover, on a circular concretebase, approx 1.8m high overall.
7/31/2019 John Diefenbaker Grave Site Monitoring Report 2011
3/17
GRAVE SITES OF CANADIAN PRIME MINISTERSMONITORING REPORT
[Grave Sites of Canadian Prime Ministers Monitoring Report: The Right Hon. John George Diefenbaker] Page 3 of 17
Observation: Steel back plate has corrosion onsurface and at welds. Finish has continued to fadesince 2005.
Recommended Action:Medium priority:Determine type of finish on back plate and proposemethods for corrosion removal and treatment.
Paint steel back plate satin black to match basecover. Remove plaque from backing plate to permit
proper preparation and paint application. Re-installplaque.
Observation: Marks and oxidation on steel post.Finish has continued to fade since 2005.
Recommended Action:Medium priority:Determine type of finish on steel post and proposemethods for corrosion removal and treatment.
Paint steel post satin black to match base cover.
7/31/2019 John Diefenbaker Grave Site Monitoring Report 2011
4/17
GRAVE SITES OF CANADIAN PRIME MINISTERSMONITORING REPORT
[Grave Sites of Canadian Prime Ministers Monitoring Report: The Right Hon. John George Diefenbaker] Page 4 of 17
2. Flagpole
Description: Black anodized aluminum pole with abrass ball finial and black spun-aluminum basecover, on a circular concrete base, approx 9m high.
Observation: Anodizedfinish on pole is scratched.
Condition is relatively unchanged since 2005.
Recommended Action:Ongoing: Continue to monitor condition of thefinish.
7/31/2019 John Diefenbaker Grave Site Monitoring Report 2011
5/17
GRAVE SITES OF CANADIAN PRIME MINISTERSMONITORING REPORT
[Grave Sites of Canadian Prime Ministers Monitoring Report: The Right Hon. John George Diefenbaker] Page 5 of 17
Observation: Small dent
in base cover.
Recommended Action:Ongoing: Continue tomonitor condition of basecover.
3. 125th Confederation Anniversary Plaque
Description: Cast
bronze and maroonenamel plaque, approx300mm x 500mm,mounted on a light greygranite base. The granitebase has a slope andcoved-edge detailmatching the main gravemarker.
7/31/2019 John Diefenbaker Grave Site Monitoring Report 2011
6/17
GRAVE SITES OF CANADIAN PRIME MINISTERSMONITORING REPORT
[Grave Sites of Canadian Prime Ministers Monitoring Report: The Right Hon. John George Diefenbaker] Page 6 of 17
Observation: Right edge
of plaque is abraded.Condition is relativelyunchanged since 2005.
Recommended Action:Low priority: Examineabrasion damage andadvise if repair ispossible.
Observation: Smallmarks and oxidation.
Condition is relativelyunchanged since 2005.
Recommended Action:Low priority: Examinemarks and oxidation andadvise if repair ispossible.
7/31/2019 John Diefenbaker Grave Site Monitoring Report 2011
7/17
GRAVE SITES OF CANADIAN PRIME MINISTERSMONITORING REPORT
[Grave Sites of Canadian Prime Ministers Monitoring Report: The Right Hon. John George Diefenbaker] Page 7 of 17
Observation: Granitebase chipped at bothfront corners. Condition isunchanged since 2005.
Recommended Action:Low priority: Examinedamage to granite baseand advise if repair ispossible.
4. Former Prime Ministers Grave Marker
Description: Ten light-grey granite slabs,approx 400mm x 800mmand more than 100mmthick, arranged in asquare approx 2.4m x2.4m overall, set flushwith the ground. There isa central panel of lightgrey granite with blacklettering and a coved
edge around the top andbottom perimeter. Thecentral panel is tilted atan angle towards thepath and there are twosmall flower beds in theinterstitial spaces.
7/31/2019 John Diefenbaker Grave Site Monitoring Report 2011
8/17
GRAVE SITES OF CANADIAN PRIME MINISTERSMONITORING REPORT
[Grave Sites of Canadian Prime Ministers Monitoring Report: The Right Hon. John George Diefenbaker] Page 8 of 17
Observation: Chips on
edges of severalperimeter slabs. Thereappears to be moredamage than in 2005.
Recommended Action:Low priority: Examinedamage to granite slabsand advise if repair ispossible.
Observation: Perimeterslabs are uneven. The
movement and settling ofgranite slabs is morepronounced than in 2005.
Recommended Action:High priority: Lift slabs,level and compact base,and re-set slabs in place.
7/31/2019 John Diefenbaker Grave Site Monitoring Report 2011
9/17
GRAVE SITES OF CANADIAN PRIME MINISTERSMONITORING REPORT
[Grave Sites of Canadian Prime Ministers Monitoring Report: The Right Hon. John George Diefenbaker] Page 9 of 17
Observation: Chip atlower left (front) corner ofcentre panel. Condition isunchanged since 2005.
