    JHS #12/10

    6.22 P 2 A L*

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    To use dust m ask ( cartri dge)

    BET Supervisor

    Accidents / M inor

    Injur y / damage to

    assest / Stop w ork

    8.

    8 .3 E lec t roc ut io n P

    /

    A

    /

    R

    4 C M

    To w ear chemical rub ber gloves Perform i nvesti gation

    *Johnny - BET

    Site SupervisorTo w ash t he apparel or hand gloves after w ork Inform in Toolbox talk

    To refer to M SDS/CSDS of t he product

    8.2 Chemical & Fume P 1 B L

    To provi de rack for th e cables (avoid lyi ng on the

    ground)

    To check t he enclosed source regularly wi th surveymeter

    To issue survey meter w it hin t he surround ings

    To swit ch off the projector when not in use (i.e.

    cover t he source wit h l ead shots bags)

    To pre-inspect on the conditi on of the equipment

    To perfrom proper earthing comply wi th SM DS

    l

    Reminder :

    H o t W o rk

    To perform pre-inspection for the tools & the

    equipments

    To ensure the souce is closely monit ored &

    guarded (to prevent lost)

    JOB

    STEP

    NO.

    DESCRIPTION OF JOB

    TASKHAZARD / THREAT BARRIER / CONTROL MEASURE

    RESPONSIBLE

    PARTY

    To monit or the sit e closely wi th colli mater (as to

    reduce / minimi ze the source strength from b eing

    absorbed by th e public)

    7.(REFER TO ITEMS #5 : ERECTION / DISMANTLING OF SCAFFOLDING)

    CONSEQUENCESACTION

    PARTIES

    DISMANTLING OF

    SCAFFOLDING

    To ensure only competent operator for t he work

    To equip the machine w it h warni ng system

    To foll ow Radiographic Testing emergency

    response plan

    To inform in the Toolbox Talk / control room

    To barricade & install signage i.e.'CAU TIO N.

    RADIOGRAPHIC TESTING W ORK.

    Inform SM DS*

    Kerosmi - BET

    HSE OfficerTo w ear proper apparel & PPE for radiography Send to M edic

    P/A/E/R

    Severity

    Probability

    Sl ip per y h an d t ool s T o w ear sem i l eat her or leat her h an d gl oves ( no

    cott on gloves)

    RAM Rating

    Rank

    Reminder : W orking-

    at-height (height > 1.8mtrs)

    RECOVERY MEASURE

    To perform pre inspection for the tools

    TANK NDT

    (RADIOGRAPHY,

    VACUUM BOX,

    PENETRANT TEST) &

    HYDROTESTING

    (WATER FILLING)

    M8.1 Leakage o f

    radioactive source

    P

    /

    R

    3 C

    Per for m i nvest i gat i on *Johnny - BET

    Site Supervisor

    Inform in Toolbox talk SMDS

    Personnel

    BET SMDS - JHA. Tank Erection. 100810

    Page 11 of Page 18

  • 8/10/2019 Jha Tank Erection Ndt

    2/3

    JHS #12/10

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    To foll ow SMDS electri cal procedure (i.e. only use

    low voltage equipm ent,

  • 8/10/2019 Jha Tank Erection Ndt

    3/3

    JHS #12/10

    8.7 P 1 B L*

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    9 .3 F a

    ll i

    n

    P

    /

    A

    2 C M*

    *

    BLASTING & PAINTING

    (INTERNAL &EXTERNAL)

    9.1 Confined Space

    Area

    P/

    R

    3 C M

    BET Supervisor

    Accidents / M inor

    Injur y / damage to

    assest / Stop w ork

    BET Supervisor

    JOB

    STEP

    NO.

    DESCRIPTION OF JOB

    TASKHAZARD / THREAT

    RAM Rating

    BARRIER / CONTROL MEASURERESPONSIBLE

    PARTY

    P/A/E/R

    Severity

    Probability

    Rank

    9.

    RECOVERY MEASURECONSEQUENCES

    Accidents / M inor

    Injur y / damage to

    assest / Stop w ork

    ACTION

    PARTIES

    Insufficient

    lightings

    To provide sufficient lightings

    To have good Communi cation betw een authori sed

    w orki ng person and stanby person during work

    .To p rovi de emergency response pr epadeness

    To ensure access manhole is not blocked (i.e nocable air hoses)

    To engage Confi ned Space Stand by Person

    To monitor & control the movement of personnel

    w orki ng inside the tank ( by the Confined Space

    To ensure good & sufficient ventil ation by

    installing air blow er & air eductor.

    To ensure the personnel are w it hin safe work ing

    area during t he test

    To place singage 'CAUTION. CONFINED SPACE

    W O R K'

    To w ear body harness wi th 2 lanyards & clip t o

    the fix structure whil e work ing

    To allow onl y authorized personnel entering

    To ensure only competent personnel for t he work

    To station por table gas detector for cont inous

    monit oring for oxygen level

    L

    Inform in Toolbox talkTo foll ow SMDS Confined Space Procedure

    To monitor the tank sett lement of tank pad during

    water fi l l ing in progress

    To provide signage 'CAUTION. FOR

    AUT HORI ZED PERSONS ONLY' during

    hydrotest

    Tank structur

    rupture / t opple ~

    during hydrotest

    P 3 A

    SMDS

    PersonnelReminder : W orking-

    at-height (height > 1.8mtrs)

    To ensure all t he roof vent manholes are full y

    opened durin g draining of water

    8.8

    9.2 Insuff icient oxygen

    supply

    P

    /

    A

    2 C M To check the breathing apparatus, the air li ne

    system before use

    Reminder :

    Confin ed Space Area

    To inform b oth t he operator & the Confined Space

    standby person on proper communication signal

    Inform SM DS*

    Kerosmi - BET

    HSE OfficerSend to M edic

    Per for m i nvest i gat i on *Johnny - BET

    Site Supervisor

    BET SMDS - JHA. Tank Erection. 100810