Upload
nguyendien
View
212
Download
0
Embed Size (px)
Citation preview
ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007
ABOUT HICC
HEAVY INDUSTRY & CONSTRUCTION CO.
is a privately-owned company established in Istanbul, Turkey. HICC started in
2006 and have already opened a branch office in Baku Azerbaijan and Batumi Georgia, is recognized throughout world markets as a trusted company in heavy industrial construction solutions.
HICC employs high-qualified specialists, invests heavily in their training and education. HICC ensures the highest standards of health, safety and environment and governance is applied throughout the organization. An important growth area and the key reason for been selected by many clients is HICC’s unique ability to link all necessary parts of the industrial work services chain in-house. By delivering top quality, technically advanced, reliable facilities and equipment on time, within budget and with an impeccable safety record, HICC Heavy Industry Construction Co. has earned a reputation as a leading construction and management contractor.
Specialisations:
Construction Management General Construction Commissioning & Start-up Services Procurement Inspection Services Preconstruction Consulting NDT Applications Process Equipment Manufacturing
GROUP COMPANIES
A d a m a n t E n g i n e e r i n g
A h s e n E n e r g y
‘s two main Group Companies are:
ADAMANT ENGINEERING
Adress: Mizan hotel, Mizan business center,
Archabil str. B. 55, 744 038 Ashgabat, Turkmenistan
Web:
www.adamanteng.com
E-mail: [email protected]
Tel:
+993 12 48 78 11
AHSEN ENERGY
Adress: Uğur Mumcunun Sokağı No: 20/1 Gaziosmanpaşa/Çankaya/Ankara
Fax:
+90 312 436 27 65
Tel: +90 312 436 27 62
ONGOING PROJECTS
AZERBAIJAN, RUSSIA, GEORGIA
Scope of Work
Piping Steel Structure Reformer Equipment Inspection Equipment Erection Electrical Works Quality Control NDT Services Project Management Services
AZMECO METHANOL PLANT PROJECT
AZERBAIJAN
Project’s Visuals
Contractor : NOBEL OIL COMPANY Location : Guneshli DDO-4 Oil & Gas Platform - BAKU/AZERBAIJAN
Scope of Work:
Maintenance, cleaning, testing, pre-commissioning
Modification and rectification works of various gas compressors
Installation of pipe lines, welding works, NDT application cleaning and hydro-test works of pipe lines on platform
Steel erection works
* All works were completed by our own manpower (offshore certificated) and equipment.
OFFSHORE MAINTENANCE WORKS
GUNESHLI DDO - 4 OIL & GAS PLATFORM
DREDGING WORKS
PRIMORSK PORT
Contractor : VAN OORD Location : Primorsk Port - BAKU/AZERBAIJAN
Scope of Work:
Dredging piping works
Mechanical erection works
RUSVINLY PVC PLANT
RUSSIA
Scope of Work Piping Steel Structure Equipment Erection Quality Control NDT Services Project Management Services
POTI METHANOL TERMINAL
GEORGIA
Client : Poti Terminal Holding LLC. Location : POTI/GEORGIA
Project Information
30.000 m3 Methanol Storage Capacity
Lump Sum Turn Key EPC Project
SCOPE OF WORK
Project Management Design & Engineering Procurement Construction Commissioning & Start - Up Quality Assurance/Quality Control Health, Safety & Environment (HSE)
P ro p o s e d E n g i n e e r i n g , P ro c u r e m e n t ,
Construction, Installation and Commissioning
(EPCIC) of industrial projects including
oil & gas industry:
PROJECT MANAGEMENT
Discussion with Client to confirm scope of project
Develop the proposed layout
Coordination with authorities for obtaining initial approval & requirements
Coordinate procurement
Provide construction supervision
Coordinate with Client’s operation team for commissioning and project start-up
PROJECT ORGANIZATION CHART
Design & Engineering Team
• Project Engineer
• Document Controller
• Project Secretary
Civil & Structural
Mechanical
Electrical/ Instrumentation
Detailed Design
Team for Civil &
Structural
Detailed Design Team for Piping
Detailed Design Team for Electrical/Control and Instrumentation
Project Management &
Coordinating Team
Lead Discipline Engineer
Civil & Structural:
Mechanical / Piping:
Electrical / Instrumentation:
Procurement Engineer
Site Manager
Supervising Engineers/ Supervisors
Commissioning & Start-up Assistance
Construction Supervision Team
Project Director
Project Manager
QA/QC HSE
HEALTH, SAFETY & ENVIRONMENT
1 0 , 0 0 0 , 0 0 0 M A N H O U R
A C H I E V E D W I T H O U T L O S S T I M E I N J U R Y
HSE HIGHLIGTHS
Site inspections
Safety task analysis and risk reduction talks
Area safety meetings
Daily trade workforce safety meetings
Toolbox talks
Incident, accident and near miss reporting
Safety Training
Personal Protective Equipment
Safety Statistics
In line with ISO 9001:2000 requirements;
Project Quality Plan will be developed to be implemented throughout the
project
Quality objectives will be identified and framework to achieve o b j e c t i v e s
w i l l b e p r o v i d e d
P e r i o d i c a u d i t s w i l l b e
c a r r i e d o u t t o c o n f i r m
compliance to procedures
QA/QC
Feritscope Meter 604-300
Hardness Tester
Vacuum Test Equipment
Magnetic Field Strength Meter
Film Developing System
Gamma Ray Equipment
IRIS 10 Crawler X-Ray
Mobil Dark Room
Panetremeter
Radiometer
X-Ray
Multi-Probe Hand Scanner
Ultrasonic Flaw Detector (Phased Array-TOFD)
PWHT Equipments
PMI Equipment
Coating Thickness Gauge
Painting Inspection Equipments
To t a l q u a n t i t y o f N D T e q u i p m ent s i s 8 8 3 p c s .
