14
ROADMAP TOWARD EFFECTIVE FLOOD HAZARD MAPPING IN INDONESIA JICA Regional Training Course on Flood Hazard Mapping 31 October - 3 December 2005 JICA - Tsukuba International Center Koyadai, Tsukuba, Ibaraki JAPAN Prepared by: Thomas Firdaus Larosa Water Resources Engineer Research Institute for Water Resources Development Indonesia

JICA - Tsukuba International CenterConcluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia Thomas Firdaus Larosa - Indonesia 2 LEGEND Inundation Depth (m)

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: JICA - Tsukuba International CenterConcluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia Thomas Firdaus Larosa - Indonesia 2 LEGEND Inundation Depth (m)

ROADMAP TOWARD EFFECTIVE FLOOD HAZARD MAPPING

IN INDONESIA

JICA Regional Training Course on Flood Hazard Mapping 31 October - 3 December 2005

JICA - Tsukuba International Center Koyadai, Tsukuba, Ibaraki

JAPAN

Prepared by: Thomas Firdaus Larosa Water Resources Engineer

Research Institute for Water Resources Development Indonesia

Page 2: JICA - Tsukuba International CenterConcluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia Thomas Firdaus Larosa - Indonesia 2 LEGEND Inundation Depth (m)

Concluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia

Thomas Firdaus Larosa - Indonesia i

CONTENT I THE ROLE OF FHM TO MITIGATE FLOOD DAMAGE .................................. 1

I.1 Present Flood........................................................................................... 1 I.2 Mitigation Flood........................................................................................ 3 I.3 Useful of Flood Hazard Map (FHM).......................................................... 4

II THE ALLOCATION OF ROLES IN MAKING FLOOD HAZARD MAPS IN INDONESIA............................................................................................................ 6

II.1 Organization for Making Fundamental FHM............................................. 6 II.2 Disseminating of Flood Hazard Maps....................................................... 8

III ACTION PLAN OF MAKING FLOOD HAZARD MAPS (FHM) ........................ 9

III.1 Target Basin area..................................................................................... 9 III.2 Propose next five years.......................................................................... 11 III.3 Problem in propose FHM ....................................................................... 11

IV SUGGESTIONS FOR TRAINING COURSE MORE MEANINGFUL ............. 12 V OTHERS ................................. エラー! ブックマークが定義されていません。

Page 3: JICA - Tsukuba International CenterConcluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia Thomas Firdaus Larosa - Indonesia 2 LEGEND Inundation Depth (m)

Concluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia

Thomas Firdaus Larosa - Indonesia 1

CONCLUDING REPORT

ROADMAP TOWARD EFFECTIVE FLOOD HAZARD MAPPING (FHM)

IN INDONESIA

Name : Thomas Firdaus Larosa Country : Indonesia E-mail : [email protected]

I THE ROLE OF FHM TO MITIGATE FLOOD DAMAGE

I.1 Present Flood

The most severe climate-related natural disaster in Indonesia are monsoon flood, flash flood and debris flood. These flood are common hydrological phenomena in Indonesia. Flash flood from intense thunderstorms are becoming very common phenomena, especially in urban area like Jakarta province. Figure 1 shows the location of annual inundation, limited only on flood location occur without inundation area.

Table 1. Flood type in Indonesia Flood Type Location River Time Cause of flood Damage Flash flood “banjir bandang”

Nias island Masio Feb, 2001

Radial river basin type Small tributary outlet

325 house felt down 121 death

Medan Bahorok 2003 (Leuser mountain) Deforestation Hard rainfall on upstream 67 death (3 foreign)

East Java, Pacet, Mjokerto

Brantas tributary

Dec, 2002 Deforestation 26 death

Leisure area broken

Monsoon flood “Banjir musiman”

Jakarta Ciliwung, etc annual

Inland area Tide + water from upstream Land use change (retard flood area) Poor drainage system Garbage

170 location Jump traffic Stop school activity

Semarang annual

Inland area Tide (rob) + water from upstream Land use change (retard flood area) Poor drainage system Garbage

Aceh & Nias 2005 200 000 death Tsunami flood Flores Earth quake in deep Indonesian ocean 2 100 death

Debris flood “Banjir lahar dingin”

Yogyakarta Progo, Opak, Oyo

Merapi mountain Debris volcano

West Java Citanduy Galunggung mountain Debris volcano

Aggradations river mouth

Page 4: JICA - Tsukuba International CenterConcluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia Thomas Firdaus Larosa - Indonesia 2 LEGEND Inundation Depth (m)

Concluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia

Thomas Firdaus Larosa - Indonesia 2

LEG

EN

D

Inun

dati

on D

epth

(m

)D A

Inun

dati

on A

rea

(m )2

50.0

00 m

A

10

.000

man

d 0.