Recommended Action:Low priority: Examinedamage to granite centrepanel and advise if repairis possible.
Observation: Rust-likemarks on faces and
edges of slabs. Conditionis relatively unchangedsince 2005.
Recommended Action:Low priority: Examinedamage to granite slabsand advise if repair ispossible.
Determine cause of
marks.
7/31/2019 John Diefenbaker Grave Site Monitoring Report 2011
10/17
GRAVE SITES OF CANADIAN PRIME MINISTERSMONITORING REPORT
[Grave Sites of Canadian Prime Ministers Monitoring Report: The Right Hon. John George Diefenbaker]Page 10 of 17
Observation: Grass is
growing between graniteslabs. This is an ongoingmaintenance issue.
Recommended Action:Ongoing: Removeblades of grass by hand.
5. Vegetation (trees, shrubs, plant material, lawn)
Description: Vegetationconsists oflawn and two
Little-leaf Lindenssymmetrically placed onthe grave (south) side ofthe path and a small risewith lawn and trees onthe opposite side of thepath.These trees consist of sixLittle-leaf Lindens approx6m high and spacedapprox 5m apart, and a
clump of three ScotsPines.A group of shrubs flanksthe left side of the path atits starting point.
Flower beds within the grave marker are planted with a selection of annuals.
7/31/2019 John Diefenbaker Grave Site Monitoring Report 2011
11/17
GRAVE SITES OF CANADIAN PRIME MINISTERSMONITORING REPORT
[Grave Sites of Canadian Prime Ministers Monitoring Report: The Right Hon. John George Diefenbaker]Page 11 of 17
Observation: TwoLittle-leaf Lindens approx 2.5mhigh are located about3.5m from either side ofthe grave. They wereplanted in 2008 andreplace aged poplars asper recommendation ofthe 2005 report.
Recommended Action:Ongoing: Provide
ongoing maintenance toensure vigorous growthof young trees.
Observation:Richardson groundsquirrels are nesting near
the grave. They do notappear to be having anadverse effect on thegrave site. Condition isrelatively unchangedsince 2005.
Recommended Action:Ongoing: Continue tomonitor squirrel activity.
7/31/2019 John Diefenbaker Grave Site Monitoring Report 2011
12/17
GRAVE SITES OF CANADIAN PRIME MINISTERSMONITORING REPORT
[Grave Sites of Canadian Prime Ministers Monitoring Report: The Right Hon. John George Diefenbaker]Page 12 of 17
6. Landscape Features (pavement, benches and others)
Description: The gravesite is reached by anasphalt-paved pathleading from the parkingentrance. It isapproximately 2.4m widewith a concrete edge.A gravel landscapefeature, where theflagpole and awareness
panel are located,defines the entry point.Irregularly spacedaluminum light standards,approximately 3.5m high,are located along oneside of the path.The path connects twonearby parking areas andwill soon connect with thelarger path system on the
university campus.
Observation: Damagedconcrete edge. Condition isrelatively unchanged since2005.
Recommended Action:Ongoing: Continue tomonitor condition.
Replace concrete edge ifcondition worsens.
7/31/2019 John Diefenbaker Grave Site Monitoring Report 2011
13/17
GRAVE SITES OF CANADIAN PRIME MINISTERSMONITORING REPORT
[Grave Sites of Canadian Prime Ministers Monitoring Report: The Right Hon. John George Diefenbaker]Page 13 of 17
Observation: Gravel
landscape feature atentry point to the path.
The 2005 reportrecommended installationof pre-cast concretepaving units to address amaintenance issue.
Current maintenanceappears to be adequate.
Recommended Action:Ongoing: Continue tomonitor condition ofgravel landscapefeature.
3.0 PREVIOUS CONSERVATION INTERVENTIONS
1994 Install 125th anniversary commemorative plaque
2000 Install Awareness Panel, flagpole and entry node2008 Re-enamel lettering on grave marker2008 Re-pave the path from entry node to approx 5m past grave site2008 Replace two poplars with Little-leaf Lindens
4.0 ADDITIONAL COMMENTS
The 2005 Condition Monitoring Report makes some recommendations regarding themaintenance agreement between the Government of Canada and the University ofSaskatchewan. The University has confirmed that there is no formal maintenanceagreement. South Saskatchewan Field Unit has reported that preliminary discussions
about entering into an agreement were held in 2006/2007. A preliminary cost estimate toimplement the recommended maintenance was prepared by the University.
The 2005 Condition Monitoring Report recommends annually supplying a new Canadianflag to the University. None have been provided except possibly in 2009.