NDT EQUIPMENTS
Engineering Team:
Discuss and confirm Client’s requirement
Land survey and soil investigation
Liaise with relevant authorities to establish their requirements
Plan and prepare general infrastructure layout
Effectively plan the design to optimize the cost
Develop conceptual civil and structural design
Design all mechanical and electrical works
Submit infrastructure, M&E drawings to relevant authorities for approval
Production:
Products and services include pressure vessels, columns and towers, reactors,
hoppers, scrubbers, separators, process skid packages, storage terminals, heat
exchangers, specialised steel structural systems, piping systems and post
manufacturing services
Industries covered – oil & gas, petrochemicals
DESIGN PARTNERS
Heavy Lifting Services Available Cranes and Equipments
Crawler Cranes
Manitowoc 18000 750 tons
Demag CC 2800-1 600 tons 3 pcs
Demag CC 2400-1 400 tons
Demag CC 1800 300 tons
Mobile Cranes
LTM 1500 500 tons
LTM 1300-1 300 tons
Heavy Equipment Transportation
IVECO Jumbo Lowbed
IVECO Bronkay Lowbed
HEAVY LIFTING PARTNERS
Procurement of plant machinery and equipment
Procurement – MTO preparation, MR issuance, inquiry and receipt of quotation
Technical Bid Evaluation (TBE)
Commercial Bid Evaluation (CBE)
Purchase Order
Expediting
PROCUREMENT
Construction, erection and installation of all civil, structural, mechanical, electrical,
instrumentation and piping works
Preparation of any further design and specification necessary for contractors to carry
out the works
Site meetings
Testing and commissioning of M & E works
Obtaining approvals from relevant authorities
Preparation of final As-Built Drawings and O & M manuals
Training of all personnel
CONSTRUCTION
Pre-commissioning and flushing of all piping and equipment
First feed in
Commissioning and plant start-up
Completion of check list items
Performance tests
Issuance of certificate of acceptance
COMMISSIONING & START-UP
KEY PERSONNEL
BOARD OF DIRECTORS
KEY PERSONNEL
COMPANIES INVOLVED IN PROJECT MANAGEMENT TEAM
Petronas Carigali / Malaysia MMHE / Malaysia Technip / France KNM / Malaysia Sumatec Corporation Sdn. Bhd. / Malaysia GAMA-CTSD / Chiyoda Toyo Cns and Shell HMB / Technip Germany Mannesmann / Germany Merhav / Israel JGC / Japan BATEMAN / USA
COMPLETED PROJECTS
1993-1995 Bratsk LPK Project, Russia / Bratsak LPK
1995-1996 Gazprom Head Office Commissioning, Russia / Gazprom
1996-1997 Bukhara Refinery Project, Uzbekistan / Technip France
1997-1998 Gas Compressor Station, Russia / Bateman
1998-1999 Turkmenistan Refinery CCR unit, Turkmenistan / Chiyoda
1999-2000 Turkmenistan Refinery MSCC unit, Turkmenistan / Mannesmann
2000-2001 Turkmenistan Refinery Lube-oil unit, Turkmenistan / Technip
2001-2002 Kazakhstan Refinery, Kazakhstan / JGC
2002-2004 Turkmenistan Refinery, Turkmenistan (DHT Blending) / Shell & Chiyoda
2004-2005 Sakhalin 2-Russia / Shell
2006-2007 Petronas Carigali Block 1 Project-MDP, Turkmenistan / Petronas& Technip
2007-2010 Petronas Carigali Block 1 Project-MCR and OGT Tankage, Turkmenistan
/ Petronas & Technip