50 m

D

0

.20

m

2

>> => =

>2

A

100

.000

m o

r D

1

0 m

> =2

> =

>10

0.00

0 m

A

5

0.00

0 m

and

10 m

D

0

.50

m

2> =

>> =

2

U1

Te

luk

Gon

gU

2

Bun

dara

n Pl

uit

U3

K

apuk

Mua

raU

4

Jem

bata

n II

& I

II B

inok

U5

K

p. P

adem

anga

n Ti

mur

U6

Pa

dem

anga

n B

arat

U7

K

elap

a G

adin

g Ve

spa

U8

Pe

rum

Wal

i K

ota

Jkt.

Uta

raU

9

Kpl

x. A

. L. K

odam

arU

10 P

erum

H. I

. Kel

apa

Gad

ing

U11

Kpl

x. D

ewa

Ruc

iU

12 K

ali

Bar

u Ta

nah

Mer

deka

U13

Kp.

Mal

aka

U15

Kp.

Raw

a B

adak

U16

Kp.

Tug

u U

tara

U17

Jl.

Don

ggal

aU

18 L

agoa

U19

Kp.

Keb

on B

awan

gU

20 S

unga

i Bam

buU

21 K

p. W

arak

asU

22 K

p. P

apan

gga

U23

Jl.

R. E

. M

arta

dina

taU

24 (

Sun

ter

Jaya

) / M

uara

Bah

anU

25 J

l. Yo

s S

udar

so /

deal

er H

onda

U26

Pod

omor

o S

unte

r A

U27

Kp.

Bah

an

JAK

AR

TA U

TAR

AIN

UN

DA

TIO

N A

REA

NO

INU

ND

ATI

ON

AR

EAIN

UN

DA

TIO

N A

REA

JAK

AR

TA B

AR

AT

B1

Pa

l M

erah

B2

Je

lam

bar

Ilir

B3

K

plx.

Wal

i Kot

a Jk

t. B

arat

B4

Po

ndok

Ban

dung

B6

Po

glar

B7

Jl

. Kap

uk R

aya

B8

Dur

i Kos

ambi

/ B

oyon

gB

9

Bat

u S

ari

B10

Kel

apa

Dua

/ H

UB

AD

B11

Mar

uya

Ilir

B12

Bas

moi

B14

Kom

p. D

PR K

ebon

Jer

ukB

15 P

os P

engu

mbe

nB

18 T

aman

Kot

aB

19 B

udi M

ulya

B20

Mar

uya

Udi

kB

21 K

emba

ngan

B22

Jl.

Jem

bata

n B

atu

Pina

ngsi

tB

23 K

ali B

eton

B24

Man

gga

Bes

ar I

B25

Man

gga

Bes

ar I

VB

26 K

alid

eres

B27

Kam

alB

28 P

egad

unga

nB

29 S

eman

anB

30 T

egal

Alu

rB

31 J

ati

Pulo

B32

Jem

bata

n B

esi

B33

Kre

ndan

gB

34 J

emba

tan

Lam

a

INU

ND

ATI

ON

AR

EA

NO

JAK

AR

TA S

ELA

TAN

NO

INU

ND

ATIO

N A

RE

AS

1

Kp.

Cir

ende

S2

Jl

. Rin

g R

d. S

port

Clu

b C

LDK

S3

G

anda

ria

Sel

atan

S4

G

anda

ria

BD

N C

ilan

dak

S5

Po

ndok

Lab

uS

6

Ses

kopo

l / D

epda

gri

S7

IK

PN

Bin

taro

S8

K

p. U

luja

mi

S9

S

ango

la I

ndah

S10

Pes

angg

raha

nS

11 P

etuk

anga

n U

tara

S12

Kp.

Pon

dok

Pina

ngS

13 K

p. D

ukuh

S14

Jl.