7/31/2019 John Diefenbaker Grave Site Monitoring Report 2011
14/17
GRAVE SITES OF CANADIAN PRIME MINISTERSMONITORING REPORT
[Grave Sites of Canadian Prime Ministers Monitoring Report: The Right Hon. John George Diefenbaker]Page 14 of 17
The 2005 Condition Monitoring Report speculates that landscape maintenance and/or
snow clearance appears to be the source of damage at the grave marker andrecommends reviewing grounds-keeping practices with University maintenance staff. Itis not known if this was done.
The steel back-plate and supporting pole for the Awareness Panel had a poor qualitypaint finish applied in 2000. Significant fading was observed in 2005 and was already aforeseen concern in 2001. The Universitys cost estimate assumed annual paintingwould be required. Since the original paint specifications are obsolete, consider using acoating system that is better suited to a severe exterior environment.
Annual inspections have been done by the Field Unit but detailed records have not been
kept. Records of interventions have been kept by the Diefenbaker Centre.
5.0 SUMMARY OF RECOMMENDATIONS
Awareness Panel
Medium priority: Determine type of finish on back plate and propose methods forcorrosion removal and treatment.Paint steel back plate satin black to match base cover. Remove plaque from backingplate to permit proper preparation and paint application. Re-install plaque.Determine type of finish on steel post and propose methods for corrosion removaland treatment.
Paint steel post satin black to match base cover.
Flagpole
Ongoing: Continue to monitor condition of the finish.Continue to monitor condition of base cover.
125th Confederation Anniversary Plaque
Low Priority: Examine abrasion damage and advise if repair is possible.Examine marks and oxidation and advise if repair is possible.Examine damage to granite base and advise if repair is possible.
Former Prime Ministers Grave Marker High Priority: Lift slabs, level and compact base, and re-set slabs in place.
Low Priority: Examine damage to granite slabs and advise if repair is possible.Examine damage to granite centre panel and advise if repair is possible.Examine damage to granite slabs and advise if repair is possible. Determine causeof marks.
Ongoing: Remove blades of grass by hand.
7/31/2019 John Diefenbaker Grave Site Monitoring Report 2011
15/17
GRAVE SITES OF CANADIAN PRIME MINISTERSMONITORING REPORT
[Grave Sites of Canadian Prime Ministers Monitoring Report: The Right Hon. John George Diefenbaker]Page 15 of 17
Vegetation Ongoing: Provide ongoing maintenance to ensure vigorous growth of young trees.
Continue to monitor squirrel activity.
Landscape Features
Ongoing: Continue to monitor condition. Replace concrete edge if damageworsens.Continue to monitor condition of gravel landscape feature.
Following is a summary of the recommended actions over the next five coming years:
Recommendations 2012 2013 2014 2015 2016Awareness Panel Determine
type offinish onback plateandproposemethods forcorrosionremovaland
treatment.Paint steelback platesatin blackto matchbase cover.Removeplaque frombackingplate topermit
properpreparationand paintapplication.Re-installplaque.
7/31/2019 John Diefenbaker Grave Site Monitoring Report 2011
16/17
GRAVE SITES OF CANADIAN PRIME MINISTERSMONITORING REPORT
[Grave Sites of Canadian Prime Ministers Monitoring Report: The Right Hon. John George Diefenbaker]Page 16 of 17
Determine
type offinish onsteel postandproposemethodsforcorrosionremovalandtreatment.
Paint steelpost satinblack tomatchbasecover.
Flagpole Continue to monitor condition of the finish and of the base cover.125th
ConfederationAnniversaryPlaque
Examineabrasiondamageand advise
if repair ispossible.
If possible, repair.
Examinemarks andoxidationand adviseif repair ispossible.
If possible, repair
Examinedamage togranite
base andadvise ifrepair ispossible.
If possible, repair
7/31/2019 John Diefenbaker Grave Site Monitoring Report 2011
17/17
GRAVE SITES OF CANADIAN PRIME MINISTERSMONITORING REPORT
[Grave Sites of Canadian Prime Ministers Monitoring Report: The Right Hon. John George Diefenbaker]Page 17 of 17
Former Prime
Ministers GraveMarker
Remove blades of grass by hand.
Examinedamage tograniteslabs andadvise ifrepair ispossible.Determinecause ofmarks.
If possible, repairgranite slabs.
Lift slabs, level
and compactbase, and re-set slabs inplace.
Examinedamage togranitecentrepanel andadvise ifrepair is
possible.
If possible, repairgranite centre panel.
Vegetation Provide ongoing maintenance to ensure vigorous growth ofyoung trees and continue to monitor squirrel activity.
LandscapeFeatures
Continue to monitor condition (including the gravel landscapefeature). Replace concrete edge of paths if damage worsens.