13
Chapter-6 Construction Process 6.1 Site Surveying and Preparation 6.2 Arrangement of Facilities and Shops/Job Layout 6.3 Material Handling System 6.4 Financial Management and Cash flow Management

Job Layout

Embed Size (px)

DESCRIPTION

how to layout the facilitees on the construction site

Citation preview

Chapter-6 Construction Process6.1SiteSurveyingand Preparation6.2ArrangementofFacilities and Shops/o! "ayout6.#$aterial %andling System6.&Financial$anagement and Cash'o( $anagement6.1 Site Surveying and Preparation)hile e*ecuting design and dra(ing at +rst, the engineer has to lay outthedesignsanddra(ingonthegroundtostartphysically !uildinguptheproposeddesignandplan.-hisis(hatismeant site surveying and preparation in the e*ecution stage. -he site engineer has to mo!ili.e a large num!ers of craft people, heavy e/uipment, stac0 materials and set up an o1ce to e*ecute all of them. -herefore, during site surveying, the engineer has to allocatespaces,servicesandfacilitiestothepeopleinvolvedin the construction. At the same time safety during construction has to !e paid attentions.-emporaryservicesarenecessarytoe*ecutetheconstruction (or0.-emporaryservicesincludetemporaryo1ces,electricity, telecommunication,road(ays2accessroad3,drin0ing(ater, sanitation system etc. Also,heavyandcostliere/uipmentandconstructionmaterials shouldalso!eallocatedspacesinandaroundthesiteo1ceso that no part of the e/uipment, materials or any other !e stolen or !ro0en !y outsiders. Continued--he engineer also needs to thin0 a!out the disposal of thede!risgeneratedfromtheconstruction.4nroad construction,e*cavatedearthhasto!edisposed properly (ithout distur!ing the environment. )hilesettingtemporaryo1ce,theengineershould considerfunctiona!ility(ithinandaroundthesite o1ce to avoid delay in any (or0 !eing carried out.4nsitesurveyingtheengineerlayoutcenterlinesand sidesoftheproposedroad,andsearchesreference pointsand!enchmar0ssetpreviouslytocarryout laying e*actly as in the design and dra(ings.Similarly,cornerpro+lesare+*edforcenterlinesof (allsin!uildingsites.5enchmar0sarealso esta!lished for carrying out levels of the !uildings so thatrelativelevelsofotherstructuresandfacilities can!edetermined.-hosepaintsshould!e maintainedthroughouttheconstructionperioduntil the construction completes.6.2 Arrangement of Facilities and Shops/o! "ayoutFacilitiesre/uiredforthesitemay!etheresourcesas re/uired in the site. -hose include manpo(er, machines, andmaterials.Amongthese,manpo(eristhe+rstto consider,forhumans(or0(iththeirmind.-hose humans are laid out according to their +eld of (or0. 4t is usuallycalledanorgani.ation,in(hichtheperformers andthecontrollercomefacetofacetosolvethe pro!lems in time. -hemaino!6ectiveofconstructionmanagementisto e*ecutetheconstructionpro6ectinane1cientmanner toaccomplishthe(or0economically.Construction pro6ectinvolvesfrompro6ect!eginningtoits accomplishment.-herefore,constructionmanagement (or0involvesfrompro6ectinceptiontocompletionand utility start up. -he ma6or o!6ectives can !e summari.ed as follo(s-Continued--to complete the work in time,toexecutetheworkwithinallocatedbudget economically,toexecutetheworkatanticipatedquality standard,toexecutetheworkinanon-dispute environment, andTo maintain the environment at balance.Factors to !e considered in preparing 6o! layout1.Access to site7 -here should !e entrance/e*it to site. 5eside, there should !e a trac0 on the site for easy and e1cient movement of all site tra1c (ith economic distance.2.Storage of materials7 Cement !ags should !e stac0ed in raised platform covering (ith (ater proo+ng materials. 4t should !e 0ept #8 cm a(ay from the (all and stac0 shall normally contain 12 !ags.5ric0s tiles and concrete !loc0s are stac0ed at ground level (ith ma*imum ht. of 2m.Aggregate are stac0ed on a clean hard surface in stac0s of 2m92m98.:m.4n'amma!le/;*plosive materialsmust !e stac0ed separately from other com!usti!le material especially protected from +re ha.ards.