Cil

eduk

Ray

aS

15 K

p. C

ipul

irS

16 K

eman

dora

n P

luit

S17

Gro

gol

Sel

atan

S19

Kp.

Per

tam

ina

Pasa

r M

ingg

uS

20 K

plx.

Pol

ri P

asar

Min

ggu

S21

Jat

i Pad

ang

S22

Rag

unan

S23

Cila

ndak

Tim

urS

24 K

p. P

etog

ogan

S25

Gan

dari

a U

tara

S26

Han

g Ja

bat

S27

Han

g Le

kir

S28

Kra

mat

Pel

aS

29 C

ipet

eS

30 G

unun

gS

31 M

elaw

aiS

32 R

awa

Bar

atS

33 T

ebet

S34

Keb

on B

aru

S35

Buk

it D

uri T

anja

kan

S36

Man

ggar

ai S

elat

anS

37 K

p. M

elay

u K

ecil

S38

Men

teng

Dal

amS

39 K

plx.

Pol

ri P

ondo

k K

arya

S40

Pul

o R

aya

Tara

kani

taS

41 K

unin

gan

Bar

atS

42 B

angk

a an

d K

uman

gS

43 M

ampa

ng P

rapa

tan

S44

Set

ia B

udi B

arat

S45

Gun

tur

Kaw

i-ka

wi

S46

Men

teng

Ata

sS

47 K

aret

Kun

inga

nS

48 K

unin

gan

Tim

urS

49 D

uren

Tig

aS

50 P

enga

dega

nS

51 K

alib

ata

S52

Tan

jung

Bar

atS

53 L

ente

ng A

gung

JAK

AR

TA P

USA

TN

OIN

UN

DA

TIO

N A

RE

AP1

P

etam

bura

n +

Ben

d. H

ilir

P2

Jl.

Ben

dung

an H

ilir

P4

Jl.

Sab

ang

/ Agu

s S

alim

P6

Ser

dang

Tim

urP7

J

l. I

ndus

tri

P8

Jl.

Ang

kasa

/ B

ungu

rP9

R

ajaw

ali S

elat

anP1

2 J

l. P

ange

ran

Jaya

kart

aP1

3 M

anng

a D

ua A

bdad

P14

Dw

i War

naP1

5 J

l. B

atu

Tuka

/ Ju

anda

III

P16

Jl.

Bat

u C

eper

P17

Dur

i Pul

oP1

8 P

etoj

o E

ncle

kP1

9 K

ebon

Kel

apa

JAK

AR

TA T

IMU

RN

OIN

UN

DA

TIO

N A

RE

AT1

C

ipin

ang

Rum

bata

nT3

K

p. M

akas

arT4

K

p. K

ebon

Pal

aT5

C

ipin

ang

Mel

ayu

T6

Sun

ter

Hal

im P

erda

na K

usum

aT7

C

awan

Dew

i S

arti

kaT8

B

idar

a C

ina

T9

Kp.

Mel

ayu

T10

Con

det

T11

Kra

mat

Jat

iT1

2 K

ebon

Nan

asT1

3 C

ipin

ang

Bes

ar

T14

Cip

inan

g M

uara

T15

Kp.

Sod

ong

T16

Keb

on P

ala

Jati

nega

raT1

7 R

awa

Bun

gaT1

9 K

plx.

Pal

adT2

0 J

l. Pe

rint

is K

emer

deka

anT2

1 P

erum

HI

Kel

apa

Gad

ing

Uta

raT2

2 J

atin

egar

a K

aum

T23

Kay

u Pu

tih

T25

Cip

inan

g Ja

gal

T26

Pis

anga

n Ti

mur

T27

Uta

n K

ayu

T32

Dur

en S

awit

T33

Kle

nder

T34

Pon

dok

Bam

buT3

6 P

engg

ilin

gan

T37

Pul

au G

eban

g

Figu

re 1

. Lo

catio

n of

inun

datio

ns a

rea

in J

akar

ta u

rban

City

Page 5: JICA - Tsukuba International CenterConcluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia Thomas Firdaus Larosa - Indonesia 2 LEGEND Inundation Depth (m)

Concluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia

Thomas Firdaus Larosa - Indonesia 3

I.2 Mitigation Flood

Since flood management and flood fighting should be provided on the comprehensive and holistic work, it should be achieve technical and non technical measures.