Ogün SANCAKLI Mechanical Engineer
Chairman
KEY PERSONNEL
COMPANIES INVOLVED IN PROJECT MANAGEMENT TEAM
Petronas Carıgali / Malaysia MMHE / Malaysia Technip / France Technip / Germany Mannesmann / Germany Chiyoda / Japan KNM / Malaysia Sumatec Corporation Sdn. Bhd. / Malaysia Mitsui Engineering and Shipbuilding / Japan Technip / Italy Kvaerner Metals Davy / USA IKEA / Sweden
COMPLETED PROJECTS
1996-1997 GAMA Soda Prilling Plant - Japan, KSA / Mitsui Engineering & Shipbuilding
1997-1998 GAMA Epoxy Resin Plant - Japan, KSA / Mitsui Engineering & Shipbuilding
1997-1998 GAMA Steel Factory-USA, KSA / Kvaerner Metals Davy
1998-2001 Turkmenistan Refinery CCR unit, Turkmenistan / Chiyoda
1999-2000 Turkmenistan Refinery MSCC unit, Turkmenistan / Mannesmann
2000-2001 Turkmenistan Refinery Lube-oil unit, Turkmenistan / Technip
2000-2001 Podlask City Project, Poland / Inteba
2001-2003 ENKA Business Center, Russia / ENKA
2003-2005 Renaissance Construction Shopping Malls, Russia / Russian Investments
2005-2008 Renaissance Construction Shopping Malls, Russia / IKEA
2008- 2010 Petronas Carigali Block 1 Project-MCR and OGT Tankage, Turkmenistan
/ Petronas & Technip
Harun UNAL Electrical Engineer
Vice Chairman
KEY PERSONNEL
COMPANIES INVOLVED IN PROJECT MANAGEMENT TEAM
Soyak Energy Investment Co. /Turkey Foster Wheeler / USA Gama Power Systems / Turkey Transbalkan As. / Ukraine Gama-Tekfen JV / Turkey STFA Enerkom /Turkey GAMA / Turkmenistan GAMA / Uzbekistan Alarko Alsim / Russia Bil-Danis / Turkey
COMPLETED PROJECTS
1995-1996 Lentransgas Administration Building, 5000 m2 St. Petersburg-Russia / Alarko
1996-1997 Bukhara Refinery Project, Main Contractor - Uzbekistan / Technip
1997-1999 Turkmenbashi Refinery CCR Project, Consortium with Chiyoda / Turkmenistan
2000-2002 2x605 MW İskenderun - Sugözü Coal Fired Thermal Power Plant Prj. / GATE
2002-2003 80 km., 48” Natural Gas Pipeline Project, Ukraine / GAMA
2003-2004 EPC Project: 35 MW Combined Cycle Power Plant, Ankara / GAMA Power
2004-2005 400 MW Tynagh Combined Cycle Power Plant, Galway, Ireland / GAMA Power
2005-2006 Steam Boilers Project, İskenderun , Turkey / GAMA Power
2006-2007 Modernization of Mazeikiu Nafta Refinery, Heaters & Boilers, Mazeikia, Lithuania
/ Foster Wheeler
2007-2008 Basic Engineering of Combined Cycle Power Plant Projects, Bursa, Turkey / Foster Wheeler
2008-2010 Thermal Power Plant Projects 100 MW Kangal-Etyemez Lignite Coal Fired Power Plant, Soyak Energy
Ergün SECMEER Mechanical Engineer
Board Member
INDIRECT & DIRECT MANPOWER
Project Managers: 2 QA/QC Managers: 2 Construction Managers: 5 Contract Managers: 2 Cost Control Managers: 2 Planning Managers: 2 Engineers: 25 Welding Engineers: 5 Material Engineers: 2 Foremen: 30 Supervisors: 45 HSE: 20 Riggers: 15 Welders: 275 Fitters: 125 Pipe fitters: 55 E/I technicians: 45 Blasters & Painters: 35 Scaffolders: 45 Insulators: 35 NDT technicians: 25
*Overall Manpower can be increased up to 5000 workers which shall be allocated from Malaysia, Philippines, Uzbekistan, Azerbaijan, Russia etc. in case of urgent requirement.
