www.pace2020.com | See the possibilities… Job Costing & Work In Process

Job Costing & Work In Process

  • Upload
    finn

  • View
    24

  • Download
    0

Embed Size (px)

DESCRIPTION

Job Costing & Work In Process. Overview. Department, Cost Centers & Activity Codes (DCA) is the breakdown of the business. Departments & Cost Centers organize the activity codes in a logical order. ID’s contain logic to maintain DCA order. - PowerPoint PPT Presentation

Citation preview

Page 1: Job Costing & Work In Process

www.pace2020.com | See the possibilities…

Job Costing & Work In Process

Page 2: Job Costing & Work In Process

www.pace2020.com | See the possibilities…

Overview• Department, Cost Centers & Activity Codes

(DCA) is the breakdown of the business.• Departments & Cost Centers organize the

activity codes in a logical order.• ID’s contain logic to maintain DCA order.• Every cost in ePace is associated to an activity

code.• Materials & outside purchases are considered

departments in the organized structure.• Activity codes can also be used for tracking jobs.

Page 3: Job Costing & Work In Process

Departments

• Top tier of the structure• Three-digit ID• Most often broken down by internal

departments• Contain additional settings for job jacket notes

www.pace2020.com | See the possibilities…

Page 4: Job Costing & Work In Process

Cost Centers• Cost centers are a group of like activity codes

or pieces of equipment.• Three-digit ID, containing the department ID.• Each department contains a group of relative

cost centers.• Can track total impressions of a press when

production units are tracked in Data Collection.• Can capture actual hours and cost vs.

budgeted hours and cost for the cost center.(Cost Recovery Report)

www.pace2020.com | See the possibilities…

Page 5: Job Costing & Work In Process

Activity Codes

• Group of like operations relative to a specific cost center

• Budgeted hourly rates reside on the activity code• Five-digit ID containing the department and cost

center ID’s• Contains Data Collection settings specific to the

operation• Can leverage activity codes to track milestones

during the manufacturing of a job

www.pace2020.com | See the possibilities…

Page 6: Job Costing & Work In Process

Activity Codes

• Can be set to automatically create an actual cost for items you may not necessarily track. Example: Ink

• WIP category is associated to the activity code

www.pace2020.com | See the possibilities…

Page 7: Job Costing & Work In Process

WIP Categories

• User-defined buckets that capture actual costs generated on a job.

• Determines those operations (costs) considered as value added, for Estimating and reporting purposes.

• Determines those operations (costs) considered hard costs, for Estimating and reporting purposes.

www.pace2020.com | See the possibilities…

Page 8: Job Costing & Work In Process

WIP Categories

• No WIP category should be flagged as both value added and cost.

• WIP category 10, Freight, cannot be altered because ePace coded logic uses this category.

• Costs are distributed to WIP when transactions are posted to the jobs.

• Costs are removed from WIP when the job is billed.

www.pace2020.com | See the possibilities…

Page 9: Job Costing & Work In Process

Common WIP Categories

• Materials• Paper• Prepress• Press• Bindery• Freight• Outside Purchases• Shipping/Fulfillment

www.pace2020.com | See the possibilities…

Page 10: Job Costing & Work In Process

Note Categories

Used to categorize notes in various parts of ePace:– Customer – Contact– Job – Job Jacket– CRM

www.pace2020.com | See the possibilities…

Page 11: Job Costing & Work In Process

Note Categories – Job Control

The following categories are used in job control when associated with a department:– General– Prepress– Press– Finishing– Fulfillment– Shipping– Material– Data Processing

www.pace2020.com | See the possibilities…

Page 12: Job Costing & Work In Process

Note Categories – Customer/Reporting• The following categories are used on the

customer:– Account– Collection– Job

• The following categories are for reporting purposes only:– CRM– Sales– Estimating

www.pace2020.com | See the possibilities…

Page 13: Job Costing & Work In Process

Non-Planned Reasons

• Used to provide explanation for labor or materials beyond what was originally requested.

• Allows for markup to provide a suggested sell price for transactions tagged with NPW code.