a. Technical Measures • Multi purpose Reservoir • River embankments (“dyke” as not a long the river, part of branch that

flood occur). • River Normalization (improvement/restoration). • Short Cut. • Sabo Dam. • Drainage system, Flap gate & pump (garbage problem) • Retention Reservoir (kolam penahan air sementara)

b. Non Technical Measures • Triangulations Point that sound return period of flood (Peil Banjir). • Garbage management (periodically). • Clean side ditch (“kerja bakti’) • Making PRE-Flood Hazard Maps • Elevate house (Living harmony with flood)

Table 2. Structural and non structural measures activities sharing Action Risk Management (Pro-active Response) Crisis Management (Re-active Response)

• Flood insurance • Flood proofing

• Collection of flood information • Rising household goods • Self initiated evacuation

• Pre Flood hazard mapping (case) • Organization flood fighting corps • Assign higher elevation for

evacuation (not building) • Cooperation with rescue volunteers

• Dissemination of flood information/enquire on safety condition

• Flood fighting • Assign provide emergency

applicants (boat)

Dam

age

Miti

gatio

n

Dam

age

Red

uctio

n

• Observation and data collection • Flood forecasting and warning

system • Organization of rescue teams • Emergency drainage pump

Em

erge

ncy

Res

pons

e

• Supply real time flood information and warning (case)

• Evacuation order and evacuation directives (event)

• Rescue activities • Emergency flood control works

• Resettlement to safe area-social problem

• Elevate housing land-harmony flood

• Removal of mud garbage • Reconstruction and restoration of

house • Zoning flood prone area • Drainage pump • Ring levee (seldom) • Understanding among stakeholders

of flood control project (sometime)

• Collecting and distributing relief fund• Draw and report lessons from the

disaster

Dam

age

Det

erre

nce

Ris

k R

educ

tion

• Planning & flood control project • River improvement works (dredging

and widening channel, diversion channel)

• Levee construction and rising levee • Flood control dams and reservoir

Reh

abilit

atio

n R

esto

ratio

n

• Inspection and study of the cause of damage

• Epidemic prevention • Restoration of attacked facilities • Rank up of flood control plan

Page 6: JICA - Tsukuba International CenterConcluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia Thomas Firdaus Larosa - Indonesia 2 LEGEND Inundation Depth (m)

Concluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia

Thomas Firdaus Larosa - Indonesia 4

I.3 Useful of Flood Hazard Map (FHM)

Table 3. Use of Flood Hazard Maps Category Local Resident Local Municipalities/Government

• Consider proper land use patterns and water resistant buildings suited to the flood vulnerability of the area

• Review urban planning and land use patterns that are resistant to flood

• Prepare emergency kits, emergency food, etc

• Prepare boats and other appropriate means of evacuation

• Updated disaster prevention and flood fighting plans of the area

• Review refuges and evacuation routes

• Updated specific assistance plan to evacuate or rescue the vulnerable (elderly, handicapped, sick, injured, etc)

• Identify proper communication channels and systems for information on evacuation

• Organize voluntary disaster prevention units

• Updated communication channels and systems for information on evacuation

• Develop voluntary disaster prevention units

Everyday life

• Learn about past inundation history and risk of inundation of the local area

• Organize educational sessions on potential flood damage, preparedness and evacuation

• Promote education on disaster prevention and conduct evacuation practice drills

• Publicize importance of disaster prevention and preparedness

• Confirm proper refuges, evacuation routes, emergency kits, etc

• Identify flooded areas, inundation depth, location of refuges, and evacuation routes

• Evacuate independently, following weather forecast, flood related information, emergency warnings, etc

• Provide information on weather forecast and flood forecast

• Assist in evacuation of those vulnerable to floods

• Support and rescue those vulnerable to floods

Emergency situations

• Evacuate to proper refuges through safe routes, following advisory and imperative evacuation warnings

• Provide continuous flood related information on evacuation

• Set up refuges • Issue advisory and imperative

evacuation warnings • Direct evacuation

The information incorporated in flood hazard maps shall be those items that are practical and useful in the event of flooding, ensuring the safety and proper evacuation of local residents. Items such as predicted inundation areas and location of refuges, are terms “Evacuation use Information”, and items that will be helpful in everyday life, by notifying the residents of potential flood damage and enhancing their awareness of the importance of flood disaster preparedness, are termed “Educational use Information”.