PERSONAL REFERENCES
(PROJECTS WHICH FOUNDERS OF HICC HAVE BEEN INVOLVED)
MDP - A DRILLING PLATFORM
TURKMENISTAN
Project information
Steel works : 1200 MT Painting & Blasting : 12,000 m2 Total man-hour : 1,000,000 Height : 78 mt
MDP-A LOAD OUT
TURKMENISTAN
ONSHORE GAS TERMINAL TANKAGE
TURKMENISTAN
Project Information
Weight : 2500 MT Man-hour : 800,000
MCR - A TOPSIDE & GBS
TURKMENISTAN
*Block 1 MCR-A
MCR - A TOPSIDE & GBS
TURKMENISTAN
MCR - A TOPSIDE & GBS
TURKMENISTAN
MCR - A GBS INSTALLATION
TURKMENISTAN
MCR-A GBS LOAD OUT
TURKMENISTAN
LUBE - OIL UNIT TURKMENBASHI REFINERI
TURKMENISTAN
Project Information
Piping : 3,000 MT Steel works : 14,950 MT Equipment : 1,380 MT
E/I : 30 km Civil works : 17,250 m3 Man-hour : 2,070,000
CCR UNIT TURKMENBASHI REFINERY
TURKMENISTAN
Project Information
Piping : 2,000 MT Steel works : 4,000 MT Equipment : 1,200 MT E/I : 80 km Civil works : 15,000 m3 Man-hour : 1,800,000
MSCC UNIT TURKMENBASHI REFINERY
TURKMENISTAN
Project Information Piping : 1,900 MT Steel works : 3,800 MT Equipment : 3,550 MT E/I : 63 km Civil works : 13,000 m3 Man-hour : 1,600,000
HDT UNIT TURKMENBASHI REFINERY
TURKMENISTAN
Project Information Piping : 1,520 MT Steel works : 3,040 MT Equipment : 1,120 MT E/I : 195 km Civil works : 10,400 m3 Man-hour :1,280,000
BUHKARA REFINERY
UZBEKISTAN
Project Information
Piping : 2,750 MT Steel works : 3,040 MT Equipment : 2,800 MT E/I : 528 km Civil works : 26,600 m3 Man-hour : 6,280,000
SAKHALIN LNG UNIT
RUSSIA
Project Information
Piping : 3,600 MT Steel works : 5,800 MT
TOMSKNEFT GAS COMPRESSOR STATION
RUSSIA
Project Information
Piping : 1,100 MT Steel works : 3,040 MT Equipment : 3,300 MT E/I : 310 km Civil works : 6,500 m3 Man-hour : 2,280,000
NATURAL GAS PIPELINE PROJECT
UKRAINE
Project Information
80 km., 48” Pipe Line 5 Tie-ins 1 river crossing (Danube) Valve Stations E&I Works
2X605 MW ISKENDERUN - SUGOZU COAL FIRED
THERMAL POWER PLANT
TURKEY
Project Information
Piping : 3,500 MT Steel works : 26,500 MT Equipment : 8,800 MT E/I : 585 km Civil works :205,000 m3 Man-hour : 7,350,000
EPC PROJECT : 400 MW TYNAGH COMBINED CYCLE
POWER PLANT
GALWAY/IRELAND
Project Information
Piping : 1,500 MT Steel works : 2,500 MT Equipment : 3,800 MT
E/I : 185 km Civil wokrs : 25,000 m3 Man-hour : 1,350,000
RT Equipments UT Equipments
MT Equipments PT Equipments
NDT EQUIPMENTS
RECENT AWARDS
CERTIFICATES
CERTIFICATES
ISO 14000:2004 ISO 9001:2008
OHSAS 18001:2007
CONTACT INFORMATION
H I C C H e a v y I n d u s t r y C o n s t r u c t i o n C o . T u r k e y H e a d O f f i c e
Cumhuriyet Mah. Simsek Sok. No:2/A, D:105 Buyukcekmece 34500 Istanbul -TURKEY Tel : +90 212 872 22 93 Fax : +90 212 872 22 95 Web : www.hiccompany.com
A z e r b a i j a n B r a n c h O f f i c e
Sebail Rayonu Bayil Hanlari Kucesi 42 Menzil-1 Baku -AZERBAIJAN Tel : +994 12 491 26 30 E-mail : [email protected]
G e o r g i a B r a n c h O f f i c e
40/13 , 26 May street, Batumi - GEORGIA