• Captures additional work for reporting purposes.• Ability to control the status of job planning

records.• Also displays as NPW code in ePace.

www.pace2020.com | See the possibilities…

Page 14: Job Costing & Work In Process

Non-Planned Reason Locations

Non-planned reason codes are available in the following locations:– Data Collection– Job Control– Change Order– Purchase Order– Job Billing

www.pace2020.com | See the possibilities…

Page 15: Job Costing & Work In Process

Job Costing Module Settings

Global settings that control the behavior of the module.

www.pace2020.com | See the possibilities…

Page 16: Job Costing & Work In Process

Job Costing Reports

Administrative level reports which show various lists from ePace:– Cost Center Listing– Activity Code Listing– Hourly Rate Listing– Productivity Info– Job Costing Time And Planning

www.pace2020.com | See the possibilities…

Page 17: Job Costing & Work In Process

Job Costing User

Costs are generated from users entering transactional data to the following parts of ePace: – Data Collection– Purchase Orders– Material Pulls– Shipping– Change Orders– Manual Entry

www.pace2020.com | See the possibilities…

Page 18: Job Costing & Work In Process

Job Costing Facts

• All costs must be posted before they become an actual cost on the job.

• Reports do not reflect any un-posted costs. • Costs can be edited prior to posting. • Cost are not editable once they become posted.• WIP is generated by posted Job Costing

transactions.

www.pace2020.com | See the possibilities…

Page 19: Job Costing & Work In Process

Adding Costs Manually

• Costs can be entered into the system manually, in the event you inadvertently left out something.

• Negative hours or dollars can be entered to correct any transaction posted in excess.

www.pace2020.com | See the possibilities…

Page 20: Job Costing & Work In Process

Editing Transactions

• Use an ePaceStation query to easily edit transactions.

• Editing transactions before posting helps minimize manual corrections later.

• Editing before posting ensures accurate job costs.

• You should perform this on daily basis.

www.pace2020.com | See the possibilities…

Page 21: Job Costing & Work In Process

Approve & Post Transactions

• All transactions must be approved in order for the system to post them.

• There are two methods to complete this task. The difference between each is time to complete the task and a report.

• You should perform this on a daily basis.

www.pace2020.com | See the possibilities…

Page 22: Job Costing & Work In Process

Approve Transactions: Method 1

• Select Approve Transactions from main menu.• Transactions are broken down by type.• Clicking all selects all transactions on the page

you are currently on.(Be sure to click [Update] before navigating to the next page.)

• Must approve transactions on each page.• Print Job Charges Register, if desired.

(Only available prior to posting.)

www.pace2020.com | See the possibilities…

Page 23: Job Costing & Work In Process

Approve Transactions: Method 2

• Select Post Transactions from the main menu.• Select the desired transaction type from the

drop-down menu. Typically, you want to select all transaction types.

• Check the Post Unapproved Transaction box. ePace automatically approves it for you.

• Job Charges Register is not available with this method.

www.pace2020.com | See the possibilities…

Page 24: Job Costing & Work In Process

Post Transactions

• If you use Method 1, navigate to Post Transactions after printing the Job Charges Register.

• Select a transaction type to post, then click Post.

• If you use Method 2, simply click Post after you check the Post Unapproved box.

www.pace2020.com | See the possibilities…

Page 25: Job Costing & Work In Process

Reports

Once you posted transactions, actual cost data is available on the various Job Costing reports.

www.pace2020.com | See the possibilities…

Page 26: Job Costing & Work In Process

Work In Process (WIP)

• WIP is generated as transactional data is posted in the system.

• WIP is relieved once jobs are billed and closed.• Partial billed jobs relieve the portion of WIP

already generated. • Each transaction is tagged with the “date

expensed” on the cost record when the job is billed.

www.pace2020.com | See the possibilities…

Page 27: Job Costing & Work In Process

Review WIP

• You can review WIP by each category from the main menu under Review WIP.

• Various reports can also be printed to review your WIP.

www.pace2020.com | See the possibilities…