To make efficient use of flood hazard maps, local residents must be thoroughly convinced of the real danger of flooding. The indispensable information on evacuation and, accordingly, the evacuation use information, shall be incorporated in the hazard maps. Educational-use information shall be appropriately incorporated or

Page 7: JICA - Tsukuba International CenterConcluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia Thomas Firdaus Larosa - Indonesia 2 LEGEND Inundation Depth (m)

Concluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia

Thomas Firdaus Larosa - Indonesia 5

not, depending on the purpose of preparing the flood hazard maps in the respective municipalities.

Table 4. Key items to be corporated in Flood Hazard Map

Evacuation use Information Educational use Information • Predicted inundation area, inundation depth,

flood concentration time • Historical inundation records • Areas to be evacuated (where inundated and

high land) • Location of evacuation refuges (high area) • Evacuation routes (nearest high area to

evacuate) • Dangerous spot on evacuation routes • Rules to follow in the event of evacuation • Communication channels and systems for

information on evacuation • Issuance criteria for evacuation warnings • Map preparing body, date of preparation

• Flooding mechanism • Topographic features, flood types • Real danger of flood, predicted extent of

damage • Meteorological information • Past flood records (rainfall, inundation and

damage) • Rules to follow in the event of flood • Explanation and directions to use-up flood

hazard maps • Preparedness against flood

Page 8: JICA - Tsukuba International CenterConcluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia Thomas Firdaus Larosa - Indonesia 2 LEGEND Inundation Depth (m)

Concluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia

Thomas Firdaus Larosa - Indonesia 6

II THE ALLOCATION OF ROLES IN MAKING FLOOD HAZARD MAPS IN INDONESIA

II.1 Organization for Making Fundamental FHM

The responsibility for making FHM are lay on the people who fell warn of the flood, Flood not became a problem if it is occur on land where there is not a human life.

Since flood “disturb” human life, so that we try to avoid flood, include level of inundation just 10 cm. But sometime or many time we disturb swam pond or flood retention area for resident/household.

There are some stakeholder who have link to government policy : a. Central = National = Pusat b. Prefecture = Province/Governor = Propinsi/Gubernur c. Local Government = Municipality = Kabupaten/Bupati

Role sharing

A

B

Sea

River C River D

River Administrative area Shore line

Figure 1. Illustrated river management

The cases in Indonesia about role sharing to manage some river that it cross over the administrative boundary area, the river managed by one level above of government, , if it is cross two or more the border line administrative area. If it cross province boundary area the river managed by central government and If it cross local government boundary area the river managed by province government.

Page 9: JICA - Tsukuba International CenterConcluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia Thomas Firdaus Larosa - Indonesia 2 LEGEND Inundation Depth (m)

Concluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia

Thomas Firdaus Larosa - Indonesia 7

Central Government

Central government has ministry who responsible to flood damage. Since flood damage influence many aspect, there are several ministry involve in flood management activities.

Such as Ministry of Public Works, Where I have been work, has several division. Who concern to flood such as Directorate of Water Resources.

The river which it is manage under central government would be handled case by case as project work such as Ciliwung-Cisadane River Basin Project, Citanduy-Ciwulan River Basin Project and Bengawan Solo River Basin Project, etc.

Making Flood hazard maps in Indonesia depending on Table 4 should be provided by project work, such as :

Table 5. Stakeholder should be work together for making FHM

Data type / items Analysis work Ministry (national) Dinas (local) Individual/private

Rainfall (meteorological information)

BMG BMG daerah

Land use cover Bakosurtanal Pemetaan & survai Relief contour

Soil type Soil research agency

Predicted flood PU-DGWRD Balai-Local Gov. Flood mechanism PU-DGWRD Balai-Local Gov. Flood type PU-DGWRD Balai-Local Gov.

Inundated simulation & predicted PU-DGWRD Balai-Local Gov.

Historical inundated records

Inner Gov. & PU Dinas inner Gov. Yes

Area to be evacuated Inner Gov. & PU Local inner & PU-

balai Yes

Location of refuge

• legal law aspect of the location

• Location capability

Inner minister PU

Local inner Gov. Local Yes

• Evacuation routes • Traffic routes supplies Inner Gov. & PU Local Gov. Yes

Explanation & direction to use-up FHM

Social, Transportation (BMG), Inner Gov., PU (DGWRD)

Dangerous spot on evacuation route

Inner Gov. Local Gov. Yes

Flood warning system PU-DGWRD Balai-Local Gov.

Order to evacuated

• Flood warning sign • Evacuation

• PU-DGWRD • Rescue fire,

Soldier, Volunteers

• Balai-Local Gov. • Inner local Gov. Yes

Page 10: JICA - Tsukuba International CenterConcluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia Thomas Firdaus Larosa - Indonesia 2 LEGEND Inundation Depth (m)

Concluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia

Thomas Firdaus Larosa - Indonesia 8

Local Government

Local government (prefecture or municipalities) has division who they work as long arms of central government. It is called “Dinas”, since reform political situation, it change in many name, such as “Dinas pengairan” always work together on river basin project work (see Table 5).

II.2 Disseminating of Flood Hazard Maps

My office has been made leaflet that it is inform how to escape from flood and earthquake. Disseminating and distribution the information needs more works. Information on the leaflet is limited since many data should be provided.

Disseminating should be provided by everyone who has warned to the flood. Firstly it is provided by central government. Method of disseminating by using radio or TV as educational information.

Page 11: JICA - Tsukuba International CenterConcluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia Thomas Firdaus Larosa - Indonesia 2 LEGEND Inundation Depth (m)

Concluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia

Thomas Firdaus Larosa - Indonesia 9

III ACTION PLAN OF MAKING FLOOD HAZARD MAPS (FHM)

III.1 Target Basin area

Jakarta province is my target for making FHM, but I am employer of government and no promise to JICA, since there are many considerations for selected river basin, such as political condition, etc. My selected area depend on available data, such as rainfall data (1916 – 2004 publish), discharge, relief contour (Digital Terrain Module), climatologically data, land use cover.

Fulfill the request action plan FHM, supported only for Jati Pinggir (Central Jakarta) area, since on that area I have data on my hand for making pre-FHM.

Figure 2. Target area for action plan Flood Hazard Map

Page 12: JICA - Tsukuba International CenterConcluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia Thomas Firdaus Larosa - Indonesia 2 LEGEND Inundation Depth (m)

Concluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia

Thomas Firdaus Larosa - Indonesia 10

8

9.5

5

8

6.5 5

9.5

11

55

8 6.5

59.5

5

11

6.5

8

9.5

11

9.5

47.2 48.2

47

48

5

Figure 3. Relief contour line, on Jati Pinggir area

Page 13: JICA - Tsukuba International CenterConcluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia Thomas Firdaus Larosa - Indonesia 2 LEGEND Inundation Depth (m)

Concluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia

Thomas Firdaus Larosa - Indonesia 11

III.2 Propose next five years

Proposed on making flood hazard maps for next five year ahead is Jakarta Province, since there are 13 river basin enter to Jakarta province boundary and much effort to define loss of flood damage.

III.3 Problem in propose FHM

The problem for making FHM such as updated topographic map/relief contour include in detail scale map, may be on budget, as this project just in my head plan.

Page 14: JICA - Tsukuba International CenterConcluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia Thomas Firdaus Larosa - Indonesia 2 LEGEND Inundation Depth (m)

Concluding Report – Roadmap Toward Effective Flood Hazard Mapping in Indonesia

Thomas Firdaus Larosa - Indonesia 12

IV SUGGESTIONS FOR TRAINING COURSE MORE MEANINGFUL All lecturer designed for this course were useful, some of them have provided in term of materials, process, concept, theory, and practical, especially on exercise in the group field survey for making the hazard maps ISE City with group presentation on the Town Watching.

The field survey is more importance, because of the real situation found could be comparing to lecture.

Flood management in Japan is very importance for expertise. The significance of hydrological statistics, flood inundation analysis, calculation of residents evacuation, runoff flood analysis and anticipation of inundation area are key functional of flood hazard map drawing and establishment.

Tryout when making pre-FHM after town watching more useful if we work together with resident people by using PARTICIPATORY RURAL APPRAISSAL). We can get information directly about inundation area, vest life and traffic refuge routes need.